Quick alignment structure for burner block of gasification furnace
By using a tenon structure to connect the refractory bricks at the burner of the gasifier, the problem of refractory brick deviation during the construction process is solved, the center line alignment is achieved, the service life is extended and the construction efficiency is improved.
Patent Information
- Application Number
- CN202421093235.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-20
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-05-20
AI Technical Summary
The refractory bricks in the burner part of the existing gasifier are prone to deviation during the construction process, resulting in the burner being not on the same center line, causing uneven erosion and local damage, affecting service life and increasing costs.
The burner channel refractory bricks, refractory bricks in the first furnace, refractory bricks in the second furnace and refractory bricks in the third furnace are spliced through the tenon structure to ensure the center line is aligned and a plane or specific shape is connected to ensure the docking is flat. .
Through the tenon structure connection, the burner passage and the center line of the refractory brick in the furnace overlap, reduce local damage, extend the service life of the overall burner brick and improve construction efficiency.
Smart Images

Figure CN222331858U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gasification furnace lining, in particular to a quick alignment structure of burner bricks of a gasification furnace. Background Art
[0002] Gasification is a modern high-temperature, high-pressure industrial process that uses coal as raw material. After coal is mixed with high-temperature water vapor and oxygen, a series of chemical reactions occur to convert solid coal into gases containing CO, H2, CH4, etc. It is used to produce chemical products such as synthetic ammonia, methanol and dimethyl ether, as well as direct and indirect liquefaction of coal, combined cycle power generation and multi-generation based on coal gasification. It is an important supporting process in my country's energy and chemical fields.
[0003] The refractory material at the burner of a four-nozzle water-coal slurry gasifier is a weak link in the gasifier. According to the steel shell structure of the gasifier, the refractory bricks can be divided into two parts: channel bricks and furnace bricks. The existing structure of the gasifier burner channel refractory bricks and furnace refractory bricks are two unconnected parts. In the past, during construction, it was necessary to manually pull the center line at the center of the burner channel, and then lay the furnace refractory bricks according to the center line position. In the actual operation process, the refractory bricks in the furnace may have a certain deviation, resulting in it not being on the same center line as the gasifier burner. During operation, the refractory bricks in the burner furnace are unevenly scoured and locally damaged quickly, affecting the service life of the overall burner bricks and increasing labor costs and material costs. Summary of the invention
[0004] The technical problem to be solved by the utility model is to overcome the existing defects and provide a gasification furnace burner brick quick alignment structure, which does not require manual pulling of the center line, ensures that the refractory bricks in the burner furnace and the refractory bricks in the burner channel are aligned in the center, improves construction efficiency, and can effectively solve the problems in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a gasification furnace burner brick quick alignment structure, including burner channel refractory bricks, first burner furnace refractory bricks, second burner furnace refractory bricks and third burner furnace refractory bricks, the burner channel refractory bricks, the first burner furnace refractory bricks, the second burner furnace refractory bricks and the third burner furnace refractory bricks are sequentially spliced by mortise and tenon structures.
[0006] As an optimal technical solution of the utility model, the mortise and tenon joints of the burner channel refractory bricks, the first burner furnace refractory bricks, the second burner furnace refractory bricks and the third burner furnace refractory bricks are all located at the edge of the burner channel and the burner channel composed of the four surfaces is a plane.
[0007] As a preferred technical solution of the utility model, the burner channel refractory bricks and the third burner furnace refractory bricks are L-shaped.
[0008] As a preferred technical solution of the utility model, the refractory bricks in the first burner furnace and the refractory bricks in the second burner furnace are Z-shaped.
[0009] Compared with the prior art, the beneficial effects of the utility model are as follows: the gasifier burner brick quick alignment structure is achieved by connecting and laying the burner channel refractory bricks, the first burner furnace refractory bricks, the second burner furnace refractory bricks and the third burner furnace refractory bricks in sequence through mortise and tenon structures, so that the center lines of the burner channel refractory bricks and the furnace refractory bricks coincide with each other. Since the center lines of the burner channel refractory bricks originally coincide with the center lines of the burner channel, the refractory bricks in the furnace and the center of the gasifier burner are aligned, thereby reducing the phenomenon of rapid local damage and extending the overall service life of the burner bricks. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a schematic diagram of the structure of the utility model.
[0011] In the figure: 1 burner channel refractory bricks, 2 first burner furnace refractory bricks, 3 second burner furnace refractory bricks, 4 third burner furnace refractory bricks. DETAILED DESCRIPTION
[0012] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0013] See also Figure 1 The utility model provides a technical solution: a gasification furnace burner brick rapid alignment structure, comprising a burner channel refractory brick 1, a first burner furnace refractory brick 2, a second burner furnace refractory brick 3 and a third burner furnace refractory brick 4, the burner channel refractory brick 1, the first burner furnace refractory brick 2, the second burner furnace refractory brick 3 and the third burner furnace refractory brick 4 are sequentially spliced by mortise and tenon structures, the mortise and tenon joints of the burner channel refractory brick 1, the first burner furnace refractory brick 2, the second burner furnace refractory brick 3 and the third burner furnace refractory brick 4 are all located at the edge of the burner channel and the burner channel composed of the four surfaces is a plane, ensuring the flatness of the surface after docking, preventing the burner furnace refractory bricks from being unevenly scoured, and extending the service life of the overall burner bricks.
[0014] In order to facilitate the quick connection between the bricks, the burner channel refractory bricks 1 and the third burner furnace refractory bricks 4 are L-shaped.
[0015] In order to avoid straight-through seams among the burner channel refractory bricks 1, the first burner furnace refractory bricks 2, the second burner furnace refractory bricks 3 and the third burner furnace refractory bricks 4 and reduce the risk of gas blowby, the first burner furnace refractory bricks 2 and the second burner furnace refractory bricks 3 are Z-shaped.
[0016] When in use: the burner channel refractory bricks 1, the first burner furnace refractory bricks 2, the second burner furnace refractory bricks 3 and the third burner furnace refractory bricks 4 are sequentially spliced according to the reserved mortise and tenon structures, and then laid to ensure that the center lines of the first burner furnace refractory bricks 2, the second burner furnace refractory bricks 3, the third burner furnace refractory bricks 4 coincide with the burner channel refractory bricks 1, thereby aligning the first burner furnace refractory bricks 2, the second burner furnace refractory bricks 3, the third burner furnace refractory bricks 4 with the center of the gasifier burner.
[0017] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A quick alignment structure for gasifier burner bricks, characterized in that: The invention comprises a burner channel refractory brick (1), a first burner furnace refractory brick (2), a second burner furnace refractory brick (3) and a third burner furnace refractory brick (4), wherein the burner channel refractory brick (1), the first burner furnace refractory brick (2), the second burner furnace refractory brick (3) and the third burner furnace refractory brick (4) are sequentially spliced by mortise and tenon structures.
2. The gasifier burner brick quick alignment structure according to claim 1, characterized in that: The mortise and tenon joints of the burner channel refractory bricks (1), the first burner furnace refractory bricks (2), the second burner furnace refractory bricks (3) and the third burner furnace refractory bricks (4) are all located at the edge of the burner channel, and the burner channel formed by the four surfaces is a plane.
3. The gasifier burner brick quick alignment structure according to claim 1 is characterized by: The burner channel refractory bricks (1) and the third burner furnace refractory bricks (4) are L-shaped.