Cooling device for tubular pile end plate machining
By introducing purification circulation devices and suspension devices into the pipe pile end plate processing equipment, the problems of wastewater recovery and simultaneous cooling of multiple pipe pile end plates are solved, and the environmental protection treatment of wastewater and the improvement of production efficiency are achieved.
Patent Information
- Application Number
- CN202323590023.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2033-12-27
AI Technical Summary
The cooling devices in the existing pipe pile end plate processing equipment cannot effectively recover and treat wastewater, resulting in environmental pollution and waste of water resources. At the same time, it is impossible to cool multiple pipe pile end plates at the same time, increasing the workload of operators.
A cooling device including a purification circulation device and a suspension device is designed. The purification circulation device recycles and purifies wastewater through components such as booster converter, purification main box, sewage room, water purification room, purification device, etc., while the suspension device is suspended by large suspension. Plates, lifting auxiliary devices, etc. realize the simultaneous cooling of multiple pipe pile end plates.
Effectively recycle and purify waste water, avoid environmental pollution and waste of water resources, shorten production processes, and improve the work efficiency of operators.
Smart Images

Figure CN222335833U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of pipe pile end plate processing equipment, in particular to a cooling device used for pipe pile end plate processing. Background Art
[0002] The pipe pile end plate is a disc-shaped part, which is most common in pipeline engineering. Flanges are used in pairs. In pipeline engineering, flanges are mainly used for pipe connection. The pipe pile end plate is divided into two types: flange plate and flange disc. Both are used to connect accessories on the equipment. The purpose is to make the equipment more firm and durable.
[0003] However, it still has some disadvantages. For example, the cooling device in the currently used pipe pile end plate processing equipment does not have a wastewater recovery and treatment device. The wastewater after use is directly discharged, and the harmful substances in the wastewater device will also be discharged into the air, causing damage to the surrounding environment. It is also a waste of water resources. In addition, the currently used pipe pile end plates cannot cool multiple pipe pile end plates at the same time during the cooling process, which increases the workload of operators.
[0004] In order to solve the above problems, the present application proposes a cooling device for processing pipe pile end plates. Utility Model Content
[0005] The utility model aims to provide a cooling device for pipe pile end plate processing, so as to solve the problems in the prior art proposed in the above background technology that multiple devices cannot be cooled simultaneously and waste water cannot be effectively recycled and treated.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a cooling device for pipe pile end plate processing, comprising a water tank, a front end outer surface of the water tank is fixedly connected to an equipment control box, a front end outer surface of the water tank is embedded with a wastewater outlet valve, a side outer surface of the water tank is movably connected to a purification circulation device, a side inner surface of the water tank is fixedly connected to a supporting column, an upper end outer surface of the water tank is fixedly connected to a water inlet pipe, and a side outer surface of the support column is slidably connected to a suspension device.
[0007] Preferably, the purification circulation device includes a boost converter, a wastewater delivery pipe, a purification main box, a sewage chamber, a clean water chamber, a purification device, a starter, a water outlet boost pump, a purified water outlet pipe and a pipe support frame, a boost converter is fixedly sleeved on the outer surface of one side of the wastewater outlet valve, a wastewater delivery pipe is fixedly sleeved on the outer surface of one side of the boost converter, and the upper end outer wall of the wastewater delivery pipe is fixedly connected to the purification main box.
[0008] Preferably, a sewage chamber is opened on the inner wall of the purification main box, a clean water chamber is opened on the inner wall of the purification main box, a purification device is embedded in the inner wall of the sewage chamber, a starter is fixedly connected to the inner surface of the lower end of the purification main box, and a water outlet booster pump is fixedly connected to the inner surface of the lower end of the purification main box.
[0009] Preferably, a purified water outlet pipe is fixedly connected to the outer surface of the rear end of the purification main box, a pipe support frame is fixedly connected to the outer surface of the lower end of the water inlet pipe, the purification device comprises a purification frame, an outer purification net, a deodorizing layer, an adsorption layer and an oxidation layer, the inner wall of the purification main box is embedded with the purification frame, the outer surface of the upper end of the purification frame is fixedly connected to the outer surface of the outer net, the outer surface of one side of the purification frame is movably sleeved with the deodorizing layer, the lower outer surface of the deodorizing layer is fixedly connected to the adsorption layer, and the lower outer surface of the adsorption layer is fixedly connected to the oxidation layer.
[0010] Preferably, the suspension device includes a suspension plate, a lifting auxiliary device, a connecting vertical pipe, a clamping controller, a connecting ring and a multi-directional suspension clamp; the suspension plate is movably sleeved on the outer surface of one side of the support column; the lifting auxiliary device is fixedly connected to the outer surface of one side of the suspension plate; and the connecting vertical pipe is fixedly connected to the outer surface of the lower end of the suspension plate.
[0011] Preferably, the front end outer surface of the connecting vertical pipe is rotatably connected with a clamping controller, the lower end outer surface of the connecting vertical pipe is movably sleeved with a connecting ring, and the lower end outer surface of the connecting ring is fixedly connected with a multi-directional suspension clamp.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The utility model can firstly effectively collect waste water through the purification circulation device and the purification device, and avoid the random discharge of waste water, so that harmful substances in the waste water will not pollute the surrounding environment. At the same time, the setting of the purification main box and the purification device effectively saves water resources, avoids the waste of water sources, and saves the production cost of the manufacturer.
[0014] The utility model can cool a plurality of pipe pile end plates that have been processed simultaneously by means of the provided suspension device, thereby shortening the production process, saving the working time of operators, and improving the working efficiency of operators. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure of a cooling device for processing a pipe pile end plate according to the utility model;
[0016] Figure 2 This is a schematic structural diagram of a purification main body box in a cooling device for processing a pipe pile end plate according to the utility model;
[0017] Figure 3 This is a schematic structural diagram of a purification device in a cooling device for processing a pipe pile end plate according to the utility model;
[0018] Figure 4 This is a schematic diagram of the structure of a suspension device in a cooling device for processing a pipe pile end plate according to the utility model;
[0019] In the figure: 1. water storage tank; 2. equipment control box; 3. wastewater outlet valve; 4. purification circulation device; 5. support column; 6. suspension device; 7. water inlet pipe; 8. boost converter; 9. wastewater delivery pipe; 10. purification main box; 11. sewage chamber; 12. water purification chamber; 13. purification device; 14. starter; 15. outlet boost pump; 16. purified water outlet pipe; 17. pipe support frame; 18. purification frame; 19. surface purification net; 20. deodorization layer; 21. adsorption layer; 22. oxidation layer; 23. suspension large board; 24. lifting auxiliary device; 25. connecting vertical pipe; 26. clamping controller; 27. connecting ring; 28. multi-directional suspension clamp. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0021] See also Figure 1-Figure 4 The utility model provides a technical solution: a cooling device for processing pipe pile end plates, comprising a water tank 1, a front end outer surface of the water tank 1 is fixedly connected to an equipment control box 2, a front end outer surface of the water tank 1 is embedded with a wastewater outlet valve 3, a side outer surface of the water tank 1 is movably connected to a purification circulation device 4, a side inner surface of the water tank 1 is fixedly connected to a supporting column 5, an upper end outer surface of the water tank 1 is fixedly connected to a water inlet pipe 7, a side outer surface of the supporting column 5 is slidably connected to a suspension device 6, and the setting of the supporting column 5 enables the suspension device 6 to achieve fast and stable lifting and lowering on one side of the supporting column 5, thereby improving the stability of the equipment.
[0022] In this embodiment, Figure 2-3As shown, the purification circulation device 4 includes a boost converter 8, a wastewater delivery pipe 9, a purification main box 10, a sewage chamber 11, a clean water chamber 12, a purification device 13, a starter 14, a water outlet boost pump 15, a purified water outlet pipe 16 and a pipe support frame 17. The outer surface of one side of the wastewater outlet valve 3 is fixedly sleeved with a boost converter 8, and the outer surface of one side of the boost converter 8 is fixedly sleeved with a wastewater delivery pipe 9. The upper end outer wall of the wastewater delivery pipe 9 is fixedly connected with the purification main box 10. The boost converter 8 is set so that the wastewater discharged from the wastewater outlet valve 3 can quickly flow through the wastewater delivery pipe 9 to the purification main box 10 for purification. The inner wall of the purification main box 10 is provided with a sewage chamber 11, and the inner wall of the purification main box 10 is provided with a clean water chamber 12. The inner wall of the sewage chamber 11 is embedded with a purification device 13, and the lower inner surface of the purification main box 10 is fixedly connected with the starter 14. The lower inner surface of the purification main box 10 is fixedly connected with the outlet The water booster pump 15 makes full use of water resources through the sewage chamber 11 and the clean water chamber 12, and effectively separates the wastewater from the purified water for later use. The rear end outer surface of the purification main box 10 is fixedly connected with a purified water outlet pipe 16, and the lower end outer surface of the water inlet pipe 7 is fixedly connected with a pipe support frame 17. The purification device 13 includes a purification frame 18, an outer purification net 19, a deodorizing layer 20, an adsorption layer 21 and an oxidation layer 22. The inner wall of the purification main box 10 is embedded with the purification frame 18, the upper end outer surface of the purification frame 18 is fixedly connected with the outer purification net 19, and the outer surface of one side of the purification frame 18 is movably sleeved with the deodorizing layer 20, the lower end outer surface of the deodorizing layer 20 is fixedly connected with the adsorption layer 21, and the lower end outer surface of the adsorption layer 21 is fixedly connected with the oxidation layer 22. The deodorizing layer 20 can effectively remove the odor in the wastewater to avoid excessive odor and stimulation of the operator's olfactory organ.
[0023] In this embodiment, Figure 4 As shown, the suspension device 6 includes a suspension plate 23, a lifting auxiliary device 24, a connecting vertical pipe 25, a clamping controller 26, a connecting ring 27 and a multi-directional suspension clamp 28. The outer surface of one side of the supporting column 5 is movably sleeved with the suspension plate 23, and the outer surface of one side of the suspension plate 23 is fixedly connected with the lifting auxiliary device 24. The lower end outer surface of the suspension plate 23 is fixedly connected with the connecting vertical pipe 25. Through the setting of the suspension plate 23, multiple connecting vertical pipes 25 can be suspended at the lower end of the suspension plate 23 at the same time, thereby meeting the suspension of multiple pipe pile end plates. The front end outer surface of the connecting vertical pipe 25 is rotatably connected with the clamping controller 26, and the lower end outer surface of the connecting vertical pipe 25 is movably sleeved with the connecting ring 27. The lower end outer surface of the connecting ring 27 is fixedly connected with the multi-directional suspension clamp 28. The connecting ring 27 can be quickly clamped and replaced through the setting of the clamping controller 26, thereby improving the speed and stability of the equipment.
[0024] Working principle:
[0025] First, the user places the water tank 1 in a suitable position, and then injects water into the water tank 1 through the water inlet pipe 7 for storage. When the pipe pile end plate is processed and taken out, the pipe pile end plate is clamped on the multi-directional hanging clamp 28. After completion, the equipment control box 2 is used to control the hanging large plate 23 and the lifting auxiliary device 24 to rise and fall on the inner wall of the supporting column 5, so that the pipe pile end plate on the multi-directional hanging clamp 28 is quickly cooled in the water stored in the water tank 1. After completion, the hanging large plate 23 is raised through the equipment control box 2 and then the pipe pile end plate on the multi-directional hanging clamp 28 is removed. When the water in the water tank 1 is very turbid, the wastewater outlet valve 3 is opened so that the wastewater in the water tank 1 can be cooled by The wastewater flows into the boost converter 8 through the wastewater outlet valve 3 for increase, and then flows into the purification main box 10 for purification through the wastewater delivery pipe 9. When the wastewater in the water storage tank 1 is discharged, the water outlet boost pump 15 is controlled by the equipment control box 2, so that the pure water stored in the clean water chamber 12 flows into the water storage tank 1 through the purified water outlet pipe 16 and the water inlet pipe 7. After the wastewater flows into the purification main box 10, it flows into the sewage chamber 11, and then passes through the surface purification net 19, the deodorization layer 20, the adsorption layer 21 and the oxidation layer 22. Layer by layer purification and filtration makes the wastewater harmless and also avoids the arbitrary discharge of wastewater. When the wastewater treatment in the sewage chamber 11 is completed, it enters the clean water chamber 12 for storage.
[0026] Based on the embodiments of the present utility model, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present utility model.
Claims
1. A cooling device for processing a pipe pile end plate, comprising a water storage tank (1), characterized in that: The front end outer surface of the water storage tank (1) is fixedly connected to an equipment control box (2), the front end outer surface of the water storage tank (1) is embedded with a wastewater outlet valve (3), one side outer surface of the water storage tank (1) is movably connected to a purification circulation device (4), one side inner surface of the water storage tank (1) is fixedly connected to a support column (5), the upper end outer surface of the water storage tank (1) is fixedly connected to a water inlet pipe (7), and one side outer surface of the support column (5) is slidably connected to a suspension device (6).
2. A cooling device for processing pipe pile end plates according to claim 1, characterized in that: The purification circulation device (4) comprises a boost converter (8), a wastewater delivery pipe (9), a purification main body box (10), a sewage chamber (11), a clean water chamber (12), a purification device (13), a starter (14), a water outlet boost pump (15), a purified water outlet pipe (16) and a pipe support frame (17); a boost converter (8) is fixedly sleeved on the outer surface of one side of the wastewater outlet valve (3); a wastewater delivery pipe (9) is fixedly sleeved on the outer surface of one side of the boost converter (8); and the upper end outer wall of the wastewater delivery pipe (9) is fixedly connected to the purification main body box (10).
3. A cooling device for processing pipe pile end plates according to claim 2, characterized in that: The inner wall of the purification main body box (10) is provided with a sewage chamber (11), the inner wall of the purification main body box (10) is provided with a clean water chamber (12), the inner wall of the sewage chamber (11) is embedded with a purification device (13), the lower inner surface of the purification main body box (10) is fixedly connected with a starter (14), and the lower inner surface of the purification main body box (10) is fixedly connected with a water outlet booster pump (15).
4. A cooling device for processing pipe pile end plates according to claim 3, characterized in that: The rear end outer surface of the purification main box (10) is fixedly connected to a purified water outlet pipe (16), the lower end outer surface of the water inlet pipe (7) is fixedly connected to a pipe support frame (17), the purification device (13) comprises a purification frame (18), an outer surface purification net (19), a deodorizing layer (20), an adsorption layer (21) and an oxidation layer (22), the inner wall of the purification main box (10) is embedded with the purification frame (18), the upper end outer surface of the purification frame (18) is fixedly connected to the outer surface of the outer surface of the purification frame (18), the deodorizing layer (20) is movably sleeved on one side outer surface of the purification frame (18), the lower end outer surface of the deodorizing layer (20) is fixedly connected to the adsorption layer (21), and the lower end outer surface of the adsorption layer (21) is fixedly connected to the oxidation layer (22).
5. The cooling device for processing pipe pile end plates according to claim 1, characterized in that: The suspension device (6) comprises a suspension plate (23), a lifting auxiliary device (24), a connecting vertical pipe (25), a clamping controller (26), a connecting ring (27) and a multi-directional suspension clamp (28); the suspension plate (23) is movably sleeved on the outer surface of one side of the support column (5); the lifting auxiliary device (24) is fixedly connected to the outer surface of one side of the suspension plate (23); and the connecting vertical pipe (25) is fixedly connected to the outer surface of the lower end of the suspension plate (23).
6. A cooling device for processing pipe pile end plates according to claim 5, characterized in that: The front end outer surface of the connecting vertical pipe (25) is rotatably connected to a clamping controller (26), the lower end outer surface of the connecting vertical pipe (25) is movably sleeved with a connecting ring (27), and the lower end outer surface of the connecting ring (27) is fixedly connected to a multi-directional suspension clamp (28).