Fastening structure for water conservancy and hydropower construction

By designing a fastening structure including flange seat, adjustable bracket and clamp in water conservancy and hydropower construction, the problem of difficulty in positioning the axis center of the pipeline and the middle joint is solved, and rapid and simple fixed installation is achieved, which improves the Construction efficiency.

CN222351685UInactive Publication Date: 2025-01-14RURAL ELECTRIFICATION RES INST OF THE MINISTRY OF WATER RESOURCES
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421270076.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2025-01-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing water conservancy and hydropower construction, it is difficult for the fixed mechanism to position the axis line of the pipeline and the intermediate joint, resulting in insufficiency of installation and requires multiple adjustments or manpower lifting.

Method used

A fastening structure is designed, including flange seat, adjustable bracket, boom, stud, slip ring, locking female and clamping. Through the cooperation of these components, the axis line docking correction of the pipe and the intermediate joint and Quick fix.

Benefits of technology

This structure simplifies the construction and installation process, improves the rapid fixing limiting capacity of water conservancy and hydropower pipelines, facilitates the coaxial docking and fixing of the two sections of pipelines with the middle joints, and improves installation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222351685U_ABST
    Figure CN222351685U_ABST
Patent Text Reader

Abstract

The utility model discloses a fastening structure for water conservancy and hydropower construction, and belongs to the technical field of water conservancy and hydropower pipeline installation. Comprising a flange base, the flange base is installed in a suspended limiting mode through bolts, the flange base is fixedly connected with an adjustable support, the adjustable support comprises a hanging rod, the hanging rod is fixedly connected with the flange base, a stud is connected into the hanging rod in a threaded mode, a threaded sleeve is installed on the outer surface of the hanging rod in a threaded mode, and the threaded sleeve is rotationally connected with a sliding ring. The sliding ring is slidably connected with the hanging rod in a sleeved mode, two inclined rods are fixedly arranged on the upper surface of the sliding ring and are symmetrically arranged along the axis of the stud, the outer surface of the stud is sleeved with a lock nut in a threaded mode, and the lock nut rotates along the stud and tightly presses the surface of the upper end of the hanging rod. Water conservancy and hydropower pipelines can be conveniently and rapidly fixed and limited, and coaxial butt joint and fixed installation of the two pipelines and the middle connector can be rapidly assisted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water conservancy and hydropower pipeline installation, and more specifically, to a fastening structure used in water conservancy and hydropower construction. Background Art

[0002] In the construction and installation of urban municipal water conservancy and hydropower pipelines in hydropower tunnels, when the two sections of pipelines are butt-jointed and fixed, they can be fixed and limited by bolts through flanges, and when the middle joint and the two sections of pipelines are positioned and connected, it is usually necessary to manually lift the pipeline port to unify the axis lines of the middle joint and the two sections of pipelines, and then the bolts between the flanges can be smoothly installed. The existing public technology number CN220688233U proposes a water conservancy and hydropower construction fastening device. The device, through the setting of a protective mechanism, first inserts the card block into the inner wall of the card slot during the protection of the pipeline of the water conservancy and hydropower construction, so as to limit the first protective pad, and then screws the first screw clockwise into the first threaded hole and the second threaded hole to fix the first protective pad. At this time, the water conservancy and hydropower construction The construction pipeline is placed above the first protective pad, and then the motor is started. The motor drives the ball screw to rotate through the rotating shaft. At the same time, the rotating ball screw drives the ball nut, the second fastening plate and the second protective pad to fall downward until the second protective pad fastens the water conservancy and hydropower construction pipeline, so that the first protective pad and the second protective pad completely wrap the water conservancy and hydropower construction pipeline, thereby effectively protecting the pipeline. With respect to the above-mentioned related technologies, the utility model inventor believes that the following defects still exist: the fixing mechanism in the comparative literature cannot realize the axial centerline positioning of the middle joint and the two sections of the pipeline when the two sections of the pipeline are butt-jointed and installed. It is usually necessary to adjust the position of the fixing mechanism multiple times or manually lift the pipeline port, and the installation efficiency is low. In view of this, we propose a fastening structure for water conservancy and hydropower construction. Utility Model Content

[0003] 1. Technical problems to be solved

[0004] The purpose of the present application is to provide a fastening structure for water conservancy and hydropower construction, which solves the technical problem that the fixing mechanism in the comparative literature in the above-mentioned background technology cannot realize the axial centerline positioning of the middle joint and the two sections of pipes when the two sections of pipes are butt-jointed and installed, and usually requires multiple adjustments to the position of the fixing mechanism or manual lifting of the pipe port, resulting in low installation efficiency. The fixing mechanism has a simple structure, is convenient for construction and installation, is convenient for quickly fixing the limited water conservancy and hydropower pipes, and quickly assists the two sections of pipes to be coaxially butt-jointed and fixedly installed with the middle joint.

[0005] 2. Technical solution

[0006] The technical solution of the present application provides a fastening structure for water conservancy and hydropower construction, comprising: a flange seat, the flange seat is installed by bolt suspension type limit, the flange seat is fixedly connected with an adjustable bracket, the adjustable bracket includes a suspension rod, the suspension rod is fixedly connected with the flange seat, the suspension rod is internally threaded with a stud, the outer surface of the suspension rod is threaded with a threaded sleeve, the threaded sleeve is rotatably connected with a slip ring, the slip ring is slidably sleeved with the suspension rod, two inclined rods are fixedly provided on the upper surface of the slip ring, the two inclined rods are symmetrically arranged along the axis of the stud, and the outer surface of the stud A lock nut is threadedly connected, and the lock nut rotates along the stud and presses the upper end surface of the hanger rod. A clamp is fixedly provided at the upper end of the stud and the upper end of the inclined rod, respectively. The clamp comprises a lower clamp and an upper clamp. The lower clamp and the upper clamp are rotatably hinged and threadedly connected by bolts. The inner walls of the lower clamp and the upper clamp are detachably clamped and installed with wear-resistant pads. The upper clamp located at the inclined rod is fixedly connected with a centering mechanism, and the centering mechanism comprises a connecting block. A threaded rod is threadedly installed at an adjacent end of the connecting block, and the threaded rod is rotatably connected with a pressure block.

[0007] By adopting the above technical scheme, when the urban municipal water conservancy and hydropower pipeline is constructed and installed in the hydropower tunnel, when the pipeline is butt-jointed and installed, the fixed structure composed of the adjustable bracket and the three clamps can connect the two pipelines at the same time through the pipeline joint, and the axis centerline butt-joint correction processing is realized by using the centering mechanism. Specifically, the hanger is suspended and installed by bolts through the flange seat, and the stud is rotated and adjusted along the hanger, and the screw sleeve is rotated along the hanger to make the slip ring slide along the hanger, so that the two oblique rods can be moved, and then the installation height of the three clamps can be adjusted, and the middle joint is installed by the clamp limit fixing of the stud. The clamps at the upper ends of the inclined rods are respectively used to limit and fix a pipe to be connected. The clamps are composed of a lower clamp and an upper clamp that are rotatably hinged, and the inner walls of the lower clamp and the upper clamp are clamped with wear-resistant pads to effectively protect the pipe and the intermediate joint. Then, in order to make the pipe and the intermediate joint on the same axial line, the pressure block is pressed and adjusted to adjust the port position of the pipe by rotating the adjusting threaded rod, so as to unify the axial lines of the pipe and the intermediate joint. The fixing mechanism has a simple structure and is convenient for construction and installation. It is convenient to quickly fix and limit the water conservancy and hydropower pipelines, and quickly assist the two sections of the pipeline to be coaxially docked and fixed with the intermediate joint for installation.

[0008] Optionally, an external thread groove is provided on the outer surface of the suspension rod, and a plurality of strip grooves are provided at the external thread groove of the suspension rod, and the suspension rod is threadably sleeved with a threaded sleeve through the external thread groove, and the suspension rod is slidably sleeved with a slip ring through the plurality of strip grooves.

[0009] By adopting the above technical solution, after the stud is rotated and adjusted along the boom, the stud limiting treatment can be achieved by locking the lock nut, and the screw sleeve rotates along the outer surface of the boom to push the slip ring to slide linearly along the outer surface of the boom.

[0010] Optionally, an inner cavity is opened in the suspension rod, and an anti-dropping block is fixedly provided at the bottom end of the stud, and the anti-dropping block is slidably arranged in the inner cavity opened in the suspension rod.

[0011] By adopting the above technical solution, the anti-dropping block fixedly connected to the bottom end of the stud is slidably arranged in the inner cavity opened by the suspension rod, thereby achieving the purpose of preventing the stud from dropping out.

[0012] Optionally, two positioning grooves are provided on the lower clamp and the upper clamp, and two clamping blocks are fixedly provided on the wear-resistant pad, and the clamping blocks are clamped and installed in the positioning grooves.

[0013] By adopting the above technical solution, the wear-resistant pad can be quickly clamped and installed on the inner wall of the lower clamp and the upper clamp through two fixed clamping blocks, which is convenient for disassembly and replacement.

[0014] Optionally, the wear-resistant pad has an arc-shaped structure, and the inner wall of the wear-resistant pad is provided with a plurality of arc-shaped anti-skid grooves.

[0015] By adopting the above technical solution, after the intermediate joint and the pipeline are clamped and fixed by the clamp, the anti-skid clamping treatment is achieved through multiple arc-shaped anti-skid grooves opened by the wear-resistant pad, so that the intermediate joint and the pipeline can be stably and firmly installed.

[0016] 3. Beneficial effects

[0017] One or more technical solutions provided in the technical solution of the present application have at least the following technical effects or advantages: the fixing mechanism has a simple structure, is convenient for construction and installation, is convenient for quickly fixing the limited water conservancy and hydropower pipelines, and quickly assists the two sections of the pipeline to be coaxially docked and fixed with the middle joint for installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the overall structure of a fastening structure for water conservancy and hydropower construction disclosed in a preferred embodiment of the present application;

[0019] Figure 2 A schematic diagram of an adjustable bracket structure of a fastening structure for water conservancy and hydropower construction disclosed in a preferred embodiment of the present application;

[0020] Figure 3 A fastening structure for water conservancy and hydropower construction disclosed in a preferred embodiment of the present application Figure 2 The enlarged structural diagram at A in the middle;

[0021] Figure 4 A fastening structure for water conservancy and hydropower construction disclosed in a preferred embodiment of the present application Figure 2 The enlarged structural diagram at B in the middle;

[0022] Explanation of the numbers in the figure: 1. Flange seat; 2. Adjustable bracket; 21. Hanging rod; 211. External thread groove; 212. Strip groove; 22. Stud; 221. Anti-slip block; 23. Lock nut; 24. Inclined rod; 25. Screw sleeve; 26. Slip ring; 3. Hoop; 31. Lower clamp; 32. Upper clamp; 33. Positioning groove; 4. Centering mechanism; 41. Connecting block; 42. Threaded rod; 43. Press block; 5. Wear-resistant pad; 51. Clamp block; 52. Arc-shaped anti-slip groove. DETAILED DESCRIPTION

[0023] The present application is further described in detail below in conjunction with the accompanying drawings.

[0024] Reference Figures 1 to 4The embodiment of the present application provides a fastening structure for water conservancy and hydropower construction, comprising: a flange seat 1, the flange seat 1 is installed by bolt suspension limit, the flange seat 1 is fixedly connected with an adjustable bracket 2, the adjustable bracket 2 includes a suspension rod 21, the suspension rod 21 is fixedly connected with the flange seat 1, the suspension rod 21 is internally threaded with a stud 22, the outer surface of the suspension rod 21 is threaded with a screw sleeve 25, the screw sleeve 25 is rotatably connected with a slip ring 26, the slip ring 26 is slidably sleeved with the suspension rod 21, two inclined rods 24 are fixedly provided on the upper surface of the slip ring 26, the two inclined rods 24 are symmetrically arranged along the axis of the stud 22, and the outer surface of the stud 22 is threaded with a lock nut 2 3, the lock nut 23 rotates along the stud 22 and presses the upper end surface of the suspension rod 21, the upper end of the stud 22 and the upper end of the inclined rod 24 are respectively fixed with a clamp 3, the clamp 3 includes a lower clamp 31 and an upper clamp 32, the lower clamp 31 and the upper clamp 32 are rotatably hinged and threadedly connected by bolts, the inner walls of the lower clamp 31 and the upper clamp 32 are detachably clamped and installed with wear-resistant pads 5, the upper clamp 32 located at the inclined rod 24 is fixedly connected with a centering mechanism 4, the centering mechanism 4 includes a connecting block 41, the adjacent end of the connecting block 41 is threadedly installed with a threaded rod 42, the threaded rod 42 is rotatably connected with a pressing block 43, the municipal water supply When the hydropower pipeline is installed in the hydropower tunnel, the fixed structure composed of the adjustable bracket 2 and the three clamps 3 can connect the two pipelines at the same time through the pipeline joint, and the centering mechanism 4 is used to realize the axis center line docking correction. Specifically, the hanger 21 is suspended and installed by bolts through the flange seat 1, and the stud 22 is rotated and adjusted along the hanger 21. The screw sleeve 25 rotates along the hanger 21 to make the slip ring 26 slide along the hanger 21, so that the two oblique rods 24 can be moved, and then the installation height of the three clamps 3 can be adjusted. The clamp 3 of the stud 22 is limited and fixed to install the middle joint, and the oblique rod 24 The clamps 3 at the upper ends are respectively used to limit and fix a pipe to be connected. The clamps 3 are composed of a lower clamp 31 and an upper clamp 32 that are rotatably hinged, and the inner walls of the lower clamp 31 and the upper clamp 32 are clamped and installed with wear-resistant pads 5, which effectively protect the pipe and the intermediate joint. Then, in order to make the pipe and the intermediate joint on the same axial line, the pressure block 43 is pressed and adjusted to adjust the port position of the pipe by rotating the adjusting threaded rod 42, so as to unify the axial lines of the pipe and the intermediate joint. The fixing mechanism has a simple structure and is convenient for construction and installation. It is convenient for quickly fixing and limiting the water conservancy and hydropower pipelines, and quickly assists the two sections of the pipeline to be coaxially docked and fixed with the intermediate joint for the purpose of installation.

[0025] Reference Figure 2 and Figure 4An external thread groove 211 is provided on the outer surface of the suspension rod 21, and a plurality of strip grooves 212 are provided at the external thread groove 211 of the suspension rod 21. The suspension rod 21 is threadedly sleeved with the screw sleeve 25 through the external thread groove 211, and the suspension rod 21 is slidably sleeved with the slip ring 26 through the plurality of strip grooves 212. After the stud 22 is rotated and adjusted along the suspension rod 21, the stud 22 can be limited by locking the lock nut 23. The screw sleeve 25 rotates along the outer surface of the suspension rod 21 to push the slip ring 26 to slide linearly along the outer surface of the suspension rod 21.

[0026] Reference Figure 2 and Figure 4 An inner cavity is opened in the suspension rod 21, and an anti-dropping block 221 is fixedly provided at the bottom end of the stud 22. The anti-dropping block 221 is slidably set in the inner cavity opened in the suspension rod 21. Since the anti-dropping block 221 fixedly connected to the bottom end of the stud 22 is slidably set in the inner cavity opened in the suspension rod 21, the purpose of preventing the stud 22 from dropping out can be achieved.

[0027] Reference Figure 2 and Figure 3 Two positioning grooves 33 are provided on the lower clamp 31 and the upper clamp 32, and two clamping blocks 51 are fixedly provided on the wear-resistant pad 5. The clamping blocks 51 are clamped and installed in the positioning grooves 33. The wear-resistant pad 5 can be quickly clamped and installed on the inner walls of the lower clamp 31 and the upper clamp 32 through the two fixed clamping blocks 51, which is convenient for disassembly and replacement.

[0028] Reference Figure 2 and Figure 3 The wear-resistant pad 5 has an arc-shaped structure, and a plurality of arc-shaped anti-skid grooves 52 are provided on the inner wall of the wear-resistant pad 5. After the intermediate joint and the pipeline are clamped and fixed by the clamp 3, the anti-skid clamping treatment is achieved through the plurality of arc-shaped anti-skid grooves 52 provided on the wear-resistant pad 5, so that the intermediate joint and the pipeline are stably and firmly installed.

[0029] Working principle: When installing a hydropower tunnel for the construction of urban municipal water conservancy and hydropower pipelines, when the pipelines are butt-jointed and fixed, the fixed structure composed of an adjustable bracket 2 and three clamps 3 can simultaneously connect two pipelines through a pipeline joint, and use the centering mechanism 4 to achieve axial centerline butt correction. Specifically, the hanger 21 is suspended and installed by bolts through the flange seat 1, and the stud 22 is rotated and adjusted along the hanger 21. The screw sleeve 25 rotates along the hanger 21 to make the slip ring 26 slide along the hanger 21, so that the two inclined rods 24 can be moved, and then the installation height of the three clamps 3 can be adjusted, and the clamp 3 of the stud 22 is limited and fixed to install the middle joint. The clamps 3 at the upper ends of the inclined rods 24 are respectively used to limit and fix a pipe to be connected. The clamps 3 are composed of a lower clamp 31 and an upper clamp 32 that are rotatably hinged, and the inner walls of the lower clamp 31 and the upper clamp 32 are clamped and installed with wear-resistant pads 5, which effectively protect the pipe and the intermediate joint. Then, in order to make the pipe and the intermediate joint on the same axial line, the pressure block 43 is pressed and adjusted to adjust the port position of the pipe by rotating the adjusting threaded rod 42, so as to unify the axial lines of the pipe and the intermediate joint. The fixing mechanism has a simple structure and is convenient for construction and installation. It is convenient for quickly fixing and limiting the water conservancy and hydropower pipelines, and quickly assists the two sections of the pipeline to be coaxially docked and fixed with the intermediate joint for the purpose of installation.

Claims

1. A fastening structure for water conservancy and hydropower construction, characterized in that: The invention comprises: a flange seat (1), wherein the flange seat (1) is installed by bolt suspension type limiting, the flange seat (1) is fixedly connected to an adjustable bracket (2), the adjustable bracket (2) comprises a suspension rod (21), the suspension rod (21) is fixedly connected to the flange seat (1), the suspension rod (21) is internally threadedly connected to a stud (22), a threaded sleeve (25) is threadedly installed on the outer surface of the suspension rod (21), the threaded sleeve (25) is rotatably connected to a slip ring (26), the slip ring (26) is slidably sleeved with the suspension rod (21), two inclined rods (24) are fixedly provided on the upper surface of the slip ring (26), the two inclined rods (24) are symmetrically arranged along the axis of the stud (22), the outer surface of the stud (22) is threadedly sleeved with a lock nut (23), the lock nut (23) ) rotates along the stud (22) and presses the upper end surface of the suspension rod (21), the upper end of the stud (22) and the upper end of the inclined rod (24) are respectively fixed with a clamp (3), the clamp (3) includes a lower clamp (31) and an upper clamp (32), the lower clamp (31) and the upper clamp (32) are rotatably hinged and threadedly connected by bolts, the inner walls of the lower clamp (31) and the upper clamp (32) are both detachably clamped and installed with wear-resistant pads (5), the upper clamp (32) located at the inclined rod (24) is fixedly connected with a centering mechanism (4), the centering mechanism (4) includes a connecting block (41), the adjacent end of the connecting block (41) is threadedly installed with a threaded rod (42), and the threaded rod (42) is rotatably connected with a pressing block (43).

2. A fastening structure for water conservancy and hydropower construction according to claim 1, characterized in that: An external thread groove (211) is provided on the outer surface of the suspension rod (21), and a plurality of strip grooves (212) are provided at the external thread groove (211) of the suspension rod (21); the suspension rod (21) is threadably sleeved on a threaded sleeve (25) through the external thread groove (211), and the suspension rod (21) is slidably sleeved on a slip ring (26) through the plurality of strip grooves (212).

3. A fastening structure for water conservancy and hydropower construction according to claim 1, characterized in that: An inner cavity is provided in the suspension rod (21), an anti-slip block (221) is fixedly provided at the bottom end of the stud (22), and the anti-slip block (221) is slidably arranged in the inner cavity provided in the suspension rod (21).

4. A fastening structure for water conservancy and hydropower construction according to claim 1, characterized in that: The lower clamp (31) and the upper clamp (32) are each provided with two positioning grooves (33), and the wear-resistant pad (5) is each fixedly provided with two clamping blocks (51), and the clamping blocks (51) are clamped and installed in the positioning grooves (33).

5. A fastening structure for water conservancy and hydropower construction according to claim 4, characterized in that: The wear-resistant pad (5) has an arc-shaped structure, and the inner wall of the wear-resistant pad (5) is provided with a plurality of arc-shaped anti-slip grooves (52).

Citation Information

Patent Citations

  • Fastening device for water conservancy and hydropower construction

    CN220688233U