Integrated lightweight concrete prefabricated wallboard

By setting up baffles, feed pipes and storage bags in prefabricated wall panels, using the design of connecting tapes and pins, the wall panels are lightweight during lifting, and strengthening hardness by filling adhesives and gravels, prefabricated The problem of heavy lifting of wall panels has achieved lightweight and hardness.

CN222362675UActive Publication Date: 2025-01-17SUZHOU LIANGPU ENERGY-SAVING NEW MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323418526.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2025-01-17
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing prefabricated wall panels are too heavy during lifting, and it is difficult to control the weight during lifting and installation, which affects the wind resistance of the building.

Method used

An integrated lightweight concrete prefabricated wall panel was designed, with baffle plates, feed pipes, pins and storage bags inside the wall panel. The lightness of the wall panel is achieved by setting the connecting belt and alternating filling of the storage bags. Quality and reinforcement.

Benefits of technology

When lifting, the wall panels are lighter. After installation, the wall panels are strengthened by filling adhesive and gravel, which meets the lightweight needs without affecting the hardness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222362675U_ABST
    Figure CN222362675U_ABST
Patent Text Reader

Abstract

The utility model aims to solve the problem of light weight of a prefabricated wallboard, and discloses an integrated lightweight concrete prefabricated wallboard which comprises a wallboard body, a baffle is vertically installed in the wallboard body, a second material passing pipe and a first material passing pipe are installed on the left side and the right side of the side wall of the wallboard body respectively, a second inserting needle is installed on the second material passing pipe, and a second inserting needle is installed on the first material passing pipe. A first inserting needle is arranged on the first material passing pipe, a connecting belt is connected to the first material passing pipe, a first material storage bag and a second material storage bag are arranged in the connecting belt at intervals, the first material storage bag and the second material storage bag are both made of rubber materials, an adhesive is contained in the first material storage bag, and broken stones are contained in the second material storage bag. Through the arrangement of the connecting belt, the first material storage bag and the second material storage bag, the light weight of the wallboard is facilitated, materials can be filled in the wallboard, and the hardness of the wallboard is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of prefabricated wall panels, in particular to an integrated lightweight concrete prefabricated wall panel. Background Art

[0002] With the development of prefabricated buildings, there are more and more prefabricated wall panels, but prefabricated wall panels are relatively heavy and inconvenient to hoist. If all of them are made of lightweight wall panels, the overall wind resistance of the building will also decrease. The weight of the current prefabricated wall panels is uncontrollable. It cannot become lighter during hoisting and heavier after installation. Therefore, our company team conducted research and creation and found that the interior of the prefabricated wall panels can be made hollow when hoisting and then filled after hoisting. Therefore, an integrated lightweight concrete prefabricated wall panel was invented to solve the hoisting problem of prefabricated wall panels. Utility Model Content

[0003] The utility model aims to solve the deficiencies of the prior art and provides an integrated lightweight concrete prefabricated wall panel.

[0004] The utility model is realized through the following technical solutions:

[0005] An integrated lightweight concrete prefabricated wall panel comprises a wall panel, wherein a baffle is vertically installed inside the wall panel, a second material passing pipe and a first material passing pipe are respectively installed on the left and right side walls of the wall panel, the second material passing pipe is equipped with a second plug pin, the first material passing pipe is equipped with a first plug pin, the first material passing pipe is connected to a connecting belt, and a first material storage bag and a second material storage bag are intermittently arranged inside the connecting belt.

[0006] As a preferred technical solution of the utility model, the first storage bag and the second storage bag are both made of rubber material, the first storage bag is filled with adhesive, and the second storage bag is filled with gravel.

[0007] As a preferred technical solution of the present utility model, the interior of the wall panel is a hollow structure.

[0008] As a preferred technical solution of the utility model, the connecting belt is communicated with the first material passing pipe, and a through groove corresponding to the connecting belt is opened in the wall panel.

[0009] As a preferred technical solution of the utility model, the baffle is located in the middle of the wall panel.

[0010] As a preferred technical solution of the present utility model, the wall panel is made of ALC material.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The utility model can make the connecting belt on the ground when the wall panel is hoisted by setting the connecting belt, the first storage bag and the second storage bag, so that the wall panel is lighter when hoisted, and after the wall panel is installed, the stones and adhesive in the storage bag can be filled into the wall panel by filling the connecting belt in the wall panel and setting the pins, and the stones and adhesive can be alternately filled into the wall panel by alternating the first storage bag and the second storage bag, so as to reinforce the wall panel, so that the wall panel can meet the requirements of light weight and not affect the hardness of the wall panel. The utility model can make the wall panel lighter by setting the connecting belt, the first storage bag and the second storage bag, and can also fill the wall panel with materials to strengthen the hardness of the wall panel. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of the utility model.

[0014] Figure 2 It is a schematic diagram of the utility model being connected with a connecting belt.

[0015] In the figure: 1. wall panel, 2. first plug pin, 3. first feed pipe, 4. baffle, 5. second feed pipe, 6. second plug pin, 7. connecting belt, 8. first storage bag, 9. second storage bag. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0017] See also Figure 1-2 , the utility model provides a technical solution:

[0018] An integrated lightweight concrete prefabricated wall panel comprises a wall panel 1, wherein a baffle 4 is vertically installed inside the wall panel 1, a second material passing pipe 5 and a first material passing pipe 3 are respectively installed on the left and right side walls of the wall panel 1, a second material passing pipe 5 is installed with a second plug pin 6, a first material passing pipe 3 is installed with a first plug pin 2, a connecting belt 7 is connected to the first material passing pipe 3, and a first material storage bag 8 and a second material storage bag 9 are intermittently arranged inside the connecting belt 7.

[0019] The first storage bag 8 and the second storage bag 9 are both made of rubber material. The first storage bag 8 is filled with adhesive, and the second storage bag 9 is filled with gravel.

[0020] The interior of the wall panel 1 is a hollow structure.

[0021] The connecting belt 7 is communicated with the first material passing pipe 3 , and a through groove corresponding to the connecting belt 7 is opened in the wall panel 1 .

[0022] The baffle plate 4 is located in the middle of the wall plate 1 .

[0023] The wall panel 1 is made of ALC material.

[0024] Working principle: Applied to the present embodiment, when hoisting the wall panel 1, the connecting belt 7 is placed on the ground. At this time, the wall panel 1 is relatively light and hoisting is more convenient. After the wall panel 1 is hoisted to the installation position for installation, the connecting belt 7 is pulled to pull the connecting belt 7 into the wall panel 1. While pulling the connecting belt 7, the first pin 2 and the second pin 6 are slid to puncture the first storage bag 8 and the second storage bag 9, and the adhesive in the first storage bag 8 and the gravel in the second storage bag 9 will fall into the wall panel 1 to fill the wall panel 1, thereby increasing the strength of the wall panel 1, making the wall panel 1 relatively light when hoisted, and not affecting the hardness of the wall panel when in use.

[0025] The utility model can make the connecting belt on the ground when the wall panel is hoisted by setting the connecting belt, the first storage bag and the second storage bag, so that the wall panel is lighter when hoisted, and after the wall panel is installed, the stones and adhesive in the storage bag can be filled into the wall panel by filling the connecting belt in the wall panel and setting the pins, and the stones and adhesive can be alternately filled into the wall panel by alternating the first storage bag and the second storage bag, so as to reinforce the wall panel, so that the wall panel can meet the requirements of light weight and not affect the hardness of the wall panel. The utility model can make the wall panel lighter by setting the connecting belt, the first storage bag and the second storage bag, and can also fill the wall panel with materials to strengthen the hardness of the wall panel.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An integrated lightweight concrete prefabricated wall panel, comprising a wall panel (1), characterized in that: A baffle (4) is vertically installed inside the wall panel (1), and a second material passage pipe (5) and a first material passage pipe (3) are installed on the left and right side walls of the wall panel (1), respectively. The second material passage pipe (5) is installed with a second plug pin (6), and the first material passage pipe (3) is installed with a first plug pin (2). The first material passage pipe (3) is connected with a connecting belt (7), and a first material storage bag (8) and a second material storage bag (9) are intermittently arranged inside the connecting belt (7).

2. The integrated lightweight concrete prefabricated wall panel according to claim 1, characterized in that: The first storage bag (8) and the second storage bag (9) are both made of rubber material. The first storage bag (8) is filled with adhesive, and the second storage bag (9) is filled with crushed stone.

3. The integrated lightweight concrete prefabricated wall panel according to claim 1, characterized in that: The interior of the wall panel (1) is a hollow structure.

4. The integrated lightweight concrete prefabricated wall panel according to claim 1, characterized in that: The connecting belt (7) is in communication with the first material passage pipe (3), and a through groove corresponding to the connecting belt (7) is provided in the wall panel (1).

5. The integrated lightweight concrete prefabricated wall panel according to claim 1, characterized in that: The baffle (4) is located in the middle of the wall panel (1).

6. The integrated lightweight concrete prefabricated wall panel according to claim 1, characterized in that: The wall panel (1) is made of ALC material.