Novel feeding crane

By adopting the dual -run car layout and the three -rails and four -track structures in the feeding crane, combined with the design of the peaceful pairing mechanism of the main and the vice -lifting mechanism, the existing feeding cranes have the lack of safety stability and energy saving and consumption reduction. , Safe feeding operations.

CN222389447UActive Publication Date: 2025-01-24HENAN WEIHUA HEAVY MACHINE
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423047362.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-01-24
Estimated Expiration
2034-12-11

AI Technical Summary

Technical Problem

The existing feeding cranes have shortcomings in feeding safety and stability, energy saving and consumption reduction, and it is difficult to meet the efficiency, safety and energy saving requirements after the steelmaking process is upgraded.

Method used

A new type of feeding crane is designed, which adopts the dual -run car layout and the three -beams and four -track structures. Through the cooperation of the peaceful quadrilateral mechanism of the main and vice -up mechanism, it has achieved efficient and safe feeding operations. The accuracy and safety of feeding.

Benefits of technology

The improvement of the efficiency of the feed is achieved, saving the time of the rotation of the furnace and the operation of the thermal insulation door, improved the safety and stability of the feeding process, and reduced energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222389447U_ABST
    Figure CN222389447U_ABST
Patent Text Reader

Abstract

The utility model relates to a novel charging crane in the field of hoisting equipment, which comprises a main beam and a travelling trolley, a lifting and overturning device is mounted on the travelling trolley, and the lifting and overturning device comprises a main lifting mechanism and an auxiliary lifting mechanism; the two travelling trolleys are symmetrically arranged on the two sides of the upper surface of the main beam, each travelling trolley is provided with a lifting and overturning device, the main beam comprises a middle cross beam and side cross beams symmetrically arranged on the two sides of the middle cross beam at intervals, and each travelling trolley is installed on the middle cross beam and the corresponding side cross beam in a crossing mode; a connecting piece is arranged between the main lifting appliance and the auxiliary lifting appliance of each lifting and overturning device, a main hook and an auxiliary hook are arranged at the lower end of each main lifting appliance and the lower end of each auxiliary lifting appliance respectively, and the two ends of each connecting piece are correspondingly and rotationally connected with the upper end of each main lifting appliance and the upper end of each auxiliary lifting appliance respectively, so that a parallelogram mechanism is formed among the connecting pieces, the main lifting appliances, the auxiliary lifting appliances and the trough piece; the novel feeding crane can feed more conveniently, efficiently, safely and stably.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of lifting equipment, in particular to a novel charging crane. Background Art

[0002] As is known, charging crane is an indispensable equipment for steelmaking, which is used to add scrap steel, various alloys and other cold materials into the converter to complete the smelting of specific molten steel in different proportions with molten iron; for example, Chinese utility model patent with announcement number CN218174455U discloses a bridge crane for tipping over a ladle, which lifts and tips the ladle by means of a main lifting mechanism and an auxiliary lifting mechanism installed on a trolley frame; however, with the improvement and upgrading of steelmaking process, steelmaking efficiency has been greatly improved. Under the premise that the original factory building and converter and other equipment are not changed, higher performance requirements are put forward for charging cranes, and green, low-carbon and energy-saving requirements are put forward for the entire charging process, while the existing cranes have shortcomings in terms of charging safety, stability and energy saving and consumption reduction. Utility Model Content

[0003] In order to overcome the deficiencies in the background technology and solve the existing technical problems, the utility model discloses a novel charging crane, which can charge materials more conveniently, efficiently, safely and stably.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] A new type of loading crane comprises a main beam that can be moved and positioned along a trolley track, the main beam is equipped with a running trolley that can be moved and positioned along the main beam, the running trolley is equipped with a lifting and tilting device for driving a trough member to load materials, the lifting and tilting device comprises a main lifting mechanism and an auxiliary lifting mechanism for lifting and controlling a main lifting device and an auxiliary lifting device respectively; the running trolleys are symmetrically provided with two on both sides of the upper surface of the main beam, and each running trolley is installed with a lifting and tilting device, the main beam comprises a middle crossbeam and side crossbeams symmetrically arranged on both sides of the middle crossbeam at intervals, and each running trolley is installed across the middle crossbeam and the corresponding side crossbeam; a connecting piece is provided between the main lifting device and the auxiliary lifting device of each lifting and tilting device, the lower ends of the main lifting device and the auxiliary lifting device are respectively provided with a main hook and an auxiliary hook for lifting the front end and the rear end of the trough member, and the two ends of the connecting piece are respectively rotatably connected with the upper ends of the main lifting device and the auxiliary lifting device, so that a parallelogram mechanism is formed between the connecting piece, the main lifting device, the auxiliary lifting device and the trough member.

[0006] Furthermore, a smelting furnace capable of rotating the furnace mouth toward the main beam is provided outside the front end of the main beam, and a material trough feeding device is provided outside the rear end of the main beam.

[0007] Furthermore, a heat-insulating door that can slide and open along the direction of the trolley track is provided between the main beam and the smelting furnace.

[0008] Furthermore, each lifting and tipping device has two main slings and two auxiliary slings on both sides of the corresponding trough member.

[0009] Furthermore, an inclinometer is installed at the center of the upper surface of the connecting piece.

[0010] Furthermore, a visual camera is installed at the center of the lower surface of the connecting piece.

[0011] Due to the adoption of the above-mentioned technical solution, the utility model has the following beneficial effects:

[0012] The new charging crane disclosed by the utility model adopts a double-operating trolley layout and changes the main beam into a three-beam four-track structure, so that the lifting and lowering transformation is completed at a low cost without major changes to the original factory building structure, and the operation arrangement of two lifting and tipping devices for twice the amount of charging at a time is realized, which not only improves the efficiency, but also saves the time and energy of the rotation of the smelting furnace and the operation of the insulation door, making the charging process more convenient and efficient; more importantly, through the parallelogram mechanism formed between the connecting parts, the main hoist, the auxiliary hoist and the material trough parts, the tilting and tilting of the auxiliary hoist during the lifting process is avoided, the risk of the auxiliary hook on the auxiliary hoist being unhooked is reduced, the stability of the coordination between the main and auxiliary lifting mechanisms is ensured, and the safety of the charging process is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the implementation structure of the utility model;

[0014] Figure 2 yes Figure 1 Schematic diagram of the side layout and installation structure of the running trolley.

[0015] In the figure: 1. running trolley; 101. middle cross beam; 102. side cross beam; 2. running trolley; 3. trough parts; 4. main lifting fixture; 5. connecting parts; 6. auxiliary lifting fixture; 7. melting furnace; 8. insulation door. DETAILED DESCRIPTION

[0016] The technical solution of the present invention will be described below in conjunction with the drawings in the embodiments of the present invention. In the description, it should be understood that if there are terms such as "upper", "lower", "front", "rear", "left", "right" and the like indicating directions or positional relationships, they are only corresponding to the drawings of the present invention, for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific direction:

[0017] Combined with Figure 1-2The novel charging crane comprises a main beam 1 which can be moved and positioned along a trolley track, a running trolley 2 which can be moved and positioned along the main beam 1 is installed on the main beam 1, a lifting and tilting device for driving a trough part 3 for charging is installed on the running trolley 2, and the lifting and tilting device comprises a main lifting mechanism and a secondary lifting mechanism which are respectively used to lift and control a main hoist 4 and a secondary hoist 6, the main lifting mechanism is generally used to lift the trough part 3, and the secondary lifting mechanism is used to tilt the trough part 3; as needed, a smelting furnace 7 which can rotate the furnace mouth toward the main beam 1 is provided outside the front end of the main beam 1, and a trough charging device is provided outside the rear end of the main beam 1, so as to facilitate loading at the rear end of the crane and loading at the front end; in addition, a heat-insulating door 8 which can slide and open along the direction of the trolley track is provided between the main beam 1 and the smelting furnace 7, and is only opened when charging to play a role of heat insulation.

[0018] Two running trolleys 2 are symmetrically arranged on both sides of the upper surface of the main beam, and each running trolley 2 is installed with a lifting and overturning device. The main beam 1 includes a middle crossbeam 101 and side crossbeams 102 symmetrically arranged on both sides of the middle crossbeam 101. Each running trolley 2 is installed across the middle crossbeam 101 and the corresponding side crossbeam 102, that is, a trolley track is arranged on the side crossbeam 102, and two trolley tracks are arranged side by side on the middle crossbeam 101. The running trolley 2 is installed with two trolley tracks for travel, one from the side crossbeam 102, and the other from the middle crossbeam 101. This three-beam four-track double running trolley layout can realize the operation arrangement of two lifting and overturning devices with twice the amount of material added at one time, which saves time, improves efficiency, and greatly reduces energy consumption.

[0019] A connecting piece 5 is provided between the main sling 4 and the auxiliary sling 6 of each lifting and tipping device, and the lower ends of the main sling 4 and the auxiliary sling 6 are respectively provided with a main hook and an auxiliary hook for lifting the front and rear ends of the trough member 3; generally, the trough member 3 is a rectangular trough, so according to needs, the main sling 4 and the auxiliary sling 6 of each lifting and tipping device are respectively provided with two on both sides of the trough member 3, and can move synchronously; the two ends of the connecting piece 5 are respectively rotatably connected with the upper ends of the main sling 4 and the auxiliary sling 6, so that a parallelogram mechanism is formed between the connecting piece 5, the main sling 4, the auxiliary sling 6 and the trough member 3, that is, during the articulated rotation process, the lengths of each side of the parallelogram mechanism can remain unchanged, which can not only limit the main sling 4 and the auxiliary sling 6 from swinging and touching each other or separating at a long distance, but also avoid the auxiliary sling 6 from tilting and tilting during the lifting process, reduce the risk of unhooking the auxiliary hook on the auxiliary sling 6, and ensure the stability and safety of the coordination between the main and auxiliary lifting mechanisms.

[0020] As needed, an inclinometer is installed in the center of the upper surface of the connecting member 5, which can detect and feedback the overturning angle of the trough member 3 to ensure the accuracy of lifting control and feeding; in addition, a visual camera is installed in the center of the lower surface of the connecting member 5 to observe and detect the feeding situation of the trough member 3.

[0021] The new charging crane described in the utility model is implemented. When the two trough parts 3 are filled with materials and are lifted by two lifting and tilting devices respectively, the main beam 1 and the running trolley 2 are controlled to move to the corresponding smelting furnace 7, and the insulation door 8 is controlled to be opened first, and the smelting furnace 7 is rotated to the position, and then the auxiliary hoist 6 of a lifting and tilting device is controlled to be lifted, and the rear end of the trough part 3 is raised so that it can be tilted and dumped smoothly. After the charging is completed, the main beam 1 is moved so that the trough part 3 lifted by the other lifting and tilting device corresponds to the smelting furnace 7, and then the trough part 3 is controlled to be charged in the same way. After the charging is completed, the smelting furnace 7 is resumed to rotate and the insulation door 8 is closed, so that a charging operation with twice the charging amount compared with the traditional method can be completed.

[0022] The parts of the present invention that are not described in detail are prior art. It is obvious to those skilled in the art that the present invention is not limited to the details of the above-mentioned exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the above-mentioned embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is limited by the attached claims rather than the above description. Therefore, it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention, and any figure marks in the claims should not be regarded as limiting the content of the claims involved.

Claims

1. A novel charging crane, comprising a main beam (1) capable of being moved and positioned along a trolley track, a running trolley (2) capable of being moved and positioned along the main beam (1) being mounted on the main beam (1), a lifting and tilting device for driving a trough member (3) for charging is mounted on the running trolley (2), the lifting and tilting device comprising a main lifting mechanism and a secondary lifting mechanism for lifting and controlling a main sling (4) and a secondary sling (6) respectively, and characterized in that: Two running trolleys (2) are symmetrically arranged on both sides of the upper surface of the main beam, and each running trolley (2) is installed with a lifting and tilting device. The main beam (1) includes a middle crossbeam (101) and side crossbeams (102) arranged symmetrically on both sides of the middle crossbeam (101). Each running trolley (2) is installed across the middle crossbeam (101) and the corresponding side crossbeam (102). A connecting piece (5) is arranged between the main sling (4) and the auxiliary sling (6) of each lifting and tilting device. The lower ends of the main sling (4) and the auxiliary sling (6) are respectively provided with a main hook and an auxiliary hook for lifting the front end and the rear end of the trough member (3). The two ends of the connecting piece (5) are respectively rotatably connected to the upper ends of the main sling (4) and the auxiliary sling (6), so that a parallelogram mechanism is formed between the connecting piece (5), the main sling (4), the auxiliary sling (6) and the trough member (3).

2. The new charging crane according to claim 1 is characterized in that: A smelting furnace (7) capable of rotating the furnace opening toward the main beam (1) is provided outside the front end of the main beam (1), and a material trough feeding device is provided outside the rear end of the main beam (1).

3. The new charging crane according to claim 2 is characterized in that: A heat-insulating door (8) that can be slid open and closed along the direction of the trolley track is provided between the main beam (1) and the smelting furnace (7).

4. The new charging crane according to claim 1 is characterized in that: Each lifting and tipping device has two main slings (4) and two auxiliary slings (6) respectively disposed on both sides of the trough member (3).

5. The new charging crane according to claim 1 is characterized in that: An inclinometer is installed at the center of the upper surface of the connecting member (5).

6. The new charging crane according to claim 1 is characterized in that: A visual camera is installed in the centre of the lower surface of the connecting piece (5).

Citation Information

Patent Citations

  • Bridge crane for steel ladle overturning

    CN218174455U