Box type water taking structure in river
By using a combination of steel box structure and positioning steel pipe piles, the problems of heavy weight and high construction difficulty of box-shaped water intake structures in the river in the existing technology have been solved, and a lighter and safer water intake structure construction has been achieved.
Patent Information
- Application Number
- CN202421155169.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-24
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-05-24
AI Technical Summary
The existing river box-type water intake structure has high weight due to the large precast concrete structure, which leads to high construction difficulty and low connection quality assurance rate, and requires a large number of construction machinery and large-tonnage ships.
The steel sleeve structure is used, including hollow box -type steel plates, positioning steel pipes and water pipes. The steel tube box is fixed by positioning steel pipe piles, and concrete is poured on the steel sleeve box to form a water extraction structure.
The weight of the water intake structure is reduced, the construction difficulty and cost are reduced, and the construction quality and safety are improved at the same time.
Smart Images

Figure CN222390550U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water conservancy and hydropower engineering, and in particular to a box-type water intake structure in a river. Background Art
[0002] Conventional box-type water intake structures in the river all use prefabricated concrete structures. The prefabricated structures are large in size and tonnage, and require a very large prefabrication site on the riverside. Some projects are generally prefabricated in sections due to the high height of the water intake structure. After prefabrication, they need to be towed to the installation waters by large-tonnage ships, and then hoisted and installed in sections by cranes. The prefabricated concrete structure is constructed underwater to connect the structure. It is very difficult to connect the joints of the concrete structure underwater, and the connection quality assurance rate is low. Due to the heavy weight of the prefabricated concrete structure, large-tonnage ships, lifting equipment and other construction machinery are required. At the same time, due to the operation in the river, the construction difficulty is very large. Utility Model Content
[0003] A first aspect of an embodiment of the present application provides a box-type water intake structure in a river, which can reduce the weight of the water intake structure, ensure that functional requirements are met, reduce construction difficulty, and ensure construction quality.
[0004] The first aspect of the embodiment of the present application provides a river box-type water intake structure comprising:
[0005] A steel casing, wherein the steel casing comprises a steel casing steel plate, a positioning steel pipe and a water intake steel pipe. The steel casing steel plate is a hollow box-shaped structure. The positioning steel pipe is arranged on the opposite side of the steel casing steel plate. The water intake steel pipe is located on the side wall of the steel casing steel plate and communicates with the inner cavity of the steel casing steel plate.
[0006] A positioning steel pipe pile, wherein the positioning steel pipe pile is arranged at a preset position of the water body, and the positioning steel pipe pile and the steel casing are in a connected state, and in the connected state, the positioning steel pipe pile and the positioning steel pipe are sleeved to fix the steel casing;
[0007] A concrete pouring layer is at least partially poured on the steel casing to form a water intake structure.
[0008] In addition, the river box-type water intake structure provided in the embodiment of the present application may also have the following additional technical features:
[0009] In an optional solution, the steel casing steel plate includes a supporting channel steel, a first supporting angle steel, a second supporting angle steel and a third supporting angle steel;
[0010] The supporting channel steel includes a first supporting channel steel and a second supporting channel steel arranged relatively to each other, the first supporting angle steel is vertically arranged between the first supporting channel steel and the second supporting channel steel, the second supporting angle steel is obliquely arranged between the first supporting channel steel and the second supporting channel steel, and the third supporting angle steel is arranged on the first supporting channel steel and / or the second supporting channel steel.
[0011] In an optional solution, the steel casing steel plate further includes a first supporting steel pipe, a second supporting steel pipe, a third supporting steel pipe and a supporting I-beam;
[0012] The first support steel pipe and the second support steel pipe are arranged in a crisscross manner on the second support channel steel, the third support steel pipe is arranged obliquely on the second support channel steel, and the support I-beam is arranged on the first support steel pipe and / or the second support steel pipe.
[0013] In an optional solution, the positioning steel pipe pile is partially buried in the steel pipe pile borehole, the side wall of the positioning steel pipe pile is provided with a grouting hole, and the positioning steel pipe pile and the space between the positioning steel pipe pile and the steel pipe pile borehole are filled with cement mortar.
[0014] In an optional solution, the number of the steel casings is at least two, at least two of the steel casings are stacked along the gravity direction, and two adjacent layers of the stacked steel casings are fixedly connected by a reinforcing steel plate.
[0015] A second aspect of the present application provides a construction method for constructing the river box-type water intake structure in the first aspect of the present application, and the construction method comprises the following steps:
[0016] 1) making a steel casing, and setting a steel pipe collar at the end of the steel casing;
[0017] 2) Construct and position steel pipe piles at the edge of the water intake in the river as the launching and positioning structure of the steel casing;
[0018] 3) After the steel casing is processed, it is transported to the designed location by ship, and the steel casing is lifted by crane. The positioning steel pipes at both ends of the steel casing are inserted into the positioning steel pipe piles that have been constructed, and the steel casing is slowly sunk;
[0019] 4) After the steel casing is sunk steadily, pour the underwater foundation concrete inside and outside the steel casing to seal the bottom of the steel casing; after the pouring of the internal and external foundation concrete of the steel casing is completed, pour the underwater structure concrete inside the steel casing layer by layer, and the concrete structure between the two side walls of the steel casing is used as the water intake structure until the water intake structure is poured.
[0020] In an optional solution, the construction method further comprises the following steps:
[0021] For high steel casing structures, they can be hoisted in sections, with reinforcement steel plates welded between each section and connected by bolts. The bolts are connected by underwater construction to ensure the integrity of the steel casing structure.
[0022] The positioning steel pipe piles can be permanently retained, exposed above the river surface, and serve as anti-collision structures for the underwater water intake structure.
[0023] In an optional solution, the manufacturing of the steel casing in step 1) includes the following steps:
[0024] The steel box is processed at a suitable site on the shore. The steel box is used as a template for pouring concrete for the water intake structure. As a part of the permanent structure, the template will not be removed. The steel box structure is equipped with reliable internal and external supports to ensure that the steel box has sufficient rigidity during lifting.
[0025] The beneficial effects of the embodiments of the present application are:
[0026] The box-type water intake structure and construction method in the embodiment of the present application provide a new design scheme and construction method. By lifting a lightweight steel casing and pouring underwater concrete, it avoids lifting a large and heavy concrete structure, reduces the construction difficulty, and at the same time, the steel casing serves as an external protection measure for the water intake concrete structure, ensuring the safety of the water intake structure.
[0027] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 A schematic diagram of the structure of a box-type water intake structure in a river provided by the present application in a specific embodiment;
[0029] Figure 2 for Figure 1 A schematic diagram of the enlarged structure at point A;
[0030] Figure 3 Installation diagram of the positioning steel pipe pile provided for this application;
[0031] Figure 4 A plan view of the horizontal joints of the box-type water intake structure in the river provided for this application;
[0032] Figure 5 A cross-sectional view of the horizontal joints of the box-type water intake structure in the river provided for this application;
[0033] Figure 6 A schematic diagram of the connection of the river box-type water intake structure at the joint provided for this application;
[0034] Figure 7 A schematic structural diagram of a reinforced steel plate in a specific embodiment provided for the application.
[0035] Figure numerals: steel casing steel plate 1, positioning steel pipe 2, water intake steel pipe 3, positioning steel pipe pile 4, first supporting channel steel 5, second supporting channel steel 6, first supporting angle steel 7, second supporting angle steel 8, third supporting angle steel 9, first supporting steel pipe 10, second supporting steel pipe 11, third supporting steel pipe 12, supporting I-beam 13, steel pipe pile drilling hole 14, grouting hole 15, cement mortar 16, reinforcing steel plate 17.
[0036] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION
[0037] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0038] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0039] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0040] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0041] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.
[0042] like Figure 1-7As shown, the first aspect of the embodiment of the present application provides a box-type water intake structure in the river, which can reduce the weight of the water intake structure, ensure that the functional requirements are met, reduce the construction difficulty, and ensure the construction quality. The box-type water intake structure in the river specifically includes a steel casing, a positioning steel pipe pile 4 and a concrete pouring layer. The steel casing includes a steel casing steel plate 1, a positioning steel pipe 2 and a water intake steel pipe 3. The steel casing steel plate 1 is a hollow box-type structure. The positioning steel pipe 2 is arranged on the opposite side of the steel casing steel plate 1. The water intake steel pipe 3 is located on the side wall of the steel casing steel plate 1 and communicates with the inner cavity of the steel casing steel plate 1; the positioning steel pipe pile 4 is arranged at a preset position of the water body, and the positioning steel pipe pile 4 and the steel casing are in a connected state. In the connected state, the positioning steel pipe pile 4 is sleeved with the positioning steel pipe 2 to fix the steel casing; the concrete pouring layer is at least partially poured on the steel casing to form a water intake structure.
[0043] like Figure 1-2 As shown, in a specific embodiment, the steel casing steel plate 1 includes a supporting channel steel, a first supporting angle steel 7, a second supporting angle steel 8 and a third supporting angle steel 9; the supporting channel steel includes a first supporting channel steel 5 and a second supporting channel steel 6 arranged relatively, the first supporting angle steel 7 is vertically arranged between the first supporting channel steel 5 and the second supporting channel steel 6, the second supporting angle steel 8 is obliquely arranged between the first supporting channel steel 5 and the second supporting channel steel 6, and the third supporting angle steel 9 is arranged on the first supporting channel steel 5 and / or the second supporting channel steel 6.
[0044] like Figure 1-2 As shown, in a specific embodiment, the steel casing steel plate 1 also includes a first supporting steel pipe 10, a second supporting steel pipe 11, a third supporting steel pipe 12 and a supporting I-beam 13; the first supporting steel pipe 10 and the second supporting steel pipe 11 are crisscrossedly arranged on the second supporting channel steel 6, the third supporting steel pipe 12 is obliquely arranged on the second supporting channel steel 6, and the supporting I-beam 13 is arranged on the first supporting steel pipe 10 and / or the second supporting steel pipe 11.
[0045] like Figure 3 As shown, in a specific embodiment, the positioning steel pipe pile 4 is partially buried in the steel pipe pile borehole 14, the side wall of the positioning steel pipe pile 4 is provided with a grouting hole 15, and the positioning steel pipe pile 4 and the space between the positioning steel pipe pile 4 and the steel pipe pile borehole 14 are filled with cement mortar 16.
[0046] like Figure 4-7 As shown, in a specific embodiment, the number of the steel casings is at least two, at least two steel casings are stacked along the gravity direction, and two adjacent layers of the stacked steel casings are fixedly connected by a reinforcing steel plate 17.
[0047] The second aspect of the embodiment of the present application provides a construction method for constructing the river box-type water intake structure in the embodiment of the first aspect, and the construction method comprises the following steps:
[0048] 1) Make a steel casing and process it at a suitable site on the shore. The steel casing is used as a template for pouring concrete for the water intake structure. The template is a part of the permanent structure and will not be removed. The steel casing structure is equipped with reliable internal and external supports to ensure that the steel casing has sufficient rigidity during the lifting process. Then, a steel pipe ring is set at the end of the steel casing;
[0049] 2) construct and position steel pipe piles 4 at the edge of the water intake in the river as the steel casing launching positioning structure;
[0050] 3) After the steel casing is processed, it is transported to the designed position by ship, and the steel casing is lifted by crane. The positioning steel pipes 2 at both ends of the steel casing are inserted into the positioning steel pipe piles 4 that have been completed, and the steel casing is slowly sunk;
[0051] 4) After the steel casing is sunk and stabilized, pour the underwater foundation concrete inside and outside the steel casing to seal the bottom of the steel casing; after the pouring of the internal and external foundation concrete of the steel casing is completed, pour the underwater structure concrete inside the steel casing layer by layer, and the concrete structure between the two side walls of the steel casing is used as the water intake structure until the water intake structure is poured. After the steel casing is positioned in the water, pour the concrete inside the steel casing to form the water intake structure. This solution optimizes the traditional lifting of large-tonnage concrete structures to the lifting of lighter steel casing structures, which can greatly reduce the difficulty of lifting.
[0052] For a high steel casing structure, it can be lifted in sections, and reinforcing steel plates 17 can be welded between each section and connected with bolts. The connecting bolts can be constructed underwater to ensure the integrity of the steel casing structure; the positioning steel pipe piles 4 can be permanently retained and exposed above the river surface to serve as an anti-collision structure for the underwater water intake structure.
[0053] The box-type water intake structure and construction method in the embodiment of the present application provide a new design scheme and construction method. By lifting a lightweight steel casing and pouring underwater concrete, it avoids lifting a large and heavy concrete structure, reduces the construction difficulty, and at the same time, the steel casing serves as an external protection measure for the water intake concrete structure, ensuring the safety of the water intake structure.
[0054] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A box-type water intake structure in a river, characterized in that: include: A steel casing, wherein the steel casing comprises a steel casing steel plate, a positioning steel pipe and a water intake steel pipe. The steel casing steel plate is a hollow box-shaped structure. The positioning steel pipe is arranged on the opposite side of the steel casing steel plate. The water intake steel pipe is located on the side wall of the steel casing steel plate and communicates with the inner cavity of the steel casing steel plate. A positioning steel pipe pile, wherein the positioning steel pipe pile is arranged at a preset position of the water body, and the positioning steel pipe pile and the steel casing are in a connected state, and in the connected state, the positioning steel pipe pile and the positioning steel pipe are sleeved to fix the steel casing; A concrete pouring layer is at least partially poured on the steel casing to form a water intake structure.
2. The box-type water intake structure in the river according to claim 1, characterized in that: The steel casing steel plate includes a supporting channel steel, a first supporting angle steel, a second supporting angle steel and a third supporting angle steel; The supporting channel steel includes a first supporting channel steel and a second supporting channel steel arranged relatively to each other, the first supporting angle steel is vertically arranged between the first supporting channel steel and the second supporting channel steel, the second supporting angle steel is obliquely arranged between the first supporting channel steel and the second supporting channel steel, and the third supporting angle steel is arranged on the first supporting channel steel and / or the second supporting channel steel.
3. The box-type water intake structure in the river according to claim 2, characterized in that: The steel casing steel plate also includes a first supporting steel pipe, a second supporting steel pipe, a third supporting steel pipe and a supporting I-beam; The first support steel pipe and the second support steel pipe are arranged in a crisscross manner on the second support channel steel, the third support steel pipe is arranged obliquely on the second support channel steel, and the support I-beam is arranged on the first support steel pipe and / or the second support steel pipe.
4. The box-type water intake structure in the river according to any one of claims 1 to 3, characterized in that: The positioning steel pipe pile is partially buried in the steel pipe pile borehole, a grouting hole is arranged on the side wall of the positioning steel pipe pile, and cement mortar is filled between the positioning steel pipe pile and the steel pipe pile borehole.
5. The box-type water intake structure in the river according to claim 4, characterized in that: The number of the steel casings is at least two, at least two of the steel casings are stacked along the gravity direction, and two adjacent layers of the stacked steel casings are fixedly connected by a reinforcing steel plate.