Casting production line
By installing the heating device on the casting production line, the real -time heating ingot mold mold solves the problem of cracking and safety accidents due to thermal expansion and contraction, and achieves the effect of extending the life of the mold and improving production safety.
Patent Information
- Application Number
- CN202421138894.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-23
AI Technical Summary
When the ingot mold comes into contact with high-temperature aluminum liquid, it is easy to cause fine cracks due to thermal expansion and contraction, resulting in water seepage and possible molten metal explosion accidents.
Install the heating device on the casting production line to reduce its thermal stress through the heating mechanism in real time. Heating devices include fuel stations, control systems, gas distribution systems, air distribution systems, and leakage detection systems to ensure safe and efficient heating process.
Through the use of heating device, the thermal stress of the ingot mold is effectively reduced, its service life is extended, and the cracks and potential safety accidents caused by thermal expansion and contraction are avoided.
Smart Images

Figure CN222403426U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of casting processing, in particular to a casting production line. Background Art
[0002] Ingot molds are made by pouring molten metal into permanent or reusable molds. After solidification, these ingots (or bars, slabs or billets depending on the container) are further machined into a variety of new shapes. Ingot molds are generally set on the casting production line and move with the conveyor line of the casting production line.
[0003] If the ingot mold (referred to as: mold) directly contacts high-temperature aluminum liquid of about 720°C without residual heat, it is easy for the bottom of the mold to expand and contract due to rapid heating until tiny cracks appear. When the cracks extend to the outer shell of the mold and water seepage occurs, the high-temperature aluminum liquid flows into the mold and encounters water, which can easily cause a molten metal explosion accident. Utility Model Content
[0004] The utility model aims to provide a casting production line, which can heat the ingot casting mold in real time, effectively reduce the thermal stress of the ingot casting mold, and extend the service life of the ingot casting mold.
[0005] The technical solution of the utility model is: a casting production line, comprising a conveyor line, an ingot casting mold arranged on the conveyor line and a heating device, the heating device comprising a heating mechanism installed beside the conveyor line and arranged close to the ingot casting mold and a fuel station located outside the conveyor line, the fuel station and the heating mechanism are connected through a first pipeline; a control system, a gas distribution system and an air distribution system are arranged in the fuel station, and the gas distribution system and the air distribution system are electrically connected to the control system respectively; the gas distribution system comprises a filter, a safety solenoid valve, a pressure reducing valve, a combustion solenoid valve and a proportional valve connected in sequence through a second pipeline, one end of the second pipeline on which the filter is arranged is connected to a natural gas source, and the other end of the second pipeline is connected to the first pipeline; the air distribution system comprises a fan and a third pipeline, one end of the third pipeline is connected to the fan, and the other end of the third pipeline is connected to the first pipeline; the heating mechanism is provided with a heating port on the side facing the ingot casting mold.
[0006] Preferably, the second pipeline is further provided with a first pressure gauge, and the first pressure gauge is located between the natural gas source and the filter.
[0007] Preferably, a pressure switch is also provided on the second pipeline, and the pressure switch is located between the pressure reducing valve and the combustion solenoid valve.
[0008] Preferably, the third pipeline is connected with a second pressure gauge and an air valve.
[0009] Preferably, the second pipeline is also connected to a leakage detection system, and the leakage detection system is electrically connected to the control system.
[0010] Preferably, the heating mechanism includes a fourth pipeline, a cover shell and a heater arranged in the cover shell, one end of the fourth pipeline extends into the cover shell and is connected with one end of the heater, the other end of the fourth pipeline forms the heating port, and the end of the heater away from the fourth pipeline is connected with the first pipeline.
[0011] Preferably, thermal insulation cotton is applied on the inner surface of the cover shell.
[0012] Preferably, the heater is a linear heater.
[0013] Compared with the related art, the beneficial effects of the utility model are:
[0014] 1. Installing a heating device for heating the ingot mold on the casting production line can heat the ingot mold in real time, effectively reduce the thermal stress of the ingot mold, and extend the service life of the ingot mold;
[0015] 2. The heating device can perform heating operation in real time without affecting the overall operation of the ingot mold, and preheat the ingot mold conveniently and efficiently;
[0016] 3. The heating device is equipped with a leak detection system, which will immediately alarm if any abnormality occurs and cut off the gas in time to ensure the safe use of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A schematic diagram of the structure of the casting production line provided by the utility model;
[0018] Figure 2 This is a schematic diagram of the internal structure of the fuel station;
[0019] Figure 3 It is a schematic diagram of the gas distribution system;
[0020] Figure 4 Schematic diagram of the internal structure of the heating mechanism.
[0021] In the attached figure: 1. fuel station; 2. first pipeline; 3. heating mechanism; 4. control system; 5. gas distribution system; 6. air distribution system; 7. leakage detection system; 8. cover; 9. thermal insulation cotton; 10. heater; 11. filter; 12. safety solenoid valve; 13. pressure reducing valve; 14. combustion solenoid valve; 15. proportional valve; 16. natural gas source; 17. first pressure gauge; 18. pressure switch; 19. second pipeline; 20. third pipeline; 21. fan; 22. second pressure gauge; 23. air valve; 24. conveying line; 25. heating port; 26. fourth pipeline; 27. ingot mold; 28. heating device. DETAILED DESCRIPTION
[0022] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict. For the convenience of description, if the words "upper", "lower", "left" and "right" appear in the following text, they only indicate that the upper, lower, left and right directions are consistent with the drawings themselves, and do not limit the structure.
[0023] like Figure 1 As shown, a casting production line provided in this embodiment includes a conveyor line 24 , an ingot mold 27 and a heating device 28 arranged on the conveyor line 24 .
[0024] The heating device 28 includes a heating mechanism 3 installed beside the conveyor line 24 and close to the ingot mold 27, and a fuel station 1 located outside the conveyor line 24. The fuel station 1 and the heating mechanism 3 are connected through a first pipeline 2. The first pipeline 2 is provided with an ignition line and a fire detection line, and ignition is performed through the ignition line.
[0025] like Figure 2 As shown, the fuel station 1 is provided with a control system 4, a gas distribution system 5, an air distribution system 6 and a leakage detection system 7. The gas distribution system 5, the air distribution system 6 and the leakage detection system 7 are respectively electrically connected to the control system 4. The entire heating device 28 is controlled by the control system 4 to realize the automatic ignition and gas leakage alarm functions.
[0026] like Figure 3 As shown, the gas distribution system 5 includes a filter 11, a safety solenoid valve 12, a pressure reducing valve 13, a combustion solenoid valve 14 and a proportional valve 15 which are sequentially connected through a second pipeline 19. One end of the second pipeline 19 provided with the filter 11 is connected to a natural gas source 16, and the other end of the second pipeline 19 is connected to the first pipeline 2. A first pressure gauge 17 is also provided on the second pipeline 19, and the first pressure gauge 17 is located between the natural gas source 16 and the filter 11.
[0027] like Figure 2 As shown, the air distribution system 6 includes a fan 21 and a third pipeline 20, one end of the third pipeline 20 is connected to the fan 21, and the other end of the third pipeline 20 is connected to the first pipeline 2. The third pipeline 20 is connected to a second pressure gauge 22 and a wind valve 23.
[0028] The leakage detection system 7 is electrically connected to the control system 4 .
[0029] like Figure 4As shown, the heating mechanism 3 includes a fourth pipeline 26, a cover shell 8 and a heater 10 arranged in the cover shell 8, one end of the fourth pipeline 26 extends into the cover shell 8 and communicates with one end of the heater 10, and the other end of the fourth pipeline 26 forms a heating port 25, and the heating port 25 is arranged toward the ingot mold 27. One end of the heater 10 away from the fourth pipeline 26 is connected to the first pipeline 2. The inner surface of the cover shell 8 is provided with a heat preservation cotton 9. The heater 10 is a linear heater, which heats more evenly, can reduce the thermal stress of the ingot mold, and effectively extend the service life of the ingot mold.
[0030] When in use, the natural gas source 16 is turned on, and the gas is supplied to the heater 10 after filtering and reducing pressure through the filter 11. The amount of gas supply can be adjusted by the proportional valve 15. The pressure of the second pipeline 19 is detected by the pressure switch 18, and the second pipeline 19 is detected to be leaking by the leakage detection system 7. The regulated air and gas are input to the heater 10 through the first pipeline 2, and the high-temperature flue gas after combustion is blown to the surface of the ingot mold 27 through the heater 10 to bake the ingot mold 27. By heating the natural gas, the ingot mold 27 on the conveyor line 24 is simply and safely baked, and automatic ignition is achieved through the ignition electrode. Flame detection can be automatically achieved through the fire detection electrode. The heating device 28 is equipped with pressure abnormality alarm and natural gas leakage alarm light functions. In case of abnormality, the gas is cut off in time to ensure the safe use of the equipment.
[0031] The utility model preheats the ingot mold uniformly and efficiently by adding a heating device to the casting production line, thereby extending the service life of the ingot mold 27 from the original 8-month replacement to 1-1.5 years. The heating device is designed to be safe, with a cover and insulation cotton, which solves the hidden danger of splashing of aluminum liquid casting during use and can effectively protect the safety of on-site workers.
[0032] The heating device is placed at the end of the conveying line, which effectively utilizes the on-site space and can achieve an effective baking effect.
[0033] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A casting production line, comprising a conveyor line (24) and an ingot casting mold (27) arranged on the conveyor line (24), characterized in that: The invention also comprises a heating device (28), wherein the heating device (28) comprises a heating mechanism (3) installed beside the conveyor line (24) and close to the ingot casting mold (27), and a fuel station (1) located outside the conveyor line (24), wherein the fuel station (1) and the heating mechanism (3) are connected via a first pipeline (2); a control system (4), a gas distribution system (5) and an air distribution system (6) are arranged in the fuel station (1), wherein the gas distribution system (5) and the air distribution system (6) are respectively electrically connected to the control system (4); the gas distribution system (5) comprises a filter (19) and a filter (21) connected in sequence via a second pipeline (19); The invention relates to a first insulator (11), a safety solenoid valve (12), a pressure reducing valve (13), a combustion solenoid valve (14) and a proportional valve (15); one end of the second pipeline (19) provided with a filter (11) is connected to a natural gas source (16), and the other end of the second pipeline (19) is connected to the first pipeline (2); the air distribution system (6) comprises a fan (21) and a third pipeline (20); one end of the third pipeline (20) is connected to the fan (21), and the other end of the third pipeline (20) is connected to the first pipeline (2); and a heating port (25) is provided on a side of the heating mechanism (3) facing the ingot casting mold (27).
2. The casting production line according to claim 1, characterized in that: The second pipeline (19) is also provided with a first pressure gauge (17), and the first pressure gauge (17) is located between the natural gas source (16) and the filter (11).
3. The casting production line according to claim 1, characterized in that: The second pipeline (19) is also provided with a pressure switch (18), and the pressure switch (18) is located between the pressure reducing valve (13) and the combustion solenoid valve (14).
4. The casting production line according to claim 1, characterized in that: The third pipeline (20) is connected to a second pressure gauge (22) and a wind valve (23).
5. The casting production line according to claim 1, characterized in that: The second pipeline (19) is also connected to a leakage detection system (7), and the leakage detection system (7) is electrically connected to the control system (4).
6. The casting production line according to claim 1, characterized in that: The heating mechanism (3) comprises a fourth pipeline (26), a housing (8) and a heater (10) arranged in the housing (8); one end of the fourth pipeline (26) extends into the housing (8) and is connected to one end of the heater (10); the other end of the fourth pipeline (26) forms the heating port (25); and one end of the heater (10) away from the fourth pipeline (26) is connected to the first pipeline (2).
7. The casting production line according to claim 6, characterized in that: The inner surface of the cover shell (8) is provided with heat-insulating cotton (9).
8. The casting production line according to claim 6, characterized in that: The heater (10) is a linear heater.