Novel transition layer structure of concrete filled steel tubular column and reinforced concrete column

By adopting the transition layer structure between the concrete column and the steel concrete column of the steel pipe, the problem of the two connections is solved, and a safe, reliable, and good economic connection effect is achieved.

CN222413474UActive Publication Date: 2025-01-28HENNAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323525300.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2025-01-28
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The connection problem between steel pipe concrete columns and reinforced concrete columns is difficult to achieve economical and reliable connection in the prior art.

Method used

The transitional structure of the new type of steel pipe concrete column and steel concrete column, which includes steel concrete columns and embedded steel pipe concrete columns. Set up ring and beam gluten in the middle to enhance stiffness and integrity.

Benefits of technology

The safe and reliable connection of steel pipe concrete columns and reinforced concrete columns has the characteristics of good economy and easy implementation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222413474U_ABST
    Figure CN222413474U_ABST
Patent Text Reader

Abstract

The utility model relates to a novel steel pipe concrete column and reinforced concrete column transition layer structure, a transition layer is located between a steel pipe concrete column and a reinforced concrete column, the transition layer structure comprises the reinforced concrete column and the embedded steel pipe concrete column, the steel pipe concrete column comprises a steel pipe, the diameter of the lower portion of the steel pipe is large, and the diameter of the upper portion of the steel pipe is small. The section of the steel pipe is gradually reduced from bottom to top; the structure further comprises ring beams arranged on the transition layer column bottom beam-column joint and the transition layer column top beam-column joint respectively, beam surface ribs are arranged at the tops of the ring beams on the transition layer column top beam-column joint, and the tops of the steel pipe columns extend to the bottoms of the beam surface ribs. The steel pipe concrete column and the reinforced concrete column are connected, and the connecting structure has the advantages of being safe, reliable, good in economical efficiency and easy to implement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a novel transition layer structure of a steel tube concrete column and a reinforced concrete column. Background Art

[0002] The combination of steel and concrete in steel tube concrete columns improves the rigidity of the steel tube and the compressive resistance of the concrete, thereby greatly improving the bearing capacity. The bearing capacity of reinforced concrete columns is generally lower than that of steel tube concrete columns, but it is more economical and the construction is relatively simple. If the lower columns of the structure are steel tube concrete columns and the upper columns of the structure are reinforced concrete columns, the bearing capacity of the lower columns can be improved while considering economy and ease of construction, providing technical support for the large hip structure. However, the connection of two different types of structural components requires an economical and reliable connection method. Utility Model Content

[0003] The technical problem to be solved by the utility model is: the connection problem of steel tube concrete column and reinforced concrete column. In order to solve the problem, the utility model provides a novel transition layer structure of steel tube concrete column and reinforced concrete column.

[0004] In order to achieve the above object, the utility model is realized by the following technical solutions:

[0005] A new transition layer structure of steel tube concrete column and reinforced concrete column, the transition layer is located between the steel tube concrete column and the reinforced concrete column, the transition layer structure includes a reinforced concrete column and an embedded steel tube concrete column, the steel tube concrete column includes a steel tube, the lower diameter of the steel tube is large, the upper diameter is small, the cross-section gradually decreases from bottom to top, and bolts are arranged on the outer circumference of the steel tube; it also includes ring beams respectively arranged on the bottom beam-column node of the transition layer column and the top beam-column node of the transition layer column, and the top of the ring beam on the top beam-column node of the transition layer column is provided with beam surface reinforcement, and the top of the steel tube column extends to the bottom of the beam surface reinforcement.

[0006] The ring beam is a reinforced concrete ring beam.

[0007] A ring plate is arranged on the inner side of the top of the variable cross-section of the steel pipe.

[0008] A reinforcement ring is arranged on the outer side of the variable cross-section bottom of the steel pipe.

[0009] Compared with the prior art, the utility model has the following beneficial effects: the utility model realizes the connection between the steel tube concrete column and the reinforced concrete column, and has the characteristics of safety, reliability, good economy and easy implementation. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is the overall structure diagram of the utility model. DETAILED DESCRIPTION

[0011] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0012] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0013] like Figure 1 As shown, a new transition layer structure of a steel tube concrete column and a reinforced concrete column, the transition layer is located between the steel tube concrete column 1 and the reinforced concrete column 2, the transition layer structure includes the reinforced concrete column 2 and the embedded steel tube concrete column 1, the steel tube concrete column 1 includes a steel tube 8, the steel tube 8 has a large diameter at the bottom and a small diameter at the top, and the cross section gradually decreases from bottom to top, and bolts 6 are arranged on the outer circumference of the steel tube 8 to enhance the integrity of the structural member. In addition, the transition layer includes ring beams 3 respectively arranged at the bottom beam-column node of the transition layer column and the top beam-column node of the transition layer column, and beam reinforcement 7 is arranged at the top of the ring beam 3 at the top beam-column node of the transition layer column, and the top of the steel tube 8 extends to the bottom of the beam reinforcement 7.

[0014] Furthermore, the ring beam 3 is a reinforced concrete ring beam.

[0015] Furthermore, a ring plate 5 is provided inside the top of the steel pipe 8 with a variable cross-section, and the self rigidity is improved by the additional ring plate 5 .

[0016] Furthermore, a reinforcing ring 4 is provided on the outer side of the variable-section bottom of the steel pipe 8 to improve the integrity of the beam-column node.

[0017] When the utility model is used, the cross-sectional dimensions and reinforcement of the steel tube concrete column 1 and the reinforced concrete column 2 are first determined according to the overall structural calculation, then the cross-sectional dimensions of the steel tube 8 are selected according to the calculation results of the transition layer, and then the cross-sectional change rate at the cross-sectional change of the steel tube 8 is determined, and finally the dimensions and quantity of the studs 6 are calculated according to the bending and shear bearing capacity requirements. All the above calculations should be based on the structural requirements in accordance with the specifications.

[0018] The above is only a preferred embodiment of the present invention. It should be pointed out that those skilled in the art can make several changes and improvements without departing from the overall concept of the present invention, and these should also be regarded as the protection scope of the present invention.

Claims

1. A new type of transition layer structure between steel tube concrete column and reinforced concrete column, characterized by: The transition layer is located between a steel tube concrete column (1) and a reinforced concrete column (2), the transition layer structure comprises a reinforced concrete column (2) and an embedded steel tube concrete column (1), the steel tube concrete column (1) comprises a steel tube (8), the steel tube (8) has a large diameter at the bottom and a small diameter at the top, and the cross section gradually decreases from bottom to top, bolts (6) are arranged on the outer circumference of the steel tube (8); and it also comprises ring beams (3) respectively arranged on the transition layer column bottom beam-column nodes and the transition layer column top beam-column nodes, and beam surface reinforcement (7) is arranged on the top of the ring beam (3) on the transition layer column top beam-column nodes, and the top of the steel tube (8) extends to the bottom of the beam surface reinforcement (7).

2. The novel steel tube concrete column and reinforced concrete column transition layer structure according to claim 1 is characterized by: The ring beam (3) is a reinforced concrete ring beam.

3. The new steel tube concrete column and reinforced concrete column transition layer structure according to claim 1 is characterized by: A ring plate (5) is arranged on the inner side of the top of the steel pipe (8) with a variable cross section.

4. The novel steel tube concrete column and reinforced concrete column transition layer structure according to claim 1 is characterized by: A reinforcement ring (4) is arranged on the outer side of the variable cross-section bottom of the steel pipe (8).