Assembling type water surface photovoltaic installation operation platform
By designing the assembly waterfolier installation operation platform, the motor drives the screw rod to achieve the lifting of the scissors -type lifting frame, and improves the stability and drainage efficiency of the platform through drainage components and supporting reinforcement components. The lack of drainage and stability achieves higher safety and use efficiency.
Patent Information
- Application Number
- CN202420912341.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-04-29
AI Technical Summary
The existing surface working platform does not have good support and positioning when used. It is troublesome to use a water suction pump to drain water when draining, and has low stability and poor early warning performance.
Design a kind of assembly water surface photovoltaic installation operation platform, including water storage cavity, scissors -type lifting frames and top boards. The positioning rod is used to slide the positioning rod by setting up the motor to achieve the lifting of the scissors of the scissors. Components and supporting reinforcement components improve the stability and drainage efficiency of the platform.
Achieve the good support positioning work of the platform, simplify the drainage process, improve the stability and early warning performance of the platform, and ensure the safety of under strong storms.
Smart Images

Figure CN222413979U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water surface operations, in particular to an assembled water surface photovoltaic installation operation platform. Background Art
[0002] 1. The height of the above-mentioned working platform is fixed, and it can neither realize uniform lifting and lowering adjustment nor adjust the heights on both sides separately to realize gradient use. Therefore, its scope of application is relatively limited. The weight of the main floating block cannot be automatically adjusted. When small wind and waves appear on the water surface, it cannot realize automatic water intake and drainage to achieve the purpose of overall stability. Therefore, its stability is low. When the wind speed on the water surface is high, the environment in which the platform is located is risky. The above-mentioned device cannot issue an alarm in time, so its early warning performance is poor.
[0003] In the patent with publication number CN112389597A, an assembled water surface photovoltaic installation work platform is proposed, which includes a hollow plate, a water inlet pipe, a water suction pump, a water inlet valve, a first filter, a drain valve, a floating airbag, a double scissor lift, a second rotating shaft, an upper pulley, an alarm, a bearing seat, a rotating shaft, a blade, a speed sensor, and a controller. The first platform and the second platform can realize synchronous lifting and can also realize gradient lifting at different heights, so that it is convenient for workers to use the work platform for water surface photovoltaic installation, which is more convenient to use and has a wider range of applications. The hollow plate is wide, so that the first platform and the second platform can float on the water surface. At the same time, a water storage tank is also arranged inside the hollow plate, and the water storage tank is connected with a water inlet pipe and a drainage pipe. A rotatable blade is arranged on the side of the second platform, and a speed sensor is arranged on the rotating shaft on which the blade is installed. When the wind speed on the water surface is greater, the blade rotates faster, and the value detected by the speed sensor is greater, and this information is sent to the controller in real time. The controller controls the water suction pump and the drainage pump to operate according to different powers respectively, so as to adjust the water amount in the water storage tank. When the wind speed is greater, the speed sensor measures a greater value, and the storage tank is The larger the water storage capacity in the water tank, the heavier the weight of the hollow board is, the more stable the overall structure is, and the small wind and waves on the water surface are effectively dealt with, which is safer. When the wind speed on the water surface is too high and the water in the water tank is full, the water will drive the float to rise, thereby triggering the first switch and the second switch. After the first switch is triggered, the control alarm is activated to promptly remind relevant personnel to avoid risks. After the second switch is triggered, the control hydraulic cylinder is activated to contract the hydraulic cylinder and drive the first platform and the second platform to lower, so as to avoid excessive risks when personnel stand high in strong winds and waves. Therefore, the platform height is forcibly lowered to ensure safety. The patent has higher safety and eliminates dangerous operations. The first platform and the second platform can be raised and lowered synchronously or independently. The water storage capacity in the bottom hollow plate will be automatically adjusted according to the wind speed. The greater the wind speed, the greater the water storage capacity, and the overall stability will be higher. When the wind speed exceeds the set value, the water storage tank is filled with water and the first switch and the second switch are triggered. On the one hand, the alarm is activated, and on the other hand, the hydraulic cylinder drives the first and second platforms to be forced to lower, so as to avoid excessive risks caused by people standing high in strong winds and waves. The patent has higher safety and is very worthy of promotion. However, the following problems still exist in the patent:
[0004] The existing water surface working platform does not have good support and positioning performance when in use, and it is troublesome to use a water suction pump to drain water when draining water.
[0005] In view of the above problems, it is necessary to design an assembled surface photovoltaic installation operation platform to overcome the above problems. Utility Model Content
[0006] The main purpose of the utility model is to provide an assembled water surface photovoltaic installation operation platform, which can effectively solve the problems in the background technology.
[0007] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0008] An assembled water surface photovoltaic installation work platform comprises a water storage chamber, a scissor-type lifting frame and a top plate, wherein the top of the water storage chamber is provided with a scissor-type lifting frame, the top of the scissor-type lifting frame is provided with a top plate, and a drainage component is provided inside the water storage chamber;
[0009] The drainage assembly comprises a bottom plate arranged at the bottom of the water storage chamber, connecting rods are installed at the four corners of the top of the bottom plate, and a positioning frame is installed on the top of the four connecting rods, water storage pipes are installed at the left and right ends of the interior, and drainage ports are arranged at the front and rear ends of the left and right sides of the two water storage pipes, and the front and rear ends of the inner wall of the positioning frame are connected to a plurality of limiting rods, and the inner sides of the plurality of limiting rods are provided with drainage boards, and the top of the drainage board is provided with a water storage port;
[0010] A support and reinforcement assembly is provided on the top of the top plate, and the support and reinforcement assembly includes support plates installed at both the front and rear ends of the top of the top plate, guide frames are installed at the front and rear ends of the tops of the two support plates, and top rods are installed at the left and right ends of the tops of the two support plates. The tops of the four top rods pass through the tops of the guide frames and are equipped with reinforcement rods. The front and rear surfaces of the four reinforcement rods are equipped with reinforcement blocks, the tops of the four reinforcement blocks are equipped with locking shafts, the tops of the four locking shafts are equipped with working platforms, and the inner sides of two adjacent reinforcement rods are equipped with reinforcement strips;
[0011] A motor is arranged at the upper end of the left side of the water storage chamber, a screw rod is arranged at the right side of the motor, a slider is arranged on the outer wall of the screw rod, positioning rods are arranged on the front and rear sides of the slider, and sliding grooves are arranged at the front and rear ends of the top of the water storage chamber.
[0012] As a preferred solution of the utility model, the water storage chamber is detachably connected to the bottom plate, the bottom plate is detachably connected to the four connecting rods, the four connecting rods are detachably connected to the positioning frame, and the positioning frame is detachably connected to the multiple limit rods.
[0013] As a preferred solution of the utility model, the plurality of limit rods are detachably connected to the drain board, the positioning frame is detachably connected to the two water storage pipes, the interiors of the two water storage pipes penetrate the interiors of the plurality of limit rods, and the interiors of the plurality of limit rods penetrate the interior of the drain board.
[0014] As a preferred solution of the utility model, the support plate is detachably connected to a plurality of push rods, and the plurality of push rods are detachably connected to a guide frame, and the top of the guide frame contacts the bottom of the four reinforcement blocks.
[0015] As a preferred solution of the utility model, the top rod is detachably connected to the four reinforcement rods, the four reinforcement rods are detachably connected to the multiple reinforcement blocks, the multiple locking shafts are detachably connected to the working platform, and the front and rear surfaces of the reinforcement strip block are in contact with the inner side surfaces of the four reinforcement rods.
[0016] As a preferred solution of the utility model, the motor is transmission-connected to the screw rod, the screw rod is detachably connected to the slider, the slider is detachably connected to the two positioning rods, and the positioning rods slide in the slide grooves and are detachably connected. Beneficial Effects
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] 1. The assembled water surface photovoltaic installation work platform uses a motor to drive the screw rod to operate, so that the positioning rod slides in the slide groove to realize the lifting and use of the scissor-type lifting frame. The drain plate is convenient for draining the water in the water storage chamber, and there is sufficient time for drainage. The limit rod is convenient for the installation of the drain plate and the positioning frame. The two water storage pipes are convenient for draining the water in the water storage port. The top rod reinforces the connection between the guide frame and the four reinforcement blocks. The four locking shafts are convenient for installing the work platform while improving the stability of use. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the screw rod structure of the utility model;
[0021] Figure 3 It is a structural schematic diagram of the drainage board of the utility model;
[0022] Figure 4 It is a schematic diagram of the locking shaft structure of the utility model.
[0023] In the figure: 1. water storage chamber; 2. scissor-type lifting frame; 3. top plate; 4. drainage assembly; 5. support reinforcement assembly; 6. motor; 7. screw rod; 8. slider; 9. positioning rod; 10. slide groove; 401. bottom plate; 402. connecting rod; 403. positioning frame; 404. water storage pipe; 405. drainage outlet; 406. limiting rod; 407. drainage board; 408. water storage outlet; 501. support plate; 502. top rod; 503. guide frame; 504. reinforcement rod; 505. reinforcement block; 506. locking shaft; 507. reinforcement strip; 508. working platform. DETAILED DESCRIPTION
[0024] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0025] like Figure 1-4 As shown, an assembled water surface photovoltaic installation work platform includes a water storage chamber 1, a scissor-type lifting frame 2 and a top plate 3. The scissor-type lifting frame 2 is arranged on the top of the water storage chamber 1, the top plate 3 is arranged on the top of the scissor-type lifting frame 2, and a drainage component 4 is arranged inside the water storage chamber 1;
[0026] The drainage assembly 4 includes a bottom plate 401 arranged at the bottom of the water storage chamber 1, connecting rods 402 are installed at the four corners of the top of the bottom plate 401, and positioning frames 403 are installed on the tops of the four connecting rods 402. Water storage pipes 404 are installed at the left and right ends of the inside, and drainage ports 405 are arranged at the front and rear ends of the left and right sides of the two water storage pipes 404. The front and rear ends of the inner wall of the positioning frame 403 are connected to multiple limiting rods 406, and the inner sides of the multiple limiting rods 406 are provided with drainage plates 407. The top of the drainage plate 407 is provided with a water storage port 408;
[0027] A support reinforcement assembly 5 is provided on the top of the top plate 3. The support reinforcement assembly 5 includes support plates 501 installed at both the front and rear ends of the top of the top plate 3, guide frames 503 installed at both the front and rear ends of the tops of the two support plates 501, top rods 502 installed at both the left and right ends of the tops of the two support plates 501, reinforcement rods 504 installed at the tops of the four top rods 502 passing through the tops of the guide frames 503, reinforcement blocks 505 installed on the front and rear sides of the four reinforcement rods 504, locking shafts 506 installed on the tops of the four reinforcement blocks 505, working platforms 508 installed on the tops of the four locking shafts 506, and reinforcement strips 507 installed on the inner sides of two adjacent reinforcement rods 504;
[0028] A motor 6 is provided at the upper end of the left side of the water storage chamber 1, a screw rod 7 is provided at the right side of the motor 6, a slider 8 is provided on the outer wall of the screw rod 7, and positioning rods 9 are provided on the front and rear sides of the slider 8. A slide groove 10 is provided at both the front and rear ends of the top of the water storage chamber 1;
[0029] The water storage chamber 1 is detachably connected to the bottom plate 401, the bottom plate 401 is detachably connected to the four connecting rods 402, the four connecting rods 402 are detachably connected to the positioning frame 403, the positioning frame 403 is detachably connected to the plurality of limiting rods 406, the plurality of limiting rods 406 are detachably connected to the drainage board 407, the positioning frame 403 is detachably connected to the two water storage pipes 404, the interiors of the two water storage pipes 404 are penetrated by the interiors of the plurality of limiting rods 406, the interiors of the plurality of limiting rods 406 are penetrated by the interiors of the drainage board 407, the support plate 501 is detachably connected to the plurality of top rods 502, and the plurality of top rods 50 2 is detachably connected to the guide frame 503, the top of the guide frame 503 is in contact with the bottom of the four reinforcement blocks 505, the top rod 502 is detachably connected to the four reinforcement rods 504, the four reinforcement rods 504 are detachably connected to the multiple reinforcement blocks 505, the multiple locking shafts 506 are detachably connected to the working platform 508, the front and rear surfaces of the reinforcement strip 507 are in contact with the inner side surfaces of the four reinforcement rods 504, the motor 6 is transmission-connected to the screw rod 7, the screw rod 7 is detachably connected to the slider 8, the slider 8 is detachably connected to the two positioning rods 9, the positioning rods 9 slide in the slide groove 10 and are detachably connected;
[0030] Among them, the motor 6 is set to drive the screw rod 7 to operate, so that the positioning rod 9 slides in the slide groove 10, and the scissor-type lifting frame 2 is lifted and lowered. The drain plate 407 is set to facilitate the drainage of the water source in the water storage chamber 1, and there is sufficient time for drainage. The limit rod 406 is set to facilitate the installation of the drain plate 407 and the positioning frame 403. The two water storage pipes 404 are set to facilitate the drainage of water in the water storage port 408. The top rod 502 is set to reinforce the connection between the guide frame 503 and the four reinforcement blocks 505. The four locking shafts 506 are set to facilitate the installation of the working platform 508 while improving the stability of use.
[0031] It should be noted that the utility model is an assembled water surface photovoltaic installation work platform. When the working platform 508 is used on the water surface, water is stored in the water storage chamber 1 according to the size of the wind and waves. The water storage port 408 arranged on the top of the drain plate 407 is used to transport water to the two water storage pipes 404 through multiple limit rods 406, and the water is discharged outward from the drain port 405, which is convenient for installation and use. The motor 6 drives the slider 8 to slide on the outer wall of the screw rod 7, so that the two positioning rods 9 slide in the slide groove 10 to adjust the lifting height of the scissor-type lifting frame 2. The two reinforcement strips 507 are locked and installed with multiple reinforcement blocks 505 through multiple locking shafts 506 to improve the stability of use. The two reinforcement strips 507 support the use of the working platform 508. Multiple top rods 502 connect and reinforce the guide frame 503 with multiple reinforcement blocks 505 to improve the stability of use of the working platform 508.
[0032] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. An assembled water surface photovoltaic installation operation platform, comprising a water storage chamber (1), a scissor-type lifting frame (2) and a top plate (3), characterized in that: A scissor-type lifting frame (2) is arranged on the top of the water storage chamber (1), a top plate (3) is arranged on the top of the scissor-type lifting frame (2), and a drainage component (4) is arranged inside the water storage chamber (1); The drainage assembly (4) comprises a bottom plate (401) arranged at the bottom of the water storage chamber (1), connecting rods (402) are installed at the four corners of the top of the bottom plate (401), positioning frames (403) are installed on the tops of the four connecting rods (402), water storage pipes (404) are installed at the left and right ends of the interior, and drainage ports (405) are arranged at the front and rear ends of the left and right sides of the two water storage pipes (404), and the front and rear ends of the inner wall of the positioning frame (403) are connected to a plurality of limiting rods (406), and drainage plates (407) are arranged on the inner sides of the plurality of limiting rods (406), and a water storage port (408) is arranged on the top of the drainage plate (407); A support reinforcement assembly (5) is provided on the top of the top plate (3), and the support reinforcement assembly (5) comprises support plates (501) installed at both the front and rear ends of the top of the top plate (3), guide frames (503) installed at both the front and rear ends of the tops of the two support plates (501), top rods (502) installed at both the left and right ends of the tops of the two support plates (501), reinforcement rods (504) installed at the tops of the four top rods (502) penetrating through the tops of the guide frames (503), reinforcement blocks (505) installed on the front and rear surfaces of the four reinforcement rods (504), locking shafts (506) installed at the tops of the four reinforcement blocks (505), working platforms (508) installed at the tops of the four locking shafts (506), and reinforcement strips (507) installed on the inner side surfaces of two adjacent reinforcement rods (504); A motor (6) is arranged at the upper end of the left side of the water storage chamber (1), a screw rod (7) is arranged at the right side of the motor (6), a slider (8) is arranged on the outer wall of the screw rod (7), positioning rods (9) are arranged on the front and rear sides of the slider (8), and sliding grooves (10) are arranged at the front and rear ends of the top of the water storage chamber (1).
2. The assembled water surface photovoltaic installation operation platform according to claim 1 is characterized by: The water storage chamber (1) is detachably connected to the bottom plate (401), the bottom plate (401) is detachably connected to the four connecting rods (402), the four connecting rods (402) are detachably connected to the positioning frame (403), and the positioning frame (403) is detachably connected to the plurality of limiting rods (406).
3. The assembled water surface photovoltaic installation operation platform according to claim 1, characterized in that: The plurality of limit rods (406) are detachably connected to the drainage board (407), the positioning frame (403) is detachably connected to the two water storage pipes (404), the interiors of the two water storage pipes (404) penetrate the interiors of the plurality of limit rods (406), and the interiors of the plurality of limit rods (406) penetrate the interior of the drainage board (407).
4. The assembled water surface photovoltaic installation operation platform according to claim 1, characterized in that: The support plate (501) is detachably connected to the plurality of top rods (502), the plurality of top rods (502) is detachably connected to the guide frame (503), and the top of the guide frame (503) is in contact with the bottoms of the four reinforcement blocks (505).
5. The assembled water surface photovoltaic installation operation platform according to claim 1, characterized in that: The top rod (502) is detachably connected to the four reinforcement rods (504), the four reinforcement rods (504) are detachably connected to the plurality of reinforcement blocks (505), the plurality of locking shafts (506) are detachably connected to the working platform (508), and the front and rear surfaces of the reinforcement strip block (507) are in contact with the inner side surfaces of the four reinforcement rods (504).
6. The assembled water surface photovoltaic installation operation platform according to claim 1, characterized in that: The motor (6) is transmission-connected to the screw rod (7), the screw rod (7) is detachably connected to the slider (8), the slider (8) is detachably connected to the two positioning rods (9), and the positioning rods (9) slide in the slide grooves (10) and are detachably connected.
Citation Information
Patent Citations
Assembled water surface photovoltaic installation operation platform
CN112389597A