Dike piping danger disposal skill assessment device

Through the design of the technical assessment device of the dyke control rush, solve the problem of difficult, not intuitive, difficult to operate single soldiers in the existing technologies, solve the effects of performing single -person practical assessment and simulation pipe risks in the room in the room Essence

CN222421141UActive Publication Date: 2025-01-28江苏省防汛防旱抢险中心(江苏省防汛抢险训练中心)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420874405.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-01-28
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively solve the skill assessment of dike pipe surge dangers, especially in individual operations and on-site practical operation of senior commanders, which lacks real scene reproduction and systematic training.

Method used

A kind of technical assessment device for dyke tube surge is designed, including operating desks, water circulation components, and dangerous disposal props. The operation desk simulates soil dykes. The water circulation component simulates the danger of pipes through mud pools and mud pumps. The dangerous sentiment setting props include soil bag fence and gravel filter layers for simulation and training measures.

Benefits of technology

This device can conduct single -person practical assessment indoors, simulate the dangers of pipelines and conduct relevant nursing methods tests, improve the intuition and systemicity of skill assessment, and is suitable for the training of flood control rescue players and senior commanders.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222421141U_ABST
    Figure CN222421141U_ABST
Patent Text Reader

Abstract

The utility model discloses an embankment piping danger disposal skill assessment device, and belongs to the technical field of flood prevention emergency assessment equipment. The device is characterized by comprising an operation table which comprises a supporting frame and a soil embankment; the water circulation assembly comprises a slurry pool, a slurry pump, a piping opening, a water return groove and a water return pipe; the mud pump is connected with a piping port through a water inlet pipe; the piping port penetrates through the ground near the dike foot; the water return groove is arranged along the outer side of the soil embankment; the water return pipe is communicated with the water return groove and the slurry pool; the dangerous case disposal tool comprises a soil bag trunk, a gravel filtering layer and a PVC pipe. The soil bag trunk is formed by stacking mini soil bags in a staggered joint mode with a piping opening as the center, the gravel filtering layer is laid in the soil bag trunk, and the PVC pipe penetrates through the side wall of the soil bag trunk and is located above the gravel filtering layer. According to the utility model, the problem of single-soldier examination for flood fighting team members and commanders in the prior art is solved, and the device is suitable for indoor single-soldier practical operation examination, piping dangerous case simulation and related rescue method tests for dike piping dangerous cases.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a dike piping danger handling skill assessment device, belonging to the technical field of flood control and emergency rescue assessment equipment. Background Art

[0002] Piping refers to the phenomenon that soil particles are carried out by seepage and destroyed. The development of piping danger is the most rapid in soil flow. Its process is that as the water level rises, the sand and soil carried out by the gushing water increase, and the amount of gushing water also increases. As the amount of gushing water increases, more sand and soil are carried out. If the sand layer under the foundation of the nearby embankment (gate) is emptied, it will cause the embankment (gate) to drop suddenly, and even cause the disaster of dam breach.

[0003] The principle of emergency rescue of pipe bursts should be to prevent the gushing water from carrying sand, but to leave a way for water to seep out. This will not only prevent the sand layer from being damaged, but also reduce the nearby seepage pressure, so that the danger can be controlled and stabilized. The training subjects for emergency rescue of pipe bursts on embankments lack real scene reproduction, lack systematic training and assessment, and require a large number of labor forces to complete. It is not suitable for individual operations of flood control and rescue team members and on-site operations of senior commanders. The training intensity is high and it is easy to hurt people. Utility Model Content

[0004] In order to solve the technical problems that the skill assessment of dike piping hazard is difficult, non-intuitive, difficult for single soldiers to operate, and difficult for senior commanders to operate, the utility model provides a dike piping hazard handling skill assessment device.

[0005] The technical solution of the utility model is as follows:

[0006] A device for assessing skills in handling dangerous situations of pipe bursts in dikes, characterized in that it comprises:

[0007] The operating platform includes a support frame and an earthen embankment; the support frame includes a support platform and four support legs located below the support platform; the earthen embankment is laid on the support platform, including the embankment and the ground near the embankment foot; the embankment is provided with an embankment pile number sign;

[0008] A water circulation component includes a mud pool, a mud pump, a water inlet pipe, a pipe gushing port, a return water trough, and a return water pipe; the mud pool is arranged below the supporting platform, and a mixer is arranged in the mud pool; the mud pump is located in the mud pool, and the mud pump is connected to the pipe gushing port through the water inlet pipe; the pipe gushing port penetrates the ground near the foot of the embankment and is flush with the top of the ground; the return water trough is arranged on the supporting platform and arranged along the outer side of the earthen embankment, and the return water pipe is connected to the return water trough and the mud pool respectively;

[0009] Dangerous situation handling props (i.e., assessment props) include earthbag enclosures, gravel filter layers, and PVC pipes; the earthbag enclosures are stacked with mini earthbags staggered around the pipe burst outlet, the gravel filter layer is laid in the earthbag enclosures, and the PVC pipe runs through the side walls of the earthbag enclosures and is located above the gravel filter layer. The gravel filter layer includes a coarse sand layer, a small gravel layer, and a large gravel layer, and the top of the earthbag enclosure is higher than the top of the gravel filter layer.

[0010] The return water trough is a U-shaped structure, surrounding the edge of the earthen embankment. The return water trough is formed by a water retaining plate arranged along the edge of the earthen embankment, the water retaining plate is kept at a certain distance from the side of the earthen embankment, and the top of the water retaining plate is higher than the ground near the embankment foot.

[0011] When in use, add appropriate mud liquid into the mud pool under the operating table and stir it evenly with a mixer to make the mud and sand uniform. The mud liquid is transported to the pipe outlet through the water inlet pipe by a mud pump, forming a soil flow or pipe burst hazard. The emitting liquid overflows to the return water tank through the platform, and falls back to the mud pool through the return water pipe, forming a circulating pipe burst hazard.

[0012] When dealing with dangerous situations:

[0013] 1. Trainees observe the dangerous points of pipe bursts on the dike (i.e. pipe burst openings) and the pile number signs on the dike, record the dangerous conditions of pipe bursts, measure the diameter of pipe burst openings, and calculate the inner wall diameter of the earthbag enclosure, the bottom paving range, and the base clearing range;

[0014] 2. Use mini earthbags to stack the earthbags along the diameter range of the inner wall of the well, with the mouths of the earthbags stacked downward and staggered to form a pipe well;

[0015] 3. After the earthbags are stacked around the well, fill the well with coarse sand, small gravel and large gravel layers according to the direction of water seepage. After waiting for the clear water to emerge, arrange a PVC pipe as a drain on the top of the clear water to drain the seepage water.

[0016] 4. On-site examiners can accurately assign points and comments on individual assessments based on the students' handling effects and processes of pipe burst hazards. The key points of the assessment include: measurement of pipe burst outlets; determination of base clearing range and earthbag paving range; determination of well enclosure height, earthbag width and stability; selection of sand and gravel filter materials and layered laying; setting of drainage outlets and layout directions.

[0017] The utility model is a skill assessment device for handling embankment pipe burst hazards, which is a special equipment for flood control and rescue assessment. It solves the existing individual assessment method for flood control and rescue team members and commanders, and is suitable for indoor single-person practical assessment of embankment pipe burst hazards, pipe burst hazard simulation, and related rescue method tests. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 It is a schematic diagram of the structure of the utility model;

[0020] Figure 3 It is a schematic diagram of laying out the dangerous situation handling props in the utility model;

[0021] In the figure: supporting platform 1, supporting legs 2, embankment 3, ground near the embankment foot 4, embankment pile number sign 5, mud pool 6, mud pump 7, mixer 8, water inlet pipe 9, pipe outlet 10, return water trough 11, return water pipe 12, earthbag well 13, PVC pipe 14, coarse sand layer 15, small gravel layer 16, large gravel layer 17, inner wall diameter of earthbag well 18. DETAILED DESCRIPTION

[0022] A device for assessing skills in handling dangerous situations of pipe bursts in dikes, comprising: an operating table, a water circulation component, and dangerous situation handling props, wherein:

[0023] 1. Operating platform, including support frame and earth embankment.

[0024] The support frame includes a support platform 1 and four support legs 2 located below the support platform.

[0025] The earth embankment is laid on a supporting platform, including an embankment 3 and the ground 4 near the embankment foot. An embankment pile number sign 5 is provided on the embankment.

[0026] 2. Water circulation components, including a mud pool 6, a mud pump 7, a mixer 8, a water inlet pipe 9, a pipe outlet 10, a return water tank 11, and a return water pipe 12.

[0027] The mud pool is set under the supporting platform, and a mixer and a mud pump are installed in the mud pool; the mud pump is connected to the pipe outlet through an inlet pipe; the pipe outlet runs through the ground near the foot of the embankment and is flush with the top of the ground.

[0028] The return water trough is set on the supporting platform. The return water trough is arranged along the edge of the earth embankment by a water retaining plate to form a U-shaped structure. The water retaining plate keeps a certain distance from the side of the earth embankment, and the top of the water retaining plate is higher than the ground near the foot of the embankment.

[0029] The return pipe is connected to the return tank and the mud pool respectively.

[0030] 3. Dangerous situation handling props (i.e. assessment props) include earthbag surrounding well 13, sand and gravel filter layer, and PVC pipe 14; the sand and gravel filter layer includes coarse sand layer 15, small gravel layer 16, and large gravel layer 17.

[0031] According to the assessment points, the diameter of the pipe mouth is measured, and the inner wall diameter of the earthbag enclosure, the bottom paving range and the base clearing range are calculated; mini earthbags are used to stack the earthbag enclosure along the inner wall diameter range line of the enclosure, and the earthbag enclosure is stacked downward and staggered to form a pipe well; after the earthbag enclosure is stacked, fill the well with coarse sand layer, small gravel layer and large gravel layer according to the direction of water seepage, wait for clear water to emerge, and arrange PVC pipes on the upper part of the clear water (side wall of the earthbag enclosure) as drains to drain the seepage water.

Claims

1. A device for assessing the skills of handling dangerous situations of pipe bursts in dikes, characterized in that: include: The operating platform includes a support frame and an earthen embankment; the support frame includes a support platform and four support legs located below the support platform; The earth embankment is laid on a supporting platform, including the embankment and the ground near the embankment foot; A water circulation component includes a mud pool, a mud pump, a water inlet pipe, a pipe burst port, a return water trough, and a return water pipe; the mud pool is arranged below the support platform, the mud pump is located in the mud pool, and the mud pump is connected to the pipe burst port through the water inlet pipe; the pipe burst port penetrates the ground near the foot of the embankment and is flush with the top of the ground; the return water trough is arranged on the support platform and along the outer side of the earthen embankment, and the return water pipe is connected to the return water trough and the mud pool respectively; Dangerous situation handling tools include an earthbag enclosure, a gravel filter layer, and a PVC pipe; the earthbag enclosure is formed by mini earthbags stacked with staggered seams around a pipe burst outlet, the gravel filter layer is laid in the earthbag enclosure, and the PVC pipe penetrates the side wall of the earthbag enclosure and is located above the gravel filter layer.

2. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 1 is characterized in that: The embankment is provided with an embankment pile number sign.

3. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 1 is characterized in that: A mixer is arranged in the mud pool.

4. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 1 is characterized in that: The return water trough is a U-shaped structure, surrounding the edge of the earthen embankment.

5. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 4 is characterized in that: The return water channel is formed by arranging a water retaining plate along the edge of the earthen embankment. The water retaining plate is kept at a certain distance from the side of the earthen embankment, and the top of the water retaining plate is higher than the ground near the embankment foot.

6. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 1 is characterized in that: The sand and gravel filtering layer comprises a coarse sand layer, a small gravel layer and a large gravel layer.

7. The device for assessing the skills of handling dangerous situations of pipe bursts in dikes according to claim 6 is characterized in that: The top of the earth bag enclosure is higher than the top of the sand and gravel filter layer.