Roof lifting device

By designing a roof crane device suitable for high-rise buildings, the problem of insufficient existing technology in special space applications is solved, and flexible installation and efficient use in limited spaces are achieved.

CN222433989UActive Publication Date: 2025-02-07SHANDONG FENGHUI EQUIP TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420495134.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2025-02-07
Estimated Expiration
2034-03-13

AI Technical Summary

Technical Problem

The existing roof crane structures are not sufficient to meet the needs of installation and use in special space applications, especially in high-rise buildings with limited space.

Method used

A roof hanging device is designed, including columns, downward rods, upper pull rods, trapezoidal rods, guide pulleys, hooks and hoists. Through detachable connections and segmented design, it is adapted to the installation of different roof structures.

Benefits of technology

The device can be installed directly on the concrete beams of the existing house, the base is adjustable, and the hoist is independently installed, which can be adjusted according to the on-site situation, improving application flexibility and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222433989U_ABST
    Figure CN222433989U_ABST
Patent Text Reader

Abstract

The utility model discloses a roof lifting device which comprises a stand column, a lower pressing rod, an upper pull rod, a first diagonal draw bar, a second diagonal draw bar, a guide pulley, a lifting hook and a winch, the stand column is fixed to the crossed position of a cross beam of a roof through a stand column base, and the stand column base is connected with a first diagonal draw bar base through a first connecting rod; the stand column base is connected with a second diagonal draw bar base through a second connecting rod perpendicular to the first connecting rod, one end of the first diagonal draw bar is connected with the first diagonal draw bar base, the other end of the first diagonal draw bar is connected with the top of the stand column, one end of the second diagonal draw bar is connected with the second diagonal draw bar base, and the other end of the second diagonal draw bar is connected with the top of the stand column; the lower portion of the stand column is connected with a lower pressing rod, the upper portion of the stand column is connected with an upper pull rod, the lower pressing rod is hinged to the upper pull rod, and a hook is arranged at the hinged position and connected with a winch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lifting and hoisting, in particular to a novel roof hanging device suitable for special environments of high-rise buildings. Background Art

[0002] With the continuous development of society, the level of science and technology has been greatly improved, and many new roof structures have emerged. The roof structures are complex in shape and limited in space, and there is no longer sufficient space for the installation and application of roof cranes. In particular, for the installation and application of roof cranes, the existing roof crane structures are no longer suitable for special space applications and there is not enough space for installation and use. For example, the large-scale public construction project steel structure roof hoisting equipment disclosed in patent CN117430036A needs to be installed on one side of the building. Once the reserved space is insufficient, the equipment cannot be used. Utility Model Content

[0003] In view of the shortcomings of the technical problems raised in the above background, the utility model proposes a roof hanging device.

[0004] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:

[0005] An embodiment of the utility model provides a roof hanging device, including a column, a lower pressure rod, an upper pull rod, a first oblique pull rod, a second oblique pull rod, a guide pulley, a hook, and a winch. The column is fixed at the intersection of the cross beam of the roof through a column base, the column base is connected to the first oblique pull rod base through a first connecting rod, the column base is connected to the second oblique pull rod base through a second connecting rod perpendicular to the first connecting rod, one end of the first oblique pull rod is connected to the first oblique pull rod base, and the other end is connected to the top of the column, one end of the second oblique pull rod is connected to the second oblique pull rod base, and the other end is connected to the top of the column; the lower part of the column is connected to the lower pressure rod, the upper part is connected to the upper pull rod, and the lower pressure rod is hinged to the upper pull rod, a hook is set at the hinge position, and the hook is connected to the winch.

[0006] As a further technical solution, a guide pulley is arranged on the top of the column, and the wire rope of the winch passes around the guide pulley and is connected to the hook.

[0007] As a further technical solution, the first inclined tie rod base is fixed on one of the cross beams, and the second inclined tie rod base is fixed on the other of the cross beams.

[0008] As a further technical solution, the column includes multiple sections, and the multiple sections are connected by flanges and bolts.

[0009] As a further technical solution, the first inclined tie rod base includes two parts, and the two parts are detachably connected by bolts.

[0010] As a further technical solution, the second inclined tie rod base includes two parts, and the two parts are detachably connected by bolts.

[0011] As a further technical solution, the column base is detachably connected to the intersection of the cross beam.

[0012] As a further technical solution, the winch is fixed at the intersection of the cross beams of the roof through a winch base.

[0013] As a further technical solution, the lower pressure rod and the upper pull rod each include multiple sections, and the multiple sections are detachably connected.

[0014] As a further technical solution, the first oblique tie rod and the second oblique tie rod each include multiple sections, and the multiple sections are detachably connected.

[0015] As a further technical solution, the columns are provided with a plurality of connecting ears of the lower pressure rods and the upper pull rods, so as to realize the connection of the lower pressure rods and the upper pull rods at different positions to adapt to the installation on different roofs.

[0016] The beneficial effects of the above-mentioned embodiments of the utility model are as follows:

[0017] Compared with the prior art, the utility model provides a roof hanging device that can be directly installed on the concrete beams of an existing house. In order to better fix the roof hanging device, the utility model uses the cross concrete beams on the roof hanging base to fix each base with bolts. The base is adjustable and can adapt to different roof cross beams.

[0018] The winch is installed independently and can be adjusted according to the actual conditions on site, making it more practical.

[0019] The base and columns, lower pressure rods, upper pull rods and diagonal pull rods are designed in sections to reduce weight and facilitate installation.

[0020] The columns are equipped with multiple connecting ears for the lower pressure rods and the upper pull rods, which can realize the connection of the lower pressure rods and the upper pull rods at different positions to adapt to the installation of different roofs. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0022] Figure 1 Shown is a three-dimensional schematic diagram of the structure of the utility model;

[0023] Figure 2This is the structural front view of the utility model;

[0024] Figure 3 This is a schematic diagram of the base installation of the utility model;

[0025] Figure 4 This is a schematic diagram of the installation of the column of the utility model;

[0026] Figure 5 This is a schematic diagram of the installation of the inclined tie rod of the utility model;

[0027] Figure 6 This is a schematic diagram of the installation of the lower pressure rod and the upper pull rod of the utility model;

[0028] Figure 7 This is a schematic diagram of the installation of the winch of the utility model;

[0029] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for illustration only.

[0030] 1 base and column, 1-1 column base, 1-2 first inclined rod base, 1-3 second inclined rod base 1-4 column; 2 lower pressure rod, 3 upper pull rod, 4 inclined rod, 5 guide pulley, 6 winch, 7 hook, 8 roof cross beam. DETAILED DESCRIPTION

[0031] It should be noted that the following detailed descriptions are all illustrative and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0032] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or their combinations;

[0033] For the convenience of description, if the words "upper" and "lower" appear in the present invention, they only indicate that they are consistent with the upper and lower directions of the drawings themselves, and do not limit the structure. They are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0034] As introduced in the background technology, there are deficiencies in the prior art. In order to solve the above technical problems, the utility model proposes a roof hanging device and an installation and disassembly method thereof.

[0035] In a typical implementation of the present invention, Figure 2 As shown, this embodiment provides a roof hanging device, including a base and a column 1, a lower pressure rod 2, an upper pull rod 3, a first oblique pull rod 4-1, a second oblique pull rod 4-2, a guide pulley 5, a hook 6, and a winch 7. The base and the column 1 are fixed on the roof cross beam 8, the lower pressure rod 2, the upper pull rod 3, the oblique pull rod 4 and the base 1 are connected by a pin shaft, the guide pulley 5 is fixed to the guide pulley frame by a pin shaft, the pulley adopts maintenance-free bearings, has a long service life, and high safety and reliability, the hook 6 has a safety buckle to prevent slipping, and the hook head is a single hook type, and the winch 7 is composed of an electric motor, a brake, a reducer, a coupling, a drum, a wire rope, etc.

[0036] In a further technical solution, the base and column 1 include a column base 1-1, a first inclined rod base 1-2, a second inclined rod base 1-3 and a column 1-4, and the column base 1-1 is fixed to the roof cross concrete frame by bolt connection, and its structure is as follows Figure 3 As shown; the column base 1-1 is installed at the cross-intersection position of the cross concrete beam; the first inclined tie rod base 1-2 is connected to the column base 1-1 through the first connecting rod, the second inclined tie rod base 1-3 is connected to the column base 1-1 through the second connecting rod, and the first connecting rod and the second connecting rod are perpendicular to each other, the first inclined tie rod base 1-2 is fixed to one of the concrete beams, and the other second inclined tie rod base 1-3 is fixed to the other concrete beam; wherein the first inclined tie rod base 1-2 is connected to the first inclined tie rod 4, the second inclined tie rod base 1-3 is connected to the second inclined tie rod 4, the lower part of the column 1-4 is connected to one end of the lower pressure rod 2, and the upper part is connected to one end of the upper pull rod 3; and the other end of the lower pressure rod 2 is hinged to the other end of the upper pull rod 3, and a hook 7 is provided at the hinged position; the hook 7 is connected to the winch 6 through a wire rope, and the winch 6 is also fixed to the cross-intersection position of the roof cross beam through a winch base 6-1, see details Figure 7 A guide pulley is also provided at the top of the column 1-4.

[0037] As a further technical solution, the lower pressure rod 2, the upper pull rod 3, and the inclined pull rod 4 are designed in sections, and the sections are connected by circular flanges + bolt groups.

[0038] As a further technical solution, the column is provided with a plurality of connecting ears of the lower pressure rod and the upper pull rod to realize the connection of the lower pressure rod and the upper pull rod at different positions to adapt to the installation of different roofs. Specifically, different lifting angles can be adjusted according to on-site requirements.

[0039] As a further technical solution, the winch 6 adopts a wire rope winding method, and the hoisting motor drives the drum through a hard-toothed reducer to drive the wire rope to raise or lower the hook. The winch motor adopts a variable frequency motor and is equipped with a variable frequency speed control system. The winch has a self-braking system, a reliable braking system and an end travel limit device, and the electrical braking comes first and the mechanical braking comes later.

[0040] The installation and removal method of the above-mentioned roof hanging device is as follows:

[0041] Install the straight rod hanger, which consists of two parts: the base and the hanger. The base is fixed to the concrete beam by a hoop, and the straight rod hanger can be fixed in three directions. The hanger uses three 20 hemp ropes to pull the wind, and the other end of the hemp rope is fastened to the concrete column. A 1t chain hoist is hung on the upper end of the straight rod hanger as a hook.

[0042] Install the lower section of the column and the column base. The column is divided into 3 sections: the upper section, the middle section, and the lower end. The lower end of the lower section is connected to the base, and the upper end is connected to the middle section through a flange plate. The lower section of the column is hoisted into place using a straight rod hanger, and then the column base and the upper section of the column are connected by bolts and held on the concrete beam. Adjust the verticality of the lower section of the column and tighten the bolts.

[0043] Install the remaining bases, including the diagonal tie rod base and winch base. Each base is divided into 2 parts, which are connected by bolts to the concrete beam. Draw the position on the beam according to the size of the drawing and mark it. Place each base in the designated position. The base of the diagonal tie rod is temporarily connected with bolts and the connecting rod of the vertical pole base and the diagonal bar base is installed. Only the bolts are connected without tightening. Tighten and plug after the diagonal tie rod is installed.

[0044] Install the middle section and upper section of the column. The upper end of the upper section contains a guide pulley frame and a lightning rod, and the lower end is connected to the middle section through a flange plate. The two ends of the middle section are connected and fixed to the upper and lower sections respectively through flanges. The middle section and lower section of the column are installed in place using straight rod hangers, and the bolts connecting the base and the middle section are tightened. The guide pulley of the upper section is installed on the ground, and after assembly, it is installed in place using a straight rod hanger. The lightning rod is not installed for the time being, and the lightning rod will be installed after everything is completed.

[0045] Install the diagonal tie rod, the upper end is connected to the column through the pin shaft, and the lower end is connected to the corresponding base through the pin shaft. The diagonal tie rod is hoisted into place by a straight rod.

[0046] The installation of the down-pressure rod 2 is divided into 3 sections. The lower section is connected to the column through a pin shaft, and the lower section is connected to the middle section through a flange with bolts. The lower end of the upper section is connected to the middle section through a flange with bolts, the upper section is connected to the column through a pin shaft, and the middle section is connected to the upper section and the lower end through a flange. Assemble the middle section and the upper section of the down-pressure rod on the ground, tighten the flange connection bolts and complete the installation of the down-pressure rod head pulley.

[0047] The upper pull rod 3 is divided into two parts, the upper section is connected to the lower pressure rod through a pin, the lower section is connected to the column through a pin, and the upper section and the lower section are connected by bolts. The upper pull rod is assembled on the ground and the upper pull rod pulley is assembled.

[0048] The lower pressure rod 2 and the upper pull rod 3 are integrally combined, the pins connecting the upper pull rod and the lower pressure rod are connected into a whole, and a slip rope is fastened to the head position of the lower pressure rod.

[0049] Use the inverted chain hoist at the upper end of the straight rod hanger to hang the lower pressure rod. The hanging point is 1.7m above the middle section of the lower pressure rod. Hang a slip rope at the lower end of the upper pull rod. The slip rope passes through the pulley at the head of the column, and the rope end is fixed on the roof beam.

[0050] Use the chain hoist to slowly raise the upper pull rod and the lower pressure rod. The lower pressure rod is supervised by a dedicated person, and the upper pull rod is slowly retracted through the pulley until it reaches the installation position. The upper pull rod is adjusted by sliding the rope (cooperating with the chain hoist) until the upper pull rod and the pin of the column are connected. The lower pressure rod is lifted to the installation position by the hoist at the upper end of the straight rod hanger and connected to the connecting pin with the column.

[0051] Install the winch 6, which is fastened to the roof beam by a clamp. After the winch is debugged, the lifting wire rope is threaded and tested. After the wire rope comes out of the drum, it first passes over the guide pulley at the top of the column from the upper end, goes down to the pulley at the root of the upper pull rod, and finally connects and fixes to the hook head through the pulley at the head of the lower pressure rod. After threading the rope, power on and test run to check the operation of each mechanism and the stability of the structure. Install equipment grounding and lightning protection equipment. The lightning protection facility is connected to the roof grounding grid by bolts. After the lifting equipment is installed, a load test is carried out according to the load to verify its steel structure strength and the stability of the crane.

[0052] The disassembly of hoisting equipment is the reverse process of its installation. The disassembly of hoisting equipment is carried out in the reverse process of installation.

[0053] The utility model has a compact structure, is simple to manufacture, and is easy to install and use. In order to better fix the roof crane device, the utility model uses the cross concrete beam on the roof crane base to fix it to the base through bolts. The base is adjustable and can adapt to different roof cross beams. The winch is installed independently and can be adjusted according to the actual conditions on site, which makes it more practical and further improves safety. The base and columns, lower pressure rods, upper pull rods and inclined rods are designed in sections to reduce weight and facilitate installation. The installation and disassembly method of the new roof crane is introduced. The installation and disassembly of the whole machine are completed manually, which saves costs, is more applicable, and is better used in some places where it is inconvenient for large equipment to enter.

[0054] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

[0055] Finally, it should be noted that relational terms such as first and second are merely used to distinguish one entity or operation from another entity or operation, but do not necessarily require or imply any actual relationship or order between these entities or operations.

[0056] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A roof hanging device, comprising a column, a lower pressure rod, an upper pull rod, a first inclined pull rod, a second inclined pull rod, a guide pulley, a hook and a winch, characterized in that: The column is fixed at the intersection of the cross beam of the roof through the column base, the column base is connected to the first inclined rod base through the first connecting rod, the column base is connected to the second inclined rod base through the second connecting rod perpendicular to the first connecting rod, one end of the first inclined rod is connected to the first inclined rod base, and the other end is connected to the top of the column, one end of the second inclined rod is connected to the second inclined rod base, and the other end is connected to the top of the column; the lower part of the column is connected to the lower pressure rod, the upper part is connected to the upper pull rod, and the lower pressure rod is hinged to the upper pull rod, a hook is set at the hinge position, and the hook is connected to the winch.

2. The roof hanging device according to claim 1, characterized in that: A guide pulley is arranged on the top of the column, and the wire rope of the winch passes around the guide pulley and is connected to the hook.

3. The roof hanging device according to claim 1, characterized in that: The first inclined tie rod base is fixed on one of the cross beams, and the second inclined tie rod base is fixed on the other of the cross beams.

4. The roof hanging device according to claim 1, characterized in that: The column comprises multiple sections, and the multiple sections are connected by flanges and bolts.

5. The roof hanging device according to claim 1, characterized in that: The first inclined tie rod base comprises two parts, which are detachably connected by bolts.

6. The roof hanging device according to claim 1, characterized in that: The second inclined tie rod base comprises two parts, which are detachably connected by bolts.

7. The roof hanging device according to claim 1, characterized in that: The column base is detachably connected to the intersection of the cross beam.

8. The roof hanging device according to claim 1, characterized in that: The hoist is fixed at the intersection of the cross beams of the roof through a hoist base.

9. The roof hanging device according to claim 1, characterized in that: The down-pressing rod, the up-pull rod, the first diagonal pull rod and the second diagonal pull rod each comprise a plurality of sections, and the plurality of sections are detachably connected.

10. The roof hanging device according to claim 1, characterized in that: The upright column is provided with a plurality of connecting ears of the down-pressing rods and the up-pull rods.