Multi-component alloy co-permeation equipment for long rod piece
By designing openable and closed furnace covers and detachable furnace tanks in multi-alloy co-penetration equipment, the difficulty of inserting and removing long rods in co-penetration processing is solved, and the operation efficiency and convenience are improved.
Patent Information
- Application Number
- CN202421277114.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-06-05
AI Technical Summary
The existing multi-alloy co-penetration equipment is difficult to efficiently handle long rods. The size of the long rods is large, which makes the length of the furnace tank difficult to insert and remove the long rods, and the heating furnace of the furnace tank The cover is heavy and lacks a suitable opening and closing cover control structure, which makes the operation time and effort consuming.
A heating furnace including a top open opening and an open-closed furnace cover is designed. The furnace cover is moved forward and rearward by a translation lifting device, and the furnace tank is detachable from the middle to meet the processing needs of the long rod.
Optimize the operation of the furnace cover by the translation lifting device, and improve the efficiency of the furnace tank insertion and removal in the heating furnace; through the detachable furnace tank design, the insertion and removal process of the long rods is simplified, and the operation is improved Convenience.
Smart Images

Figure CN222434597U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of alloy co-penetration equipment, in particular to a long rod multi-element alloy co-penetration equipment. Background Art
[0002] The multi-element alloy co-penetration process is used to treat the surface of metal parts, which can significantly improve the surface corrosion resistance of metal parts and is widely used in products such as thin plates and standard parts. At present, the multi-element alloy co-penetration process is usually carried out by the powder method. Specifically, the metal parts, multi-element alloy powders and additives are placed in a furnace pot, and a heating furnace is used to heat and raise the temperature during the rotation process. After a certain process time, the furnace pot is taken out of the heating furnace, and then the workpiece is taken out of the furnace pot.
[0003] For small metal parts, the aforementioned multi-element alloy co-infiltration process is easier to carry out, because small metal parts occupy a small volume and are easier to put into and take out of the furnace tank. However, for metal parts such as long rods, there are many inconveniences during the co-infiltration process. First, due to the long size of the long rod, the size of the furnace tank is also relatively long, which makes it difficult to put the long rod into and take out of the furnace tank; secondly, the longer furnace tank requires an extended heating furnace, so the furnace cover that is suitable for the heating furnace is also heavier. Due to the lack of a suitable control structure for opening and closing the cover, it is more time-consuming and laborious to put the furnace tank in before the process and take it out after the process.
[0004] In summary, it is necessary to develop and design a new type of long rod multi-element alloy co-infiltration equipment to solve the above-mentioned technical problems. Utility Model Content
[0005] The utility model aims to provide a long rod multi-element alloy co-infiltration device, which improves the convenience of inserting and removing the long rod into and from a furnace tank, and improves the efficiency of inserting and removing the furnace tank into a heating furnace.
[0006] The technical solution adopted by the utility model is: a long rod multi-element alloy co-diffusion equipment, including a heating furnace with an open top, a furnace cover that can be opened and closed is arranged on the top, and also includes a translation and lifting device for driving the furnace cover to move forward and backward and up and down; a furnace partition with a window is installed in the lower middle part of the furnace of the heating furnace, and a first roller and a second roller are installed in parallel below the furnace partition, the two rollers have multiple groups of supporting turntables and each group of supporting turntables is respectively located below each window of the furnace partition, and a rotary drive motor for driving the first roller and / or the second roller to rotate is also provided outside the heating furnace; a rotary furnace pot that can be split by the middle is placed on the first roller and the second roller, and the rotary furnace pot has multiple turntables and each turntable falls on each group of supporting turntables.
[0007] Preferably, the translational lifting device includes walking rails installed at both ends of the heating furnace, a translational drive assembly is installed between the end of the furnace cover and the walking rail on this side, and also includes a lifting drive assembly that drives the walking rail to move up and down and a limit assembly that limits the front and rear end positions of the furnace cover.
[0008] Preferably, the translation drive assembly includes two front and rear traveling wheels installed at the ends of the furnace cover, and a traveling drive motor for driving the traveling wheels is also installed at one end of the furnace cover.
[0009] Preferably, the lifting drive assembly includes a rear support located behind the heating furnace, a first hydraulic cylinder is installed on the top of the rear support, and a second hydraulic cylinder is installed on the top side of the heating furnace. The upper ends of the piston rods of the first hydraulic cylinder and the second hydraulic cylinder are fixedly connected to the walking track on this side, and also includes a hydraulic station.
[0010] Preferably, the limit assembly includes a rear limiter installed at the rear end of the furnace cover and a front limiter installed at the front end. A rear limit switch cooperating with the rear limiter is installed at the rear end of the walking track, and a front limit switch cooperating with the front limiter is installed at the front end.
[0011] Preferably, the rotary furnace tank is formed by splicing two furnace tank monomers, the furnace tank monomer includes a tank body with a feeding port, an outer end turntable is installed at the outer end of the tank body, and an inner end flange is installed at the inner end, the inner end flanges of the two furnace tank monomers are fixedly connected by bolts to form an intermediate turntable, and a feeding door is installed on the feeding port.
[0012] Preferably, a plurality of lifting ears are installed on the furnace pot body of the rotary furnace pot, and the rotary furnace pot is hoisted and transferred into the furnace of the heating furnace or hoisted and transferred out from the furnace by a crane on site.
[0013] Preferably, a step is further provided at the front of the heating furnace.
[0014] The advantages and positive effects of the utility model are:
[0015] The utility model provides a long rod multi-element alloy co-infiltration equipment with a reasonable structural design, which is suitable for co-infiltration processing of metal parts such as long rods. By setting a translation lifting device that can drive the furnace cover to move forward and backward and up and down, when the furnace pot is placed in the heating furnace and the furnace pot is taken out of the heating furnace after the process time is reached, the heavy furnace cover can be controllably displaced by the translation lifting device, thereby improving the operating efficiency. By enabling the furnace pot to be split from the middle, when a metal part such as a long rod is placed in the furnace pot and when the long rod is taken out of the furnace pot, the convenience of placing and taking out the long rod into and from the furnace pot can be improved by splitting the longer furnace pot. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a main structural schematic diagram of the utility model;
[0017] Figure 2 It is a three-dimensional structural schematic diagram of the main part of the utility model;
[0018] Figure 3 yes Figure 2 Schematic diagram of the cross-sectional structure at the AA position;
[0019] Figure 4 yes Figure 1 Schematic diagram of the matching structure of the rotary furnace tank and rollers.
[0020] In the figure:
[0021] 1. Rear bracket; 2. First hydraulic cylinder; 3. Rear limit switch; 4. Rear limiter; 5. Travel wheel; 6. Travel drive motor; 7. Furnace cover; 8. Front limiter; 9. Travel track; 10. Front limit switch; 11. Fireproof insulation layer; 12. Heating furnace; 13. Second hydraulic cylinder; 14. Electric heating layer; 15. Rotary furnace tank; 15-1. Tank body; 15-2. Outer end turntable; 15-3. Inner end flange; 15-4. Feeding door; 16. Furnace partition; 17. First roller; 18. Hydraulic station; 19. Second roller; 20. Rotary drive motor; 21. Step; 22. Support turntable; 23. Long rod. DETAILED DESCRIPTION
[0022] In order to further understand the content, features and effects of the present invention, the following embodiments are given to explain in detail.
[0023] See also Figure 1 , Figure 2 and Figure 3 The long rod multi-element alloy co-infiltration equipment of the utility model comprises a heating furnace 12 with an open top, a furnace cover 7 which can be opened and closed is arranged on the top thereof, and a translation lifting device which drives the furnace cover 7 to move forward and backward and to move up and down. Before the furnace pot with the long rod 23 placed in it is placed in the furnace chamber of the heating furnace 12, the translation lifting device drives the furnace cover 7 to open and fully open the top opening of the heating furnace 12. After the placement, the furnace cover 7 is closed again to fully seal the top opening of the heating furnace 12. After the co-infiltration process time is over, before the furnace pot is taken out of the furnace chamber of the heating furnace 12, the translation lifting device drives the furnace cover 7 to open and fully open the top opening of the heating furnace 12 again, and then the furnace pot is taken out.
[0024] In this embodiment, the translation lifting device includes running rails 9 installed at both ends of the heating furnace 12, a translation driving assembly is installed between the end of the furnace cover 7 and the running rails 9 on this side, and also includes a lifting driving assembly that drives the running rails 9 to move up and down and a limit assembly that limits the front and rear end positions of the furnace cover 7. The lifting driving assembly is used to drive the running rails 9 to move up and down, and the furnace cover 7 can also move up and down accordingly, so that the furnace cover 7 can be completely buckled on the top opening of the heating furnace 12 or completely separated from the top opening. The translation driving assembly drives the furnace cover 7 to move forward to the top of the heating furnace 12 or move backward to move away from the top opening of the heating furnace 12. The front end position and the rear end position of the furnace cover 7 can be limited by setting the limit assembly.
[0025] The translation drive assembly includes two front and rear running wheels 5 installed at the ends of the furnace cover 7 , and a running drive motor 6 for driving the running wheels 6 is also installed at one end of the furnace cover 7 .
[0026] The lifting drive assembly includes a rear support 1 located behind the heating furnace 12, a first hydraulic cylinder 2 is installed on the top of the rear support 1, and a second hydraulic cylinder 13 is installed on the top side of the heating furnace 12. The upper ends of the piston rods of the first hydraulic cylinder 2 and the second hydraulic cylinder 13 are fixedly connected to the travel track 9 on this side. It also includes a hydraulic station 18, and the first hydraulic cylinder 2 and the second hydraulic cylinder 13 at the left end of the furnace cover 7 and the first hydraulic cylinder 2 and the second hydraulic cylinder 13 at the right end are connected to the hydraulic station 18 through a hydraulic oil circuit. The hydraulic station 18 drives the left and right groups of the first hydraulic cylinder 2 and the second hydraulic cylinder 13 to act synchronously, so that the two travel tracks 9 are lifted or lowered, and the furnace cover 7 is lifted or lowered accordingly.
[0027] The limit assembly includes a rear limiter 4 installed at the rear end of the furnace cover 7 and a front limiter 8 installed at the front end. A rear limit switch 3 cooperating with the rear limiter 4 is installed at the rear end of the walking track 9, and a front limit switch 10 cooperating with the front limiter 8 is installed at the front end. When the furnace cover 7 moves to the rear end position, the rear limiter 4 generates a trigger signal, and when the furnace cover 7 moves to the front end position, the front limiter 8 generates a trigger signal.
[0028] A furnace partition 16 with a window is installed in the lower middle part of the furnace of the heating furnace 12. The furnace partition 16 divides the furnace into two parts, the upper space is the heating zone, and the lower space is the transmission zone. The purpose of setting the window on the furnace partition 16 is to allow the furnace pot placed in the heating zone to contact with the driving mechanism below.
[0029] A fireproof insulation layer 11 is installed on the inner wall of the heating zone, and an electric heating layer 14 is installed on the fireproof insulation layer 11. The electric heating layer 14 can be an electric heating wire or an electric belt laid on the surface of the fireproof insulation layer 11. The furnace is heated by electric heating. The fireproof insulation layer 11 is provided to reduce the loss of heat energy to the outside of the heating furnace 12, thereby reducing energy consumption.
[0030] In this embodiment, a step 21 is further provided at the front of the heating furnace 12. The step 21 is provided for the on-site workers to climb up and check the internal working conditions of the heating furnace 12 after climbing up.
[0031] See also Figure 2 , Figure 3 and Figure 4 , we can see that:
[0032] A first roller 17 and a second roller 19 are installed in parallel below the furnace partition 16. The two rollers have multiple groups of support turntables 22, and each group of support turntables 22 is respectively located below each window of the furnace partition 16. A rotary drive motor 20 for driving the first roller 17 and / or the second roller 19 to rotate is also provided outside the heating furnace 12. Specifically, a driven gear can be installed at the end of the first roller 17 and / or the second roller 19, and a driving gear can be installed on the output shaft of the rotary drive motor 20, and the driving gear is connected with the driven gear in a transmission manner.
[0033] As shown in the figure, there are three windows on the furnace partition 16, which are respectively arranged at the left end, the middle and the right end. Correspondingly, three groups of left, middle and right supporting turntables 22 are provided on the first roller 17 and the second roller 19. The supporting turntable 22 is a cylindrical turntable with an outer diameter significantly larger than the outer diameter of the roller. When rotating, the three groups of supporting turntables 22 support and rotate the furnace tank in the heating zone.
[0034] A rotary furnace pot 15 that can be split from the middle is placed on the first roller 17 and the second roller 19. The rotary furnace pot 15 has a plurality of turntables, and each turntable falls on each group of supporting turntables 22. As mentioned above, the supporting turntables 22 are provided with three groups of left, middle and right. In this embodiment, the rotary furnace pot 15 has three turntables whose positions correspond to the positions of each group of supporting turntables 22.
[0035] like Figure 4As shown in the figure, the rotary furnace tank 15 is composed of two furnace tank monomers, the furnace tank monomer includes a tank body 15-1 with a feeding port, the cross section of the tank body 15-1 can be rectangular or circular, an outer end turntable 15-2 is installed at the outer end of the tank body 15-1, and an inner end flange 15-3 is installed at the inner end. The inner end flanges 15-3 of the two furnace tank monomers are fixedly connected by bolts to form an intermediate turntable. A feeding door 15-4 is installed on the feeding port, and multi-element alloy powder and co-infiltration aid are placed inside by opening and closing the feeding door 15-4.
[0036] The long rod 23 is inserted into the interior of the rotary furnace tank 15. During the loading stage of the long rod 23, the two furnace tank monomers are disconnected, and then the two ends of the long rod 23 are respectively inserted into the two furnace tank monomers, and the two furnace tank monomers are combined into one by extrusion, pulling, etc., and then the two inner end flanges 15-3 are fixed together by bolts, and then the feeding door 15-4 is opened to place the multi-element alloy powder and co-infiltration aid powder.
[0037] In this embodiment, a plurality of lifting lugs are installed on the furnace body of the rotary furnace pot 15, and the rotary furnace pot 15 is hoisted into the furnace of the heating furnace 12 or hoisted out of the furnace by a crane on site.
[0038] How to run:
[0039] The electric heating layer 14 is heated and the heating zone in the heating furnace 12 reaches the co-infiltration temperature condition; the rotary furnace pot 15 is opened, the long rod 23 is placed inside and then assembled into one, the charging door 15-4 is opened and the multi-element alloy powder and the co-infiltration auxiliary agent powder are placed, and the charging door is closed; the furnace cover 7 is opened, and then the rotary furnace pot 15 is hoisted and transferred into the interior of the heating furnace 12 and the rotary disks of the rotary furnace pot 15 are respectively placed on the three groups of supporting turntables 22 of the first roller 17 and the second roller 19; then the furnace cover 7 is closed;
[0040] Under the driving action of the rotary drive device composed of the rotary drive motor 20, the first roller 17 and the second roller 19, the rotary furnace pot 15 rotates, and the internal long rod 23 is in continuous contact with the powder during rotation, thereby producing a multi-element alloy co-infiltration effect under high temperature conditions, thereby achieving surface modification of the long rod 23; after the process time is reached, the electric heating layer 14 is powered off, the rotary drive device suspends the driving action, the furnace cover 7 is opened, and the rotary furnace pot 15 is hoisted and taken out. After complete cooling, it is disassembled and the long rod 23 is taken out, and the powder is recycled.
Claims
1. A multi-element alloy co-infiltration device for long rods, characterized by: The invention comprises a heating furnace (12) with an open top, a furnace cover (7) which can be opened and closed is arranged on the top, and a translation and lifting device which drives the furnace cover (7) to move forward and backward and to move up and down; a furnace partition (16) with a window is installed in the middle and lower part of the furnace of the heating furnace (12); a first roller (17) and a second roller (19) are installed in parallel below the furnace partition (16); the two rollers have a plurality of groups of supporting turntables (22), and each group of supporting turntables (22) is respectively located below each window of the furnace partition (16); a rotary drive motor (20) which drives the first roller (17) and / or the second roller (19) to rotate is also arranged outside the heating furnace (12); a rotary furnace pot (15) which can be split from the middle is placed on the first roller (17) and the second roller (19); the rotary furnace pot (15) has a plurality of turntables, and each turntable falls on each group of supporting turntables (22).
2. The long rod multi-element alloy co-infiltration equipment according to claim 1, characterized in that: The translation lifting device comprises running rails (9) installed at both ends of the heating furnace (12), a translation driving assembly is installed between the end of the furnace cover (7) and the running rail (9) on this side, and also comprises a lifting driving assembly for driving the running rail (9) to move up and down, and a limit assembly for limiting the front and rear end positions of the furnace cover (7).
3. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 2, characterized in that: The translation drive assembly comprises two front and rear running wheels (5) mounted at the ends of the furnace cover (7), and a running drive motor (6) for driving the running wheels (5) is also mounted at one end of the driving furnace cover (7).
4. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 3, characterized in that: The lifting drive assembly includes a rear support (1) located behind the heating furnace (12), a first hydraulic cylinder (2) is installed on the top of the rear support (1), and a second hydraulic cylinder (13) is installed on the top side of the heating furnace (12). The upper ends of the piston rods of the first hydraulic cylinder (2) and the second hydraulic cylinder (13) are fixedly connected to the walking track (9) on this side, and also includes a hydraulic station (18).
5. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 4, characterized in that: The limit assembly comprises a rear limiter (4) installed at the rear end of the furnace cover (7) and a front limiter (8) installed at the front end of the furnace cover (7); a rear limit switch (3) matched with the rear limiter (4) is installed at the rear end of the walking track (9); and a front limit switch (10) matched with the front limiter (8) is installed at the front end.
6. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 5, characterized in that: The rotary furnace tank (15) is formed by splicing two furnace tank monomers, the furnace tank monomer comprising a tank body (15-1) with a feeding port, an outer end turntable (15-2) is installed at the outer end of the tank body (15-1), and an inner end flange (15-3) is installed at the inner end, the inner end flanges (15-3) of the two furnace tank monomers are fixedly connected by bolts to form an intermediate turntable, and a feeding door (15-4) is installed on the feeding port.
7. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 6 is characterized in that: A plurality of lifting lugs are installed on the furnace body of the rotary furnace pot (15). The rotary furnace pot (15) is hoisted and transferred into the furnace of the heating furnace (12) or hoisted and transferred out from the furnace by a crane on site.
8. The multi-element alloy co-infiltration equipment for long rods as claimed in claim 7, characterized in that: A step (21) is also provided at the front of the heating furnace (12).