Pipeline installation butt joint tool
By designing a pipeline installation and docking tool combining flower basket bolts and pipeline holders underground in the coal mine, the problems of manual connection difficulties, large errors and high dangers in the installation of underground pipelines in the coal mine are solved, and efficient and accurate pipeline connections are achieved to ensure that Quality standards have been achieved.
Patent Information
- Application Number
- CN202420287254.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-07
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-02-07
AI Technical Summary
The installation of underground pipelines of coal mines has problems such as difficulty in manual connection, large errors, high risk and large connection errors, resulting in poor pipeline connections and inability to meet quality standards.
A pipe installation butt tool is designed, using a combined structure of flower basket bolts and pipe clamps. Through the connection between hook joints and bolt hooks, the pipe is accurately positioned and docked.
This tool improves the efficiency and accuracy of pipeline installation by reducing manual operation, reduces risks during installation, and ensures the quality of pipeline connections.
Smart Images

Figure CN222437210U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a pipeline installation tool in an underground coal mine, in particular to a pipeline installation butt joint tool. Background Art
[0002] The connection of pipelines between the fully mechanized mining face and the excavation face in underground coal mines is mostly done manually. It takes 5-6 people to connect a 6-meter-long pipeline. The connection of pipe joints is labor-intensive and dangerous. If the connection error is large, water leakage and air leakage will occur. The existing high-pressure pipeline models are φ76.1×7mm, φ88.9×9mm, and φ108×8mm, which are connected with quick connectors; the air supply, water supply, drainage, nitrogen injection, and grouting pipeline models are φ108mm, which are connected with flanges and bolts. When connecting a large number of pipelines, due to the unevenness of the tunnel and errors in manual installation, it is easy to have large errors in pipeline connection and large deviations in pipeline center distance, which cannot meet the quality standard requirements. Utility Model Content
[0003] The utility model aims to provide a pipeline installation butt joint tool to facilitate the installation of pipelines underground in coal mines.
[0004] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a pipeline installation docking tool, including two sets of pipeline clamps respectively fixed on two pipelines, two sets of basket bolts 40 are arranged between the two sets of pipeline clamps, and the two sets of basket bolts respectively connect the two sets of pipeline clamps at both ends of the pipeline clamps.
[0005] Furthermore, a structure of a pipe clamp is that each set of the pipe clamps includes two first U-shaped clamps 10, and the two sides of the first U-shaped clamps are respectively provided with symmetrical first wing plates 11, and the first wing plates are provided with symmetrical first fixing holes 12. The first U-shaped clamps are fixed to the pipe by first bolts 13 passing through the first fixing holes, and each set of the pipe clamps is provided with hook joints 14 on both sides, and the hook joints are provided with hook holes 15. Bolt hook heads 41 are provided at both ends of the basket bolts, and the bolt hook heads are hooked into the hook holes to connect the two sets of pipe clamps.
[0006] Furthermore, a hook joint 14 is installed on each of the first U-shaped clamps 10, and the hook joint is installed on the outer side surface 11a of the first wing panel. The hook joint is provided with a connecting groove 16, and the connecting groove is nested in the first wing panel of the first U-shaped clamp. The hook joint is provided with a hook joint fixing hole 17, and the first bolt 13 passes through the hook joint fixing hole 17 to fix the hook joint on the first wing panel 11.
[0007] Furthermore, a structure of a pipe clamp is that each set of the pipe clamp includes two second U-shaped clamps 20, and the two sides of the second U-shaped clamps 20 are respectively provided with a second long wing plate 21 and a second short wing plate 22, the long wing plates of the two second U-shaped clamps are symmetrically arranged on both sides of the pipe, and the second long wing plates are provided with a second hook hole 23, and the two ends of the basket bolt 40 are provided with a bolt hook head 41, and the bolt hook head is hooked into the second hook hole 23 to connect the two sets of pipe clamps.
[0008] Furthermore, the second long wing plate and the second short wing plate are provided with symmetrical second fixing holes 24, the length L1 of the second long wing plate is greater than the length L2 of the second short wing plate, and the second hook hole 23 is arranged on the side of the second fixing hole 24 away from the pipeline.
[0009] Furthermore, a structure of a pipe clamp is that each set of the pipe clamp includes a first U-shaped clamp 10 and a third U-shaped clamp 30, and the first U-shaped clamp is provided with symmetrical first wing plates 11 on both sides, and the first wing plates are provided with symmetrical first fixing holes 12, and the third U-shaped clamp 30 is provided with symmetrical third wing plates 31 on both sides, and the third wing plates are provided with third fixing holes 32 corresponding to the first fixing holes, and the length of the third wing plate is greater than the length of the first wing plate L4 by L3, and the end of the third wing plate is provided with a basket bolt connecting shaft 33, and the two ends of the basket bolt are hinged to the basket bolt connecting shaft 33.
[0010] The beneficial effects of the utility model are: using basket bolts and pipe clamps to provide operating tools for manual correction of butt pipes, saving manpower in pipe installation, improving work efficiency, ensuring the work quality of pipe connection, the tool has a simple structure, is easy to carry, and uses universal components, which is easy to implement.
[0011] The utility model is described in detail below with reference to the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a structural diagram of the utility model, which uses a hook joint to connect the turnbuckle bolt;
[0013] Figure 2 yes Figure 1 Exploded view of the structure;
[0014] Figure 3 This is a schematic diagram of the operation of the utility model, where two sets of pipe clamps are respectively fixed on two butted pipes;
[0015] Figure 4 This is a schematic diagram of the operation of the utility model, in which the pipeline connecting bolts connect and fix the two pipeline flanges through two bolt holes avoiding the basket bolts;
[0016] Figure 5 : is the operation diagram of the utility model, remove the pipe clamp and the basket bolt, and complete the installation and tightening of the pipe connection bolts;
[0017] Figure 6 This is a structural diagram of the utility model, which adopts a U-shaped clamp with a hook hole;
[0018] Figure 7 yes Figure 6 Exploded view of the structure;
[0019] Figure 8 This is a structural diagram of the utility model, which adopts a U-shaped clamp with a basket bolt connecting the shaft;
[0020] Fig. 9 yes Figure 8 The structure is a combination of turnbuckle bolts and U-shaped clamps;
[0021] Fig.10 yes Figure 8 Exploded view of the structure. DETAILED DESCRIPTION
[0022] Embodiment 1:
[0023] like Figures 1 to 5 A pipeline installation butt joint tool comprises two sets of pipeline clamps respectively fixed on two pipelines 50. The pipeline 50 is provided with a pipeline flange 51 for butt joint.
[0024] Each set of pipe clamps includes two first U-shaped clamps 10, that is, there are four first U-shaped clamps 10. The first U-shaped clamps are provided with symmetrical first wing plates 11 on both sides, and the first wing plates are provided with symmetrical first fixing holes 12. The first U-shaped clamps are fixed to the pipe by first bolts 13 passing through the first fixing holes. In fact, the pipe clamps can adopt components of universal structure.
[0025] Each set of pipe clamps is provided with a hook connector 14 on both sides, and there are four hook connectors 14 in total, and one hook connector 14 is installed on each first U-shaped clamp 10. The hook connector 14 is a groove-shaped structure, and the hook connector is provided with a connecting groove 16, a hook hole 15 and a hook connector fixing hole 17.
[0026] The hook connector 14 is mounted on the outer side 11a of the first wing plate, and the connecting groove 16 is embedded in the first wing plate of the first U-shaped clamp. The first bolt 13 fixes the first U-shaped clamp while passing through the hook connector fixing hole 17 to fix the hook connector on the first wing plate 11, and the hook hole 15 protrudes out of the pipe clamp (that is, protrudes out of the first wing plate 11 of the first U-shaped clamp).
[0027] Two sets of flower basket bolts 40 are arranged between the two sets of pipeline clamps, and the two sets of flower basket bolts are respectively connected to the two sets of pipeline clamps at both ends of the pipeline clamps. Bolt hooks 41 are arranged at both ends of the flower basket bolts, and the bolt hooks are hooked into the hook holes 15 to connect the two sets of pipeline clamps.
[0028] When in use, two sets of pipe clamps are fixed on two pipes to be butted, and the hook connector 14 is also fixed on the fixing clamp while fixing the pipe clamp. In this way, four hook connectors 14 are arranged in pairs on both sides of the two pipes. When fixing the pipe clamp, it is important to make the bolt holes 52 on the two pipe flanges 51 correspond to each other. Figure 3 Then, the two pipes 50 are butt-jointed so that the flanges of the two pipes are as close as possible, and the bolt hooks 41 of the two sets of turnbuckle bolts 40 are hooked into the hook holes 15 of the hook joint, as shown. Figure 1 The situation shown. Then, the turnbuckle bolts are retracted to make the two pipe flanges 51 butt-jointed (i.e., the end faces of the two pipe flanges are in contact or very close). In this process, since the turnbuckle bolts and the hook joints are connected by bolt hooks, the pipe flanges can be properly rotated to make the bolt holes 52 on the two pipe flanges align with each other. Then, the pipe connecting bolts 53 are used to connect and fix the two pipe flanges at the two bolt holes avoiding the turnbuckle bolts, as shown in FIG. Figure 4 After that, remove the two sets of pipe clamps and turnbuckle bolts, and complete the installation and tightening of other pipe connection bolts 53, as shown in FIG. Figure 5 shown.
[0029] The bolt fixing described in this embodiment is fixing by the cooperation of bolts and nuts.
[0030] The utility model uses a basket bolt and a U-shaped clamp to dock and correct the pipe joints, which saves a lot of time and manpower for manual docking of pipes, helps to accurately correct the docking of pipe joints, and has a simple structure and is easy to carry. The tool has few structural parts, and the pipe clamps and basket bolts can use standardized universal parts. Different U-shaped clamps can be replaced according to different pipes to adapt to various types of pipe docking. The tool is easy to use and easy to use in coal mines.
[0031] Embodiment 2:
[0032] like Figure 6 , Figure 7 , a pipe installation docking tool. This embodiment is a structural improvement of the first embodiment.
[0033] This embodiment improves the structure of the pipeline clamp. Each set of pipeline clamps includes two second U-shaped clamps 20, and the two sets of pipeline clamps have a total of four second U-shaped clamps 20.
[0034] The second U-shaped clamp 20 is provided with a second long wing plate 21 and a second short wing plate 22 on both sides respectively. The second long wing plate and the second short wing plate are provided with symmetrical second fixing holes 24. The length L1 of the second long wing plate is greater than the length L2 of the second short wing plate. The second long wing plate is provided with a second hook hole 23. The second hook hole 23 is arranged on the side of the second fixing hole 24 away from the pipe.
[0035] The two second U-shaped clamps 20 of each set of pipe clamps are fixed to the pipe 50 by bolts 25, the long wing plate of one second U-shaped clamp is butted with the short wing plate of the other second U-shaped clamp, and the long wing plates of the two second U-shaped clamps are symmetrically arranged on both sides of the pipe.
[0036] Similar to the first embodiment, bolt hooks 41 are provided at both ends of the turnbuckle bolt 40 , and the bolt hooks 41 are hooked into the second hook holes 23 to connect the two sets of pipe clamps.
[0037] Compared with the first embodiment, the hook holes of the two turnbuckle bolts are integrated on the U-shaped clamp in this embodiment, eliminating the hook joint. During assembly, it is no longer necessary to connect and fix the hook joint, which further facilitates use and operation.
[0038] Embodiment three:
[0039] like Figure 8 , Fig.10 , a pipe installation docking tool. This embodiment is a structural replacement of the first embodiment.
[0040] In this embodiment, each set of pipe clamps includes a first U-shaped clamp 10 and a third U-shaped clamp 30. Similar to the first embodiment, the first U-shaped clamp has symmetrical first wing plates 11 on both sides, and the first wing plates have symmetrical first fixing holes 12.
[0041] The third U-shaped clamp 30 is provided with symmetrical third wing plates 31 on both sides, and the third wing plates are provided with third fixing holes 32 corresponding to the first fixing holes. The length L3 of the third wing plate 31 is greater than the length L4 of the first wing plate 11, and the end of the third wing plate is provided with a basket bolt connecting shaft 33, which extends out of the third wing plate 31, and the axis of the basket bolt connecting shaft 33 is perpendicular to the pipe 50. The basket bolt connecting shaft 33 is welded to the third wing plate 31.
[0042] The two ends of the turnbuckle bolt 40 are provided with turnbuckle bolt connection holes 42, and the two ends of the turnbuckle bolt are hinged with the turnbuckle bolt connection shaft 33. The turnbuckle bolt connection shaft is also provided with a pin hole 34, and the turnbuckle bolt 40 is assembled with the third U-shaped clamp 30 through a cylindrical pin 35 and a flat washer 36, such as Fig. 9 shown.
[0043] In this embodiment, the third U-shaped clamp 30 and the turnbuckle bolt 40 are assembled into one component.
[0044] When in use, first move the flanges of the two pipes to a close position, then use the assembled third U-shaped clamp 30 and basket bolt 40 assembly to buckle the two third U-shaped clamps 30 on the two pipes respectively, and then use the first U-shaped clamp 10 to fix the third U-shaped clamp 30. It is no longer necessary to use a hook to connect the pipe clamp and the basket bolt, which simplifies the operation. Since the axis of the basket bolt connecting shaft 33 is perpendicular to the pipe 50, the pipe flange can be properly rotated so that the bolt holes 52 on the two pipe flanges are aligned with each other.
[0045] In the above embodiment, only the flange connection mode of the pipeline is exemplified, and the technical solution of the utility model can also be applied to the butt joint operation of pipelines with other connection modes. For butt joint of pipelines with different diameters, pipeline clamps of different specifications can be used.
Claims
1. A pipe installation docking tool, characterized in that: It comprises two sets of pipeline clamps respectively fixed on two pipelines, two sets of basket bolts (40) are arranged between the two sets of pipeline clamps, and the two sets of basket bolts respectively connect the two sets of pipeline clamps at both ends of the pipeline clamps.
2. The pipeline installation docking tool according to claim 1, characterized in that: Each set of the pipe clamps comprises two first U-shaped clamps (10), the first U-shaped clamps are provided with symmetrical first wing plates (11) on both sides, the first wing plates are provided with symmetrical first fixing holes (12), the first U-shaped clamps are fixed to the pipe by means of first bolts (13) passing through the first fixing holes, and each set of the pipe clamps is provided with hook joints (14) on both sides, the hook joints are provided with hook holes (15), and bolt hook heads (41) are provided at both ends of the basket bolts, the bolt hook heads are hooked into the hook holes to connect the two sets of pipe clamps.
3. The pipeline installation docking tool according to claim 2, characterized in that: A hook joint (14) is installed on each of the first U-shaped clamps (10), the hook joint being installed on the outer side surface (11a) of the first wing plate, the hook joint being provided with a connection groove (16), the connection groove being nested in the first wing plate of the first U-shaped clamp, the hook joint being provided with a hook joint fixing hole (17), the first bolt (13) passing through the hook joint fixing hole (17) to fix the hook joint on the first wing plate (11).
4. The pipeline installation docking tool according to claim 1, characterized in that: Each set of the pipe clamps comprises two second U-shaped clamps (20), the second U-shaped clamps (20) being provided with second long wing plates (21) and second short wing plates (22) on both sides, the long wing plates of the two second U-shaped clamps being symmetrically arranged on both sides of the pipe, the second long wing plates being provided with second hook holes (23), and bolt hook heads (41) being provided at both ends of the basket bolts (40), the bolt hook heads being hooked into the second hook holes (23) to connect the two sets of pipe clamps.
5. The pipeline installation docking tool according to claim 4, characterized in that: The second long wing plate and the second short wing plate are provided with symmetrical second fixing holes (24); the length (L1) of the second long wing plate is greater than the length (L2) of the second short wing plate; and the second hook hole (23) is arranged on a side of the second fixing hole (24) away from the pipeline.
6. The pipeline installation docking tool according to claim 1, characterized in that: Each set of the pipeline clamp comprises a first U-shaped clamp (10) and a third U-shaped clamp (30), wherein the first U-shaped clamp is provided with symmetrical first wing plates (11) on both sides, and the first wing plates are provided with symmetrical first fixing holes (12), and the third U-shaped clamp (30) is provided with symmetrical third wing plates (31) on both sides, and the third wing plates are provided with third fixing holes (32) corresponding to the first fixing holes, and the length of the third wing plates is greater (L3) than the length of the first wing plates (L4), and the ends of the third wing plates are provided with basket bolt connection shafts (33), and the two ends of the basket bolts are hinged to the basket bolt connection shafts (33).