Prefabricated T-beam concrete pouring operation platform
By designing a prefabricated T-beam concrete pouring operation platform including support frames, platforms, ladders, walking wheels and track grooves, the problems of inconvenience in operation of construction personnel, deformation of roof steel bars and safety hazards are solved, and safe and convenient concrete pouring and Vibrating operations improve construction efficiency and quality.
Patent Information
- Application Number
- CN202420560157.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-03-21
AI Technical Summary
During the pouring of prefabricated T-beam concrete for highway bridges, construction personnel are inconvenient to operate, which can easily lead to deformation of the roof steel bars, and there are safety hazards and concrete pollution problems.
A prefabricated T-beam concrete pouring operation platform is designed, including support frames, platforms, ladders, walking wheels and track grooves arranged side by side, allowing operators to pour, vibrate and surface-collection operations on the platform, and pass the walking wheels and The track groove realizes the movement and stable positioning of the platform.
This operating platform enables construction personnel to pour and vibrating concrete safely and conveniently, avoid deformation of the roof steel bars, reduce safety hazards, and improve construction efficiency and the quality of concrete.
Smart Images

Figure CN222450821U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of highway bridge construction, and particularly relates to a precast T-beam concrete pouring operation platform. Background Art
[0002] During the process of precast T-beam concrete pouring for highway bridges, the concrete is transported by a concrete mixer truck to the pedestal to be poured. After being tested and qualified by testers, the concrete is poured into the pouring hopper. Usually, a gantry crane is used to lift the hopper into the bin for pouring. The operator directly steps on the top plate steel bars of the T-beam to discharge, vibrate, and finish the surface. In this way, it is inconvenient for the construction workers to operate, which easily causes the deformation of the top plate steel bars. Without an operation platform, it is inconvenient to finish the surface, and there are safety hazards for personnel to go up and down. At the same time, when the operator directly steps on the steel bars and concrete, it will pollute the concrete. In view of this, the present application provides a small movable precast T-beam concrete pouring operation platform. Content of the Utility Model
[0003] To solve the above technical problems, the utility model proposes a precast T-beam concrete pouring operation platform.
[0004] The technical solution of the utility model is realized as follows:
[0005] A precast T-beam concrete pouring operation platform includes two support frames arranged side by side. A platform is arranged between the tops of the two support frames. Ladders are arranged on both sides of the platform. The bottom ends of the ladders are connected to the support frames on the same side. A pair of walking wheels are installed on the front and rear sides of the bottom of each support frame. A track groove is formed in the middle of the circumferential surface of the walking wheels.
[0006] Furthermore, cross beams are arranged on both sides of the bottom of the support frames. The walking wheels are installed at the ends of the cross beams. And a wheel positioning structure for fixing the orientation of the walking wheels is arranged between the ends of the cross beams and the walking wheels.
[0007] Furthermore, the walking wheels include a wheel frame, a wheel body, and a mounting shaft. The wheel body is installed at the bottom of the wheel frame. The mounting shaft is fixedly installed at the top of the wheel frame. And the mounting shaft is rotatably installed on the cross beam. The wheel positioning structure includes a positioning groove and a positioning rod. The positioning rod is arranged on the side of the cross beam in a liftable manner. The positioning rod is installed on the cross beam in a liftable manner. And the walking wheel is positioned in a state where its orientation is parallel to the length direction of the precast T-beam by inserting the positioning rod into the positioning groove.
[0008] Furthermore, one positioning groove is arranged on each side of the top of the wheel frame. One positioning rod is arranged on each side of the cross beam. And the two positioning rods are connected by a sliding plate. The sliding plate is in a "C" shape and sleeved on the end of the cross beam.
[0009] Furthermore, slide grooves are provided on both sides of the crossbeam, and sliding blocks slidably arranged in the slide grooves are fixed on the inner wall surfaces on both sides of the slide plate.
[0010] Furthermore, an adjusting bolt is threadedly connected to the slide plate, and both ends of the adjusting bolt pass through the slide plate and are rotatably mounted on the crossbeam.
[0011] Furthermore, a sliding sleeve is fixedly installed on the crossbeam, the sliding sleeve is arranged at the bottom of the support frame, and an adjusting screw is threadedly installed on the top of the sliding sleeve, and both ends of the adjusting screw pass through the sliding sleeve and are rotatably installed on both sides of the support frame.
[0012] Furthermore, when one of the traveling wheels on the crossbeam is located at a middle position of the support frame in the width direction, one end of the sliding sleeve contacts the support frame.
[0013] The utility model has the following beneficial effects:
[0014] 1. This application sets up ladders on both sides of the platform, which makes it convenient and safe for construction workers to go up and down.
[0015] 2. The pouring platform of this application is equipped with a standing platform for workers, who can pour concrete, vibrate, finish and roughen the surface while standing on the platform, which facilitates construction and avoids workers stepping directly on the top plate steel bars, causing deformation of the top plate steel bars and difficulty in finishing and roughening the surface.
[0016] (3) The support frame of the present application is provided with running wheels at the bottom, which is convenient for movement and for repeated use between various pedestals. In addition, track grooves are provided on the running wheels, so that the running wheels can roll not only on the ground but also on the track.
[0017] (4) The prefabricated T-beam concrete pouring operation platform of the present application is used for concrete pouring, vibrating, and finishing operations. The construction is convenient, the operation is simple, the safety hazards of personnel going up and down are reduced, and the construction quality of the top plate reinforcement is effectively controlled. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is an overall schematic diagram of the utility model prefabricated T-beam concrete pouring operation platform;
[0019] Figure 2 This utility model Figure 1 A in the enlarged view;
[0020] Figure 3 This utility model Figure 2 Enlarged view of point B in .
[0021] In the figure: 1. Support frame; 2. Platform; 3. Ladder; 4. Traveling wheel; 4.1. Wheel frame; 4.2. Wheel body; 4.3. Mounting shaft; 5. Track groove; 6. Crossbeam; 7. Positioning groove; 8. Positioning rod; 9. Slide plate; 10. Slide groove; 11. Slider; 12. Adjusting bolt; 13. Sliding sleeve; 14. Adjusting screw. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figures 1 to 3 As shown, a prefabricated T-beam concrete pouring operation platform includes two support frames 1 arranged side by side, a platform 2 is arranged between the tops of the two support frames 1, ladders 3 are arranged on both sides of the platform 2, the bottom ends of the ladders 3 are connected to the support frames 1 on the same side, a pair of walking wheels 4 are installed on the front and rear sides of the bottom of the support frames 1, and a track groove 5 is opened in the middle of the circumferential surface of the walking wheel 4.
[0024] The operating platform is easy to move. The operator can walk up to the platform 2 via the ladder 3, and then perform operations such as pouring concrete, vibrating, finishing, and roughening on the platform 2. The construction is convenient, the operation is simple, and the safety hazard of personnel going up and down is reduced. At the same time, it avoids the operator stepping directly on the top plate steel bars during construction, causing deformation of the top plate steel bars, so that the construction quality of the top plate steel bars is effectively controlled.
[0025] In addition, a track groove 5 is provided on the running wheel 4, so that the running wheel 4 has two functions of running on the ground and running on the tracks on the ground on both sides of the prefabricated T-beam. Therefore, there is no need to separately provide wheels for running on the ground and wheels for running on the tracks.
[0026] Crossbeams 6 are arranged on both sides of the bottom of the support frame 1 , the travel wheels 4 are installed at the ends of the crossbeams 6 , and a wheel positioning structure for fixing the direction of the travel wheels 4 is arranged between the ends of the crossbeams 6 and the travel wheels 4 .
[0027] By setting up the wheel positioning structure, after the traveling wheel 4 moves onto the track, the traveling wheel 4 is fixed to keep the direction of the traveling wheel 4 parallel to the direction of the track, to prevent the traveling wheel 4 from rotating while walking on the track and causing it to leave the track, thereby ensuring the stability of the operating platform during construction operations.
[0028] The walking wheel 4 includes a wheel frame 4.1, a wheel body 4.2 and a mounting shaft 4.3. The wheel body 4.2 is installed at the bottom of the wheel frame 4.1, and the mounting shaft 4.3 is fixedly installed at the top of the wheel frame 4.1. The mounting shaft 4.3 is rotatably installed on the cross beam 6. The wheel positioning structure includes a positioning groove 7 and a positioning rod 8. The positioning rod 8 is arranged on the side of the cross beam 6 in a liftable manner. The positioning rod 8 is installed on the cross beam 6 in a liftable manner, and the walking wheel 4 is positioned in a state where its orientation is parallel to the length direction of the precast T-beam by inserting the positioning rod 8 into the positioning groove 7.
[0029] When the operation platform is walking on the ground, the positioning rod 8 is located above the positioning groove 7 in the height direction. At this time, the positioning rod 8 is in a separated state from the positioning groove 7. In this state, the walking wheel 4 is rotatably installed on the cross beam 6 through the mounting shaft 4.3, thereby facilitating the performance of the operation platform walking on the ground. When the walking wheel 4 moves onto the track, by inserting the positioning rod 8 into the positioning groove 7, the walking wheel 4 located on the track is fixed, improving the stability of the operation platform walking on the track.
[0030] One positioning groove 7 is provided on each side of the top of the wheel frame 4.1, and one positioning rod 8 is provided on each side of the cross beam 6. The two positioning rods 8 are connected by a slide plate 9. The slide plate 9 is in a "C" shape and is sleeved on the end of the cross beam 6. By controlling the up and down displacement of the slide plate 9 at the end of the cross beam 6, the insertion or extraction of the positioning rod 8 into or from the positioning groove 7 can be controlled.
[0031] Chute grooves 10 are provided on both sides of the cross beam 6. Sliding blocks 11 fixedly installed on the inner wall surfaces of both sides of the slide plate 9 are slidably arranged in the chute grooves 10. The cooperation between the sliding blocks 11 and the chute grooves 10 enables the slide plate 9 to slide stably on the cross beam 6, preventing the slide plate 9 from detaching from the cross beam 6. At the same time, the cooperation between the sliding blocks 11 and the chute grooves 10 maintains the stability of the slide plate 9 during the lifting movement of the slide plate 9, preventing the slide plate 9 from shifting.
[0032] An adjusting bolt 12 is threadedly connected to the slide plate 9, and both ends of the adjusting bolt 12 penetrate through the slide plate 9 and are rotatably installed on the cross beam 6. By rotating the adjusting bolt 12, the slide plate 9 makes a lifting movement, achieving the function of inserting or extracting the positioning rod 8 into or from the positioning groove 7.
[0033] A sliding sleeve 13 is fixedly installed on the cross beam 6. The sliding sleeve 13 is slidably sleeved on the bottom of the support frame 1. The top end of the sliding sleeve 13 is threadedly installed with an adjusting screw rod 14, and both ends of the adjusting screw rod 14 penetrate through the sliding sleeve 13 and are rotatably installed on both sides of the support frame 1. By rotating the adjusting screw rod 14, the displacement of the cross beam 6 in the width direction of the operation platform can be controlled, enabling the walking wheel 4 located on the outside to move to the middle position of the support frame 1 and align with the track. In this way, the support balance of the walking wheel 4 on the support frame 1 is improved. At the same time, the adjusting screw rod 14 can fix the position of the walking wheel 4 in real time.
[0034] When one of the running wheels 4 on the crossbeam 6 is located in the middle of the support frame 1 in the width direction, one end of the sliding sleeve 13 contacts the support frame 1. By using the force of the screw rod on the sliding sleeve 13, the sliding sleeve 13 cooperates with the support frame 1 to limit the running wheel 4 on both sides, further improving the stability and positioning effect of the running wheel 4.
[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated T-beam concrete pouring operation platform, characterized in that: It includes two support frames (1) arranged side by side. A platform (2) is provided between the tops of the two support frames (1). Ladders (3) are provided on both sides of the platform (2). The bottom ends of the ladders (3) are connected to the support frame (1) on the same side. A pair of walking wheels (4) are installed on the front and rear sides of the bottom of the support frame (1). A track groove (5) is formed in the middle of the circumferential surface of the walking wheel (4).
2. A prefabricated T-beam concrete pouring operation platform according to claim 1, characterized in that: Cross beams (6) are provided on both sides of the bottom of the support frame (1). The walking wheels (4) are installed at the ends of the cross beams (6), and a wheel positioning structure for fixing the orientation of the walking wheels (4) is provided between the ends of the cross beams (6) and the walking wheels (4).
3. A prefabricated T-beam concrete pouring operation platform according to claim 2, characterized in that: The walking wheel (4) includes a wheel frame (4.1), a wheel body (4.2) and a mounting shaft (4.3). The wheel body (4.2) is installed at the bottom of the wheel frame (4.1). The mounting shaft (4.3) is fixedly installed at the top of the wheel frame (4.1), and the mounting shaft (4.3) is rotatably installed on the cross beam (6). The wheel positioning structure includes a positioning groove (7) and a positioning rod (8). The positioning rod (8) is arranged on the side of the cross beam (6) so as to be able to move up and down. The positioning rod (8) is installed on the cross beam (6) so as to be able to move up and down, and the walking wheel (4) is positioned in a state where its orientation is parallel to the length direction of the precast T-beam by inserting the positioning rod (8) into the positioning groove (7).
4. A prefabricated T-beam concrete pouring operation platform according to claim 3, characterized in that: One positioning groove (7) is provided on each of the two sides of the top of the wheel frame (4.1). One positioning rod (8) is provided on each of the two sides of the cross beam (6), and the two positioning rods (8) are connected by a sliding plate (9). The sliding plate (9) is in a "C" shape, and the sliding plate (9) is sleeved on the end of the cross beam (6).
5. A prefabricated T-beam concrete pouring operation platform according to claim 4, characterized in that: Chute grooves (10) are formed on both sides of the cross beam (6). Sliding blocks (11) fixedly arranged on the inner wall surfaces of both sides of the sliding plate (9) are slidably arranged in the chute grooves (10).
6. A prefabricated T-beam concrete pouring operation platform according to claim 4, characterized in that: An adjusting bolt (12) is threadedly connected to the sliding plate (9), and both ends of the adjusting bolt (12) penetrate through the sliding plate (9) and are rotatably installed on the cross beam (6).
7. A prefabricated T-beam concrete pouring operation platform according to claim 2, characterized in that: A sliding sleeve (13) is fixedly installed on the cross beam (6). The sliding sleeve (13) is slidably sleeved on the bottom of the support frame (1). The top end of the sliding sleeve (13) is threadedly installed with an adjusting screw rod (14). Both ends of the adjusting screw rod (14) penetrate through the sliding sleeve (13) and are rotatably installed on both sides of the support frame (1).
8. A prefabricated T-beam concrete pouring operation platform according to claim 7, characterized in that: When one of the walking wheels (4) on the cross beam (6) is located at the middle position of the support frame (1) in the width direction, one end of the sliding sleeve (13) contacts the support frame (1).