Geological disaster early warning device
By adopting sliding components and clamping structures in the geological disaster warning device, combined with geological radar and intelligent control modules, the problems of poor structural stability and inflexible installation of existing devices are solved, and efficient and accurate early warning functions are achieved.
Patent Information
- Application Number
- CN202421041905.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-05-14
AI Technical Summary
The existing geological disaster warning devices have problems such as poor structural stability and inflexible installation methods.
The sliding assembly composed of slide rails and sliders combines the design of the card connector slots and card connectors to achieve flexible adjustment and rapid fixation of the connecting assembly, enhancing the stability and adaptability of the device. At the same time, geological radar is used for real-time monitoring and alarm devices to issue alarms, and the controller and communication modules realize intelligent and remote monitoring functions.
It improves the adaptability and flexibility of the early warning device, ensures the stable operation of the device and the accuracy and timeliness of early warning, and reduces the losses caused by geological disasters.
Smart Images

Figure CN222458933U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of early warning devices, in particular to a geological disaster early warning device. Background Art
[0002] Geological disasters are natural disasters caused mainly by geological dynamic activities or abnormal changes in the geological environment. Under the influence of the earth's internal dynamics, external dynamics or artificial geological dynamics, the earth releases abnormal energy, material movement, deformation and displacement of rock and soil bodies, and abnormal changes in the environment, which endanger human life and property, life and economic activities, or destroy the resources and environment on which humans depend for survival and development. Adverse geological phenomena are usually called geological disasters. Usually, geological disaster-related departments will set up geological disaster early warning devices to play an early warning role.
[0003] The existing geological disaster early warning devices have the problems of poor structural stability and inflexible installation methods.
[0004] Therefore, how to solve the problem that the existing geological disaster early warning device has poor structural stability and inflexible installation method during installation has become a technical problem that technical personnel in this field urgently need to solve. Utility Model Content
[0005] In view of this, the present invention aims at the deficiencies of the prior art and proposes a geological disaster early warning device, which aims to solve the problems of poor structural stability and inflexible installation methods of the existing geological disaster early warning devices.
[0006] The utility model provides a geological disaster early warning device, comprising:
[0007] Early warning device body;
[0008] A fixing column, which is arranged in the middle of the early warning device body in the vertical direction;
[0009] A first fixing plate, which is arranged at the bottom end of the fixing column;
[0010] a first fixing bolt passing through the first fixing plate and inserted into the ground;
[0011] A connecting sleeve, which is sleeved on the outer side wall of the fixing column, and the connecting sleeve is located in the middle of the fixing column;
[0012] A sliding assembly, which is located on a side of the connecting sleeve close to the first fixing plate;
[0013] A connecting component, one end of which is connected to the sliding component, and the other end of which is fixed on the ground; wherein the connecting component can rotate relative to the sliding component;
[0014] The detection component is located at the top of the fixing column.
[0015] Furthermore, the geological disaster early warning device also includes:
[0016] A solar panel, which is sleeved on the fixing column and located above the connecting sleeve;
[0017] A distribution box, which is located on a side of the solar panel away from the detection assembly, and one end of the distribution box close to the connecting sleeve is fixed to the connecting sleeve through a fixing belt; the distribution box is connected to the solar panel;
[0018] The fixing sleeve is sleeved on the outer side wall of the fixing column, and a distance is arranged between the fixing sleeve and the connecting sleeve.
[0019] Furthermore, the sliding assembly comprises:
[0020] Slide grooves, if there are several, the several slide grooves are opened along the axial direction of the fixing sleeve;
[0021] A slide rail, which is arranged along the axial direction of the fixed column at one end of the slide groove close to the fixed column;
[0022] A slider, which is arranged on the slide rail and can slide along the slide rail;
[0023] Wherein, one end of the connecting component is connected to the slider.
[0024] Furthermore, the sliding assembly further comprises:
[0025] A plurality of springs are provided inside the slide groove along the axial direction of the fixing column, one end of the spring is connected to the slider, and the other end of the spring is connected to the inner bottom wall of the slide groove;
[0026] There are a plurality of clamping grooves, and a plurality of the clamping grooves are provided on both sides of the slide groove, and the clamping grooves on both sides of the slide groove are symmetrically arranged with the center line of the slide groove as the symmetry axis;
[0027] A clamping piece is horizontally arranged at one end of the slider away from the connecting assembly, and both ends of the clamping piece are respectively clamped into any two symmetrically opened clamping grooves, and the clamping grooves are detachably connected to the clamping piece.
[0028] Furthermore, the engaging piece and the engaging groove are interference fit.
[0029] Furthermore, the connection component comprises:
[0030] A connecting rod, one end of which is connected to the slider;
[0031] A second fixing plate, which is arranged at an end of the connecting rod away from the sliding block;
[0032] A second fixing bolt passes through the second fixing plate and is inserted into the ground.
[0033] Furthermore, the second fixing plate is rotatably connected to the connecting rod.
[0034] Furthermore, the detection component includes: a geological radar, and the geological radar is electrically connected to the distribution box.
[0035] Furthermore, the geological disaster early warning device also includes:
[0036] A mounting seat, the top of the fixing column is provided with the mounting seat, and the detection component is fixed to the top of the fixing column through the mounting seat;
[0037] An alarm device is electrically connected to the distribution box, and the alarm device is located at the edge of the mounting seat. The alarm device includes a sound alarm and a light alarm.
[0038] Furthermore, the geological disaster early warning device also includes:
[0039] A controller connected to the geological radar;
[0040] A communication module is arranged inside the distribution box, and the communication module is connected to the controller.
[0041] Compared with the prior art, the beneficial effects of the present invention are:
[0042] First, the geological disaster warning device provided by the utility model adopts a sliding component composed of a slide rail and a slider, so that the connecting component can slide flexibly on the slide rail to adapt to different terrains and installation requirements. This not only improves the adaptability and flexibility of the warning device, but also facilitates the installation and adjustment of the staff, thereby improving work efficiency.
[0043] Second, the setting of the snap-in groove and the snap-in plate enables the slider to be quickly fixed when it slides to the corresponding position, preventing the slider from sliding freely on the slide rail, enhancing the stability and reliability of the sliding assembly, which effectively avoids the problem of position displacement or failure of the early warning device due to the movement of the slider, and ensures the stable operation of the early warning device.
[0044] Third, as the core part of the detection component, the geological radar has high resolution and strong penetration ability. It can detect geological structures deep underground and provide accurate data support for early warning. The sound alarm and light alarm of the alarm device are used in combination to send out clear and effective alarm signals in time when geological disaster risks are detected, reminding personnel to take preventive measures.
[0045] Fourth, the application of controller and communication module makes the early warning device intelligent and remotely monitored. The controller can receive the detection data of geological radar, process and analyze it, and judge the risk of geological disasters; the communication module can realize the communication connection between the early warning device and the remote monitoring center, and transmit the early warning information to relevant departments in a timely manner, providing timely and accurate support for disaster response. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 A schematic diagram of the overall structure of the geological disaster early warning device provided by the utility model;
[0047] Figure 2 A schematic diagram of the structure of the sliding assembly of the geological disaster early warning device provided by the utility model;
[0048] Figure 3 A top view of the sliding component of the geological disaster early warning device provided by the utility model.
[0049] In the figure: 100, early warning device body; 110, fixing column; 120, first fixing plate; 130, connecting sleeve; 141, fixing sleeve; 142, slide groove; 143, slide rail; 144, slider; 145, spring; 146, snap-in groove; 147, snap-in piece; 148, fixing block; 150, geological radar; 160, mounting seat; 170, solar panel; 180, distribution box; 181, fixing belt; 191, connecting rod; 192, second fixing plate. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0051] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0052] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0053] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0054] See also Figure 1-3 As shown, this embodiment provides a geological disaster warning device, including: a warning device body 100; a fixed column 110, which is arranged in the middle of the warning device body 100 along the vertical direction; a first fixed plate 120, which is arranged at the bottom end of the fixed column 110; a first fixed bolt, which passes through the first fixed plate 120 and is inserted into the ground; a connecting sleeve 130, which is sleeved on the outer wall of the fixed column 110, and the connecting sleeve 130 is located in the middle of the fixed column 110; a sliding assembly, which is located on the side of the connecting sleeve 130 close to the first fixed plate 120; a connecting assembly, one end of which is connected to the sliding assembly, and the other end of the connecting assembly is fixed to the ground; wherein the connecting assembly can rotate relative to the sliding assembly; a detection assembly, which is located at the top of the fixed column 110.
[0055] It can be seen that the fixing column 110 is the core structure of the entire device, which can provide stable support for the connecting sleeve 130, the connecting assembly and the detection assembly; the first fixing plate 120 and the first fixing bolt can firmly fix the fixing column 110 on the ground, which can ensure the stability of the early warning device body 100; the connecting sleeve 130 is sleeved on the outer wall of the fixing column 110, and the connecting sleeve 130 is located in the middle of the fixing column 110, and the connecting sleeve 130 is used to connect and fix the solar panel 170 and the distribution box 180; the sliding assembly is located on the side of the connecting sleeve 130 close to the first fixing plate 120, and is connected to the connecting assembly, and the connecting assembly can rotate relative to the sliding assembly, which enables the early warning device body 100 to adapt to different terrains and angles, and realize flexible adjustment and installation; the detection assembly is located at the top of the fixing column 110, and the detection assembly can monitor and warn geological disasters in real time, ensuring the accuracy and reliability of the early warning device body 100.
[0056] It can be understood that the geological disaster early warning device provided in this embodiment is not only stable in structure and flexible in installation, but also accurate and reliable in early warning, and can effectively warn and prevent geological disasters and reduce disaster losses.
[0057] Specifically, the geological disaster warning device also includes: a solar panel 170, which is sleeved on the fixed column 110 and located above the connecting sleeve 130; a distribution box 180, which is located on the side of the solar panel 170 away from the detection component, and the end of the distribution box 180 close to the connecting sleeve 130 is fixed to the connecting sleeve 130 by a fixing belt 181; the distribution box 180 is connected to the solar panel 170; a fixing sleeve 141, which is sleeved on the outer wall of the fixing column 110, and a spacing is set between the fixing sleeve 141 and the connecting sleeve 130.
[0058] It can be seen that the solar panel 170 is sleeved on the fixed column 110 and located above the connecting sleeve 130. It can effectively collect solar energy and convert it into electrical energy, providing a continuous and stable power supply for the geological disaster early warning device; the distribution box 180 is located on the side of the solar panel 170 away from the detection component, and the end of the distribution box 180 close to the connecting sleeve 130 is fixed to the connecting sleeve 130 by a fixing belt 181, which facilitates the installation and disassembly of the distribution box 180, and also facilitates the connection and circuit layout between the distribution box 180 and the solar panel 170; the distribution box 180 is connected to the solar panel 170, which can realize the storage, distribution and management of the electrical energy of the solar panel 170 to ensure the normal operation of the early warning device; the fixing sleeve 141 is sleeved on the outer wall of the fixed column 110, and a spacing is set between it and the connecting sleeve 130, which can ensure that the sliding component and the connecting sleeve 130 will not interfere with each other, thereby realizing the independent movement of the sliding component.
[0059] Specifically, the sliding assembly includes: a slide groove 142, if there are several slide grooves 142, the plurality of slide grooves 142 are opened along the axial direction of the fixed sleeve 141; a slide rail 143, which is arranged at one end of the slide groove 142 close to the fixed column 110 along the axial direction of the fixed column 110; a slider 144, which is arranged on the slide rail 143 and can slide along the slide rail 143; wherein one end of the connecting assembly is connected to the slider 144.
[0060] It can be seen that the slide groove 142 is opened along the axial direction of the fixed sleeve 141, which can facilitate the sliding of the slider 144 on the slide rail 143 and realize flexible adjustment of the connecting component; the slide rail 143 is arranged at the end of the slide groove 142 close to the fixed column 110 along the axial direction of the fixed column 110, which can ensure the stable sliding of the slider 144 on the slide rail 143 and prevent the slider 144 from falling off or deviating from the track during the sliding process; the slider 144 is arranged on the slide rail 143 and can slide along the slide rail 143. Through the connection between the slider 144 and the connecting component, the connection component can be rotated and adjusted to adapt to different terrains and angles, thereby ensuring the stability and flexibility of the early warning device body 100.
[0061] Specifically, the sliding assembly also includes: a spring 145, which has a plurality of springs 145, and the plurality of springs 145 are arranged inside the slide groove 142 along the axial direction of the fixed column 110, one end of the spring 145 is connected to the slider 144, and the other end of the spring 145 is connected to the inner bottom wall of the slide groove 142; a plurality of snap-in grooves 146 are arranged on both sides of the slide groove 142, and the snap-in grooves 146 on both sides of the slide groove 142 are symmetrically arranged with the center line of the slide groove 142 as the symmetry axis; a snap-in sheet 147, which is arranged in the horizontal direction at one end of the slider 144 away from the connecting assembly, and the two ends of the snap-in sheet 147 are respectively snapped into any two symmetrically opened snap-in grooves 146, and the snap-in grooves 146 and the snap-in sheet 147 are detachably connected.
[0062] It can be seen that the spring 145 is arranged inside the slide groove 142 along the axial direction of the fixed column 110, one end of the spring is connected to the slider 144, and the other end is connected to the inner bottom wall of the slide groove 142, which can play a role of buffering and shock absorption when the slider 144 slides, protecting the integrity of the slider 144 and the slide rail 143; the clamping grooves 146 are symmetrically opened on both sides of the slide groove 142, and the clamping piece 147 is arranged in the horizontal direction at one end of the slider 144 away from the connecting component, and the two ends of the clamping piece 147 are respectively clamped into the two symmetrically opened clamping grooves 146, so that the slider 144 can be quickly fixed when it slides to the corresponding position, preventing the slider 144 from sliding freely on the slide rail 143, thereby enhancing the stability and reliability of the sliding component.
[0063] Specifically, the engaging piece 147 is interference fit with the engaging groove 146 .
[0064] Preferably, a fixing block 148 is disposed at one end of the clamping piece 147 away from the fixing sleeve 141 , and the length of the fixing block 148 is less than or equal to the width of the sliding groove 142 .
[0065] It is understandable that the clamping piece 147 and the clamping groove 146 adopt an interference fit, which can ensure that the connection between the clamping piece 147 and the clamping groove 146 is firm and reliable, and is not easy to fall off or loosen; at the same time, the clamping piece 147 is provided with a fixing block 148 at one end away from the fixing sleeve 141, which can be more stably clamped in the clamping groove 146, thereby improving the stability of the sliding assembly. In addition, the clamping piece 147 is provided with a fixing block 148 at one end away from the fixing sleeve 141, which is also convenient for operation, so that the staff can conveniently and quickly perform clamping and disassembly when installing and disassembling the sliding assembly, thereby improving work efficiency.
[0066] Specifically, the connection assembly includes: a connection rod 191, one end of which is connected to the slider 144; a second fixing plate 192, which is arranged at one end of the connection rod 191 away from the slider 144; and a second fixing bolt, which passes through the second fixing plate 192 and is inserted into the ground.
[0067] It can be seen that one end of the connecting rod 191 is connected to the slider 144, and the other end is connected to the second fixed plate 192, so as to realize the connection between the connecting component and the sliding component, and realize the flexible adjustment of the connecting component by sliding the slider 144 on the slide rail 143; the second fixed plate 192 is arranged at the end of the connecting rod 191 away from the slider 144, and is used to be fixed to the ground to ensure the stability and reliability of the connecting component; the second fixing bolt passes through the second fixing plate 192 and is inserted into the ground, so as to firmly fix the second fixing plate 192 to the ground to prevent the early warning device body 100 from shifting or tipping over during use, thereby ensuring the normal operation of the early warning device body 100.
[0068] Specifically, the second fixing plate 192 is rotatably connected to the connecting rod 191 .
[0069] It can be understood that the second fixed plate 192 and the connecting rod 191 are connected by rotation, which allows the second fixed plate 192 to rotate at a certain angle relative to the connecting rod 191, so as to adapt to different terrains and angle requirements. This enhances the flexibility and adaptability of the early warning device body 100, enabling it to operate stably in various environments. The rotational connection also facilitates fine-tuning by staff when installing and adjusting the early warning device, thereby improving work efficiency and installation quality.
[0070] Specifically, the detection component includes: a geological radar 150 , and the geological radar 150 is electrically connected to a distribution box 180 .
[0071] It can be seen that the geological radar 150, as an important component of the detection component, can obtain a stable and reliable power supply through the electrical connection with the distribution box 180, so as to carry out continuous geological detection and data analysis; the geological radar 150 has high resolution and strong penetration ability, and can detect geological structures, rock layers and potential geological disasters deep underground, providing accurate data support for the early warning device; through the electrical connection with the distribution box 180, the geological radar 150 can also realize real-time transmission and processing of data, providing timely and accurate judgment basis for disaster warning.
[0072] It is understandable that the geological radar 150 can also be flexibly configured and adjusted according to different detection needs to adapt to different geological environments and disaster types. Through precise data analysis and processing, the geological radar 150 can identify potential geological disaster risks, such as landslides, mud-rock flows, etc., and issue early warning signals to provide relevant departments and residents with sufficient time to prevent and respond, which helps to reduce disaster losses and protect people's lives and property.
[0073] Specifically, the geological disaster warning device also includes: a mounting seat 160, a mounting seat 160 is provided at the top of the fixed column 110, and the detection component is fixed to the top of the fixed column 110 through the mounting seat 160; an alarm device, which is electrically connected to the distribution box 180, and the alarm device is located at the edge of the mounting seat 160, and the alarm device includes a sound alarm and a light alarm.
[0074] Specifically, the geological disaster early warning device also includes: a controller, which is connected to the geological radar 150; a communication module, which is arranged inside the distribution box 180, and the communication module is connected to the controller.
[0075] It can be seen that the mounting base 160 is arranged at the top of the fixed column 110, which can provide a stable support platform for the detection component to ensure its normal operation; the alarm device is electrically connected to the distribution box 180, and can promptly send out sound and light alarm signals when a geological disaster risk is detected, so as to alert surrounding personnel and take corresponding preventive measures; the sound alarm and the light alarm are used in combination to ensure the clear transmission of the alarm signal, and can effectively alert personnel even in severe weather or environment; the controller is connected to the geological radar 150, and can receive the detection data of the geological radar 150, and process and analyze it to determine whether there is a geological disaster risk; the communication module is arranged inside the distribution box 180 and connected to the controller, which can realize the communication connection between the early warning device and the remote monitoring center, and transmit the geological disaster early warning information to the relevant departments in time so as to take further response measures; at the same time, the communication module can also receive instructions from the remote monitoring center to remotely control and adjust the early warning device, thereby improving the intelligence level of the early warning device.
[0076] In summary, the geological disaster early warning device provided by the utility model has the characteristics of stable structure, flexible and adjustable, accurate and timely early warning, and can be widely used in the field of geological disaster monitoring and early warning. Specifically, its advantages are reflected in the following aspects:
[0077] First, the geological disaster warning device provided by the utility model adopts a sliding component composed of a slide rail 143 and a slider 144, so that the connecting component can slide flexibly on the slide rail 143 to adapt to different terrains and installation requirements. This not only improves the adaptability and flexibility of the warning device, but also facilitates the installation and adjustment of the staff, thereby improving work efficiency.
[0078] Second, the provision of the snap-fit groove 146 and the snap-fit plate 147 enables the slider 144 to be quickly fixed when sliding to the corresponding position, preventing the slider 144 from sliding freely on the slide rail 143, thereby enhancing the stability and reliability of the sliding assembly. This effectively avoids the problem of position displacement or failure of the early warning device due to the movement of the slider 144, thereby ensuring the stable operation of the early warning device.
[0079] Third, as the core part of the detection component, the geological radar 150 has high resolution and strong penetration ability. It can detect geological structures deep underground and provide accurate data support for early warning. The sound alarm and light alarm of the alarm device are used in combination to send out clear and effective alarm signals in time when geological disaster risks are detected, reminding personnel to take preventive measures.
[0080] Fourth, the application of controller and communication module makes the early warning device intelligent and capable of remote monitoring. The controller can receive the detection data of geological radar 150, process and analyze it, and judge the risk of geological disasters; the communication module can realize the communication connection between the early warning device and the remote monitoring center, and transmit the early warning information to relevant departments in a timely manner, providing timely and accurate support for disaster response.
[0081] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A geological disaster early warning device, characterized in that: include: Early warning device body; A fixing column, which is arranged in the middle of the early warning device body in the vertical direction; A first fixing plate, which is arranged at the bottom end of the fixing column; a first fixing bolt passing through the first fixing plate and inserted into the ground; A connecting sleeve, which is sleeved on the outer side wall of the fixing column, and the connecting sleeve is located in the middle of the fixing column; A sliding assembly, which is located on a side of the connecting sleeve close to the first fixing plate; A connecting component, one end of which is connected to the sliding component, and the other end of which is fixed on the ground; wherein the connecting component can rotate relative to the sliding component; The detection component is located at the top of the fixing column.
2. The geological disaster early warning device according to claim 1, characterized in that: The geological disaster early warning device also includes: A solar panel, which is sleeved on the fixing column and located above the connecting sleeve; A distribution box, which is located on a side of the solar panel away from the detection assembly, and one end of the distribution box close to the connecting sleeve is fixed to the connecting sleeve through a fixing belt; the distribution box is connected to the solar panel; The fixing sleeve is sleeved on the outer side wall of the fixing column, and a distance is arranged between the fixing sleeve and the connecting sleeve.
3. The geological disaster early warning device according to claim 2, characterized in that: The sliding assembly comprises: Slide grooves, if there are several, the several slide grooves are opened along the axial direction of the fixing sleeve; A slide rail, which is arranged along the axial direction of the fixed column at one end of the slide groove close to the fixed column; A slider, which is arranged on the slide rail and can slide along the slide rail; Wherein, one end of the connecting component is connected to the slider.
4. The geological disaster early warning device according to claim 3, characterized in that: The sliding assembly also includes: A plurality of springs are provided inside the slide groove along the axial direction of the fixing column, one end of the spring is connected to the slider, and the other end of the spring is connected to the inner bottom wall of the slide groove; There are a plurality of clamping grooves, and a plurality of the clamping grooves are provided on both sides of the slide groove, and the clamping grooves on both sides of the slide groove are symmetrically arranged with the center line of the slide groove as the symmetry axis; A clamping piece is horizontally arranged at one end of the slider away from the connecting assembly, and both ends of the clamping piece are respectively clamped into any two symmetrically opened clamping grooves, and the clamping grooves are detachably connected to the clamping piece.
5. The geological disaster early warning device according to claim 4, characterized in that: The clamping piece is interference fit with the clamping groove.
6. The geological disaster early warning device according to claim 5, characterized in that: The connection component comprises: A connecting rod, one end of which is connected to the slider; A second fixing plate, which is arranged at an end of the connecting rod away from the sliding block; A second fixing bolt passes through the second fixing plate and is inserted into the ground.
7. The geological disaster early warning device according to claim 6, characterized in that: The second fixing plate is rotatably connected to the connecting rod.
8. The geological disaster early warning device according to claim 2, characterized in that: The detection component includes: a geological radar, and the geological radar is electrically connected to the distribution box.
9. The geological disaster early warning device according to claim 2, characterized in that: The geological disaster early warning device also includes: A mounting seat, the top of the fixing column is provided with the mounting seat, and the detection component is fixed to the top of the fixing column through the mounting seat; An alarm device is electrically connected to the distribution box, and the alarm device is located at the edge of the mounting seat. The alarm device includes a sound alarm and a light alarm.
10. The geological disaster early warning device according to claim 8, characterized in that: The geological disaster early warning device also includes: A controller connected to the geological radar; A communication module is arranged inside the distribution box, and the communication module is connected to the controller.