Binding and positioning tool for prefabricated steel reinforcement framework of integral cylindrical concrete wind tower
By designing a binding and positioning tool including rotatable bracket, positioning shaft, positioning lock, positioning support rod and resetting rod, the problem of rapid correction and positioning of the prefabricated steel skeleton of the entire cylindrical concrete wind tower cannot be quickly corrected and positioned during the positioning and forming process of the overall cylindrical concrete wind tower. , realizes efficient and rapid binding and positioning, and improves construction efficiency and tool service life.
Patent Information
- Application Number
- CN202421120095.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-22
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-22
AI Technical Summary
The prior art cannot quickly correct and position during the binding and positioning and forming process of the prefabricated steel skeleton of the entire cylindrical concrete wind tower, resulting in low construction efficiency, high cost, inconvenient tool disassembly and difficult to operate.
A binding and positioning tool including a base part, a rotatable bracket part, a positioning shaft, a positioning lock, a positioning support rod and a resetting tie rod are designed. Through the adjustment of the slide groove of the base part, the horizontal adjustment of the positioning support and the longitudinal adjustment of the rotatable support, the rapid binding and positioning of the steel frames of different sizes and spacings can be achieved.
It realizes rapid correction and positioning during the steel bar binding and positioning process, improves construction efficiency, reduces the labor intensity of operators, and enables tools to be reused multiple times, significantly improving manual efficiency.
Smart Images

Figure CN222470575U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction of integral cylindrical concrete wind towers, in particular to a binding and positioning forming tool for a prefabricated steel bar skeleton of an integral cylindrical concrete wind tower. Background Art
[0002] At present, the binding and positioning of the prefabricated steel skeleton of the integral cylindrical concrete wind tower for construction is done by assembling and forming with dispersed positioning brackets before binding. After binding and forming, the frame is manually disassembled before the steel skeleton can be lifted and transported to the next workstation. This method of assembling and disassembling the positioning brackets relies entirely on the operators to install, position and disassemble. The installation accuracy depends on the technical proficiency of the operators. In addition, it is difficult to coordinate the machine with manual correction and positioning, which consumes labor and auxiliary time and has low construction efficiency. It is impossible to quickly correct and position the prefabricated steel skeleton during the installation process of binding and positioning, which ultimately leads to increased construction costs. During the use of the existing installation and positioning tools for prefabricated composite beams, the positioning bracket position needs to be repeatedly adjusted and fixed before the steel skeleton is tied, and manual adjustment consumes manpower, takes a long time to adjust, and the positioning operation is inefficient, resulting in poor use effect.
[0003] Chinese patent document CN111660430A discloses a new type of box girder reinforcement frame binding platform, which can be adjusted according to the design requirements of the box girder reinforcement, has strong applicability and can improve the standardization of the construction site. However, the binding platform of the patent is inconvenient to disassemble and difficult to operate. Utility Model Content
[0004] The utility model provides a binding and positioning tool for a prefabricated steel frame of an integral cylindrical concrete wind tower, so as to solve the problem that after binding and forming, the frame body needs to be manually disassembled so that the steel frame can be hoisted and transported to the next work station; and the problem that rapid correction and positioning cannot be performed during the installation process of binding and positioning forming of the prefabricated steel frame.
[0005] In order to solve the above problems, the utility model adopts the following technical solutions: a binding and positioning tool for a prefabricated steel frame of an integral cylindrical concrete wind tower, comprising a base portion 1, a rotatable bracket portion 2, a positioning shaft 5 and a positioning lock 6; the base portion 1 comprises an annular seat 14, a base center column 13 is vertically arranged at the center of the annular seat 14, a plurality of horizontal channel steel bottom frames 11 are radially welded between the base center column 13 and the annular seat 14, and a longitudinal slide groove 12 is provided on the horizontal channel steel bottom frame 11;
[0006] A rotatable bracket part 2 is provided on each horizontal channel steel bottom frame 11, and the rotatable bracket part 2 is welded by a horizontal channel steel bottom plate 21 and a vertical rectangular tube 22 to form a right-angle structure. A horizontal channel steel bottom plate 21 is provided in the slide groove 12 of each horizontal channel steel bottom frame 11, and the vertical rectangular tube 22 faces the direction of the base center column 13, and the vertical rectangular tube 22 is a circular structure around the base center column 13; the positioning shaft 5 is provided at the corner of the rotatable bracket part 2, and the two ends of the positioning shaft 5 are installed on the horizontal channel steel bottom frame 11;
[0007] A positioning lock 6 is provided at the outer end of the horizontal channel steel bottom frame 11 , and the positioning lock 6 fixes the outer end of the vertical rectangular tube 22 .
[0008] Furthermore, the utility model also has the following characteristics: it also includes a positioning support rod part 3 and a reset rod part 4, the horizontally arranged positioning support rod part 3 is a two-section rod body structure, and the two sections of the rod body are connected by an axis to form a hinged structure; the vertically arranged reset rod part 4 is a two-section rod body structure, and a spiral compression spring is connected between the two sections of the rod body; a positioning support rod part 3 is arranged on the inner side of each rotatable bracket part 2, and the two ends of the positioning support rod part 3 are respectively hinged to the central column 13 of the base and the vertical rectangular tube 22; a reset rod part 4 is arranged under each positioning support rod part 3, and the upper and lower ends of the reset rod part 4 are hinged to the horizontal channel steel bottom frame 11 and the middle section of the positioning support rod part 3.
[0009] Furthermore, the utility model has the following feature: a positioning block 7 is provided on the vertical rectangular tube 22 .
[0010] The beneficial effects of the utility model are:
[0011] 1. The utility model is a tool for tying and positioning the prefabricated steel frame of an integral cylindrical concrete wind tower. It is a tool for tying and positioning the prefabricated steel frame of an integral cylindrical concrete wind tower. The vertical rectangular tube of the rotatable bracket part is formed into a circle to provide a support formwork for steel bar tying. Through the horizontal adjustment of the slide groove of the base part, the horizontal adjustment of the positioning support rod part, and the longitudinal adjustment of the rotatable bracket part, it can meet the tying of steel bar frames with different diameters and horizontal ring reinforcement spacings. It has universality and can be quickly corrected and positioned during the installation process of steel bar tying and positioning molding.
[0012] 2. After the steel skeleton is formed, release the positioning lock, lift the steel skeleton, and the work of the positioning support rod is to pull the rotatable bracket part inward to separate it from the steel skeleton. At this time, the steel skeleton can be quickly and unimpededly lifted; when you are ready to use the tool again for steel binding, you can pull the elastic reset rod part upward to rotate the rotatable bracket part outward, lock it with the positioning lock, and then you can bind the steel skeleton. In this way, the binding and positioning of the prefabricated steel skeleton can be carried out more quickly and accurately, and the binding frame can be installed once and then reused many times, with rapid positioning and auxiliary rapid reset, so that the formed steel skeleton can be quickly bound and quickly detached, which greatly reduces the labor intensity of the operator and effectively improves the labor efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0014] Figure 2 It is a structural diagram of the base part;
[0015] Figure 3 It is a structural schematic diagram of the rotatable bracket part;
[0016] Figure 4 It is a structural schematic diagram of the positioning support rod part and the reset pull rod part;
[0017] Figure 5 It is a schematic diagram of the connection structure between the rotatable bracket part and the horizontal channel steel bottom frame;
[0018] Figure 6 yes Figure 5 K-direction view;
[0019] Figure 7 It is a schematic diagram of the connection structure between the positioning support rod part and the reset pull rod part;
[0020] Figure 8 yes Figure 7 Component expansion diagram;
[0021] Fig. 9 yes Figure 7 A schematic diagram of a partially bent middle positioning support rod;
[0022] Fig.10 is a schematic diagram of the connection structure between the base part and the rotatable bracket part;
[0023] Fig.11 It is a schematic diagram of the utility model in which the rotatable bracket part rotates and loses support for the steel bars after being tied.
[0024] Explanation of symbols in the figure: base part 1, horizontal channel steel bottom frame 11, slide 12, base center column 13, annular seat 14, rotatable bracket part 2, horizontal channel steel bottom plate 21, vertical rectangular tube 22, positioning support rod part 3, reset pull rod part 4, positioning shaft 5, positioning lock 6, positioning block 7, annular reinforcement 8. DETAILED DESCRIPTION
[0025] The present invention is described in detail with reference to the best embodiment below.
[0026] like Figure 1-2 As shown, a binding and positioning tool for a prefabricated steel frame of an integral cylindrical concrete wind tower includes a base portion 1, a rotatable bracket portion 2, a positioning shaft 5, a positioning support rod portion 3, a reset pull rod portion 4 and a positioning lock 6; the base portion 1 includes an annular seat 14, a base center column 13 is vertically arranged at the center of the annular seat 14, a plurality of horizontal channel steel bottom frames 11 are radially welded between the base center column 13 and the annular seat 14, and a longitudinal slide groove 12 is provided on the horizontal channel steel bottom frame 11, thereby forming a complete base frame.
[0027] like Figure 1 , 3 , 5, and 6, each horizontal channel steel bottom frame 11 is provided with a rotatable bracket part 2, and the rotatable bracket part 2 is welded by a horizontal channel steel bottom plate 21 and a vertical rectangular tube 22 to form a right-angle structure. A horizontal channel steel bottom plate 21 is provided in the slide groove 12 of each horizontal channel steel bottom frame 11, and the vertical rectangular tube 22 faces the direction of the base center column 13, and the vertical rectangular tube 22 is a circular structure around the base center column 13; the positioning shaft 5 is arranged at the corner of the rotatable bracket part 2, and the two ends of the positioning shaft 5 It is installed on the horizontal channel steel bottom frame 11, so that the rotatable bracket part 2 forms a rotatable bracket part, and the rotatable bracket part is fixed by manual operation; when tying the steel bars, the vertical rectangular tube 22 is in a vertical state, and the vertical rectangular tube 22 serves as a supporting frame for tying, and the positioning block 7 on the vertical rectangular tube 22 realizes the positioning of the steel bars; after the tying is completed, the rotatable bracket part 2 is manually rotated around the positioning shaft 5, and the horizontal channel steel bottom plate 21 is tilted toward the center column 13 of the base, so as to facilitate the lifting of the annular steel bars.
[0028] A positioning block 7 is provided on the vertical rectangular tube 22. The positioning block 7 may be an adjustable structure. The positioning block 7 may be fixed to the vertical rectangular tube 22 by screws to adjust the height, thereby satisfying the fixation of horizontal ribs with different spacings.
[0029] A positioning lock 6 is provided at the outer end of the horizontal channel steel bottom frame 11, and the positioning lock 6 fixes the outer end of the vertical rectangular tube 22. The positioning lock 6 can be a pressure block fixed to the horizontal channel steel bottom frame 11 by bolts. The pressure block is rotated to press it against the outer end of the vertical rectangular tube 22 to achieve fixation. The positioning lock 6 is opened by manual operation, that is, the rotatable bracket part 2 is rotated.
[0030] like Figure 3 , 7 As shown in Figures 8 and 9, the horizontally arranged positioning support rod part 3 is a two-section rod body structure, and the two sections of the rod body are connected by an axis to form a hinged structure; the vertically arranged reset rod part 4 is a two-section rod body structure, and a spiral compression spring is connected between the two sections of the rod body; a positioning support rod part 3 is arranged on the inner side of each rotatable bracket part 2, and the two ends of the positioning support rod part 3 are respectively hinged to the central column 13 of the base and the vertical rectangular tube 22; a reset rod part 4 is arranged under each positioning support rod part 3, and the upper and lower ends of the reset rod part 4 are hinged to the horizontal channel steel bottom frame 11 and the middle section of the positioning support rod part 3.
[0031] like Figure 1 , 11 As shown, the length of the positioning support rod part 3 is set according to the design size of the component to ensure the verticality of the vertical rectangular tube 22; the spring force of the reset pull rod part 4 pushes the positioning support rod part 3 upward to make the positioning support rod part 3 in a straight state, and then the positioning support rod part 3 supports the vertical rectangular tube 22 and ensures verticality, and the positioning lock 6 fixes the rotatable bracket part 2; after the steel skeleton is formed, the overall weight is pressed on the base part 1, the positioning lock 6 is manually released, and the middle section of the positioning support rod part 3 is manually pressed down to form a curved state, and the spring of the reset pull rod part 4 is compressed, and at the same time, the positioning support rod part 3 pulls or manually rotates the rotatable bracket part 2 inward. At this time, due to the change in the force angle of the positioning support rod part 3 on the rotatable bracket part 2, the elastic force of the reset pull rod part 4 is not enough to push the rotatable bracket part 2 back to its original position. The weight acting on the bottom frame of the positioning bracket disappears when the steel skeleton is hoisted, and the rotatable bracket part 2 is detached from the steel bars and loses support, ensuring that the steel skeleton can be quickly and smoothly hoisted away from the binding frame station.
Claims
1. A tool for tying and positioning prefabricated steel frame of an integral cylindrical concrete wind tower, characterized in that: The invention comprises a base part (1), a rotatable bracket part (2), a positioning shaft (5) and a positioning lock (6); the base part (1) comprises an annular seat (14), a base center column (13) is vertically arranged at the center of the annular seat (14), a plurality of horizontal channel steel bottom frames (11) are radially welded between the base center column (13) and the annular seat (14), and a longitudinal slide groove (12) is arranged on the horizontal channel steel bottom frame (11); A rotatable support part (2) is arranged on each horizontal channel steel bottom frame (11), and the rotatable support part (2) is formed by welding a horizontal channel steel bottom plate (21) and a vertical rectangular tube (22) to form a right-angle structure. A horizontal channel steel bottom plate (21) is arranged in the slide groove (12) of each horizontal channel steel bottom frame (11), and the vertical rectangular tube (22) faces the direction of the base center column (13), and the vertical rectangular tube (22) is in a circular structure around the base center column (13); a positioning shaft (5) is arranged at the corner of the rotatable support part (2), and both ends of the positioning shaft (5) are installed on the horizontal channel steel bottom frame (11); A positioning lock (6) is arranged at the outer end of the horizontal channel steel bottom frame (11), and the positioning lock (6) fixes the outer end of the vertical rectangular tube (22).
2. A tool for tying and positioning a prefabricated steel frame of an integral cylindrical concrete wind tower as claimed in claim 1, characterized in that: It also includes a positioning support rod part (3) and a reset pull rod part (4). The horizontally arranged positioning support rod part (3) is a two-section rod body structure, and the two sections of the rod body are connected by an axis to form a hinged structure; the vertically arranged reset pull rod part (4) is a two-section rod body structure, and a spiral compression spring is connected between the two sections of the rod body; a positioning support rod part (3) is arranged on the inner side of each rotatable bracket part (2), and the two ends of the positioning support rod part (3) are respectively hinged to the central column (13) of the base and the vertical rectangular tube (22); a reset pull rod part (4) is arranged below each positioning support rod part (3), and the upper and lower ends of the reset pull rod part (4) are hinged to the horizontal channel steel bottom frame (11) and the middle section of the positioning support rod part (3).
3. A tool for tying and positioning a prefabricated steel frame of an integral cylindrical concrete wind tower as claimed in claim 1, characterized in that: A positioning block (7) is arranged on the vertical rectangular tube (22).
Citation Information
Patent Citations
Novel box girder steel reinforcement framework binding rack
CN111660430A