Fabricated steel structure construction method building teaching model

By designing a prefabricated steel structure construction teaching model, the problem of lack of practicality in traditional teaching methods is solved, students' drawing recognition and hands-on ability are improved, and the steel structure industry's demand for talents is met.

CN222482859UActive Publication Date: 2025-02-14SICHUAN HONGYE CONSTR SOFTWARE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420550764.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2025-02-14
Estimated Expiration
2034-03-21

AI Technical Summary

Technical Problem

The traditional teaching methods of steel structure construction lack practicality, cannot effectively cultivate students' drawing recognition and hands-on ability, and cannot meet the talent needs of steel structure construction companies and steel component manufacturing companies.

Method used

Design a teaching model for the prefabricated steel structure construction work building. By setting up first and second floor structures above the cushion layer, combining door and window components, staircase components and fence components, a teaching entity model is formed to display the interior of the prefabricated steel structure construction work building. connect.

Benefits of technology

Through solid model teaching, students can intuitively understand the assembly process and various connection points of steel structures, improve their drawing recognition and hands-on ability, and enhance their understanding of the basic process and quality points of steel structure processing and production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222482859U_ABST
    Figure CN222482859U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type steel structure construction method building teaching model, which comprises a cushion layer, a first-layer structure and a second-layer structure are assembled above the cushion layer by arranging prefabricated column assemblies in sequence, a stair assembly leading to the second-layer structure is arranged inside the first-layer structure, and the stair assembly is connected with the second-layer structure. A fence assembly is arranged on the periphery of the second-layer structure. According to the teaching model, students are trained to correctly understand steel structure manual drawings and connection points in the steel structure, the basic process and quality key points of steel structure processing and manufacturing are taught to the students in the teaching process, and the learning ability of the students is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of assembled building teaching, in particular to an assembled steel structure method building teaching model. Background Art

[0002] In teaching practice, it is found that due to the limitations of practical training conditions and the lack of typical steel structure construction cases, the traditional teaching method is mainly theoretical teaching, focusing only on the calculation and design of steel structures, but ignoring students' ability to read drawings and hands-on ability, and cannot meet the talent needs of many steel structure construction companies and steel component manufacturing companies. Utility Model Content

[0003] The purpose of the utility model is to provide a teaching model of building construction using an assembled steel structure method, which solves the above-mentioned technical problems existing in the prior art by arranging a first-floor structure and a second-floor structure above a cushion layer, and combining them with door and window assemblies, stair assemblies, and fence assemblies to form a teaching entity model, so that students can understand steel structures during the teaching process.

[0004] In order to solve the above technical problems, the utility model adopts the following solutions:

[0005] A teaching model of assembled steel structure building construction method includes a cushion layer, on top of which a first-floor structure and a second-floor structure are assembled in sequence by arranging prefabricated column assemblies, the interior of the first-floor structure is provided with a staircase assembly leading to the second-floor structure, and the periphery of the second-floor structure is provided with a fence assembly.

[0006] Preferably, a plurality of symmetrical short columns are provided above the cushion layer, and the prefabricated column assembly is assembled above the short columns by anchor bolts. The prefabricated column assembly includes a round steel tube, an H-shaped column, a cross column, and a square tube column. Two round steel tubes or two H-shaped columns or two cross columns or two square tube columns are symmetrical to each other along the center of the short side of the cushion layer.

[0007] Preferably, the short column and the anchor bolt are provided with a pad and a first gasket in sequence from bottom to top, and stiffening ribs are provided on both sides of the bottom of the prefabricated column assembly and are fixedly connected to the pad by welding.

[0008] Preferably, in the one-story structure, an inter-column rigid support assembly is provided between the adjacent H-shaped columns and the cross columns.

[0009] Preferably, a plurality of transversely and longitudinally assembled main beams are provided at the top of the prefabricated column assembly, a secondary beam is assembled between two transversely assembled main beams, a composite floor is assembled above the main beams and the secondary beams, the two-story structure is located above the composite floor, and an H-shaped column 2 is arranged above the composite floor, and the H-shaped column 2 is coaxial with the prefabricated column assembly of the first-story structure.

[0010] Preferably, a roof beam is arranged at the top of the second H-shaped column longitudinally distributed in the two-story structure, and cantilever beams are arranged at both ends of the roof beam.

[0011] Preferably, a plurality of thin rod supports are arranged between adjacent H-shaped columns 2, a horizontal support rod is arranged between two thin rod supports, and both ends of the horizontal support rod are respectively connected to the H-shaped column 2.

[0012] Preferably, a plurality of purlins are provided at the top of the roof beam, the purlins and the roof beams are perpendicular to each other, struts and diagonal braces are provided between adjacent purlins, and a color steel roof is set up at the top of the purlins.

[0013] Preferably, corner braces are provided on both sides of the roof beam, and one end of the corner brace away from the roof beam is fixedly connected to the purlin, and the angle between the corner brace and the roof beam or the purlin is greater than or equal to 35°.

[0014] Preferably, in the two-story structure, between the two adjacent H-shaped columns there is an inter-column flexible support assembly, the periphery of the first-story structure and the second-story structure is provided with a corrugated steel plate wall panel, the interior is provided with a lightweight interior wall partition panel, and the corrugated steel plate wall panel is provided with door and window assemblies.

[0015] The utility model has the beneficial effects:

[0016] This teaching model of the construction of a prefabricated steel structure building mainly uses various types of steel structures to assemble an overall frame. Corrugated steel wall panels, lightweight interior wall partitions, door and window components, stair components, and fence components are set inside the frame. The first-floor structure is equipped with rigid support components between columns, and the second-floor structure is equipped with flexible components between columns. The top of the second-floor structure is equipped with a colored steel roof. The internal connections of the prefabricated steel structure building are displayed to cultivate students' correct understanding of steel structure manual drawings and various connection points in steel structures. In the teaching process, students are taught the basic technology and quality points of steel structure processing and manufacturing to improve their learning ability. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of a one-story structure of the utility model;

[0019] Figure 3 It is a structural schematic diagram of a two-story structure of the utility model;

[0020] Figure 4 This is a schematic diagram of the assembly structure of the round tube steel of the utility model;

[0021] Figure 5It is a schematic diagram of the assembly structure of the purlin and the H-shaped column 2 of the utility model.

[0022] Figure numerals: 1-first floor structure, 10-prefabricated column assembly, 100-pad, 101-short column, 102-round steel pipe, 103-cross column, 104-H-type column 1, 105-square tube column, 110-anchor bolt, 120-main beam, 130-secondary beam, 140-pad, 150-stiffening rib, 160-first gasket, 2-second floor structure, 200-roof beam, 210-cantilever beam, 2 20-thin rod support, 230-horizontal support rod, 240-support rod, 250-diagonal brace, 260-purlin, 270-corner brace, 280-combined floor, 290-H-type column two, 291-second gasket 3-rigid support assembly between columns, 4-lightweight interior wall partition, 5-corrugated steel wall panel, 6-flexible support assembly between columns, 7-stair assembly, 8-fence assembly, 9-door and window assembly, 90-color steel roof. DETAILED DESCRIPTION

[0023] The present invention will be further described in detail below in conjunction with the embodiments and drawings, but the implementation manner of the present invention is not limited thereto.

[0024] In the description of the present utility model, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "longitudinal", "lateral", "horizontal", "inside", "outside", "front", "back", "top", "bottom", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are the directions or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present utility model.

[0025] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "open", "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. Example

[0026] An embodiment of the utility model is a teaching model of assembled steel structure building construction, including a cushion layer 100, on top of which a first-floor structure 1 and a second-floor structure 2 are assembled in sequence by arranging prefabricated column assemblies 10, the interior of the first-floor structure 1 is provided with a staircase assembly 7 leading to the second-floor structure 2, and the periphery of the second-floor structure 2 is provided with a fence assembly 8.

[0027] Reference Figures 1 to 3 The utility model arranges a first-floor structure 1 and a second-floor structure 2 above the cushion layer 100, which are assembled by arranging prefabricated components respectively. The prefabricated column component 10 forms an overall frame, and the door and window component 9, the staircase component 7 and the fence component 8 are connected. The assembled building is physically simulated to expose the internal connections, so that students can conduct field teaching more intuitively. At the same time, the teaching model retains the design drawings, which can enable students to learn the actual connection process of each steel structure according to the drawings and deepen the impression of the knowledge points.

[0028] In some preferred embodiments, a plurality of symmetrical short columns 101 are provided above the cushion layer 100, and the prefabricated column assembly 10 is assembled above the short columns 101 by anchor bolts 110. The prefabricated column assembly 10 includes a round steel tube 102, an H-shaped column 104, a cross column 103, and a square tube column 105. Two round steel tubes 102 or two H-shaped columns 104 or two cross columns 103 or two square tube columns 105 are symmetrical to each other along the center of the short side of the cushion layer 100.

[0029] Specifically, Figure 4 As shown, a short column 101 is set above the cushion layer 100 and fixed with anchor bolts 110. The purpose of the cushion layer 100 is to improve the working conditions of the base and the soil foundation through water isolation, drainage and antifreeze. The water stability of the cushion layer 100 is required to be good. The length of the cushion layer 100 is 15000mm, the width is 5400mm, and the thickness is 150mm. The short column 101 is mainly used to improve the bearing capacity and seismic performance, avoid brittle failure and ensure structural stability. The specifications of the short column 101 are 800mm×800mm×100mm. The anchor bolts 110 are used to fix the short column 101 above the cushion layer 100, which provides conditions for the installation of the prefabricated column assembly 10. The prefabricated column assembly 10 mainly includes four types in this teaching model, namely round steel pipe 102, H-shaped column 104, cross column 103, and square tube column 105. Two steel structures of the same type are grouped together and arranged in sequence along the long side of the cushion layer 100. The prefabricated column assembly 10 is mainly used to improve the bearing capacity and earthquake resistance of the teaching model, avoid brittle failure and ensure structural stability.

[0030] In some preferred embodiments, the short column 101 and the anchor bolt 110 are provided with a pad 140 and a first gasket 160 from bottom to top, and stiffening ribs 150 are provided on both sides of the bottom of the prefabricated column assembly 10 and fixedly connected to the pad 140 by welding.

[0031] Gaskets are provided to protect the anchor bolts 110 and the cushion layer 100. The specification of the first gasket 160 is 540mm×290mm×20mm. At the same time, a hole is opened in the middle of the first gasket 160 to ensure the fixed connection of the anchor bolt 110. Stiffening ribs 150 are provided to increase the shear resistance of the web. The number of stiffening ribs 150 is set according to the actual steel structure to ensure the maximum shear resistance.

[0032] In some preferred embodiments, in the one-story structure 1 , an inter-column rigid support assembly 3 is provided between the adjacent H-shaped columns 104 and the cross columns 103 .

[0033] The inter-column rigid support assembly 3 is mainly set to ensure the overall stability and longitudinal rigidity of the teaching model skeleton and to bear the longitudinal horizontal load on the top. The inter-column rigid support mainly uses hot-rolled steel or steel pipe support components such as angle steel, channel steel, I-beam, etc., which are connected to the columns at both ends. They are usually connected by node plates and are used in structures with high rigidity requirements such as multi-story frames and crane beam lower section supports. The intersection angle between the rigid support and the ground should be controlled between 30° and 60°. If the support is too steep, its lateral resistance efficiency will be greatly reduced.

[0034] In some preferred embodiments, the top of the prefabricated column assembly 10 is provided with a plurality of transversely and longitudinally assembled main beams 120, a secondary beam 130 is assembled between two transversely assembled main beams 120, a composite floor 280 is assembled above the main beams 120 and the secondary beams 130, the two-story structure 2 is located above the composite floor 280, and an H-shaped column 290 is arranged above the composite floor 280, and the H-shaped column 290 is coaxial with the prefabricated column assembly 10 of the first-story structure 1.

[0035] Specifically, Figure 3 As shown, the main beam 120 is arranged in two directions, the main beam 120 between two steel structures of the same type is longitudinal, and the main beam 120 between two steel structures of different types is transverse. The main beam 120 mainly bears and transfers the load, and the number of the main beams 120 is eight. The secondary beam 130 is located between the two transverse main beams 120, and also plays the role of transferring the load. The number of the secondary beams 130 is three. The composite floor slab 280 is a corrugated steel plate composite floor slab 280, which is formed by pressing galvanized thin steel plates, and its cross section is a trapezoidal, inverted trapezoidal or similar shaped waveform. It is used for permanent support formwork of floor slabs in buildings, and can also be selected as steel plates for other purposes. It can be divided into open floor slabs, fully closed floor slabs, and dovetail floor slabs.

[0036] The thickness of the floor decking profile is 0.8mm, 1.0mm, 1.2mm, the width is 688mm-940mm, and the height is 51mm-76mm. The floor decking of the engineering floor works together with the reinforced concrete structure, which is a composite structure. The floor decking is laid and connected with the steel beam, the plate end and the steel beam are spot welded through, and the bolts and steel beams are penetrated and welded in the middle; the floor decking is connected by bite-pressure holes with special clamps; the plug is spot welded with a special galvanized plug plate and the floor decking and steel beam.

[0037] In some preferred embodiments, roof beams 200 are provided at the top ends of the H-shaped columns distributed longitudinally in the two-story structure 2 , and cantilever beams 210 are provided at both ends of the roof beams 200 .

[0038] Specifically, the roof beam 200 is arranged at the top of a plurality of H-shaped columns 290 to form the main roof frame structure at the top of the two-story structure 2. The roof beam 200 is the main structural member that bears the pressure from the purlin 260 and the roof panel in the roof structure, and mainly bears bending moment and shear force. The cantilever beam 210 is located at the two ends of the roof beam 200, one end of which is a fixed support, and the end away from the roof beam 200 is a free end.

[0039] In some preferred embodiments, a plurality of thin rod supports 220 are arranged between adjacent H-shaped columns 290, and a horizontal support rod 230 is arranged between two thin rod supports 220, and both ends of the horizontal support rod 230 are respectively connected to the H-shaped column 290. The thin rod supports 220 form a stable longitudinal frame between the roof beams 200 to ensure the longitudinal rigidity of the steel structure. The thin rod supports 220 are arranged along the entire length of the house, connecting the ridge nodes and the support nodes, and play a role in connecting each roof truss. The horizontal support rod 230 is generally composed of a cross rod and a rigid tie rod. The cross rod used in this teaching model is a round rod with a tensioning device for easy tightening. The horizontal support rod 230 forms a complete structural system by connecting the various parts of the steel structure, thereby improving the overall rigidity and strength of the structure.

[0040] In some preferred embodiments, a plurality of purlins 260 are provided at the top of the roof beam 200 . The purlins 260 are perpendicular to the roof beam 200 . Struts 240 and diagonal braces 250 are provided between adjacent purlins 260 . A color steel roof 90 is constructed at the top of the purlins 260 .

[0041] Specifically, the purlin 260 is a horizontal member distributed along the length of the roof, which mainly plays a supporting role. It is placed in the plane of the roof truss to reduce the span of the roof panel. The horizontal spacing between adjacent purlins 260 is 1100mm. The support rod 240 is used to prevent the flexural deformation of the purlin 260, and the diagonal brace 250 is used to strengthen the lateral rigidity of the steel structure. A tie rod is also provided between adjacent purlins 260. The support rod 240, the purlin 260 and the diagonal brace 250 form a geometrically invariant system, which plays a supporting role in the weak axis direction of the purlin 260 to prevent the purlin 260 from deforming in the weak axis direction, which is dangerous.

[0042] In some preferred embodiments, corner braces 270 are provided on both sides of the roof beam 200, and one end of the corner brace 270 away from the roof beam 200 is fixedly connected to the purlin 260, and the angle between the corner brace 270 and the roof beam 200 or the purlin 260 is greater than or equal to 35°.

[0043] Specifically, refer to Figure 5 The corner brace 270 can make the structure have better energy dissipation performance and deformation capacity, thereby protecting the main components of the structure. The corner brace 270 is generally made of angle steel, and the angle between the corner brace 270 and the purlin 260 or the wall beam is greater than or equal to 35°. The two ends of the corner brace 270 are connected to the beam or side column and the purlin 260 or the beam with bolts to improve the stability of the teaching model.

[0044] In addition, the roof beam 200 is made of I-beam, which is generally placed horizontally to support the board and bear various vertical loads transmitted from the board and the deadweight of the beam. At the same time, when installing the bolts, a second gasket 291 is set, which forms a fixed connection between the beam and the purlin 260, and a fixed connection between the corner brace 270 and the beam.

[0045] In some preferred embodiments, in the two-story structure 2, an inter-column flexible support assembly 6 is provided between adjacent H-shaped columns 290, and the periphery of the first-story structure 1 and the second-story structure 2 is provided with a corrugated steel plate wall panel 5, and the interior is provided with a lightweight interior wall partition panel 4, and the corrugated steel plate wall panel 5 is provided with a door and window assembly 9.

[0046] Specifically, the flexible support between columns is mainly to ensure the overall stability and longitudinal rigidity of the teaching model frame and bear the longitudinal horizontal load. The diagonal support rods between columns are divided into rigid support and flexible support according to whether they can effectively resist the axial pressure surface. The flexible support is made of cross-shaped round tubes with tensioning devices, which must be tensioned during installation and are mainly used in portal steel frame structures.

[0047] Corrugated steel wall panel 5 refers to a building maintenance panel made of color coated steel sheet or galvanized steel sheet as raw material, which is formed by roller cold bending. When used for building roofs or walls, its thickness should not be less than 0.4mm.

[0048] The corrugated steel wall panel 5 is divided into two types: non-insulated single-layer corrugated steel panel and thermal insulation composite corrugated steel panel. The non-insulated single-layer corrugated steel panel currently used more is the color-coated galvanized steel panel. It is generally a corrugated plate with a thickness of 0.4 to 1.6 mm. The color-coated galvanized steel panel has high heat resistance and corrosion resistance, and its general service life can reach about 20 years; the thermal insulation composite corrugated steel panel can be filled with plate-shaped insulation materials such as polystyrene foam board in the inner and outer layers of steel plates during construction. The structure of the corrugated steel plate exterior wall strives to be simple, easy to construct, and reliably connected to the wall beam. The detailed structures such as corners should have sufficient overlap length to ensure the waterproof effect. The door and window components 9 are mainly arranged in the external corrugated steel wall panel 5.

[0049] Lightweight interior partition wall is a new type of energy-saving wall material. It is a wall material that looks like a hollow floor slab, with male and female grooves on both sides. When installing, you only need to stand up the board, apply a small amount of caulking mortar on the male and female parts, and then assemble them. It is composed of harmless phosphogypsum, lightweight steel slag, fly ash and other industrial waste residues, and is cured by variable frequency steam pressure. Lightweight interior partition board has the advantages of light weight, high strength, multiple environmental protection, thermal insulation, sound insulation, breathable humidity control, fire prevention, fast construction, and reduced wall cost. The inner layer is equipped with reasonably arranged heat-insulating and sound-absorbing inorganic foam profiles or other thermal insulation materials.

[0050] This teaching model of the construction of an assembled steel structure building is mainly assembled into an overall frame through various types of steel structures. Corrugated steel plate wall panels 5, lightweight interior wall partitions 4, door and window components 9, staircase components 7, and fence components 8 are arranged inside the frame. The first-floor structure 1 is provided with a column-to-column rigid support component 3, the second-floor structure 2 is provided with a column-to-column flexible component, and the top of the second-floor structure 2 is provided with a color steel roof 90. The internal connections of the assembled steel structure building are displayed to cultivate students' correct understanding of steel structure manual drawings and various connection points in steel structures. In the teaching process, students are taught the basic technology and quality points of steel structure processing and manufacturing to improve students' independent learning ability.

[0051] The above is only a preferred embodiment of the utility model and does not limit the utility model in any form. According to the technical essence of the utility model, within the spirit and principles of the utility model, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the utility model.

Claims

1. A teaching model of assembled steel structure building construction, characterized in that: The invention comprises a cushion layer (100), wherein a first-floor structure (1) and a second-floor structure (2) are assembled on the cushion layer (100) in sequence by arranging prefabricated column assemblies (10), wherein a staircase assembly (7) leading to the second-floor structure (2) is arranged inside the first-floor structure (1), and a fence assembly (8) is arranged on the periphery of the second-floor structure (2), wherein a plurality of symmetrical short columns (101) are arranged on the cushion layer (100), wherein the prefabricated column assembly (10) is assembled on the top of the short columns (101) by means of anchor bolts (110), and wherein the prefabricated column assembly (10) comprises a round steel tube (102), an H-shaped column (104), a cross column (103), and a square tube column (105), wherein two round steel tubes (102) or two H-shaped columns (104) or two cross columns (103) or two square tube columns (105) are symmetrical to each other along the center of the short side of the cushion layer (100).

2. The teaching model of a prefabricated steel structure building construction method according to claim 1 is characterized in that: The short column (101) and the anchor bolt (110) are provided with a pad (140) and a first pad (160) in sequence from bottom to top, and stiffening ribs (150) are provided on both sides of the bottom of the prefabricated column assembly (10) and are fixedly connected to the pad (140) by welding.

3. The teaching model of a prefabricated steel structure building construction method according to claim 1 is characterized in that: In the one-story structure (1), an inter-column rigid support assembly (3) is provided between the adjacent H-shaped column 1 (104) and the cross column (103).

4. The teaching model of a prefabricated steel structure building construction method according to claim 1 is characterized in that: A plurality of transversely and longitudinally assembled main beams (120) are provided at the top of the prefabricated column assembly (10); a secondary beam (130) is assembled between two transversely assembled main beams (120); a composite floor slab (280) is assembled above the main beams (120) and the secondary beams (130); the second-story structure (2) is located above the composite floor slab (280); a second H-shaped column (290) is arranged above the composite floor slab (280); the second H-shaped column (290) is coaxial with the prefabricated column assembly (10) of the first-story structure (1).

5. The teaching model of a prefabricated steel structure building construction method according to claim 4 is characterized in that: A roof beam (200) is arranged at the top of a second H-shaped column (290) distributed longitudinally in the two-story structure (2), and cantilever beams (210) are respectively arranged at both ends of the roof beam (200).

6. The teaching model of a prefabricated steel structure building construction method according to claim 4 is characterized in that: A plurality of thin rod supports (220) are arranged between adjacent H-shaped columns (290), a horizontal support rod (230) is arranged between two thin rod supports (220), and both ends of the horizontal support rod (230) are respectively connected to the H-shaped column (290).

7. The teaching model of a prefabricated steel structure building construction method according to claim 5 is characterized in that: A plurality of purlins (260) are provided at the top of the roof beam (200), the purlins (260) and the roof beam (200) are perpendicular to each other, support rods (240) and diagonal braces (250) are provided between adjacent purlins (260), and a color steel roof (90) is erected at the top of the purlins (260).

8. The teaching model of a prefabricated steel structure building construction method according to claim 5 is characterized in that: Corner braces (270) are provided on both sides of the roof beam (200); one end of the corner brace (270) away from the roof beam (200) is fixedly connected to the purlin (260); and an angle between the corner brace (270) and the roof beam (200) or the purlin (260) is greater than or equal to 35 degrees.

9. The teaching model of a prefabricated steel structure building construction method according to claim 5 is characterized in that: In the two-story structure (2), a column-to-column flexible support assembly (6) is provided between two adjacent H-shaped columns (290); the first-story structure (1) and the second-story structure (2) are provided with a corrugated steel plate wall panel (5) on the periphery and a lightweight interior wall partition panel (4) on the interior; and the corrugated steel plate wall panel (5) is provided with a door and window assembly (9).