New energy power operation and maintenance device
By installing detection boxes and LED lights on the branch wires of the photovoltaic panel circuit, and using light sensors and controllers to detect circuit problems, the problem of large detection range and time-consuming of photovoltaic panel circuits is solved, and maintenance efficiency and accuracy are improved.
Patent Information
- Application Number
- CN202323426878.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2033-12-15
AI Technical Summary
When a large number of photovoltaic panel circuits are detected, the inspection range is large, the energy and time are consumed, and it is difficult to complete the maintenance efficiently.
Design a new energy power operation and maintenance device. By installing a detection box on one side of each group of photovoltaic panels, the detection box is equipped with LED lamps, controllers and light sensors. The LED lamp lighting time light sensor detects the brightness of the light source and transmits it. The maintenance personnel check the brightness of the LED light to determine the circuit problem by checking the machine.
The maintenance range of maintenance personnel for each line has been narrowed, the circuit maintenance efficiency has been improved, and the difficulty of judging faults caused by the joint use of battery power is avoided.
Smart Images

Figure CN222484668U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaic panel circuit maintenance, in particular to a new energy power operation and maintenance device. Background Art
[0002] At present, solar photovoltaic system, referred to as photovoltaic, refers to the facilities that use the photovoltaic effect of photovoltaic semiconductor materials to convert solar energy into direct current electricity. The core of photovoltaic facilities is solar panels. The semiconductor materials used for power generation are mainly: monocrystalline silicon, polycrystalline silicon, amorphous silicon and cadmium telluride. As countries have been actively promoting the application of renewable energy in recent years, the photovoltaic industry has developed rapidly.
[0003] In order for a large number of photovoltaic panels to collect solar energy normally and convert it into electrical energy for collection, each set of photovoltaic panel circuits will be tested regularly.
[0004] However, because the photovoltaic panels are laid over a large area, when testing a large number of photovoltaic panel circuits, it is necessary to test each current, which not only has a large detection range and consumes a lot of energy of maintenance personnel, but also takes a lot of time to test. Therefore, a new technical solution needs to be designed to solve this problem. Utility Model Content
[0005] The purpose of the utility model is to provide a new energy power operation and maintenance device to solve the problems raised in the background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a new energy power operation and maintenance inspection device, including photovoltaic panels, wherein the photovoltaic panels are provided in multiple groups, the multiple groups of photovoltaic panels are connected and installed with branch wires, the other sides of the multiple groups of branch wires are connected and installed with detection boxes, and each group of the detection boxes can be detachably installed with a power operation and maintenance detection mechanism;
[0007] The power operation and maintenance detection mechanism includes an LED lamp fixedly installed inside the detection box, a controller fixedly installed on one side of the inner wall of the detection box, and a light sensor fixedly installed on one side of the controller. Each group of the LED lamps is connected and installed with multiple groups of branch wires.
[0008] As an optional solution of the technical solution of the present application, the other sides of the plurality of groups of branch conductors are all connected to main conductors installed, and the other sides of the main conductors are connected to power collection equipment installed.
[0009] As an optional solution of the technical solution of the present application, one side of the multiple groups of controllers are connected and installed with connecting wires, and the other side of the multiple groups of connecting wires are connected and installed with detection bodies, so that signals can be transmitted to the detection bodies.
[0010] As an optional solution of the technical solution of the present application, both sides of each group of the detection boxes are connected and installed with connecting sleeves, and the two corresponding groups of the connecting sleeves correspond to the branch wires and the main wires respectively, so as to protect the wires.
[0011] As an optional solution of the technical solution of the present application, a sealing plate is installed on one side of each group of detection boxes through a hinge, a battery slot is detachably installed on one side of each group of controllers, and batteries are detachably installed inside each group of battery slots to power the controller.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0013] 1. The technical solution of the present application is to install a detection box on the branch wire connecting one side of each group of photovoltaic panels, so that multiple groups of branch wires are installed with LED lights, so that the multiple groups of LED lights are connected to the power supply and keep bright, and at the same time cooperate with the power operation and maintenance detection mechanism. When the LED lights are illuminated, the light sensor located on one side of the inside of the detection box will detect the brightness of the light source and transmit the signal to the detection body through the controller, so that the maintenance personnel can observe whether the multiple groups of LED lights on the detection body are bright, and judge whether there is a problem with the circuit of the branch wire on each group of photovoltaic panels, which greatly reduces the maintenance scope of each line for the maintenance personnel and improves the circuit maintenance efficiency.
[0014] 2. The technical solution of the present application is that each group of controllers is detachably installed with a battery slot on one side, and each group of battery slots is detachably installed with batteries on the inside. Through the batteries inside the battery slots, each group of controllers can be driven by independent power, avoiding the use of the same circuit and being unable to determine which group of branch wires is faulty. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0016] Figure 1 This is a schematic diagram of the overall structure of a new energy power operation and maintenance device of the utility model;
[0017] Figure 2 This is a schematic diagram of the internal structure of a detection box of a new energy power operation and maintenance device of the utility model.
[0018] In the figure: 1. Photovoltaic panel; 11. Branch wire; 12. Main wire; 13. Connecting wire; 14. Detection body; 2. Detection box; 21. Connecting sleeve; 22. LED light; 23. Sealing plate; 3. Controller; 31. Light sensor; 32. Battery slot. DETAILED DESCRIPTION
[0019] See also Figure 1-2The utility model provides a technical solution: a new energy power operation and maintenance device, including a photovoltaic panel 1, wherein the photovoltaic panel 1 is provided with multiple groups, the multiple groups of photovoltaic panels 1 are connected and installed with branch conductors 11, the other side of the multiple groups of branch conductors 11 are connected and installed with detection boxes 2, and each group of detection boxes 2 can be detachably installed with a power operation and maintenance detection mechanism;
[0020] The power operation and maintenance detection mechanism includes an LED lamp 22 fixedly installed inside the detection box 2, a controller 3 fixedly installed on one side of the inner wall of the detection box 2, and a light sensor 31 fixedly installed on one side of the controller 3. Each group of LED lamps 22 is connected and installed with multiple groups of branch conductors 11 respectively.
[0021] In this technical solution, a detection box 2 is installed on the branch conductor 11 connected to one side of each group of photovoltaic panels 1, and LED lights 22 are installed on multiple groups of branch conductors 11, so that multiple groups of LED lights 22 are connected to the power supply and keep bright. At the same time, in cooperation with the power operation and maintenance detection mechanism, when the LED lights 22 are illuminated, the light sensor 31 located on one side of the detection box 2 will detect the brightness of the light source and transmit the signal to the detection body 14 through the controller 3, so that the maintenance personnel can observe whether the multiple groups of LED lights 22 on the detection body 14 are bright, and then judge whether there is a problem with the circuit of the branch conductor 11 on each group of photovoltaic panels 1, which greatly reduces the maintenance scope of each line for the maintenance personnel and improves the circuit maintenance efficiency.
[0022] In some technical solutions, the other sides of the plurality of branch conductors 11 are connected to the main conductor 12 , and the other sides of the main conductor 12 are connected to the power collection device.
[0023] In this technical solution, multiple groups of branch conductors 11 can be concentrated on the main conductor 12 to collect a large amount of electricity into the power collection device.
[0024] In some technical solutions, one side of the multiple groups of controllers 3 is connected and installed with connecting wires 13, and the other side of the multiple groups of connecting wires 13 is connected and installed with a detection body 14.
[0025] In this technical solution, the detection body 14 is connected and installed via multiple groups of connecting wires 13 , so that the signals collected by multiple groups of optical sensors 31 can be transmitted to the detection body 14 .
[0026] In some technical solutions, both sides of each group of detection boxes 2 are connected and installed with connecting sleeves 21 , and two corresponding groups of connecting sleeves 21 correspond to the branch conductors 11 and the main conductors 12 respectively.
[0027] In this technical solution, the connecting sleeve 21 can be used to seal the inner walls of the branch conductor 11 and the main conductor 12 .
[0028] In some technical solutions, a sealing plate 23 is rotatably installed on one side of each detection box 2, a battery slot 32 is detachably installed on one side of each controller 3, and a battery can be detachably installed inside each battery slot 32.
[0029] In this technical solution, each group of controllers 3 can be driven by independent power through the batteries in the battery slot 32, thereby avoiding the use of the same circuit and being unable to determine which group of branch conductors 11 is faulty.
[0030] When a new energy power operation and maintenance device is used, it should be noted that the utility model is a new energy power operation and maintenance device, and each component is a universal standard part or a component known to technical personnel in this field, and its structure and principle can be known to technical personnel through technical manuals or through conventional experimental methods.
[0031] When in use, first install a detection box 2 on the branch conductor 11 connected to one side of each group of photovoltaic panels 1, so that multiple groups of branch conductors 11 are installed with LED lights 22, so that multiple groups of LED lights 22 are powered on and kept bright, and at the same time cooperate with the power operation and maintenance detection mechanism. When the LED lights 22 are illuminated, the light sensor 31 located on one side of the detection box 2 will detect the brightness of the light source and transmit the signal to the detection body 14 through the controller 3, so that the maintenance personnel can observe whether the multiple groups of LED lights 22 on the detection body 14 are bright, and then judge whether there is a problem with the circuit of the branch conductor 11 on each group of photovoltaic panels 1, which greatly reduces the maintenance scope of each line for the maintenance personnel and improves the circuit maintenance efficiency. At the same time, a battery slot 32 is detachably installed on one side of each group of controllers 3, and batteries are detachably installed on the inside of each group of battery slots 32. In cooperation with the batteries inside the battery slots 32, each group of controllers 3 can be driven by a separate power, avoiding the use of the same circuit and being unable to judge which group of branch conductors 11 has a fault.
Claims
1. A new energy power operation and maintenance device, comprising a photovoltaic panel (1), characterized in that: The photovoltaic panels (1) are provided in a plurality of groups, and the plurality of groups of photovoltaic panels (1) are all connected and installed with branch conductors (11), and the other sides of the plurality of groups of branch conductors (11) are all connected and installed with detection boxes (2), and each group of detection boxes (2) has a detachable power operation and maintenance detection mechanism installed inside; The power operation and maintenance detection mechanism comprises an LED lamp (22) fixedly installed inside the detection box (2), a controller (3) fixedly installed on one side of the inner wall of the detection box (2), and a light sensor (31) fixedly installed on one side of the controller (3), and each group of the LED lamps (22) is connected and installed with multiple groups of branch conductors (11).
2. A new energy power operation and maintenance device according to claim 1, characterized in that: The other side of the plurality of groups of branch conductors (11) are all connected to a main conductor (12) installed thereon, and the other side of the main conductor (12) is connected to a power collection device installed thereon.
3. A new energy power operation and maintenance device according to claim 1, characterized in that: One side of the plurality of groups of controllers (3) is connected to and installed with a connecting wire (13), and the other side of the plurality of groups of connecting wires (13) is connected to and installed with a detection body (14).
4. A new energy power operation and maintenance device according to claim 1, characterized in that: Both sides of each group of the detection boxes (2) are connected and installed with connecting sleeves (21), and the two corresponding groups of the connecting sleeves (21) correspond to the branch conductors (11) and the main conductors (12) respectively.
5. A new energy power operation and maintenance device according to claim 1, characterized in that: A sealing plate (23) is rotatably mounted on one side of each set of the detection boxes (2) via a hinge, a battery slot (32) is detachably mounted on one side of each set of the controllers (3), and a battery is detachably mounted inside each set of the battery slots (32).