Efficient transfer device for building construction formwork materials
By designing an efficient transfer device for building construction formwork materials, the rapid transfer of aluminum alloy formwork components is achieved through mechanized operations, which solves the problems of high labor intensity, low efficiency and high safety risks during construction, and achieves efficient and safe transfer of formwork materials.
Patent Information
- Application Number
- CN202420195943.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-01-26
AI Technical Summary
In construction, the dismantling and transport of aluminum alloy formwork components relies on workers' bare hands to operate, resulting in high labor intensity, low work efficiency and high safety risks.
An efficient transfer device for building construction formwork materials is designed, including lifting trolleys, trolley tracks, lifting load-bearing beams, locking mechanisms, safety protection facilities and portable electric lifting equipment, and the rapid transfer of formwork components is achieved through mechanized operation.
The device reduces the intensity of construction labor, improves work efficiency, reduces safety risks, and realizes efficient transportation of formwork materials.
Smart Images

Figure CN222498500U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a material lifting, conveying and transferring device, belonging to the technical field of vertical transportation tools for construction. Background Art
[0002] In the construction industry, the aluminum alloy formwork system has been widely used, and the aluminum alloy formwork unit components have been standardized and modularized. Usually, the width of the aluminum alloy formwork unit plate is within 500mm. When the concrete pouring is completed and the demolding conditions are met, the wall column and floor aluminum alloy formwork unit plates, support rods, quick-release joints, pull rods and other components are removed and transported to the upper floor for use. At present, basically, the removed aluminum alloy formwork components are transported to the upper floor by workers hand-to-hand through the reserved material transfer port on the floor. The existing method of hand-to-hand transfer by workers has the following problems: first, the workers work for a long time with high labor intensity, and the workers are prone to fatigue and distraction, which is not conducive to the physical and mental health of the workers and increases the safety risk of the operation; second, the workers hand-to-hand transfer of materials has low work efficiency and is not conducive to the advancement of the project progress; third, in the process of handing over the aluminum alloy formwork components, there is a risk that the upper personnel cannot hold the materials steadily and make mistakes, causing the transferred formwork components to fall, causing the personnel below to be hit by falling objects, and there is a great safety risk. Utility Model Content
[0003] The purpose of the utility model is to provide a high-efficiency transport device for building construction template materials, which can reduce the labor intensity of construction, improve construction efficiency and eliminate safety hazards.
[0004] The technical solution of this utility model:
[0005] A highly efficient transport device for building construction template materials comprises a lifting trolley, a trolley track, a lifting load-bearing beam, a locking mechanism, safety protection facilities and a portable electric lifting device.
[0006] In the above device, the lifting trolley includes a loading cage, a trolley guide wheel, an axle, a connecting rod connecting the axle and the cage, and a lifting trolley lifting ring located at the midpoint of the upper axle; the loading cage is made of φ28mm round steel by welding, the bottom and four sides of the cage are enclosed by steel plate mesh, and the cage top is a grille movable door; a set of guide wheels are installed on the upper and lower parts of the lifting trolley, a total of 4. The trolley guide wheel adopts a ball bearing with an outer diameter of 60mm, an inner diameter of 40mm, and a width of 13mm; the axle is made of φ40mm round steel; the connecting rod between the axle and the loading cage is made of φ32mm round steel; the lifting ring is made of φ24mm round steel; the round steels are all fully welded.
[0007] In the aforementioned device, the trolley track includes two track channel steels, 3 groups of connecting rods connecting the track channel steels, diagonal braces at the bottom of the track channel steels, and tension braces connecting the two diagonal braces; each group of connecting rods includes two horizontal rods and one diagonal rod, which are made of φ32mm round steel; the diagonal braces are 4 / 2.5 angle steels, and the diagonal braces and the track channel steels are connected by connecting pins of the trolley track and the diagonal braces welded on the track channel steels, and cotter pins are provided on the pins with holes; the tension braces connecting the diagonal braces are 4 / 2.5 angle steels, and are connected by connecting pins of the trolley track diagonal braces welded on the diagonal braces and the tension braces; the specifications of the aforementioned pins with holes are all M18.
[0008] In the above device, the lifting load-bearing beam includes a main beam welded on the top of the trolley track channel steel, a reinforcement welded between the trolley track channel steel and the main beam, and a load-bearing beam lifting ring welded and installed at the midpoint of the main beam. The main beam is 6.3 / 4.0 angle steel, the reinforcement is 4 / 2.5 angle steel, and the lifting ring is made of φ24mm round steel; all connections are fully welded.
[0009] In the above device, the locking mechanism includes a pair of clamping angle steels, an adjusting screw, a screw base plate, an adjusting handle and a fixing nut that clamp the floor slab. The clamping angle steel is welded to the track channel steel and is a 10 / 6.3 angle steel; the adjusting screw has a diameter of 30 mm, and a hole is opened at the corresponding position of the clamping angle steel. The hole diameter is slightly larger than the adjusting screw, and a fixing nut is welded and installed here. The S value of the fixing nut is 46 mm; the base plate is welded and installed at the bottom of the adjusting screw; the adjusting handle is installed on the top of the adjusting screw. All connections are fully welded.
[0010] In the above device, the safety protection facilities include a sealing plate, a flap shaft and a bearing. The sealing plate is made of a 2.5mm thick patterned steel plate, and the bottom of the sealing plate is welded with a φ20mm round steel for reinforcement; a flap movable bolt is installed at the corresponding position on the upper surface of the sealing plate near the guide rail, and a movable bolt socket is welded on the corresponding guide rail side; the flap shaft is made of φ24mm round steel and welded to the end of the long side of the sealing plate; the flap bearing is welded on the guide rail track channel steel and is a nut with an outer dimension S value of 36mm.
[0011] In the above device, the portable lifting equipment is a small electric hoist complete set of equipment, including an upper hook, a lower hook and a travel limit safety device; the portable electric lifting equipment has a rated lifting capacity of 500KG, a rated voltage of 220V, a lifting speed of 5m / min, and a wire rope diameter of 6mm. It has three control modes: manual control, wireless control and controller control.
[0012] The overall height of the aforementioned device should be at least 1 meter higher than the formwork installation floor, but should not be 1.5 meters higher than the formwork installation floor.
[0013] Compared with the existing template transfer method, the utility model has a simple structure and is easy to manufacture. It solves the problem of template material transfer by manual labor. It does not require too much labor during operation, and the template material transfer can be quickly completed by mechanized operation, which saves labor and time, improves work efficiency, and reduces the safety risks of template transfer operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the utility model;
[0015] Figure 2 yes Figure 1 A schematic diagram of the structure from another perspective;
[0016] Figure 3 It is a structural schematic diagram of the utility model from the front;
[0017] Figure 4 It is a schematic diagram of the structure of the utility model from the side;
[0018] Figure 5 It is a schematic diagram of the partially separated structure of the utility model;
[0019] Figure 6 It is a structural schematic diagram of a charging cage body in the utility model.
[0020] The marks in the attached drawings are: 1-loading cage, 2-trolley guide wheel, 3-wheel axle, 4-connecting rod, 5-lifting trolley lifting ring, 6-track channel steel, 7-track connecting rod, 8-track diagonal brace, 9-track diagonal brace tension brace, 10-connecting pin between trolley track and diagonal brace, 11-connecting pin between trolley track diagonal brace and tension brace, 12-lifting load-bearing main beam, 13-load-bearing main beam reinforcement, 14-load-bearing beam lifting ring, 15-locking mechanism clamping angle steel, 16-adjusting screw, 17-screw base, 18-adjusting handle, 19-fixing nut, 20-sealing plate, 21-flip shaft, 22-flip bearing, 23-flip movable bolt, 24-movable bolt socket, 25-flip reinforcement rib, 26-portable electric lifting equipment. DETAILED DESCRIPTION
[0021] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention in any way.
[0022] A highly efficient transport device for building construction template materials, such as Figure 1-6As shown. The device includes a lifting trolley, a trolley track, a lifting load-bearing beam, a locking mechanism, a safety protection facility and a portable electric lifting device. The lifting trolley includes a loading cage 1, a trolley guide wheel 2, a wheel axle 3 and a connecting rod 4 connecting the wheel axle 3 and the loading cage 1, and a lifting trolley lifting ring 5 is set at the midpoint of the upper wheel axle 3; the loading cage 1 is made of round steel by welding, the bottom and four sides of the cage are enclosed by steel plate mesh, and the cage top is a grille movable door. The trolley track includes two track channels 6, and the two track channels 6 are connected by three groups of connecting rods 7 to form a whole. A group of diagonal braces 8 is arranged at the bottom of each of the two track channels 6, with a total of four diagonal braces. Each group of diagonal braces 8 is tied by a brace 9, so that the trolley track and the diagonal braces form a stable system; the diagonal braces 8 and the track channels 6 are connected by connecting pins 10 of the trolley track and the diagonal braces welded on the track channels 6; the diagonal braces 8 and the brace 9 are connected by connecting pins 11 of the trolley track diagonal braces and the brace welded on the diagonal braces 8. The lifting load-bearing beam includes a main beam 12 welded to the top of the trolley track channel 6, a reinforcement 13 is arranged between the trolley track channel 6 and the main beam 12, and a load-bearing beam lifting ring 14 is installed at the midpoint of the main beam 12. The locking mechanism includes a pair of clamping angle steels 15 and an adjusting screw 16. A base plate 17 is welded at the bottom of the screw 16, and an adjusting handle 18 is installed on the upper part of the screw 16. A hole is opened at the corresponding position of the upper clamping angle steel, and a fixing nut is welded. The safety protection facility is a flap, including a sealing plate 20, a flap shaft 21 and a bearing 22. A reinforcing rib 25 is welded on the bottom surface of the sealing plate 20. A flap movable bolt 23 is installed at the corresponding position on the upper surface of the sealing plate close to the guide rail, and a movable bolt socket 24 is welded and installed on the corresponding side of the guide rail. The portable electric lifting device 26 is a small electric hoist complete set of equipment, including an upper hook, a lower hook and a travel limit safety device; the rated lifting capacity of the portable electric lifting device is 500KG, the rated voltage is 220V, and the lifting speed is 5m / min. The overall height of the device should be at least 1 meter higher than the template installation working floor, but should not be 1.5 meters higher than the template installation construction working floor.
[0023] Example
[0024] This example includes a lifting trolley, a trolley track, a lifting load-bearing beam, a locking mechanism, safety protection facilities and a portable electric lifting device. The lifting trolley includes a loading cage 1, two sets of trolley guide wheels 2, axles 3 and a connecting rod 4 connecting the axles 3 and the loading cage 1; the lifting trolley is provided with a set of guide wheels at the top and bottom, and a lifting trolley lifting ring 5 is installed at the midpoint of the upper axle 3; the loading cage 1 is made of φ28mm round steel by welding, the bottom and four sides of the cage are enclosed by steel plate mesh, and the cage top is equipped with a grille movable door to facilitate the vertical placement of long components and the loading of small components; the trolley guide wheel 2 is made of a ball bearing with an outer diameter of 60mm, an inner diameter of 40mm and a width of 13mm; the axle 3 is made of φ40mm round steel; the connecting rod 4 between the axle 3 and the loading cage 1 is made of φ32mm round steel; the lifting trolley lifting ring 5 is made of φ24mm round steel; the round steels are all fully welded. The trolley track includes two track channel steels 6 and three groups of connecting rods 7 connecting the track channel steels 6. A group of diagonal bracing rods 8 are arranged at the bottom of each track channel steel 6. The diagonal bracing rods 8 are connected to the track channel steel 6 by pins with holes welded on the track channel steel 6. Each group of diagonal bracing rods 8 are tied by braces 9 and connecting pins 11 between the diagonal bracing rods and the braces of the trolley track. The connecting pins 11 between the diagonal bracing rods and the braces of the trolley track are welded at the corresponding positions of the diagonal bracing 8. The connecting rod 7 includes two horizontal rods and one diagonal rod, all of which are φ32 mm round steel; the diagonal brace 8 is 4 / 2.5 angle steel; the tension brace 9 is 4 / 2.5 angle steel; the connecting pin 10 between the trolley track and the diagonal brace and the connecting pin 11 between the trolley track diagonal brace and the tension brace are both M18 in specification, and the cotter pin is installed on the pin with hole to prevent the connection component from loosening; when the aluminum alloy formwork assembly of one layer is transported, the tension brace 9 and the sealing plate 20 are disassembled, and the diagonal brace 8 is retracted to loosen the locking mechanism. At this time, the device can be lifted from the material transfer port and transported upward for reuse. The lifting load-bearing beam includes a main beam 12 welded on the top of the trolley track channel steel 6, a reinforcement 13 is welded between the trolley track channel steel 6 and the main beam 12, and a load-bearing beam lifting ring 14 is welded and installed at the midpoint of the main beam 12; the main beam 12 is 6.3 / 4.0 angle steel; the reinforcement 13 is 4 / 2.5 angle steel; the load-bearing beam lifting ring 14 is made of φ24mm round steel; all connections are fully welded. The locking mechanism includes a pair of clamping angle steels 15 that clamp the floor slab, a tension adjustment screw 16, a screw base plate 17, an adjustment handle 18 and a fixing nut 19; the clamping angle steel 15 is welded to the track channel steel 6 and is a 10 / 6.3 angle steel; the adjustment screw has a diameter of 30mm, a hole is opened at the corresponding position of the upper clamping angle steel 15 and a fixing nut 19 is welded and installed, and its overall dimension S value is 46; the screw base plate 17 is welded to the bottom of the adjustment screw 16 and is fully welded; an adjustment handle 18 is installed on the upper part of the adjustment screw 16. The portable electric lifting equipment 26 is a small electric hoist complete set of equipment, including an upper hook, a lower hook and a travel limit safety device, with a rated lifting capacity of 500KG, a rated voltage of 220V, and a lifting speed of 5m / min; it has three modes of manual control, controller control and wireless control.
[0025] The safety protection facility of this device is a flap, which is used to seal and protect the material transfer port after the aluminum alloy formwork assembly is lifted and the material transfer is completed, to prevent workers on the construction floor from falling from a height at the material transfer port, and also to prevent falling objects from hitting the material transfer port. It includes a sealing plate 20, a flap shaft 21 and a flap bearing 22; the sealing plate 20 is made of a 2.5mm thick patterned steel plate, and the length and width of the sealing plate are 150mm larger than the length and width of the material transfer port, to ensure that the sealing plate and the structural floor are effectively overlapped. A φ20mm round steel reinforcement rib 25 is welded on the bottom surface of the sealing plate 20; the flap shaft 21 is made of φ24mm round steel and welded to the end of the long side of the sealing plate; the flap bearing is welded to the guide rail track channel steel 6 and is a nut with an overall dimension S value of 36mm; a movable bolt 23 is installed on the flap, and the movable bolt is made of φ20mm round steel and a nut with an S value of 36mm, and the nut is welded at the corresponding position of the flap, and a nut with an overall dimension S value of 36mm is welded and installed at the corresponding position of the track channel steel 6 as a socket for the flap movable bolt 23.
[0026] When the transfer of the template assembly of one layer is completed, the tensioning brace 9 and the sealing plate 20 are disassembled, the diagonal brace rod 8 is folded, and the locking mechanism is loosened. At this time, the device can be lifted from the material transfer port and transported upward for repeated use.
[0027] The overall height of the device should be at least 1 meter higher than the template installation operation floor, but should not be 1.5 meters higher than the template installation construction operation floor; the loading cage is rectangular, 400mm high, 600mm long, and 400mm wide; the reserved material transfer port on the floor is 800mm long and 550mm wide. During specific implementation, it can be appropriately adjusted according to specific circumstances.
[0028] In the application example of the utility model, small components such as quick-release joints and pull rods that need to be transported are placed in the loading cage, the wall column aluminum alloy formwork unit plate is inserted on the loading cage, and then the electric lifting device is started to transfer the formwork components to the upper layer through the material transfer port. The utility model has a simple structure and is easy to make. It solves the problem of material transfer and transportation of aluminum alloy formwork components between the demolding operation layer and the installation operation layer. During operation, only a small electric lifting device is needed to complete the transfer of a large number of formwork components at one time, which saves both labor and time, improves work efficiency, and reduces the safety risk of construction operations.
Claims
1. A highly efficient transport device for building construction template materials, characterized by: The device is installed at the material transfer port between the building formwork installation floor and the formwork removal floor, and is used to quickly transfer the removed aluminum alloy formwork units and formwork tie rod materials upward; the device comprises a lifting trolley, a trolley track, a lifting load-bearing beam, a locking mechanism, a safety protection facility and a portable electric lifting device (26); The lifting trolley comprises a loading cage (1), a trolley guide wheel (2), a wheel axle (3) connected to the trolley guide wheel (2), a connecting rod (4) connecting the wheel axle (3) and the loading cage (1), and a lifting trolley lifting ring (5) arranged at the midpoint of the upper wheel axle (3); the trolley guide wheel (2) adopts a ball bearing, and a pair of trolley guide wheels (2) are arranged on the upper and lower parts of the lifting trolley, for a total of four trolley guide wheels (2); The trolley track comprises two track channel steels (6) and three groups of connecting rods (7) connecting the track channel steels (6); diagonal bracing rods (8) are arranged in groups at the bottom of the track channel steels (6); each group of diagonal bracing rods (8) is connected by a tension brace (9); each group of connecting rods (7) comprises two horizontal rods and one diagonal rod; the diagonal bracing rod (8) is connected to the track channel steel (6) by connecting pins (10) of the trolley track and the diagonal bracing rod welded on the track channel steel (6); a cotter pin is arranged on the pin with a hole; the diagonal bracing rod (8) is connected to the tension brace (9) by connecting pins (11) of the trolley track diagonal bracing rod and the tension brace welded on the diagonal bracing rod (8); The lifting load-bearing beam comprises a main beam (12) welded to the top of the trolley track channel steel (6), a reinforcement member (13) welded between the trolley track channel steel (6) and the main beam (12), and a load-bearing beam lifting ring (14) welded to the midpoint of the main beam (12); all connections are full-weld connections.
2. The efficient transport device for building construction template materials according to claim 1 is characterized by: The locking mechanism comprises a pair of clamping angle steels (15) for clamping the floor slab, an adjusting screw (16), a screw base plate (17), an adjusting handle (18) and a fixing nut (19); the clamping angle steel (15) is welded to the track channel steel (6); the adjusting screw (16) has a diameter of 30 mm, a hole is opened at a corresponding position of the clamping angle steel (15), the hole diameter is larger than the diameter of the adjusting screw (16), and a fixing nut is welded and installed at this position; the adjusting screw base plate (17) is welded to the bottom of the adjusting screw (16); and the adjusting handle (18) is installed on the upper part of the adjusting screw.
3. The efficient transport device for building construction template materials according to claim 1 is characterized in that: The safety protection facility comprises a sealing plate (20), a flap shaft (21) and a bearing (22), a flap movable bolt (23) and a movable bolt insertion hole (24); a reinforcing rib (25) is welded on the bottom surface of the sealing plate (20), and all connections are fully welded connections.
4. The efficient transport device for construction formwork materials according to claim 1, characterized in that: The portable electric lifting device (26) is a small electric hoist complete set of equipment, including an upper hook, a lower hook and a travel limit safety device.
5. The efficient transport device for building construction template materials according to claim 1 is characterized by: The overall height of the device should be at least 1 meter higher than the formwork installation floor, but not higher than 1.5 meters higher than the formwork installation floor.