Pipe shed lock catch connecting structure
By adopting a lock connection structure in the pipe shed and using alternate grouting pipes and L-plate structures, the problem of easy shaking of the grouting pipes during grouting and insufficient stability of the pipe shed connection is achieved, and the grouting stability is achieved Improvement of overall connection stability of pipe shed.
Patent Information
- Application Number
- CN202421060269.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-05-16
AI Technical Summary
The grouting pipe is prone to shake during grouting, and the overall connection stability of the pipe shed is insufficient, which affects the grouting stability and the overall connection stability of the pipe shed.
Using a pipe shed locking connection structure, an alternate first pipe body and a second pipe body are arranged in the grouting pipe, and the first L plate and the second L plate are fixedly connected at both ends thereof to form a locking structure. Limit the movement of the grouting tube and improve connection stability.
Through the design of the lock structure, the shaking of the grouting pipe during the grouting process is reduced, the grouting stability and the overall connection of the pipe shed are improved, and the stability of the grouting pipe and the strength of the overall structure are ensured.
Smart Images

Figure CN222501753U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipe racks, and in particular to a pipe rack locking connection structure. Background Art
[0002] The pipe-roof advance support method is a new technology developed in recent years for tunneling in soft surrounding rocks. The pipe-roof includes multiple grouting pipes. The support mechanism of the pipe-roof construction advance support is mainly the result of the joint action of the grouting pipe and the slurry consolidation body: on the one hand, drilling is carried out and the grouting pipe is set down. When the grouting pipe passes through the loose and weak surrounding rock, rock (soil) and other damaged areas and extends into the original soil part, it effectively guarantees the stability of the rock and soil body of the excavation face and plays the role of skeleton and grid; on the other hand, the slurry is pressed out of the grouting pipe hole through grouting, and injected into the loose and weak strata around the grouting pipe under a certain pressure, thereby forming a composite stable consolidation body, which changes the mechanical properties of the surrounding strata, strengthens the stability, and can prevent soil collapse and surface subsidence.
[0003] With regard to the above-mentioned related technologies, the inventors believe that after the grouting pipe is inserted into the drill hole, the grouting pipe serves as the main supporting skeleton of the pipe rack, but the multiple grouting pipes are independent of each other. On the one hand, the grouting pipe is easy to shake during grouting, and the stability during grouting needs to be improved. On the other hand, the stability of the overall connection of the pipe rack needs to be improved. Utility Model Content
[0004] In order to improve the stability of grouting and the stability of pipe-roof arrangement and connection, the present application provides a pipe-roof locking connection structure.
[0005] The present application provides a pipe-roof lock connection structure that adopts the following technical solution:
[0006] A pipe-roof locking connection structure comprises a plurality of grouting pipes, wherein the grouting pipes comprise a first pipe body and a second pipe body arranged in parallel, wherein the first pipe body and the second pipe body are arranged alternately;
[0007] Two first L-plates are fixedly connected to each of the two radial ends of the first tube body, and the two first L-plates at the same radial end of the first tube body are arranged back to back;
[0008] Two second L-plates are fixedly connected to each of the two radial ends of the second tube body, and the two second L-plates at the same radial end of the second tube body are arranged opposite to each other;
[0009] The two first L plates are located between the two second L plates, and the first L plates and the second L plates are correspondingly buckled.
[0010] By adopting the above technical solution, when installing the grouting pipe, the first pipe body or the second pipe body is first inserted into the drilled hole. For example, the second pipe body is first inserted into the drilled hole, and then the second pipe body is inserted into the adjacent drilled hole. When the second pipe body is inserted, the second L-plate is aligned with the first L-plate, so that the second L-plate engages with the first L-plate as the second pipe body is inserted, thereby forming a locking structure, limiting the first pipe body and the second pipe body, reducing the possibility of the grouting pipe moving alone, repeating the above steps, so that the first pipe body and the second pipe body are alternately arranged in sequence, and finally the grouting is solidified, thereby improving the stability of the grouting and the stability of the pipe rack arrangement connection.
[0011] Optionally, a first T-bar is fixedly connected to the end of the first L-plate, and a first T-groove through which the first T-bar passes is formed on the inner side wall of the second L-plate.
[0012] By adopting the above technical solution, the first L-plate and the second L-plate can be limited to each other, further improving the stability of the connection between the first tube body and the second tube body, and with the insertion of the second tube body, the first T-rod can be inserted into the first T-slot, which is convenient to operate.
[0013] Optionally, a diagonal support plate is provided on the second tube body, one end of the diagonal support plate is fixedly connected to the outer side wall of the second tube body, and the other end of the diagonal support plate is fixedly connected to the outer side wall of the second L-plate.
[0014] By adopting the above technical solution, the diagonal support plate can support the second L-plate located outside, reduce the possibility of the second L-plate being damaged due to the force applied by the first L-plate, and improve the structural strength.
[0015] Optionally, a support plate is provided between the first tube body and the second tube body, and two ends of the support plate are respectively fixedly connected to the side surfaces of the two first L-plates that are close to each other.
[0016] By adopting the above technical solution, the support plate can, on the one hand, realize the connection between the two first L-plates and improve the connection stability; on the other hand, it can reduce the possibility of the first L-plate being damaged due to the force applied by the second L-plate and improve the structural strength.
[0017] Optionally, a second T-bar is fixedly connected to both ends of the support plate, and a second T-slot for the second T-bar to pass through is provided on the sides of the two first L-plates that are close to each other.
[0018] By adopting the above technical solution, the positioning of the support plate installation chamber is facilitated and the structural stability is further improved.
[0019] Optionally, one end of the first L-plate away from the first tube body abuts against an outer side wall of the second tube body.
[0020] By adopting the above technical solution, the force applied to the first L-plate can be partially transferred to the second tube body for support and offset, thereby reducing the possibility of deformation and damage to the first L-plate.
[0021] Optionally, it further includes a plurality of steel plates, which are arranged corresponding to the grouting pipes, and the grouting pipes pass through the corresponding steel plates, and the first L-plate and the second L-plate are welded to the steel plates on the axial sides of the grouting pipes.
[0022] By adopting the above technical solution, the steel plate can be installed at the opening of the drilled hole according to actual conditions, and the first L plate and the second L plate are welded to the steel plate, which can further enhance the connection strength of the first tube body and the second tube body.
[0023] Optionally, the steel plate is farther away from the end face of the grouting pipe than the first L plate and the second L plate.
[0024] By adopting the above technical solution, the first L plate and the second L plate can be directly seen at the opening of the drilled hole, and the first L plate and the second L plate will not be blocked by the steel plate, so the field of vision is wide, which facilitates the welding operation of the first L plate and the second L plate on the steel plate.
[0025] In summary, the present application includes at least one of the following beneficial technical effects:
[0026] 1. When installing the grouting pipe, first insert the first pipe body or the second pipe body into the borehole. For example, insert the first pipe body into the borehole first, and then insert the second pipe body into the adjacent borehole. When the second pipe body is inserted, the second L plate is aligned with the first L plate, so that the second L plate is buckled with the first L plate as the second pipe body is inserted, thereby forming a locking structure, limiting the first pipe body and the second pipe body, reducing the possibility of the grouting pipe moving alone, repeating the above steps, so that the first pipe body and the second pipe body are alternately arranged in sequence, and finally the grouting solidifies, thereby improving the stability of the grouting and the stability of the pipe shed arrangement connection;
[0027] 2. The diagonal brace plate can support the second L-plate located outside, reducing the possibility of the second L-plate being damaged by the force applied by the first L-plate, thereby improving the structural strength;
[0028] 3. Through the setting of the support plate, the support plate can realize the connection between the two first L plates and improve the connection stability; on the other hand, it can reduce the possibility of the first L plate being damaged due to the force applied by the second L plate and improve the structural strength. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the overall structure of a pipe rack locking connection structure according to an embodiment of the present application.
[0030] Figure 2It is a schematic diagram used to illustrate the connection structure between the first tube body and the second tube body in an embodiment of the present application.
[0031] Figure 3 It is a structural schematic diagram used to show the diagonal brace plate in the embodiment of the present application.
[0032] Figure 4 yes Figure 3 Enlarged view of point A in the middle.
[0033] Explanation of the accompanying drawings: 1. grouting pipe; 11. first pipe body; 12. second pipe body; 2. first L-plate; 3. second L-plate; 4. first T-bar; 5. first T-slot; 6. diagonal support plate; 7. support plate; 71. second T-bar; 72. second T-slot; 8. steel plate. DETAILED DESCRIPTION
[0034] The following is combined with Figure 1-4 This application is described in further detail.
[0035] The present application embodiment discloses a pipe rack locking connection structure. Figure 1 and Figure 2 The pipe-roof locking connection structure includes a pipe-roof locking connection structure, including multiple grouting pipes 1, the grouting pipe 1 includes a first pipe body 11 and a second pipe body 12 arranged in parallel, and the first pipe body 11 and the second pipe body 12 are arranged alternately; two first L-plates 2 are fixedly connected to each other at both ends of the radial direction of the first pipe body 11, and the two first L-plates 2 at the same radial end of the first pipe body 11 are arranged back to back; two second L-plates 3 are fixedly connected to each other at both ends of the radial direction of the second pipe body 12, and the two second L-plates 3 at the same radial end of the second pipe body 12 are arranged opposite to each other; the two first L-plates 2 are located between the two second L-plates 3, and the first L-plates 2 and the second L-plates 3 are correspondingly buckled.
[0036] When installing the grouting pipe 1, first insert the first pipe body 11 or the second pipe body 12 into the borehole. Take the example of inserting the second pipe body 12 into the borehole first, and then insert the second pipe body 12 into the adjacent borehole. When the second pipe body 12 is inserted, the second L-plate 3 is aligned with the first L-plate 2, so that the second L-plate 3 is interlocked with the first L-plate 2 as the second pipe body 12 is inserted, thereby forming a locking structure, limiting the first pipe body 11 and the second pipe body 12, reducing the possibility of the grouting pipe 1 moving alone, repeating the above steps, so that the first pipe body 11 and the second pipe body 12 are alternately arranged in sequence, and finally the grouting is solidified, thereby improving the stability of the grouting and the stability of the pipe rack arrangement connection.
[0037] Reference Figure 2-4The end of the first L-shaped plate 2 is fixedly connected with a first T-shaped rod 4, and the inner wall of the second L-shaped plate 3 is provided with a first T-shaped groove 5 through which the first T-shaped rod 4 passes. The first L-shaped plate 2 and the second L-shaped plate 3 can be mutually limited, and the stability of the connection between the first tube body 11 and the second tube body 12 is further improved. With the insertion of the second tube body 12, the first T-shaped rod 4 can be inserted into the first T-shaped groove 5, which is convenient to operate.
[0038] Reference Figure 2-4 , a diagonal support plate 6 is provided on the second tube body 12, one end of the diagonal support plate 6 is welded to the outer wall of the second tube body 12, and the other end of the diagonal support plate 6 is welded to the outer wall of the second L plate 3. The diagonal support plate 6 can support the second L plate 3 located outside, reduce the possibility of the second L plate 3 being damaged due to the force applied by the first L plate 2, and improve the structural strength. A support plate 7 is provided between the first tube body 11 and the second tube body 12, and the two ends of the support plate 7 are respectively welded to the side surfaces of the two first L plates 2 that are close to each other. On the one hand, the support plate 7 can realize the connection between the two first L plates 2 and improve the connection stability; on the other hand, it can reduce the possibility of the first L plate 2 being damaged due to the force applied by the second L plate 3 and improve the structural strength.
[0039] Reference Figure 2-4 The two ends of the support plate 7 are fixedly connected with a second T-shaped rod 71, and the sides of the two first L-shaped plates 2 close to each other are provided with a second T-shaped groove 72 for the second T-shaped rod 71 to pass through, so as to facilitate the positioning of the support plate 7 installation room and further improve the structural stability. The end of the first L-shaped plate 2 away from the first tube body 11 is in contact with the outer wall of the second tube body 12. The force received by the first L-shaped plate 2 can be partially transmitted to the second tube body 12 for support and offset, reducing the possibility of deformation and damage of the first L-shaped plate 2.
[0040] Reference Figure 1-2 , also includes a plurality of steel plates 8, the steel plates 8 are arranged corresponding to the grouting pipe 1, the grouting pipe 1 passes through the corresponding steel plates 8, and the first L plate 2 and the second L plate 3 are welded to the steel plates 8 on the axial side of the grouting pipe 1. The steel plate 8 can be installed at the opening of the drilled hole according to actual conditions, and the first L plate 2 and the second L plate 3 are welded to the steel plate 8, which can further strengthen the connection strength of the first tube body 11 and the second tube body 12. The steel plate 8 is farther away from the end face of the grouting pipe 1 than the first L plate 2 and the second L plate 3. The first L plate 2 and the second L plate 3 can be directly seen at the opening of the drilled hole, and the first L plate 2 and the second L plate 3 will not be blocked by the steel plate 8, so the field of vision is relatively open, which is convenient for the welding operation of the first L plate 2 and the second L plate 3 on the steel plate 8.
[0041] The implementation principle of a pipe-roof locking connection structure of an embodiment of the present application is as follows: when installing the grouting pipe 1, first insert the first pipe body 11 or the second pipe body 12 into the borehole. For example, insert the second pipe body 12 into the borehole first, and then insert the second pipe body 12 into the adjacent borehole. When the second pipe body 12 is inserted, the second L-plate 3 is aligned with the first L-plate 2, so that the second L-plate 3 is interlocked with the first L-plate 2 as the second pipe body 12 is inserted, thereby forming a locking structure, limiting the first pipe body 11 and the second pipe body 12, reducing the possibility of the grouting pipe 1 moving alone, repeating the above steps, so that the first pipe body 11 and the second pipe body 12 are alternately arranged in sequence, and finally the grouting is solidified, thereby improving the grouting stability and the stability of the pipe-roof arrangement connection.
[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pipe-roof locking connection structure, comprising a plurality of grouting pipes (1), characterized in that: The grouting pipe (1) comprises a first pipe body (11) and a second pipe body (12) arranged in parallel, wherein the first pipe body (11) and the second pipe body (12) are arranged alternately; Two first L-plates (2) are fixedly connected to each of the two radial ends of the first tube body (11), and the two first L-plates (2) at the same radial end of the first tube body (11) are arranged opposite to each other; Two second L-plates (3) are fixedly connected to each of the two radial ends of the second tube body (12); the two second L-plates (3) at the same radial end of the second tube body (12) are arranged opposite to each other; The two first L-plates (2) are located between the two second L-plates (3), and the first L-plates (2) and the second L-plates (3) are correspondingly buckled.
2. A pipe-roof locking connection structure according to claim 1, characterized in that: The end of the first L-shaped plate (2) is fixedly connected to a first T-shaped rod (4), and the inner side wall of the second L-shaped plate (3) is provided with a first T-shaped groove (5) through which the first T-shaped rod (4) passes.
3. The pipe-roof locking connection structure according to claim 1, characterized in that: The second tube body (12) is provided with an inclined support plate (6), one end of the inclined support plate (6) is fixedly connected to the outer side wall of the second tube body (12), and the other end of the inclined support plate (6) is fixedly connected to the outer side wall of the second L-plate (3).
4. The pipe-roof locking connection structure according to claim 1, characterized in that: A support plate (7) is provided between the first tube body (11) and the second tube body (12), and two ends of the support plate (7) are respectively fixedly connected to the side surfaces of the two first L-plates (2) that are close to each other.
5. A pipe-roof locking connection structure according to claim 4, characterized in that: The two ends of the support plate (7) are fixedly connected with a second T-shaped rod (71), and the sides of the two first L-shaped plates (2) close to each other are provided with a second T-shaped groove (72) for the second T-shaped rod (71) to pass through.
6. The pipe-roof locking connection structure according to claim 1, characterized in that: One end of the first L-plate (2) away from the first tube body (11) abuts against the outer side wall of the second tube body (12).
7. The pipe-roof locking connection structure according to claim 1, characterized in that: It also includes a plurality of steel plates (8), wherein the steel plates (8) are arranged corresponding to the grouting pipes (1), the grouting pipes (1) pass through the corresponding steel plates (8), and the first L-plate (2) and the second L-plate (3) are welded to the steel plates (8) on the axial side of the grouting pipe (1).
8. A pipe-roof locking connection structure according to claim 7, characterized in that: The steel plate (8) is further away from the end surface of the grouting pipe (1) than the first L-plate (2) and the second L-plate (3).