Wall drilling device for building construction

By designing automated mobile components, height-adjusted lifting components and waste liquid and waste collection components, the problems of inconvenience in use and environmental pollution of existing drilling devices are solved, and efficient and automated wall drilling and waste disposal are achieved. .

CN222511926UActive Publication Date: 2025-02-21周晓慧
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420826391.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-21
Publication Date
2025-02-21
Estimated Expiration
2034-04-21

AI Technical Summary

Technical Problem

When used, the existing wall drilling device for construction is strong, it is difficult to control, and has high working strength, making it difficult to drill higher walls, and it is impossible to collect waste chips and waste liquid, resulting in environmental pollution.

Method used

A drilling device including a base plate, a moving assembly, a lift assembly and a collection assembly is designed. The mobile component drives the moving block to move inside the moving groove through the electric threaded rod to realize automatic drilling; the lifting component adjusts the height of the rotary hole device through the electric threaded rod; the collection component collects and discharges waste liquid and waste chips through the electric telescopic rod and drain pipe.

Benefits of technology

It reduces the fatigue level of staff, improves work efficiency, realizes drilling holes in walls of different heights, and effectively collects and treats waste liquid and waste chips, protecting the working environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222511926U_ABST
    Figure CN222511926U_ABST
Patent Text Reader

Abstract

The utility model discloses a wall drilling device for building construction, which belongs to the technical field of building construction, and adopts the technical scheme that the wall drilling device comprises a bottom plate, a moving component is arranged on the inner side of the bottom plate, a lifting component is arranged at the top of the bottom plate, and a swivel body is bolted on the front side of the lifting component; a collecting assembly is arranged on the front side of the lifting assembly, and in the process that a worker drills holes in a wall, the worker starts a rotating body and then drives a moving block to move on the inner side of a moving groove by starting a first electric threaded rod by arranging a moving assembly; by arranging the lifting assembly, the wall can be drilled without manual operation of a worker, the fatigue degree of the worker is reduced, meanwhile, the working efficiency of the worker is improved, use of the worker is facilitated, and by arranging the lifting assembly, in the wall drilling process of the worker, the work efficiency of the worker is improved, and the work efficiency of the worker is improved. And the height of the drilling device can be adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a wall drilling device for building construction. Background Art

[0002] Building construction refers to production activities during the implementation phase of engineering construction. It is the construction process of various types of buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. The place of construction is called a construction site or a construction site, also called a construction site. Construction also requires work to be done indoors, and drilling holes in indoor walls is one of its tasks.

[0003] The existing wall drilling device for construction has the following disadvantages when in use. During the use of the existing drilling device, a manual handheld drilling device is often used to drill holes in the wall. When drilling, the drilling device has a large reciprocating impact force, which is not easy to control and has a high work intensity, thereby increasing the fatigue level of the workers. At the same time, when drilling, the workers cannot drill holes in higher walls and usually need to use auxiliary tools to drill holes, which is not conducive to the use of the workers. In addition, waste chips and waste liquid cannot be collected during the drilling process, which will cause the waste liquid and waste chips to spill in the work area, thereby affecting the work area, and therefore cannot meet the use needs of the workers. Utility Model Content

[0004] The utility model provides a wall drilling device for building construction, aiming to solve the following shortcomings of the existing wall drilling device for building construction during use: during the use of the existing drilling device, a manual handheld drilling device is often used to drill holes in the wall, and when the drilling device is drilling, its reciprocating impact force is large, it is not easy to control, and the work intensity is high, thus increasing the fatigue degree of the staff, and at the same time, when drilling, the staff cannot drill holes in higher walls, and usually need to drill holes with the help of auxiliary tools, which is not conducive to the use of the staff, and during the drilling process, waste chips and waste liquid cannot be collected, so that the waste liquid and waste chips will be spilled in the working area, thereby affecting the environment of the working area, and therefore cannot meet the use needs of the staff.

[0005] The utility model is implemented as follows: a wall drilling device for construction includes a bottom plate, a moving assembly is arranged on the inner side of the bottom plate, a lifting assembly is arranged on the top of the bottom plate, a rotating head body is bolted to the front side of the lifting assembly, and a collecting assembly is arranged on the front side of the lifting assembly;

[0006] The moving assembly includes a moving groove, a first electric threaded rod and a moving block. The moving groove is opened at the top of the base plate, the first electric threaded rod is bolted to the rear side of the base plate, the front side of the first electric threaded rod passes through the rear side of the base plate and is rotatably connected to the inner side of the moving groove, the moving block is slidably connected to the inner side of the moving groove, and the moving block is threadedly connected to the outer side of the first electric threaded rod.

[0007] In order to achieve the effect of being able to drill holes in walls of different heights when the staff are drilling holes, as a preferred wall drilling device for construction of the utility model, the lifting assembly includes a vertical plate, a lifting slot, a second electric threaded rod and a lifting block, the vertical plate is bolted to the top of the moving block, the lifting slot is opened on the front side of the vertical plate, the second electric threaded rod is bolted to the top of the vertical plate, the bottom of the second electric threaded rod passes through the top of the vertical plate and is rotatably connected to the inner side of the lifting slot, the rear side of the lifting block is slidably connected to the inner side of the lifting slot, and the rear side of the lifting block is threadedly connected to the outer side of the second electric threaded rod.

[0008] In order to achieve the effect of collecting waste chips and waste liquid generated during the drilling process of the staff, as a preferred wall drilling device for construction of the utility model, the collection component includes an electric telescopic rod, a collection box, a baffle and a drain pipe, the electric telescopic rod is bolted to the inner side of the lifting block, the collection box is bolted to the telescopic end of the electric telescopic rod, the baffle is bolted to the top of the collection box, and the drain pipe is connected to the left side of the collection box.

[0009] In order to achieve the effect of limiting the height of the drilling device and preventing deviation when adjusting the height, as a preferred wall drilling device for construction of the utility model, limiting grooves are provided on both sides of the vertical plate, limiting plates are bolted on both sides of the lifting block, and the rear side of the limiting plate is slidably connected to the inner side of the limiting groove.

[0010] In order to filter the waste debris in the waste liquid and facilitate cleaning by the staff, as a preferred wall drilling device for construction of the utility model, the left side of the collection box is slidably connected to a filter plate, and the left side of the filter plate is bolted with a handle.

[0011] In order to achieve the effect of assisting the filter plate to slide, thereby facilitating the staff to take it out, as a preferred wall drilling device for construction of the utility model, a sliding groove is opened on the inner side of the left side of the collection box, and sliding blocks are bolted on both sides of the filter plate, and the sliding blocks are slidably connected to the inner side of the sliding groove.

[0012] In order to facilitate the staff to push and pull the drilling device, as a preferred wall drilling device for construction of the utility model, the rear side of the top of the base plate is bolted with a push-pull handle, the outer side of the push-pull handle is sleeved with a protective cover, and the surface of the protective cover is provided with anti-slip texture.

[0013] In order to facilitate the staff to move the drilling device, as a preferred wall drilling device for construction of the utility model, the bottom of the base plate is bolted with a universal wheel body, and the universal wheel body is evenly distributed at the four corners of the bottom of the base plate.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The wall drilling device for construction construction, during the process of workers drilling holes in the wall, the workers start the rotating body, and then by setting the moving component, the workers start the first electric threaded rod to drive the moving block to move inside the moving groove, so that the workers do not need to drill holes in the wall manually, thereby reducing the workers' fatigue and improving the workers' work efficiency, which is convenient for the workers to use; by setting the lifting component, the height of the rotary device can be adjusted during the process of workers drilling holes in the wall, so that walls of different heights can be drilled according to the needs of the workers, and the workers do not need to use auxiliary tools to drill holes in the wall, which improves the overall practicality; by setting the collecting component, the waste liquid and waste chips generated by drilling can be effectively collected, so that the waste liquid and waste chips will not be spilled in the working area, thereby avoiding the impact on the working environment, and thus can meet the use needs of the workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is the overall structural diagram of the wall drilling device for building construction of the utility model;

[0017] Figure 2 It is a structural schematic diagram of the mobile component in the utility model;

[0018] Figure 3 It is a structural schematic diagram of the lifting component in the utility model;

[0019] Figure 4 It is a structural schematic diagram of the collection component in the utility model;

[0020] Figure 5 It is a structural schematic diagram of the sliding groove and the sliding block in the utility model.

[0021] In the figure, 1, bottom plate; 2, moving component; 201, moving groove; 202, first electric threaded rod; 203, moving block; 3, lifting component; 301, vertical plate; 302, lifting groove; 303, second electric threaded rod; 304, lifting block; 4, turntable body; 5, collecting component; 501, electric telescopic rod; 502, collecting box; 503, baffle; 504, drain pipe; 6, limit groove; 7, limit plate; 8, filter plate; 9, handle; 10, sliding groove; 11, sliding block; 12, push-pull handle; 13, universal wheel body. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0024] See also Figure 1-5 The utility model provides a technical solution: a wall drilling device for construction, comprising a bottom plate 1, a moving component 2 is arranged on the inner side of the bottom plate 1, a lifting component 3 is arranged on the top of the bottom plate 1, a rotating head body 4 is bolted to the front side of the lifting component 3, and a collecting component 5 is arranged on the front side of the lifting component 3;

[0025] The moving component 2 includes a moving groove 201, a first electric threaded rod 202 and a moving block 203. The moving groove 201 is opened at the top of the base plate 1, the first electric threaded rod 202 is bolted to the rear side of the base plate 1, the front side of the first electric threaded rod 202 passes through the rear side of the base plate 1 and is rotatably connected to the inner side of the moving groove 201, the moving block 203 is slidably connected to the inner side of the moving groove 201, and the moving block 203 is threadedly connected to the outer side of the first electric threaded rod 202.

[0026] In this embodiment: the wall drilling device for construction, during the process of workers drilling holes in the wall, the workers start the rotating body, and then set the moving component 2. The workers start the first electric threaded rod 202 to drive the moving block 203 to move inside the moving groove 201, so that the workers do not need to drill holes in the wall manually, thereby reducing the workers' fatigue and improving the workers' work efficiency, which is convenient for the workers to use. By setting the lifting component 3, the height of the rotary device can be adjusted during the workers' drilling holes in the wall, so that walls of different heights can be drilled according to the needs of the workers, and the workers do not need to use auxiliary tools to drill holes in the wall, which improves the overall practicality. By setting the collecting component 5, the waste liquid and waste chips generated by drilling can be effectively collected, so that the waste liquid and waste chips will not be spilled in the working area, thereby avoiding the impact on the working environment, and thus meeting the use needs of the workers.

[0027] As a technical optimization solution of the utility model, the lifting component 3 includes a vertical plate 301, a lifting groove 302, a second electric threaded rod 303 and a lifting block 304. The vertical plate 301 is bolted to the top of the moving block 203, the lifting groove 302 is opened on the front side of the vertical plate 301, the second electric threaded rod 303 is bolted to the top of the vertical plate 301, the bottom of the second electric threaded rod 303 passes through the top of the vertical plate 301 and is rotatably connected to the inner side of the lifting groove 302, the rear side of the lifting block 304 is slidably connected to the inner side of the lifting groove 302, and the rear side of the lifting block 304 is threadedly connected to the outer side of the second electric threaded rod 303.

[0028] In this embodiment: by setting up a vertical plate 301, a lifting groove 302, a second electric threaded rod 303 and a lifting block 304, the staff can start the second electric threaded rod 303 on the top of the vertical plate 301 to drive the lifting block 304 inside the lifting groove 302 to move up and down, so that the height of the drilling device can be adjusted during the process of drilling holes in the wall.

[0029] As a technical optimization solution of the utility model, the collection component 5 includes an electric telescopic rod 501, a collection box 502, a baffle 503 and a drain pipe 504. The electric telescopic rod 501 is bolted to the inner side of the lifting block 304, the collection box 502 is bolted to the telescopic end of the electric telescopic rod 501, the baffle 503 is bolted to the top of the collection box 502, and the drain pipe 504 is connected to the left side of the collection box 502.

[0030] In this embodiment: by setting up an electric telescopic rod 501, a collection box 502, a baffle 503 and a drain pipe 504, the staff can adjust the baffle 503 on the top of the collection box 502 to a suitable position by starting the electric telescopic rod 501, and then discharge the collected waste liquid through the drain pipe 504, so that the waste liquid and waste chips generated by drilling can be effectively collected, so that the waste liquid and waste chips will not be spilled in the working area.

[0031] As a technical optimization solution of the utility model, limiting grooves 6 are provided on both sides of the vertical plate 301, and limiting plates 7 are bolted to both sides of the lifting block 304, and the rear side of the limiting plate 7 is slidably connected to the inner side of the limiting groove 6.

[0032] In this embodiment, by providing the limiting groove 6 and the limiting plate 7, the lifting block 304 can be limited when the lifting block 304 is adjusted to prevent deviation.

[0033] As a technical optimization solution of the present invention, a filter plate 8 is slidably connected to the left side of the collection box 502, and a handle 9 is bolted to the left side of the filter plate 8.

[0034] In this embodiment, by providing the filter plate 8 and the handle 9, the waste debris in the waste liquid can be filtered.

[0035] As a technical optimization solution of the utility model, a sliding groove 10 is opened on the inner side of the left side of the collection box 502, and sliding blocks 11 are bolted on both sides of the filter plate 8, and the sliding blocks 11 are slidably connected to the inner side of the sliding groove 10.

[0036] In this embodiment, by providing the sliding groove 10 and the sliding block 11 , it is convenient for the staff to take out the filter plate 8 , so as to clean the waste.

[0037] As a technical optimization solution of the utility model, a push-pull handle 12 is bolted to the rear side of the top of the bottom plate 1, and a protective sleeve is sleeved on the outer side of the push-pull handle 12, and the surface of the protective sleeve is provided with anti-slip patterns.

[0038] In this embodiment, by providing the push-pull handle 12, the drilling device can be pushed and pulled, and the hands of the workers can be protected at the same time.

[0039] As a technical optimization solution of the present invention, the bottom of the base plate 1 is bolted with a universal wheel body 13 , and the universal wheel body 13 is evenly distributed at the four corners of the bottom of the base plate 1 .

[0040] In this embodiment, by providing the universal wheel body 13, it is possible to facilitate the workers to move the drilling device, thereby making it convenient for the workers to use it.

[0041] Working principle: First, when the staff is drilling holes in the wall, the staff starts the rotating body, and then the staff starts the first electric threaded rod 202 to drive the moving block 203 to move inside the moving groove 201, so that the staff does not need to drill holes in the wall manually, thereby reducing the fatigue of the staff and improving the work efficiency of the staff, which is convenient for the staff to use. Then the staff starts the second electric threaded rod 303 on the top of the vertical plate 301 to drive the lifting block 304 inside the lifting groove 302 to lift, so that the staff can drill holes in the wall. , the height of the hole-turning device can be adjusted, so that holes in walls of different heights can be drilled according to the needs of the staff. At the same time, the staff does not need to use auxiliary tools to drill holes in the wall, which improves the overall practicality. Then the staff starts the electric telescopic rod 501 to adjust the baffle 503 on the top of the collection box 502 to a suitable position, and then discharges the collected waste liquid through the drain pipe 504, so that the waste liquid and waste chips generated by the drilling can be effectively collected, so that the waste liquid and waste chips will not be spilled in the working area, thereby avoiding affecting the working environment, and thus can meet the use needs of the staff.

[0042] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A wall drilling device for construction, comprising a base plate (1), characterized in that: A moving assembly (2) is arranged on the inner side of the bottom plate (1), a lifting assembly (3) is arranged on the top of the bottom plate (1), a rotating head body (4) is bolted to the front side of the lifting assembly (3), and a collecting assembly (5) is arranged on the front side of the lifting assembly (3); The moving assembly (2) comprises a moving groove (201), a first electric threaded rod (202) and a moving block (203); the moving groove (201) is opened at the top of the base plate (1); the first electric threaded rod (202) is bolted to the rear side of the base plate (1); the front side of the first electric threaded rod (202) passes through the rear side of the base plate (1) and is rotatably connected to the inner side of the moving groove (201); the moving block (203) is slidably connected to the inner side of the moving groove (201); and the moving block (203) is threadedly connected to the outer side of the first electric threaded rod (202).

2. A wall drilling device for construction according to claim 1, characterized in that: The lifting assembly (3) comprises a vertical plate (301), a lifting slot (302), a second electric threaded rod (303) and a lifting block (304); the vertical plate (301) is bolted to the top of the moving block (203); the lifting slot (302) is opened on the front side of the vertical plate (301); the second electric threaded rod (303) is bolted to the top of the vertical plate (301); the bottom of the second electric threaded rod (303) passes through the top of the vertical plate (301) and is rotatably connected to the inner side of the lifting slot (302); the rear side of the lifting block (304) is slidably connected to the inner side of the lifting slot (302); and the rear side of the lifting block (304) is threadedly connected to the outer side of the second electric threaded rod (303).

3. A wall drilling device for construction according to claim 1, characterized in that: The collecting assembly (5) comprises an electric telescopic rod (501), a collecting box (502), a baffle (503) and a drainage pipe (504); the electric telescopic rod (501) is bolted to the inner side of the lifting block (304); the collecting box (502) is bolted to the telescopic end of the electric telescopic rod (501); the baffle (503) is bolted to the top of the collecting box (502); and the drainage pipe (504) is connected to the left side of the collecting box (502).

4. A wall drilling device for construction according to claim 2, characterized in that: Limiting grooves (6) are provided on both sides of the vertical plate (301), and limiting plates (7) are bolted to both sides of the lifting block (304), and the rear side of the limiting plate (7) is slidably connected to the inner side of the limiting groove (6).

5. A wall drilling device for construction according to claim 3, characterized in that: A filter plate (8) is slidably connected to the left side of the collection box (502), and a handle (9) is bolted to the left side of the filter plate (8).

6. A wall drilling device for construction according to claim 5, characterized in that: The inner side of the left side of the collecting box (502) is provided with a sliding groove (10), and sliding blocks (11) are bolted to both sides of the filter plate (8), and the sliding blocks (11) are slidably connected to the inner side of the sliding groove (10).

7. A wall drilling device for construction according to claim 1, characterized in that: A push-pull handle (12) is bolted to the rear side of the top of the bottom plate (1), a protective sleeve is sleeved on the outer side of the push-pull handle (12), and a surface of the protective sleeve is provided with anti-slip patterns.

8. A wall drilling device for construction according to claim 1, characterized in that: The bottom of the base plate (1) is bolted with a universal wheel body (13), and the universal wheel body (13) is evenly distributed at the four corners of the bottom of the base plate (1).