Implementation hanging basket for civil engineering

By using a combined structure of spring and telescopic rod in the construction hanging basket to buffer the impact force, and intercept high-altitude falls through the roof plate and shock-proof pad, and setting a folding flat plate and universal wheel to facilitate tool storage and adjustment of the hanging basket position, the existing solution is solved In the technology, the problems of ground impact of hanging baskets, inconvenient tool storage and insufficient safety have achieved the improvement of safety protection of hanging baskets and personnel and construction efficiency.

CN222513351UActive Publication Date: 2025-02-21GUODIAN LIAOCHENG POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420980788.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2025-02-21
Estimated Expiration
2034-05-08

AI Technical Summary

Technical Problem

The existing construction hanging basket will produce impact when it hits the ground, causing damage to the bottom of the hanging basket and poses a danger to construction workers. At the same time, the tools for high-altitude operations are inconvenient to store and insufficient safety protection measures.

Method used

A hanging basket for civil engineering was designed, using a combined structure of spring and telescopic rod to buffer the impact force when hitting the ground, and intercept high-altitude falls through the roof plate and shock-proof pads, and a folding flat plate and universal wheel are set to facilitate tool storage and Adjust the position of the hanging basket.

Benefits of technology

It effectively buffers the impact force when touching the ground, protects the safety of the hanging basket and personnel, facilitates the storage of tools and adjusts the position of the hanging basket, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222513351U_ABST
    Figure CN222513351U_ABST
Patent Text Reader

Abstract

The implementation hanging basket for civil engineering comprises a frame body, the bottom of the frame body is fixedly connected with a telescopic rod, the side surface of the telescopic rod is fixedly connected with a spring, the end, away from a bottom plate, of the telescopic rod is fixedly connected with a base, and the top of the frame body is movably connected with a fixed supporting column. A top plate is fixedly connected to the ends, away from the frame body, of the fixed supporting columns, an anti-vibration pad is fixedly connected to the upper surface of the top plate, and folding flat plates are arranged in the frame body and close to the left side and the right side. According to the construction hanging basket, impact force generated when the construction hanging basket touches the ground is buffered through the spring and the telescopic rod, the purpose of protecting the hanging basket and personnel is achieved, the top plate intercepts objects falling from high altitudes, constructors are protected, casualties are avoided, the folding flat plate can help the constructors to store tools, and the tools are easy to take and place; and the universal wheels enable the frame body to be freely pushed, and the frame body can be adjusted to the best construction position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of civil engineering equipment, in particular to a hanging basket for civil engineering. Background Art

[0002] The hanging basket is a construction tool for high-altitude operations in construction projects, used for curtain wall installation and exterior wall cleaning. The hanging basket is a new type of high-altitude operation equipment that can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. The use of construction hanging baskets has gradually become a trend, and has been widely recognized in high-altitude operations such as exterior wall construction, curtain wall installation, insulation construction, and exterior wall maintenance and cleaning of high-rise and multi-story buildings. It can also be used for operations in large tanks, bridges, dams and other projects. Using this product, scaffolding is unnecessary. The construction cost is reduced, and the construction cost is 28% of the traditional scaffolding, and the work efficiency is greatly improved. The hanging basket is flexible to operate, easy to move, convenient and practical, safe and reliable. There are more than 400 manufacturers of hanging baskets in China.

[0003] At present, after the construction is completed, the construction basket is placed on the ground. When the basket contacts the ground, impact force will be generated, which will not only damage the bottom of the basket, but also cause certain dangers to the construction workers in the basket. When the construction workers are working in the basket, they can only wear helmets as a protective measure against falling objects from high altitudes, and cannot ensure that other parts of the body will not be injured. When the construction workers are working in the air, the construction tools can only be carried on their bodies or placed at the bottom of the basket, which is not easy to take and put. In addition, working at high altitudes will inevitably cause fatigue, and there is a certain risk to personal safety. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a hanging basket for civil engineering.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a hanging basket for civil engineering, comprising a frame, a telescopic rod is fixedly connected to the bottom of the frame, a spring is arranged on the side surface of the telescopic rod, and a base is fixedly connected to one end of the telescopic rod away from the bottom plate;

[0006] A fixed support is fixedly connected to the top of the frame, an end of the fixed support away from the frame is fixedly connected to a top plate, and an anti-vibration pad is fixedly connected to the upper surface of the top plate;

[0007] A fixing plate is fixedly connected to the right inner wall of the frame, a folding flat plate is arranged inside the fixing plate, the folding flat plate is movably connected to the fixing plate via a movable bolt, a bracket is arranged at one end of the folding flat plate away from the fixing plate, the folding flat plate is movably connected to the bracket via a pin, and a support block is movably connected to one end of the bracket away from the folding flat plate.

[0008] As a further description of the above technical solution:

[0009] A hydraulic cylinder is fixedly connected inside the base, a lifting rod is fixedly connected to the output end of the hydraulic cylinder, and a universal wheel is fixedly connected to one end of the lifting rod away from the hydraulic cylinder.

[0010] As a further description of the above technical solution:

[0011] One end of the fixed support column away from the top plate is fixedly connected with a gasket, and the fixed support column and the frame are fixedly connected with bolts through the gasket.

[0012] As a further description of the above technical solution:

[0013] The front and rear surfaces of the frame are both fixedly connected with auxiliary wheel frames, the auxiliary wheel frames are symmetrically arranged, the interior of the auxiliary wheel frames is fixedly connected with a fixed shaft, and the side surface of the fixed shaft is movably connected with a pulley.

[0014] As a further description of the above technical solution:

[0015] There are multiple fixed pillars, which are located at four corners of the top plate.

[0016] As a further description of the above technical solution:

[0017] One end of the spring is fixedly connected to the upper surface of the base, and one end of the spring away from the base is fixedly connected to the lower surface of the bottom plate.

[0018] As a further description of the above technical solution:

[0019] The upper surface of the bottom plate is fixedly connected with an anti-skid pad, and the side surface of the spring is movably connected with a protective cover.

[0020] As a further description of the above technical solution:

[0021] The right surface of the frame is provided with a plurality of drain outlets.

[0022] The utility model has the following beneficial effects:

[0023] 1. Compared with the prior art, the civil engineering hanging basket is provided with springs and telescopic rods to buffer the impact force when the construction hanging basket lands, thereby achieving a protection purpose for the hanging basket and personnel.

[0024] 2. Compared with the prior art, the civil engineering hanging basket intercepts falling objects from high altitudes by setting a top plate, protects construction workers and avoids casualties.

[0025] 3. Compared with the prior art, the civil engineering hanging basket can help construction workers store tools by providing a folding flat plate, which is easy to take and put, and they can sit when they are tired.

[0026] 4. Compared with the prior art, the civil engineering hanging basket can be pushed at will by setting universal wheels, and can be adjusted to the best construction position. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the overall structure of a hanging basket for civil engineering proposed by the utility model;

[0028] Figure 2 This is a front view of a hanging basket for civil engineering proposed by the utility model;

[0029] Figure 3 for Figure 2 The enlarged view of point A in the middle;

[0030] Figure 4 This is a side view of a hanging basket for civil engineering proposed by the utility model;

[0031] Figure 5 A schematic diagram of the internal structure of a hanging basket base for civil engineering proposed by the utility model;

[0032] Figure 6 for Figure 4 The enlarged view of point B in the middle;

[0033] Legend:

[0034] 1. Frame; 2. Base; 3. Protective cover; 4. Spring; 5. Bottom plate; 6. Anti-skid pad; 7. Bracket; 8. Fixed plate; 9. Movable bolt; 10. Folding flat plate; 11. Fixed pillar; 12. Top plate; 13. Shockproof pad; 14. Gasket; 15. Bolt; 16. Auxiliary wheel frame; 17. Pulley; 18. Fixed shaft; 19. Telescopic rod; 20. Drain outlet; 21. Hydraulic cylinder; 22. Lifting rod; 23. Universal wheel; 24. Support block. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0036] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0037] Reference Figure 1-6 The utility model provides a hanging basket for civil engineering: it includes a frame 1, a telescopic rod 19 is fixedly connected to the bottom of the frame 1, and a spring 4 is arranged on the side surface of the telescopic rod 19 to buffer the impact force generated when the hanging basket lands, so that the frame 1 lands more smoothly, one end of the spring 4 is fixedly connected to the upper surface of the base 2, and the end of the spring 4 away from the base 2 is fixedly connected to the lower surface of the bottom plate 5, and the side surface of the spring 4 is movably connected with a protective cover 3 to reduce the contact between the spring 4 and the outside world, and the end of the telescopic rod 19 away from the bottom plate 5 is fixedly connected to the base 2, and the inside of the base 2 is fixedly connected to the hydraulic cylinder 21, and the output end of the hydraulic cylinder 21 is fixedly connected to the lifting rod 22, and the end of the lifting rod 22 away from the hydraulic cylinder 21 is fixedly connected to the universal wheel 23, which can be pushed at will through the universal wheel 23 to adjust to the best construction position.

[0038] A fixed support 11 is fixedly connected to the top of the frame 1. There are multiple fixed supports 11, which are located at the four corners of the top plate 12. The end of the fixed support 11 away from the frame 1 is fixedly connected to the top plate 12 to prevent falling objects from causing harm to the human body. A shock-proof pad 13 is fixedly connected to the upper surface of the top plate 12 to prevent large falling objects from causing shaking to the frame 1. A gasket 14 is fixedly connected to the end of the fixed support 11 away from the top plate 12 to increase the contact area, reduce pressure, prevent loosening, and protect the fixed support 11 and bolts 15. The fixed support 11 and the frame 1 are fixedly connected with the bolts 15 through the gasket 14.

[0039] A fixing plate 8 is fixedly connected to the right inner wall of the frame 1, a folding flat plate 10 is arranged inside the fixing plate 8, the folding flat plate 10 is movably connected to the fixing plate 8 through a movable bolt 9, a bracket 7 is arranged at one end of the folding flat plate 10 away from the fixing plate 8, the folding flat plate 10 and the bracket 7 are movably connected through a pin, and a support block 24 is movably connected to one end of the bracket 7 away from the folding flat plate 10, so that the bracket 7 will not move at will.

[0040] The front and rear surfaces of the frame 1 are fixedly connected with auxiliary wheel frames 16, which are symmetrically arranged to ensure that the frame 1 remains balanced during the ascent. The interior of the auxiliary wheel frame 16 is fixedly connected with a fixed shaft 18, and the side surface of the fixed shaft 18 is movably connected with a pulley 17, which facilitates ascent. The right surface of the frame 1 is provided with a drain outlet 20, and there are multiple drain outlets 20, so that water will not accumulate in the frame 1. The upper surface of the bottom plate 5 is fixedly connected with an anti-slip pad 6 to prevent operators from slipping.

[0041] Working principle: When in use, the frame 1 is moved to the construction position through the universal wheel 23, the operator enters the frame 1, and rises through the pulley 17 with a rope. When the construction hanging basket rises, the universal wheel 23 is retracted through the lifting rod 22. The operator can lay the folding flat plate 10 flat in the hanging basket, and the bracket 7 sets up the folding flat plate 10. The operator can sit on the folding flat plate 10 to reach the construction site. During construction, the construction tools can also be placed on the folding flat plate 10 for easy picking. After the construction is completed, when the hanging basket contacts the ground, the spring 4 is used to reduce the impact force with the ground to avoid injuries to the operators in the hanging basket.

[0042] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A suspended platform for civil engineering, comprising a frame (1), characterized in that: A telescopic rod (19) is fixedly connected to the bottom of the frame (1), a spring (4) is provided on the side surface of the telescopic rod (19), and one end of the telescopic rod (19) away from the bottom plate (5) is fixedly connected to a base (2); The top of the frame (1) is fixedly connected to a fixed support (11), one end of the fixed support (11) away from the frame (1) is fixedly connected to a top plate (12), and the upper surface of the top plate (12) is fixedly connected to an anti-vibration pad (13); A fixing plate (8) is fixedly connected to the right inner wall of the frame (1), a folding flat plate (10) is arranged inside the fixing plate (8), the folding flat plate (10) and the fixing plate (8) are movably connected via a movable bolt (9), a bracket (7) is arranged at one end of the folding flat plate (10) away from the fixing plate (8), the folding flat plate (10) and the bracket (7) are movably connected via a pin, and a support block (24) is movably connected to one end of the bracket (7) away from the folding flat plate (10).

2. A civil engineering hanging basket according to claim 1, characterized in that: A hydraulic cylinder (21) is fixedly connected inside the base (2), a lifting rod (22) is fixedly connected to the output end of the hydraulic cylinder (21), and a universal wheel (23) is fixedly connected to one end of the lifting rod (22) away from the hydraulic cylinder (21).

3. The civil engineering implementation hanging basket according to claim 1, characterized in that: One end of the fixed support (11) away from the top plate (12) is fixedly connected with a gasket (14), and the fixed support (11) and the frame (1) are fixedly connected with bolts (15) via the gasket (14).

4. The civil engineering implementation hanging basket according to claim 1, characterized in that: The front and rear surfaces of the frame (1) are both fixedly connected to auxiliary wheel frames (16), the auxiliary wheel frames (16) are symmetrically arranged, the interior of the auxiliary wheel frames (16) is fixedly connected to a fixed shaft (18), and the side surface of the fixed shaft (18) is movably connected to a pulley (17).

5. The civil engineering implementation hanging basket according to claim 1, characterized in that: The number of the fixed pillars (11) is plural and they are located at the four corners of the top plate (12).

6. The civil engineering implementation hanging basket according to claim 1, characterized in that: One end of the spring (4) is fixedly connected to the upper surface of the base (2), and one end of the spring (4) away from the base (2) is fixedly connected to the lower surface of the bottom plate (5).

7. The civil engineering hanging basket according to claim 1, characterized in that: The upper surface of the bottom plate (5) is fixedly connected to an anti-skid pad (6), and the side surface of the spring (4) is movably connected to a protective cover (3).

8. The civil engineering implementation hanging basket according to claim 1, characterized in that: The right surface of the frame (1) is provided with a drainage port (20), and there are a plurality of drainage ports (20).