Road and bridge construction crack reinforcing structure

By using a crack reinforcement structure including base plate, connector, bracket and expansion bolt in road and bridge construction, the problem of poor crack repair effect in the prior art is solved, and a more stable crack repair effect and longer service life.

CN222525198UActive Publication Date: 2025-02-25HAIGANG ROAD & BRIDGE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421220253.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-02-25
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

In the prior art, the crack repair effect of roads and bridges after use is poor, and it is easy to expand again under subsequent vehicle crushing, resulting in frequent repairs and affecting the safety of use.

Method used

A crack reinforcement structure for road and bridge construction, including symmetrically arranged base plate, connector, bracket and expansion bolt. By adjusting the position of the bracket and the expansion degree of expansion bolts, the connection is fixed through the cracks and fills the cracks through concrete. Enhance the reinforcement effect.

Benefits of technology

Effectively stabilize and fix the bottom plates on both sides of the cracks, avoid the cracks from being deformed again under stress, improve the service life after repair, reduce subsequent maintenance needs, and ensure the safety and stability of roads and bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525198U_ABST
    Figure CN222525198U_ABST
Patent Text Reader

Abstract

The utility model discloses a road and bridge construction crack reinforcing structure, which belongs to the technical field of crack repair, and comprises symmetrically arranged bottom plates, a connecting piece for connecting is arranged between the two bottom plates, brackets corresponding to the connecting piece are arranged on the bottom plates, and two ends of the connecting piece are respectively clamped with the corresponding brackets on the two bottom plates. The support and the bottom plate are adjustably matched, a plurality of penetrating openings are formed in the bottom plate, expansion bolts penetrate through the penetrating openings, the ends, located at the bottom of the bottom plate, of the expansion bolts are sleeved with expansion sleeves, the ends, located at the top of the bottom plate, of the expansion bolts are in threaded fit with nuts, and the stability of crack repairing can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of crack repair, and more specifically to a road and bridge construction crack reinforcement structure. Background Art

[0002] With the rapid development of cities, municipal road and bridge construction has become more and more frequent. After long-term use, some structures of current bridges and roads will gradually age or be damaged. After vehicles pass by, cracks will appear on the surface of the road.

[0003] In order to ensure the safety of roads, the traditional method of crack repair is now used. Since it is impossible to directly install steel bars at the cracks to provide support, concrete can only be used to directly pour the cracks. Although direct pouring of concrete can fill the cracks, the tensile force of concrete on both sides of the cracks is small. During the subsequent use of vehicles running over them, the cracks will still expand. The repair effect is poor and requires constant maintenance, affecting normal use. A solution is proposed below to address the above problems. Utility Model Content

[0004] In view of the problems existing in the prior art, the purpose of the utility model is to provide a road and bridge construction crack reinforcement structure, which can ensure the stability of crack repair.

[0005] To solve the above problems, the utility model adopts the following technical solutions.

[0006] A crack reinforcement structure for road and bridge construction, comprising symmetrically arranged base plates, a connecting piece installed between two of the base plates for connecting purposes, a bracket corresponding to the connecting piece installed on the base plates, two ends of the connecting piece respectively clamped with the corresponding brackets on the two base plates, the brackets and the base plates are adjusted to fit, a plurality of through openings installed on the base plates, expansion bolts are passed through the through openings, an expansion sleeve is sleeved on the outside of one end of the expansion bolt located at the bottom of the base plate, and a nut is threadedly fitted on one end of the expansion bolt located at the top of the base plate.

[0007] Preferably, the connecting member comprises a connecting rod and a fixing rod, two fixing rods are provided, and the fixing rods are annular, and one end of the two fixing rods is fixedly connected to the two ends of the connecting pipe respectively.

[0008] Preferably, a plurality of groups of mounting openings are evenly arranged on the bottom plate, each group of the mounting openings cooperates with the bracket respectively, each group of the mounting openings includes a plurality of sockets, the sockets are arranged in a straight line, the straight line where the centers of the sockets are located is the same as the arrangement direction of the connecting parts, and the bracket and the sockets are plugged into each other.

[0009] Preferably, the bracket includes a pull rod, an insertion rod and a tensioning piece, the insertion rod is fixed to one end of the pull rod, the insertion rod is plugged into the bottom plate, the tensioning piece is sleeved on the pull rod, and the tensioning piece and the insertion rod are threadedly matched.

[0010] Preferably, the tensioning member comprises a clamping block, which is in the shape of a truncated cone with an upper surface larger than a lower surface, a through groove is provided at the axis of the clamping block, the through groove is sleeved on the pull rod, and the through groove and the pull rod thread cooperate.

[0011] Preferably, a support plate is installed on the base plate, and several of the support plates are C-shaped. The support plates are fixed on the base plate, and the openings of the support plates correspond to the ends of the connecting pieces. A top plate is provided on the support plate, and the top plate is provided with fixing ports corresponding to and adapted to several groups of brackets. The fixing ports have the same structure as the mounting ports, and a top rod fixedly connected to the top of the bracket is provided in the fixing ports.

[0012] Preferably, a pouring port for convenient pouring of concrete is opened on the top plate.

[0013] Compared with the prior art, the advantages of the present invention are:

[0014] 1. This solution uses expansion bolts on the base plate to expand the expansion sleeve, thereby fixing the base plate on the road surface on both sides of the crack. According to the width of the crack, the position of the bracket on the base plate is adjusted to ensure that the connecting piece passes through the crack. At the same time, since the crack is irregular, the position of the bracket can be adjusted to adapt to the change in crack width. The crack is then filled with concrete. Concrete is used to fill the crack, and the connecting piece is used to prevent the crack from being deformed by stress again, thereby ensuring the service life after repair.

[0015] 2. The fixing rod is used to cooperate with the bracket, and there is a gap between the fixing rod and the bracket, so that the fixing rod and the bracket can move, with a certain buffer amount, which facilitates the cooperation between the bracket and the corresponding socket. The connecting rod is used to support the crack and prevent the crack from deforming again.

[0016] 3. Through the straight-line arrangement of the sockets, the position of the bracket in different installation ports can be adjusted to adapt to changes in crack width. There is no need to adjust the length of the connector every time a different crack is encountered. It is easy to use, has strong applicability, and improves work efficiency.

[0017] Fourth, the plug rod and the socket are plugged in together, the pull rod and the fixing rod are matched, and the tensioning piece can play a role in fine-tuning and fixing between the pull rod and the fastening rod to prevent the connecting parts from shaking.

[0018] Fifth, through the threaded cooperation between the clamping block and the pull rod, the position of the clamping block on the pull rod can be moved by rotating the clamping block, thereby fixing the connecting piece and preventing the connecting piece from shaking.

[0019] 6. The support plate supports the top plate, and the fixing port on the top plate cooperates with the top rod to support and fix the top of the pull rod, thereby ensuring the stability of the force at both ends of the pull rod and ensuring the stability of the pull rod's fixation to the connecting parts.

[0020] 7. The pouring port facilitates the pouring of concrete between the top plate and the bottom plate, ensuring the comprehensiveness of the concrete filling and avoiding hollowing. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0022] Figure 2 It is a cross-sectional structural schematic diagram of the bottom plate, the support plate and the top plate of the utility model;

[0023] Figure 3 It is a schematic cross-sectional structure diagram of the bracket of the utility model;

[0024] Figure 4 It is a schematic diagram of the connection structure of the expansion bolt, expansion sleeve and nut of the utility model;

[0025] Figure 5 It is a schematic diagram of the top view of the bottom plate of the utility model;

[0026] Figure 6 It is a schematic diagram of the top view of the support plate of the utility model.

[0027] Description of the numbers in the figure:

[0028] 1. Bottom plate; 2. Connector; 3. Bracket; 4. Through-hole; 5. Expansion bolt; 6. Expansion sleeve; 7. Nut; 8. Connecting rod; 9. Fixing rod; 10. Mounting opening; 11. Socket; 12. Inserting rod; 13. Tensioning piece; 14. Pull rod; 15. Snap-in block; 16. Through-groove; 17. Support plate; 18. Top plate; 19. Fixing opening; 20. Push rod; 21. Filling opening. DETAILED DESCRIPTION

[0029] Embodiment 1:

[0030] See also Figure 1-6 A road and bridge construction crack reinforcement structure includes a symmetrically arranged base plate 1, four through-holes 4 are installed on the base plate 1, the four through-holes 4 are arranged in a rectangular array, and the four through-holes are respectively located at the four corners of the base plate 1, and expansion bolts 5 are penetrated inside the through-holes 4. The expansion bolts 5 are located at one end of the bottom of the base plate 1 and are sleeved with an expansion sleeve 6 on the outside. The expansion bolts 5 are threaded at one end of the top of the base plate 1 and are matched with a nut 7.

[0031] By rotating the nut 7, the nut 7 can be threadedly connected to the expansion bolt 5, so that the expansion bolt 5 can be pulled to move in the direction close to the nut 7, so that the expansion bolt 5 will pull the expansion sleeve 6 to expand, and the expansion of the expansion sleeve 6 will fix it to the road surface next to the crack. The use of four expansion sleeves 6 can ensure the stability of the fixation of the base plate 1 and reduce shaking.

[0032] A support plate 17 is installed on the bottom plate 1, and several support plates 17 are C-shaped. The support plates 17 are fixed on the bottom plate 1, and the openings of the support plates 17 on the two bottom plates 1 correspond to each other. A top plate 18 is arranged on the support plate 17, and several groups of mounting openings 10 are evenly opened on the bottom plate 1, and each group of mounting openings 10 includes several sockets 11, and the sockets 11 are arranged in a straight line, and the straight line where the centers of the sockets 11 are located is the same as the opening direction of the support plate 17, so as to ensure that the length of the connecting member 2 extending out of the support plate 17 can be adjusted, that is, the distance between the two bottom plates 1 is adjusted, so as to adapt to cracks of different widths, and several groups of fixing openings 19 corresponding to the mounting openings 10 are opened on the top plate 18, and the fixing openings 19 have the same structure as the mounting openings 10.

[0033] A plurality of brackets 3 are installed between the bottom plate 1 and the top plate 18, and the number of the brackets 3 corresponds to the number of groups of the mounting openings 10. The brackets 3 include a pull rod 14, an insert rod 12 and a tensioner 13. The insert rod 12 is fixed at one end of the pull rod 14, and the insert rod 12 is plugged into the mounting opening 10. A top rod 20 is fixedly connected to the top of the pull rod 14, and the top rod 20 corresponds to and intersperses with the fixing opening 19. By using the top rod 20 and the fixing opening 19 in combination, and the insert rod 12 and the mounting opening 10 in combination, both ends of the pull rod 14 can be limited at the same time to ensure the support of the pull rod 14 and improve the force.

[0034] Through the cooperation of the mounting port 10 and the fixing port 19, the two ends of the bracket 3 can be connected, and the design of the multiple sockets 11 can adjust the position of the bracket 3, thereby adjusting the distance between the two bottom plates 1 to adapt to cracks of different widths. The symmetrical arrangement of the mounting port 10 and the fixing port 19 can ensure that the two ends of the bracket 3 are fixed at the same time, thereby ensuring the stability of the force applied to the bracket 3.

[0035] A connecting piece 2 is installed between the two base plates 1, and both ends of the connecting piece 2 are located inside the openings of the two support plates 17. The connecting piece 2 includes a connecting rod 8 and a fixing rod 9. Two fixing rods 9 are provided, and the fixing rod 9 is annular. One end of the two fixing rods 9 is fixedly connected to the two ends of the connecting rod 8 respectively. The two fixing rods 9 are respectively sleeved on two corresponding pull rods 14, and the ring diameter of the fixing rod 9 is larger than the diameter of the pull rod 14, and the difference between the inner diameter of the ring of the fixing rod 9 and the diameter of the pull rod 14 is larger than the distance between adjacent sockets 11 in the same group. The fixing rod 9 and the pull rod 14 can move with a certain buffer amount, so that the connecting piece 2 can have corresponding fixing ports 19 and installation ports 10 to cooperate.

[0036] The tensioning member 13 is sleeved on the pull rod 14, and the tensioning member 13 and the insertion rod 12 are threadedly matched. The tensioning member 13 includes a clamping block 15, and the clamping block 15 is in the shape of a truncated cone with an upper surface larger than a lower surface. A through groove 16 is opened at the axis of the clamping block 15, and the through groove 16 is sleeved on the pull rod 14, and the through groove 16 and the pull rod 14 are threadedly matched. The bottom surface area of ​​the clamping block 15 will be smaller than the inner diameter of the ring portion of the fixing rod 9, and the top area of ​​the clamping block 15 is larger than the inner diameter of the ring portion of the fixing rod 9. The bottom area of ​​the clamping block 15 will be smaller than the inner diameter of the ring portion of the fixing rod 9, so that the clamping block 15 can be inserted between the ring portion of the fixing rod 9 and the pull rod 14. The top area of ​​the clamping block 15 is larger than the inner diameter of the ring portion of the fixing rod 9, which can ensure that the clamping block 15 can completely fix the pull rod 14 and the fixed position will not shake. The external fixed connection of the clamping block 15 is provided with a protrusion, which can facilitate the application of force to the clamping block 15, avoiding the problem that the truncated cone-shaped clamping block cannot apply force.

[0037] By rotating the protrusion, the protrusion will drive the clamping block 15 to rotate, and the clamping block 15 will drive the through groove 16 to rotate. The through groove 16 and the pull rod 14 are connected by threads. When the through groove 16 is rotated, the through groove 16 and the pull rod 14 will move relative to each other, thereby driving the clamping block 15 to move. The clamping block 15 moves along the pull rod 14, so that the clamping block 15 will move toward the ring part of the fixed rod 9, thereby fixing the fixed rod 9 and the pull rod 14 through the clamping block 15, thereby determining the position of the pull rod 14, so that the pull rod 14 can provide pulling force and supporting force to prevent the crack from continuing to expand.

[0038] The top plate 18 is provided with a pouring port 21 for convenient concrete pouring. The pouring port 21 facilitates the pouring of concrete between the top plate 18 and the bottom plate 1 to ensure the comprehensiveness of the concrete filling.

[0039] Working principle:

[0040] When in use, first drill corresponding holes on the bottom surfaces on both sides of the crack according to the position of the expansion sleeve 6 on the base plate 1, insert the corresponding expansion sleeve 6 into the hole, and by rotating the nut 7, the nut 7 pulls the expansion bolt 5 to move, the expansion bolt 5 will pull the expansion sleeve 6 to deform, and the expansion sleeve 6 will engage with the hole.

[0041] The fixing rods 9 at both ends of the connecting member 2 are sleeved on the two pull rods 14, and the two pull rods 14 are respectively arranged on the two base plates 1, and the pull rods 14 are arranged on the corresponding sockets 11 to ensure that the pull rods 14 are in a straight line state, and the protrusions are rotated, and the protrusions will drive the clamping blocks 15 to rotate, and the clamping blocks 15 will drive the through grooves 16 to rotate. The through grooves 16 and the pull rods 14 are connected by threads. When the through grooves 16 are rotated, the through grooves 16 and the pull rods 14 will move relative to each other, thereby driving the clamping blocks 15 to move, and the clamping blocks 15 move along the pull rods 14, so that the clamping blocks 15 will move toward the ring part of the fixing rod 9, thereby fixing the fixing rod 9 and the pull rods 14 through the clamping blocks 15, thereby determining the position of the pull rods 14, so that the pull rods 14 can provide pulling force and supporting force to prevent the cracks from continuing to expand.

[0042] Place the top cover on the support plate 17, and align the fixing port 19 on the top cover with the top rod 20, so that the top rod 20 is inserted into the fixing port 19. The cooperation of the fixing port 19 and the top rod 20 can stabilize the pull rod 14. Finally, weld the top plate 18 and the support plate 17 by welding, and finally fill the cracks with concrete. At the same time, concrete needs to be added between the bottom plate 1 and the top plate 18 through the filling port 21 to ensure that the concrete is fully filled and avoid hollowing. The filling port 21 can facilitate the pouring of concrete and ensure that the concrete is filled.

Claims

1. A road and bridge construction crack reinforcement structure, characterized by: The invention comprises symmetrically arranged base plates (1), a connecting piece (2) for connecting is installed between two base plates (1), a bracket (3) corresponding to the connecting piece (2) is installed on the base plate (1), two ends of the connecting piece (2) are respectively clamped with the corresponding brackets (3) on the two base plates (1), the bracket (3) and the base plate (1) are adjusted to fit, a plurality of through-holes (4) are installed on the base plate (1), expansion bolts (5) are inserted into the through-holes (4), an expansion sleeve (6) is sleeved on the outside of one end of the expansion bolt (5) located at the bottom of the base plate (1), and a nut (7) is threadedly fitted on one end of the expansion bolt (5) located at the top of the base plate (1).

2. A road and bridge construction crack reinforcement structure according to claim 1, characterized in that: The connecting member (2) comprises a connecting rod (8) and a fixing rod (9), two fixing rods (9) are provided, and the fixing rods (9) are annular, and one end of the two fixing rods (9) is respectively fixedly connected to the two ends of the connecting pipe.

3. A road and bridge construction crack reinforcement structure according to claim 1, characterized in that: The bottom plate (1) is evenly provided with a plurality of groups of mounting openings (10), each group of the mounting openings (10) respectively cooperates with the bracket (3), each group of the mounting openings (10) comprises a plurality of sockets (11), the plurality of sockets (11) are arranged in a straight line, the straight line where the centers of the plurality of sockets (11) are located is in the same direction as the arrangement direction of the connecting member (2), and the bracket (3) and the sockets (11) are plugged into each other.

4. A road and bridge construction crack reinforcement structure according to claim 1, characterized in that: The bracket (3) comprises a pull rod (14), an insertion rod (12) and a tensioning member (13); the insertion rod (12) is fixed to one end of the pull rod (14); the insertion rod (12) is plugged into the base plate (1); the tensioning member (13) is sleeved on the pull rod (14); the tensioning member (13) and the insertion rod (12) are threadedly matched.

5. A road and bridge construction crack reinforcement structure according to claim 4, characterized in that: The tensioning member (13) comprises a clamping block (15), the clamping block (15) is in the shape of a truncated cone with an upper surface larger than a lower surface, a through groove (16) is provided at the axis of the clamping block (15), the through groove (16) is sleeved on the pull rod (14), and the through groove (16) and the pull rod (14) are threadedly matched.

6. A road and bridge construction crack reinforcement structure according to claim 3, characterized in that: A support plate (17) is installed on the bottom plate (1), and a plurality of the support plates (17) are C-shaped. The support plates (17) are fixed on the bottom plate (1), and an opening of the support plate (17) is located corresponding to the end of the connecting member (2). A top plate (18) is arranged on the support plate (17), and a plurality of fixing openings (19) corresponding to and adapted to the bracket (3) are opened on the top plate (18). The fixing openings (19) have the same structure as the installation openings (10), and a top rod (20) fixedly connected to the top of the bracket (3) is arranged in the fixing openings (19).

7. A road and bridge construction crack reinforcement structure according to claim 6, characterized in that: The top plate (18) is provided with a pouring port (21) for convenient pouring of concrete.