Prefabricated stair performance inspection equipment

By designing a prefabricated stair performance inspection equipment using steel frames, hydraulic rods and clamps, the problem of lack of protection and single inspection angles in the existing equipment during the pressure application process is solved, and higher stability and inspection quality are achieved.

CN222529122UActive Publication Date: 2025-02-25JIASHENG TESTING GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420964850.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-02-25
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The existing prefabricated stair performance inspection equipment lacks protective structure during the pressure application process, which causes the stair body to sway and increase the risk of falling, and the inspection angle is single, reducing the inspection quality.

Method used

A prefabricated stair performance inspection equipment is designed, using structures such as steel frames and hydraulic rods. The stable clamping and multi-angle pressure inspection of the stair body are achieved through plywood and telescopic rods, which enhances the protection and inspection of the equipment.

Benefits of technology

By increasing stability, the equipment avoids the risk of shaking and falling of the stair body during the pressure application process, and improves the inspection quality through multi-angle pressure application inspection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222529122U_ABST
    Figure CN222529122U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of performance inspection of prefabricated stairs, and discloses performance inspection equipment for prefabricated stairs, which comprises a steel frame, a high column is fixedly mounted at the top of the steel frame, a support plate is fixedly mounted on the outer wall of the high column, a telescopic rod is fixedly mounted at the top of the support plate, a rotating rod is fixedly mounted at the output end of the telescopic rod, and the rotating rod is fixedly mounted at the output end of the rotating rod. A square rod is movably connected to the outer wall of the rotating rod, a connecting rod is rotatably connected to the inner wall of the square rod, a clamping plate is rotatably connected to the inner wall of the connecting rod, a stair body is placed at the top of the high column, and a base is fixedly installed on the outer wall of the steel frame. According to the prefabricated stair performance inspection equipment, the two clamping plates are located on the outer walls of the two sides of the stair body correspondingly, the telescopic rod is used for pushing the rotating rod, the rotating rod drives the square rod to rotate, the square rod drives the two clamping plates through the connecting rod to achieve clamping, and the stair body moves up and down, so that the stability is improved when the jack conducts pressure inspection on the stair body through the pressing beam; and falling is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated stair performance testing, in particular to a prefabricated stair performance testing device. Background Art

[0002] Prefabricated stairs are one of the commonly used components in prefabricated buildings. The prefabricated components of prefabricated stairs are mainly prefabricated concrete pedals, platform plates and supporting structures. The main support methods of stairs are wall-bearing, cantilever stepping and beam-bearing. They have the advantages of high efficiency, fast construction speed and high quality controllability. As escape routes, prefabricated stairs also have high quality requirements, so they need to be tested after production.

[0003] The existing prefabricated stair performance testing equipment does not have a protective structure during the pressure application process, which causes the main body of the stairs to shake during the pressure application process, increasing the possibility of falling. At the same time, the equipment has a single testing angle during the inspection, which makes it impossible to apply pressure at multiple angles on the main body of the stairs, resulting in reduced inspection quality. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a prefabricated stair performance testing device, which has the advantages of strong protection and good testing performance, and solves the problems raised by the above-mentioned background technology.

[0005] The utility model provides the following technical solutions: a prefabricated stair performance testing device, comprising a steel frame, a high column is fixedly installed on the top of the steel frame, a support plate is fixedly installed on the outer wall of the high column, a telescopic rod is fixedly installed on the top of the support plate, a rotating rod is fixedly installed on the output end of the telescopic rod, the outer wall of the rotating rod is rotatably connected to a square rod, the inner wall of the square rod is rotatably connected to a connecting rod, the inner wall of the connecting rod is rotatably connected to a splint, a stair body is placed on the top of the high column, a base is fixedly installed on the outer wall of the steel frame, a motor is fixedly installed on the top of the base, a power output shaft of the motor is fixedly equipped with a gear, the outer wall of the gear is meshed with a gear rod, and the outer wall of the gear rod is fixedly installed with a crossbeam.

[0006] As a preferred technical solution of the utility model, a gantry is provided on the outer wall of the steel frame, a positioning wheel is installed on the top of the gantry, a controller is fixedly installed on the outer wall of the gantry, a reducer is fixedly installed on the inner wall of the controller, a sliding wheel is rotatably connected to the bottom of the gantry, and a pressure beam is placed on the top of the stair body.

[0007] As a preferred technical solution of the utility model, a hydraulic rod is fixedly installed in the middle of the top of the steel frame, the number of the hydraulic rods is two, and the output ends of the two hydraulic rods are fixedly installed with a cushion beam, and the output end of the controller is electrically connected to the input end of the hydraulic rod.

[0008] As a preferred technical solution of the utility model, a pressure beam is placed on the top of the stair body, a pull rope is movably sleeved on the outer wall of the positioning wheel, and a reaction beam is fixedly installed at one end of the pull rope, and a jack is fixedly installed at the bottom of the reaction beam.

[0009] As a preferred technical solution of the utility model, the inner wall of the base and the outer wall of the gear rod form a sliding sleeve connection, and the output end of the controller and the input end of the motor form an electrical connection.

[0010] As a preferred technical solution of the present invention, the output end of the controller is electrically connected to the input end of the telescopic rod, the number of the clamping plates is two, and the two clamping plates are respectively located on the outer walls of both sides of the staircase body.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] 1. The prefabricated stair performance testing equipment has two clamping plates respectively located on the outer walls of both sides of the stair main body. The telescopic rod is used to push the rotating rod, and the rotating rod drives the square rod to rotate. The square rod drives the two clamping plates through the connecting rod to achieve clamping. The stair main body moves up and down, so that the jack increases stability when applying pressure to the stair main body through the pressure beam to prevent falling.

[0013] 2. The prefabricated stair performance testing equipment uses a controller to drive the motor to rotate the gears, the gears drive the gear rods to move, and the gear rods drive the stair main body to move up and down through the crossbeam, so that the stair main body is parallel. A pressure beam can be placed at the tip of the stair main body to achieve pressure testing, so that the stair main body can be tested for angles. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the structure of the hydraulic rod of the utility model;

[0016] Figure 3 This is a schematic diagram of the structure of the rotating rod of the utility model;

[0017] Figure 4 This is a schematic diagram of the gear rod structure of the utility model;

[0018] Figure 5 It is a schematic diagram of the reaction beam structure of the utility model.

[0019] In the figure: 1. Steel frame; 2. High column; 3. Telescopic rod; 4. Support plate; 5. Stair body; 6. Connecting rod; 7. Gear rod; 8. Base; 9. Gear; 10. Motor; 11. Gantry; 12. Jack; 13. Controller; 14. Positioning wheel; 15. Sliding wheel; 16. Rotating rod; 17. Clamp; 18. Square rod; 19. Hydraulic rod; 20. Crossbeam; 21. Reaction beam; 22. Pressure beam. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-5 A prefabricated stair performance inspection device comprises a steel frame 1, a high column 2 is fixedly installed on the top of the steel frame 1, a support plate 4 is fixedly installed on the outer wall of the high column 2, a telescopic rod 3 is fixedly installed on the top of the support plate 4, a rotating rod 16 is fixedly installed on the output end of the telescopic rod 3, a square rod 18 is rotatably connected to the outer wall of the rotating rod 16, a connecting rod 6 is rotatably connected to the inner wall of the square rod 18, a clamping plate 17 is rotatably connected to the inner wall of the connecting rod 6, a stair body 5 is placed on the top of the high column 2, a base 8 is fixedly installed on the outer wall of the steel frame 1, a motor 10 is fixedly installed on the top of the base 8, a gear 9 is fixedly assembled on the power output shaft of the motor 10, a toothed rod 7 is meshed on the outer wall of the gear 9, and a crossbeam 20 is fixedly installed on the outer wall of the toothed rod 7. In the above structure, the support plate 4 is fixedly installed on the outer wall of the high column 2, and the support plate 4 is used to stably support the equipment, thereby increasing the stability of the equipment.

[0022] In a preferred embodiment, a gantry 11 is provided on the outer wall of the steel frame 1, a positioning wheel 14 is installed on the top of the gantry 11, a controller 13 is fixedly installed on the outer wall of the gantry 11, a reducer is fixedly installed on the inner wall of the controller 13, the bottom of the gantry 11 is rotatably connected to a sliding wheel 15, and a pressure beam 22 is placed on the top of the stair body 5. In the above structure, the gantry 11 is used to slide through the sliding wheel 15, the gantry 11 moves to the outer wall of the steel frame 1, the controller 13 is controlled, and the reducer drives the pull rope to rotate, so that the pull rope drives the reaction beam 21 to move up and down through the positioning wheel 14, and the jack 12 is used to apply pressure to the stair body 5 through the pressure beam 22 for inspection.

[0023] In a preferred embodiment, a hydraulic rod 19 is fixedly installed in the middle of the top of the steel frame 1. The number of the hydraulic rods 19 is two, and the output ends of the two hydraulic rods 19 are fixedly installed with a cushion beam. The output end of the controller 13 is electrically connected to the input end of the hydraulic rod 19. In the above structure, by operating the controller 13, the hydraulic rod 19 is used to push the cushion beam, so that when the stair body 5 is in a horizontal state, the cushion beam is used to provide auxiliary support for the stair body 5 to increase the inspection stability.

[0024] In a preferred embodiment, a pressure beam 22 is placed on the top of the stair body 5, a pull rope is movably sleeved on the outer wall of the positioning wheel 14, and a reaction beam 21 is fixedly installed on one end of the pull rope, and a jack 12 is fixedly installed on the bottom of the reaction beam 21. In the above structure, the gantry 11 is remotely controlled to travel to the center position of the steel frame 1, and the upper and lower positions of the reaction beam 21 are adjusted through the reducer by utilizing the stroke of the jack 12 according to the height of the different stair bodies 5.

[0025] In a preferred embodiment, the inner wall of the base 8 and the outer wall of the gear rod 7 form a sliding sleeve, and the output end of the controller 13 is electrically connected to the input end of the motor 10. In the above structure, by manipulating the controller 13, the motor 10 drives the gear 9 to rotate, the gear 9 drives the gear rod 7 to move, and the gear rod 7 drives the stair body 5 to move up and down through the cross beam 20, so that the stair body 5 is in a parallel state, and the pressure beam 22 can be placed at the tip of the stair body 5 to realize pressure testing, so that the stair body 5 can be tested for angles.

[0026] In a preferred embodiment, the output end of the controller 13 is electrically connected to the input end of the telescopic rod 3, the number of the clamps 17 is two, and the two clamps 17 are respectively located on the outer walls of the two sides of the stair body 5. In the above structure, the two clamps 17 are respectively located on the outer walls of the two sides of the stair body 5, and the telescopic rod 3 is used to push the rotating rod 16, and the rotating rod 16 drives the square rod 18 to rotate. The square rod 18 drives the two clamps 17 through the connecting rod 6 to achieve clamping, so that the stair body 5 is more stable when moving up and down for inspection to avoid falling.

[0027] Working principle: the gantry 11 is used to slide through the sliding wheel 15, the gantry 11 moves to the outer wall of the steel frame 1, the controller 13 is operated, the reducer drives the pull rope to rotate, so that the pull rope drives the reaction beam 21 to move up and down through the positioning wheel 14, and the jack 12 is used to apply pressure to the stair body 5 through the pressure beam 22 for inspection. By operating the controller 13, the motor 10 is used to drive the gear 9 to rotate, the gear 9 drives the gear rod 7 to move, and the gear rod 7 drives the stair body 5 to move up and down through the cross beam 20, so that the stair body 5 is in a parallel state, and the pressure beam 22 can be placed on the tip of the stair body 5 to achieve pressure inspection, so that the stair body 5 can be inspected for angles, and the two clamps 17 are respectively located on the outer walls of the two sides of the stair body 5, and the telescopic rod 3 is used to push the rotating rod 16, and the rotating rod 16 drives the square rod 18 to rotate, and the square rod 18 drives the two clamps 17 through the connecting rod 6 to clamp, so that the stair body 5 is more stable when moving up and down for inspection to avoid falling.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated staircase performance testing device, comprising a steel frame (1), characterized in that: A high column (2) is fixedly mounted on the top of the steel frame (1), a support plate (4) is fixedly mounted on the outer wall of the high column (2), a telescopic rod (3) is fixedly mounted on the top of the support plate (4), a rotating rod (16) is fixedly mounted on the output end of the telescopic rod (3), the outer wall of the rotating rod (16) is rotatably connected to a square rod (18), the inner wall of the square rod (18) is rotatably connected to a connecting rod (6), the inner wall of the connecting rod (6) is rotatably connected to a clamping plate (17), a staircase body (5) is placed on the top of the high column (2), a base (8) is fixedly mounted on the outer wall of the steel frame (1), a motor (10) is fixedly mounted on the top of the base (8), a gear (9) is fixedly mounted on the power output shaft of the motor (10), a toothed rod (7) is meshed on the outer wall of the gear (9), and a crossbeam (20) is fixedly mounted on the outer wall of the toothed rod (7).

2. The prefabricated stair performance testing device according to claim 1 is characterized in that: The outer wall of the steel frame (1) is provided with a gantry (11), a positioning wheel (14) is installed on the top of the gantry (11), a controller (13) is fixedly installed on the outer wall of the gantry (11), a reducer is fixedly installed on the inner wall of the controller (13), a sliding wheel (15) is rotatably connected to the bottom of the gantry (11), and a pressure beam (22) is placed on the top of the staircase body (5).

3. The prefabricated stair performance testing device according to claim 2 is characterized in that: A hydraulic rod (19) is fixedly installed in the middle of the top of the steel frame (1), the number of the hydraulic rods (19) is two, and the output ends of the two hydraulic rods (19) are fixedly installed with a cushion beam, and the output end of the controller (13) is electrically connected to the input end of the hydraulic rod (19).

4. The prefabricated stair performance testing device according to claim 2 is characterized in that: A pressure beam (22) is placed on the top of the staircase body (5), a pull rope is movably sleeved on the outer wall of the positioning wheel (14), and a reaction beam (21) is fixedly installed on one end of the pull rope, and a jack (12) is fixedly installed on the bottom of the reaction beam (21).

5. The prefabricated stair performance testing device according to claim 4 is characterized in that: The inner wall of the base (8) and the outer wall of the gear rod (7) form a sliding sleeve connection, and the output end of the controller (13) and the input end of the motor (10) form an electrical connection.

6. The prefabricated stair performance testing device according to claim 2 is characterized by: The output end of the controller (13) is electrically connected to the input end of the telescopic rod (3), and the number of the clamping plates (17) is two, and the two clamping plates (17) are respectively located on the outer walls of both sides of the staircase body (5).