Anti-settlement facility for highway subgrade
By designing a combined structure of insertion rods and baffles in the highway roadbed anti-settlement facilities, the problem of poor anti-movement effect of existing facilities is solved, and better roadbed anti-settlement effect and road stability are achieved.
Patent Information
- Application Number
- CN202420917499.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-04-28
AI Technical Summary
The existing highway roadbed anti-settlement facilities are not ideal in anti-moving effects, resulting in easy movement of roadbed piles and causing road damage.
A highway roadbed anti-settlement facility is designed, using insert rods to insert into the center of the pit to fit the baffle with the inner bottom wall of the pit, to enhance the horizontal contact area between the roadbed and the ground, and through the design of slots and communication holes, the insert rods are not easily moved downward, and the support for prefabricated parts is enhanced.
It effectively improves the anti-settlement performance of the roadbed, reduces the risk of movement of the roadbed piles, enhances the stability of the road, and avoids road damage.
Smart Images

Figure CN222541180U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of roadbed, in particular to a highway roadbed anti-settling facility. Background Art
[0002] With the rapid development of social economy, highways have been greatly developed in China, and a criss-crossing highway network has gradually been formed that radiates across the country. Roadbed settlement is a common phenomenon that endangers driving safety during the use of highways. Because highways bear high loads for a long time, the roadbed sinks as a whole, making the road surface uneven. When vehicles drive on such a road surface, there are high safety issues.
[0003] After consulting the prior art, it was learned that the patent application number for "highway roadbed anti-subsidence facility" is "201821182307.8". The patent discloses a highway roadbed anti-subsidence facility, including a surface base layer, a gravel layer is laid under the surface base layer, a soil cloth layer is laid under the gravel layer, a concrete layer is laid under the soil cloth layer, a first water inlet hole is opened on the concrete layer, and a support plate is provided under the concrete layer. This solves the problem that when it rains, water will flow along the filler layer into the first stable plate and the second stable plate, and then penetrate into the roadbed from the first stable plate and the second stable plate, flushing the soil under the roadbed, causing the soil under the roadbed to loosen, and the roadbed piles cannot provide good support. Therefore, the roadbed will still have the problem of settlement, but the anti-movement effect of the roadbed piles is not good enough. If the roadbed piles move, it is easy to cause damage to the highway. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art that the anti-movement effect of the roadbed piles is not good enough and the roadbed piles move, which easily causes damage to the highway, and proposes a highway roadbed anti-settling facility.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a highway roadbed anti-subsidence facility, including a roadbed body, a fixing mechanism is arranged on the lower surface of the roadbed body, the fixing mechanism includes a connecting pipe and a separating pipe, the inner wall of the connecting pipe is fixedly connected with an anti-oxidation layer, the inner wall of the anti-oxidation layer is fixedly connected with a protective layer, the separating pipe is plugged into the connecting pipe, the lower surface of the separating pipe is fixedly connected with a baffle, and the axis of the baffle is fixedly connected with an insert rod.
[0006] As a further description of the above technical solution:
[0007] The back side of the protective layer is provided with symmetrically distributed weight-reducing grooves, and the weight-reducing grooves penetrate the anti-oxidation layer and the connecting pipe.
[0008] As a further description of the above technical solution:
[0009] A slot is arranged inside the insertion rod, and a through hole communicating with the slot is opened on the top of the insertion rod.
[0010] As a further description of the above technical solution:
[0011] The back side of the insertion rod is provided with communication holes, and the communication holes are distributed at equal intervals.
[0012] As a further description of the above technical solution:
[0013] A conical head is fixedly connected to the bottom of the insertion rod, and a wear-resistant coating is electroplated on the surface of the conical head.
[0014] As a further description of the above technical solution:
[0015] The road base body comprises a prefabricated part, and a mounting groove adapted to the fixing mechanism is arranged on the lower surface of the prefabricated part.
[0016] As a further description of the above technical solution:
[0017] A laying layer is fixedly connected to the upper surface of the prefabricated part, and steel bars are arranged on the inner wall of the laying layer.
[0018] As a further description of the above technical solution:
[0019] The upper surface of the paving layer is fixedly connected with a waterproof layer, and the upper surface of the waterproof layer is provided with a filling layer.
[0020] As a further description of the above technical solution:
[0021] The upper surface of the filling layer is fixedly connected with a road surface layer.
[0022] The utility model has the following beneficial effects:
[0023] Compared with the existing technology, the highway roadbed anti-subsidence facility inserts the rod into the center of the pothole so that the baffle is fitted with the inner bottom wall of the pothole. The baffle increases the horizontal contact area between the roadbed and the ground. During the insertion of the rod, the soil enters the slot, the connecting hole is fitted with the soil, and the soil inside the slot forms a whole with the soil outside, making it difficult for the rod to move down, thereby better supporting the prefabricated parts and improving anti-subsidence. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the overall structure of a highway roadbed anti-settling facility proposed by the utility model;
[0025] Figure 2 This is a cross-sectional view of a connecting pipe of a highway roadbed anti-settling facility proposed by the utility model;
[0026] Figure 3 This is a cross-sectional view of a separation pipe of a highway roadbed anti-settling facility proposed by the utility model;
[0027] Figure 4 This is a rear view of a separation pipe of a highway roadbed anti-settling facility proposed by the utility model;
[0028] Figure 5 The utility model provides a partial cross-sectional view of a roadbed body of a highway roadbed anti-settlement facility.
[0029] Legend:
[0030] 1. Road base; 2. Connecting pipe; 3. Anti-oxidation layer; 4. Protective layer; 5. Weight reduction groove; 6. Separation pipe; 7. Insert rod; 8. Baffle; 9. Slot; 10. Connecting hole; 11. Conical head; 12. Prefabricated part; 13. Installation groove; 14. Paving layer; 15. Steel bar; 16. Waterproof layer; 17. Filling layer; 18. Pavement layer. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0033] Example:
[0034] Reference Figure 1-Figure 4The utility model provides a highway roadbed anti-settling facility: it includes a roadbed body 1, a fixing mechanism is arranged on the lower surface of the roadbed body 1, the fixing mechanism includes a connecting pipe 2 and a separating pipe 6, an anti-oxidation layer 3 is fixedly connected to the inner wall of the connecting pipe 2, the anti-oxidation layer 3 is not easily oxidized, and its service life is improved, a protective layer 4 is fixedly connected to the inner wall of the anti-oxidation layer 3, and the protective layer 4 improves the wear resistance of the inner wall of the anti-oxidation layer 3, the separating pipe 6 is plugged with the connecting pipe 2, a baffle 8 is fixedly connected to the lower surface of the separating pipe 6, a plug rod 7 is fixedly connected to the axis of the baffle 8, and a symmetrically distributed weight-reducing groove 5 is opened on the back of the protective layer 4, the weight-reducing groove 5 passes through the anti-oxidation layer 3 and the connecting pipe 2, a slot 9 is arranged inside the plug rod 7, and the plug rod A through hole connected to the slot 9 is provided on the top of 7, and a connecting hole 10 is provided on the back of the insertion rod 7. The connecting holes 10 are distributed at equal intervals. A conical head 11 is fixedly connected to the bottom of the insertion rod 7, and the surface of the conical head 11 is electroplated with a wear-resistant coating. First, a pit that matches the connecting pipe 2 is dug on the ground, and the insertion rod 7 is inserted into the center of the pit so that the baffle 8 fits with the inner bottom wall of the pit. The conical head 11 makes it easier for the insertion rod 7 to be inserted into the inside of the pit. During the insertion of the insertion rod 7, the soil enters the inside of the slot 9, and the connecting hole 10 fits with the soil. The soil inside the slot 9 forms a whole with the soil outside, making the slot 9 not easy to move. Then the separation tube 6 is inserted into the inside of the protective layer 4, and the road base body 1 is laid according to the connecting pipe 2.
[0035] Reference Figure 1 and Figure 5 The road base body 1 includes a prefabricated part 12, and a mounting groove 13 adapted to the fixing mechanism is provided on the lower surface of the prefabricated part 12. A paving layer 14 is fixedly connected to the upper surface of the prefabricated part 12, and a steel bar 15 is provided on the inner wall of the paving layer 14 to improve the toughness of the paving layer 14. A waterproof layer 16 is fixedly connected to the upper surface of the paving layer 14. The waterproof layer 16 makes it difficult for water to accumulate under the road base body 1. A filling layer 17 is provided on the upper surface of the waterproof layer 16, and a pavement layer 18 is fixedly connected to the upper surface of the filling layer 17. Concrete is injected into the pothole until the concrete overflows from the protective layer 4, and the mounting groove 13 at the bottom of the prefabricated part 12 is aligned with the connecting pipe 2, and the prefabricated part 12 is installed. After the concrete solidifies, the prefabricated part 12 is not easy to move.
[0036] Working principle: first dig a hole on the ground that matches the connecting pipe 2, insert the rod 7 into the center of the hole, so that the baffle 8 fits with the inner bottom wall of the hole, and the conical head 11 makes it easier for the rod 7 to be inserted into the inside of the hole. During the insertion of the rod 7, the soil enters the inside of the slot 9, and the connecting hole 10 fits with the soil. The soil inside the slot 9 forms a whole with the soil outside, making the slot 9 not easy to move. Then insert the separation tube 6 into the inside of the protective layer 4, lay the road base body 1 according to the connecting pipe 2, and inject concrete into the hole until the concrete overflows from the protective layer 4. Align the installation groove 13 at the bottom of the prefabricated part 12 with the connecting pipe 2, install the prefabricated part 12, and the prefabricated part 12 is not easy to move after the concrete solidifies.
[0037] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A highway roadbed anti-settlement facility, comprising a roadbed body (1), characterized in that: The lower surface of the road base body (1) is provided with a fixing mechanism, the fixing mechanism comprising a connecting tube (2) and a separating tube (6), the inner wall of the connecting tube (2) is fixedly connected with an anti-oxidation layer (3), the inner wall of the anti-oxidation layer (3) is fixedly connected with a protective layer (4), the separating tube (6) is plugged into the connecting tube (2), the lower surface of the separating tube (6) is fixedly connected with a baffle (8), and the axis of the baffle (8) is fixedly connected with an insert rod (7).
2. A highway subsidence prevention facility according to claim 1, characterized in that: The back side of the protective layer (4) is provided with symmetrically distributed weight-reducing grooves (5), and the weight-reducing grooves (5) penetrate the anti-oxidation layer (3) and the connecting pipe (2).
3. The highway subsidence prevention facility according to claim 1 is characterized by: A slot (9) is provided inside the insertion rod (7), and a through hole communicating with the slot (9) is provided at the top of the insertion rod (7).
4. The anti-settling facility for highway subsidence according to claim 1, characterized in that: The back side of the insertion rod (7) is provided with communication holes (10), and the communication holes (10) are distributed at equal intervals.
5. The highway subsidence prevention facility according to claim 1 is characterized by: A conical head (11) is fixedly connected to the bottom of the insertion rod (7), and a wear-resistant coating is electroplated on the surface of the conical head (11).
6. The highway subsidence prevention facility according to claim 1 is characterized by: The road base body (1) comprises a prefabricated part (12), and a mounting groove (13) adapted to the fixing mechanism is provided on the lower surface of the prefabricated part (12).
7. The highway subsidence prevention facility according to claim 6 is characterized by: A laying layer (14) is fixedly connected to the upper surface of the prefabricated part (12), and a steel bar (15) is arranged on the inner wall of the laying layer (14).
8. The highway subsidence prevention facility according to claim 7 is characterized by: The upper surface of the paving layer (14) is fixedly connected with a waterproof layer (16), and the upper surface of the waterproof layer (16) is provided with a filling layer (17).
9. The highway subsidence prevention facility according to claim 8, characterized in that: The upper surface of the filling layer (17) is fixedly connected to a road surface layer (18).