Cooling water tank with two-stage sedimentation

By introducing a secondary settlement system into the cooling pool, the problem of sludge and impurities in the water after returning to the user is solved, and efficient water utilization and quality assurance are achieved.

CN222550194UActive Publication Date: 2025-03-04HANGZHOU JUHESHUN NEW MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420706483.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2025-03-04
Estimated Expiration
2034-04-08

AI Technical Summary

Technical Problem

After the existing cooling pool returns to the user, there are still some sludge and impurities in the water, affecting the use of water resources for home users.

Method used

A cooling water tank with secondary settlement is designed. By setting up a settlement tank group and a reuse water tank in the cooling water tank group, the secondary settlement and filtration of water can be achieved, and the clean water can be reused.

Benefits of technology

It greatly improves the utilization rate of water in the cooling pool, effectively removes impurities and sludge from the water, and ensures the quality of water resources for household users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222550194U_ABST
    Figure CN222550194U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of cooling water tanks, in particular to a cooling water tank with two-stage sedimentation, which comprises a cooling water tank group, a sedimentation tank group communicated with the cooling water tank group is arranged at the water outlet end of the cooling water tank group, and the sedimentation tank group is used for carrying out sedimentation treatment on water in the cooling water tank group. The water outlet end of the settling tank group is provided with a recycling water tank communicated with the settling tank group, and the water outlet end of the recycling water tank can be communicated with the cooling water tank group. Compared with the prior art, the cooling water tank with the two-stage sedimentation has the advantages that the utilization rate of water in the cooling water tank is greatly improved, and the situation that the use of household users is affected due to excessive impurities and sludge in water during use is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cooling water pools, in particular to a cooling water pool with secondary sedimentation. Background Art

[0002] When a common cooling water pool is used for sedimentation, it is only initially precipitated and cooled before being returned to each user for use. However, since some water contains a lot of impurities and sludge, after the used water is precipitated once, some sludge and impurities in the water are returned to each user along the pipeline, which can easily affect the use of water resources by household users. Therefore, improvements are made on this basis, and a cooling water pool with secondary sedimentation is proposed. Utility Model Content

[0003] 1. Technical issues to be resolved

[0004] In view of the deficiencies of the prior art, the utility model provides a cooling water pool with secondary sedimentation, which solves the problems raised in the above background technology.

[0005] (II) Technical solution

[0006] To achieve the above purpose, the utility model is implemented through the following technical scheme: a cooling water pool with secondary sedimentation, including a cooling water pool group, the water outlet end of the cooling water pool group is provided with a sedimentation tank group connected to the cooling water pool group, the sedimentation tank group is used to sediment the water in the cooling water pool group, the water outlet end of the sedimentation tank group is provided with a reuse water pool connected to the sedimentation tank group, and the water outlet end of the reuse water pool can be connected to the cooling water pool group.

[0007] Furthermore, the cooling water pool group includes a No. 1 cooling water pool and a No. 2 cooling water pool, and the No. 1 cooling water pool is connected to the No. 2 cooling water pool. The settling tank group includes a No. 1 settling tank and a No. 2 settling tank, and the No. 1 settling tank is connected to the No. 1 settling tank through a No. 1 flowmeter, and the No. 2 cooling water pool is connected to the No. 2 settling tank through a No. 2 flowmeter.

[0008] Furthermore, a No. 1 collecting support frame is provided below the No. 1 cooling water pool, a No. 1 connecting pipe connected to the No. 1 sedimentation tank is provided at the bottom of the No. 1 collecting support frame, a No. 1 rainwater drainage pipe connected to the No. 1 connecting pipe is provided below the No. 1 collecting support frame, a No. 2 collecting support frame is provided below the No. 2 cooling water pool, a No. 2 connecting pipe connected to the No. 2 sedimentation tank is provided at the bottom of the No. 2 collecting support frame, and a No. 2 rainwater drainage pipe connected to the No. 2 connecting pipe is provided below the No. 2 collecting support frame.

[0009] Furthermore, a connecting pipe A connected to the bottom end of the No. 2 cooling water pool is provided at the bottom end of the No. 1 cooling water pool, and the No. 1 flow meter and the No. 2 flow meter are both connected to the connecting pipe A. A plurality of access pipes A that can be connected to various users are provided in the connecting pipe A below the No. 1 cooling water pool, and a plurality of access pipes B that can be connected to the feed end of the refrigerator are provided in the connecting pipe A below the No. 2 cooling water pool. The discharge end of the refrigerator is connected to the top end of the No. 2 cooling water pool, and a connecting pipe B that can be connected to the discharge end of the refrigerator is provided at the top end of the No. 1 cooling water pool.

[0010] Furthermore, one of the access pipes A is connected to flow meter No. 1, and one of the access pipes B is connected to flow meter No. 2.

[0011] Furthermore, a connecting pipe A connected to the bottom end of the No. 2 sedimentation tank is provided at the bottom end of the No. 1 sedimentation tank, and a floor drain connected to the connecting pipe A is provided in the connecting pipe A.

[0012] Furthermore, the top of the No. 2 sedimentation tank is provided with a connecting pipe B connected to the reuse water pool, the bottom end of the No. 2 sedimentation tank is provided with an auxiliary connecting pipe B connected to the connecting pipe B, the top of the No. 1 sedimentation tank is provided with a connecting pipe C connected to the connecting pipe B, and the bottom end of the No. 1 sedimentation tank is provided with an auxiliary connecting pipe A connected to the connecting pipe A.

[0013] When the water conductivity of the cooling system in this scheme is high, the water can be discharged into two sedimentation tanks through two flow meters, and the impurities and sludge therein can be precipitated, while the clean water can overflow into the reuse water pool. After the cooling water pool is used, impurities and sludge in the system sink to the bottom of the pool, and it needs to be cleaned regularly. When cleaning, the pool needs to be emptied, and the water is collected in sedimentation tank No. 1 and sedimentation tank No. 2. Some impurities flow into the sedimentation tank together. When the sludge reaches a certain amount, the sedimentation tank needs to be cleaned, and the clean water flows into the reuse water pool. After flowing into the reuse water pool, the water can be filtered by RO membrane and then pumped into the cooling water pool for reuse.

[0014] Compared with the prior art, the cooling water pool with secondary sedimentation greatly improves the utilization rate of water in the cooling water pool, and avoids the influence of excessive impurities and sludge in the water during use on the use of household users. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the cooling water pool before the improvement of the utility model;

[0016] Figure 2 It is a schematic diagram of the improved cooling water pool with secondary sedimentation of the utility model.

[0017] In the figure: 1. Cooling water pool group; 2. Sedimentation tank group; 3. Recycled water pool; 4. No. 1 cooling water pool; 5. No. 2 cooling water pool; 6. No. 1 sedimentation tank; 7. No. 2 sedimentation tank; 8. No. 1 flow meter; 9. No. 2 flow meter; 10. No. 1 collecting support frame; 11. No. 1 connecting pipe; 12. No. 1 rainwater pipe; 13. No. 2 collecting support frame; 14. No. 2 connecting pipe; 15. No. 2 rainwater pipe; 16. Connecting pipe A; 17. Access pipe A; 18. Access pipe B; 19. Connecting pipe B; 20. Connecting pipe A; 21. Connecting pipe B; 22. Auxiliary connecting pipe B; 23. Connecting pipe C; 24. Auxiliary connecting pipe A; 25. Refrigerator. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0019] See also Figure 1 to Figure 2The utility model provides a technical solution: a cooling water pool with secondary sedimentation, including a cooling water pool group 1, the cooling water pool group 1 includes a No. 1 cooling water pool 4 and a No. 2 cooling water pool 5, the No. 1 cooling water pool 4 and the No. 2 cooling water pool 5 are connected, the sedimentation tank group 2 includes a No. 1 sedimentation tank 6 and a No. 2 sedimentation tank 7, the No. 1 sedimentation tank 6 and the No. 2 sedimentation tank 7 are connected, the No. 1 cooling water pool 4 is connected to the No. 1 sedimentation tank 6 through a No. 1 flow meter 8, the No. 2 cooling water pool 5 is connected to the No. 2 sedimentation tank 7 through a No. 2 flow meter 9, a No. 1 collection support frame 10 is provided below the No. 1 cooling water pool 4, and the bottom of the No. 1 collection support frame 10 is provided with a No. 1 sedimentation tank 6. A No. 1 connecting pipe 11 connected to the No. 1 collecting support frame 10 is provided below the No. 1 collecting support frame 10, and a No. 1 rainwater removal pipe 12 connected to the No. 1 connecting pipe 11 is provided. A No. 2 collecting support frame 13 is provided below the No. 2 cooling water pool 5. A No. 2 connecting pipe 14 connected to the No. 2 sedimentation tank 7 is provided at the bottom of the No. 2 collecting support frame 13. A No. 2 rainwater removal pipe 15 connected to the No. 2 connecting pipe 14 is provided below the No. 2 collecting support frame 13. A connecting pipe A16 connected to the bottom end of the No. 1 cooling water pool 4 is provided at the bottom end of the No. 2 cooling water pool 5. Both the No. 1 flow meter 8 and the No. 2 flow meter 9 are connected to the connecting pipe A16. A plurality of An access pipe A17 that can be connected to each user, a connecting pipe A16 under the No. 2 cooling water pool 5 is provided with multiple access pipes B18 that can be connected to the feed end of the refrigerator 25, the discharge end of the refrigerator 25 is connected to the top of the No. 2 cooling water pool 5, and a connecting pipe B19 that can be connected to the discharge end of the refrigerator 25 is provided at the top of the No. 1 cooling water pool 4, one of the access pipes A17 is connected to the No. 1 flow meter 8, and one of the access pipes B18 is connected to the No. 2 flow meter 9. The bottom end of the No. 1 sedimentation tank 6 is provided with a connecting pipe A20 that is connected to the bottom end of the No. 2 sedimentation tank 7, and the connecting pipe A20 is provided with a floor drain connected to the connecting pipe A20. The water outlet end of the cooling water pool group 1 is provided with a sedimentation tank group 2 connected to the cooling water pool group 1, and the sedimentation tank group 2 is used to sediment the water in the cooling water pool group 1. The water outlet end of the sedimentation tank group 2 is provided with a reuse water pool 3 connected to the sedimentation tank group 2, and the water outlet end of the reuse water pool 3 can be connected to the cooling water pool group 1. The top of the No. 2 sedimentation tank 7 is provided with a connecting pipe B21 connected to the reuse water pool 3, and the bottom end of the No. 2 sedimentation tank 7 is provided with an auxiliary connecting pipe B22 connected to the connecting pipe B21. The top of the No. 1 sedimentation tank 6 is provided with a connecting pipe C23 connected to the connecting pipe B21, and the bottom end of the No. 1 sedimentation tank 6 is provided with an auxiliary connecting pipe A24 connected to the connecting pipe A23.

[0020] The electrical components mentioned in this article are all connected to an external main controller and 380V commercial power, and the main controller can be a conventional known device for control such as a computer.

[0021] In the description of this specification, the terms "connect", "install", "fix", "set", etc. are understood in a broad sense. For example, "connection" can be a fixed connection or an indirect connection through an intermediate component without affecting the relationship between components and the technical effect. It can also be an integral connection or a partial connection. As in this example, for ordinary technicians in this field, the specific meanings of the above terms in this utility model or utility model can be understood according to the specific circumstances.

[0022] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A cooling water pool with secondary sedimentation, comprising a cooling water pool group (1), characterized in that: The water outlet of the cooling water pool group (1) is provided with a settling tank group (2) connected to the cooling water pool group (1); the settling tank group (2) is used to perform settling treatment on water in the cooling water pool group (1); the water outlet of the settling tank group (2) is provided with a reuse water pool (3) connected to the settling tank group (2); the water outlet of the reuse water pool (3) can be connected to the cooling water pool group (1).

2. A cooling water pool with secondary sedimentation according to claim 1, characterized in that: The cooling water pool group (1) comprises a first cooling water pool (4) and a second cooling water pool (5), the first cooling water pool (4) and the second cooling water pool (5) are connected, the settling tank group (2) comprises a first settling tank (6) and a second settling tank (7), the first settling tank (6) and the second settling tank (7) are connected, the first cooling water pool (4) is connected to the first settling tank (6) via a first flow meter (8), and the second cooling water pool (5) is connected to the second settling tank (7) via a second flow meter (9).

3. A cooling water pool with secondary sedimentation according to claim 2, characterized in that: A first collecting support frame (10) is provided below the first cooling water pool (4), a first connecting pipe (11) connected to a first settling tank (6) is provided at the bottom of the first collecting support frame (10), a first rainwater removal pipe (12) connected to the first connecting pipe (11) is provided below the first collecting support frame (10), a second collecting support frame (13) is provided below the second cooling water pool (5), a second connecting pipe (14) connected to a second settling tank (7) is provided at the bottom of the second collecting support frame (13), and a second rainwater removal pipe (15) connected to the second connecting pipe (14) is provided below the second collecting support frame (13).

4. A cooling water pool with secondary sedimentation according to claim 3, characterized in that: A connecting pipe A (16) connected to the bottom end of the No. 2 cooling water pool (5) is provided at the bottom end of the No. 1 cooling water pool (4), and the No. 1 flow meter (8) and the No. 2 flow meter (9) are both connected to the connecting pipe A (16). A plurality of access pipes A (17) that can be connected to various users are provided in the connecting pipe A (16) below the No. 1 cooling water pool (4). A plurality of access pipes B (18) that can be connected to the feed end of the refrigerator (25) are provided in the connecting pipe A (16) below the No. 2 cooling water pool (5). The discharge end of the refrigerator (25) is connected to the top end of the No. 2 cooling water pool (5), and a connecting pipe B (19) that can be connected to the discharge end of the refrigerator (25) is provided at the top end of the No. 1 cooling water pool (4).

5. A cooling water pool with secondary sedimentation according to claim 4, characterized in that: One of the access pipes A (17) is connected to the first flow meter (8), and one of the access pipes B (18) is connected to the second flow meter (9).

6. A cooling water pool with secondary sedimentation according to claim 5, characterized in that: A connecting pipe A (20) connected to the bottom end of the second sedimentation tank (7) is provided at the bottom end of the first sedimentation tank (6), and a floor drain connected to the connecting pipe A (20) is provided in the connecting pipe A (20).

7. A cooling water pool with secondary sedimentation according to claim 5, characterized in that: The top end of the No. 2 sedimentation tank (7) is provided with a connecting pipe B (21) connected to the reuse water tank (3), the bottom end of the No. 2 sedimentation tank (7) is provided with an auxiliary connecting pipe B (22) connected to the connecting pipe B (21), the top end of the No. 1 sedimentation tank (6) is provided with a connecting pipe C (23) connected to the connecting pipe B (21), and the bottom end of the No. 1 sedimentation tank (6) is provided with an auxiliary connecting pipe A (24) connected to the connecting pipe A (20).