Movable photovoltaic gas film bin
Through the innovative design of movable photovoltaic gas film bins, integrated components and basic parts, the problems of long installation period and high professional skills requirements of existing gas film structural equipment are solved, and rapid assembly and versatility are achieved.
Patent Information
- Application Number
- CN202420988322.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-05-09
AI Technical Summary
During the installation or dismantling of existing gas membrane structure equipment, the equipment foundations are independently installed, distribution and control cable connection, pipeline installation and other work, resulting in high professional skills requirements for installers and a long installation period.
A movable photovoltaic gas film chamber is designed, and the integrated assembly includes an integrated installation box, a fan unit and a power supply unit. The base part is composed of splicing parts, and the air film body is fixed by anchor bolts and nuts to achieve rapid assembly and disassembly.
Through the design of integrated components and foundations, the installation and disassembly of the equipment is simplified, the professional skills requirements are reduced, the installation period is shortened, and the flexibility and versatility of the equipment is improved.
Smart Images

Figure CN222557834U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of air film warehouse equipment, in particular to a movable photovoltaic air film warehouse. Background Art
[0002] At present, micro air-film structure sheds (or venues) are commonly used for temporary buildings in the field of air-film structures, and some temporary facilities are reused. Since the existing air-film structure control system, photovoltaic and energy storage equipment, fresh air mechanical unit, air conditioning outdoor unit, and backup generator are installed separately, during the installation or removal process, each equipment foundation is installed independently, and the distribution and control cables are connected, and pipelines are installed; therefore, the professional skills of the installers are required to be high, and the installation period is long. Utility Model Content
[0003] The purpose of the utility model is to provide a movable photovoltaic air film warehouse in view of the deficiencies in the prior art.
[0004] A movable photovoltaic air film warehouse comprises an air film body, an integrated component and a base member for fixing the air film body, wherein the cross-section of the base member is a right-angled trapezoid, the right-angled sides of the base member are on the outside, a plurality of anchor bolts are arranged on the base member, the corners of the air film body are fixed at the plurality of anchor bolts, the air film body, the base member and the ground form a closed cavity, the integrated component is arranged on the outside of the air film body, the integrated component comprises an integrated installation box, a fan unit and a power supply unit, the fan unit and the power supply unit are both arranged in the integrated installation box, an air inlet pipe and an air outlet pipe are connected to the fan unit, the air inlet pipe and the air outlet pipe are both arranged on the inner side of the air film body, and the air inlet pipe and the air outlet pipe are arranged close to the hypotenuse of the base member.
[0005] Furthermore, an external thread is arranged on the top of the anchor bolt, a nut is arranged on the top of the anchor bolt, a mounting plate is arranged on the lower end surface of the nut, and the air film body is arranged between the mounting plate and the base member.
[0006] Furthermore, the anchor bolt is arranged in an L shape, and the bent portion of the anchor bolt is embedded in the base member.
[0007] Furthermore, a lifting ring is provided on the base member.
[0008] Furthermore, the base member is composed of a plurality of splicing pieces spliced together, a docking piece is arranged at one end of the splicing piece, a docking groove is arranged at the other end of the splicing piece, and the docking piece in the splicing piece is embedded in the docking groove of the splicing piece at the adjacent position.
[0009] Furthermore, the power supply unit is a generator.
[0010] Furthermore, a photovoltaic panel is arranged on the top of the integrated installation box, an energy storage device is arranged on the inner side of the integrated installation box, and the photovoltaic panel is electrically connected to the energy storage device.
[0011] Furthermore, the integrated component also includes an air conditioning unit, the external unit of the air conditioning unit is arranged in the integrated installation box, and the air outlet of the air conditioning unit is connected to the air inlet duct.
[0012] Furthermore, a lifting ring is provided on the integrated installation box.
[0013] Furthermore, pin holes are respectively arranged at corresponding positions of the docking piece and the docking groove, and the pin rod passes through the pin holes on the docking piece and the docking groove at adjacent positions.
[0014] The advantages of the utility model compared with the prior art are:
[0015] First: The integrated components in this solution integrate the power supply unit, fan unit and air conditioning unit. During the equipment process, the integrated installation box can be directly transported to an appropriate location, and then hoisted to the designated location to quickly complete the assembly of the air membrane body.
[0016] Second: The basic parts in this solution are composed of several splicing parts spliced together. The installation of two adjacent splicing parts is achieved by setting docking grooves and splicing parts. Corresponding pin holes are set on the docking parts and docking grooves. The two adjacent splicing parts can be fixed by pin rods. The outer edge of the air film is limited by the set basic parts. Different sizes need to be stacked for different environments, which can facilitate the transportation and construction of the equipment.
[0017] Third: This solution has a photovoltaic panel on the top of the integrated installation box, and an energy storage device on the inside of the integrated installation box. The photovoltaic panel is electrically connected to the energy storage device. The solar energy is converted into electrical energy through the photovoltaic panel, and the electrical energy generated by the photovoltaic panel is collected and stored by the energy storage device, thereby ensuring that a variety of power supply needs are provided, while also reducing the operating cost of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the overall structure of this scheme;
[0019] Figure 2 is a schematic diagram of the structure of the integrated component;
[0020] Figure 3 It is a schematic diagram of the matching state of the air film body and the integrated components;
[0021] Figure 4 It is a schematic diagram of the matching state between the air film body and the base component;
[0022] Figure 5 for Figure 4 A schematic diagram of the enlarged structure at A in the middle;
[0023] Figure 6 It is a schematic diagram of the matching state of two adjacent splicing parts.
[0024] Figure numerals: air membrane body 1, integrated component 2, integrated installation box 21, fan unit 22, air inlet pipe 221, air outlet pipe 222, power supply unit 23, photovoltaic panel 24, air conditioning unit 25, lifting ring 26, base part 3, anchor bolt 31, nut 311, installation plate 312, lifting ring 32, splicing part 33. DETAILED DESCRIPTION
[0025] Combined with Figure 1-6 As shown, a movable photovoltaic air film warehouse includes an air film body 1, an integrated component 2 and a base member 3 for fixing the air film body 1, the cross-section of the base member 3 is a right-angled trapezoid, the right-angled sides of the base member 3 are on the outside, a plurality of anchor bolts 31 are arranged on the base member 3, the corners of the air film body 1 are fixed at the plurality of anchor bolts 31, the air film body 1, the base member 3 and the ground form a closed cavity, the integrated component 2 is arranged on the outside of the air film body 1, the base member 3 is installed on the ground, and is in a relatively fixed state with the ground through the base member 3, the shape of the base member 3 is related to the unfolded shape of the air film body 1 after inflation, the outer edge of the air film body 1 is fixed to the anchor bolts 31 on the base member 3, and the air film body 1 is pulled and unfolded by the plurality of anchor bolts 31.
[0026] The integrated assembly 2 includes an integrated installation box 21, a fan unit 22, a power supply unit 23 and an air conditioning unit 25.
[0027] The fan unit 22, the power supply unit 23 and the air conditioning unit 25 are all arranged in the integrated installation box 21, and the fan unit 22 is connected to be provided with an air inlet pipe 221 and an air outlet pipe 222, and the air inlet pipe 221 and the air outlet pipe 222 are both arranged on the inner side of the air film body 1, and the air inlet pipe 221 and the air outlet pipe 222 are arranged close to the hypotenuse of the base member 3. During the construction process, the external air is transported to the air inlet pipe through the fan unit 22, and the air in the air inlet pipe enters the air film body 1, so that the air film body 1 expands and unfolds. When in use, the fan unit 22 is continuously operated to input new air from the outside into the air inlet pipe 221, and the excess gas in the air film body 1 is discharged through the air outlet pipe 222, so as to ensure that the internal air pressure of the air film body 1 is in a balanced state, prevent the air film body 1 from being over-expanded or over-contracted, and continuously input new air into the air film body 1 to ensure the freshness of the air inside it.
[0028] Optionally, the external unit of the air-conditioning unit 25 is arranged in the integrated installation box 21, and the air outlet of the air-conditioning unit 25 is connected to the air inlet pipe 221. The air is adjusted to a suitable temperature by the air-conditioning unit 25 and then transported to the air membrane body 1, thereby improving the comfort level in the air membrane body 1.
[0029] Optionally, the air membrane body 1 in the present solution is fixed to the anchor bolt 31. Since the air membrane body 1 has a certain elasticity, it is necessary to ensure the tightness of the installation when cooperating with the anchor bolt 31. The top of the anchor bolt 31 is provided with an external thread, and a nut 311 is provided on the top of the anchor bolt 31. The lower end face of the nut 311 is provided with a mounting plate 312. The air membrane body 1 is arranged between the mounting plate 312 and the base member 3, and the air membrane body 1 is pressed and fixed by the clamping force between the mounting plate 312 and the base member 3.
[0030] Preferably, in order to improve the stability of the anchor bolt 31, the anchor bolt 31 is arranged in an L shape, and the bent portion of the anchor bolt 31 is embedded in the base member 3, and the bent portion can be stuck in the base member 3. The base member 3 in this solution can be formed by pouring cement, and the L-shaped anchor bolt 31 is embedded in it during the preparation process of the base member 3. After the base member 3 is solidified, the anchor bolt 31 is installed and fixed.
[0031] The base member 3 in the present solution is used to limit the outer edge of the air film, so it needs to be stacked in different sizes for different environments. In order to facilitate the transportation and construction of the equipment, the base member 3 is composed of a plurality of splicing pieces 33 spliced together. A docking piece is provided at one end of the splicing piece 33, and a docking groove is provided at the other end of the splicing piece 33. The docking piece in the splicing piece 33 is embedded in the docking groove of the splicing piece 33 at the adjacent position. The installation of two adjacent splicing pieces 33 is achieved by the provided docking groove and the splicing piece 33. Corresponding pin holes are provided on the docking piece and the docking groove, and the fixation of two adjacent splicing pieces 33 can be achieved by a pin rod.
[0032] Preferably, a lifting ring 32 is provided on the base member 3 , and the lifting ring 32 can be installed during the preparation of the base member 3 . The provided lifting ring 32 can facilitate the handling operation of the base member 3 during the erection process.
[0033] It can be selected that the power supply unit 23 in this scheme can adopt a gasoline generator, a diesel generator or an external power supply. Since the fan unit 22 needs to run continuously during the operation of this scheme, it is necessary to prevent power outages during the operation of the equipment. Therefore, it is preferred to use a generator as the power supply device.
[0034] Furthermore, a photovoltaic panel 24 is arranged on the top of the integrated installation box 21, and an energy storage device is arranged on the inner side of the integrated installation box 21. The photovoltaic panel 24 is electrically connected to the energy storage device. The solar energy is converted into electrical energy by the arranged photovoltaic panel 24, and the electrical energy generated by the photovoltaic panel 24 is collected and stored by the energy storage device, thereby ensuring the provision of a variety of power supply needs, and also reducing the operating cost of the equipment.
[0035] The integrated installation box 21 is provided with a lifting ring 26 to facilitate the transportation and installation of the integrated component 2 .
[0036] In the description of the present utility model, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, features defined as "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0038] In the description of the present invention, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0039] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A movable photovoltaic air film warehouse, characterized in that: The invention comprises an air film body (1), an integrated component (2) and a base member (3) for fixing the air film body (1); the cross section of the base member (3) is arranged in a right-angle trapezoidal shape, the right-angled side of the base member (3) is located on the outside, a plurality of anchor bolts (31) are arranged on the base member (3), the corners of the air film body (1) are fixed at the plurality of anchor bolts (31), the air film body (1), the base member (3) and the ground form a closed cavity, the integrated component (2) is arranged on the outside of the air film body (1), and the integrated component (2) comprises an integrated installation box (21), a fan unit (22) and a power supply unit ( 23), the fan unit (22) and the power supply unit (23) are both arranged in the integrated installation box (21), the fan unit (22) is connected with an air inlet pipe (221) and an air outlet pipe (222), the air inlet pipe (221) and the air outlet pipe (222) are both arranged on the inner side of the air membrane body (1), the air inlet pipe (221) and the air outlet pipe (222) are arranged close to the oblique edge of the base member (3), the integrated component (2) also includes an air conditioning unit (25), the external unit of the air conditioning unit (25) is arranged in the integrated installation box (21), and the air outlet of the air conditioning unit (25) is connected to the air inlet pipe (221).
2. A movable photovoltaic air film warehouse according to claim 1, characterized in that: The top of the anchor bolt (31) is provided with an external thread, a nut (311) is provided on the top of the anchor bolt (31), a mounting plate (312) is provided on the lower end surface of the nut (311), and the air membrane body (1) is arranged between the mounting plate (312) and the base member (3).
3. The movable photovoltaic air film warehouse according to claim 1, characterized in that: The anchor bolt (31) is arranged in an L shape, and the bent portion of the anchor bolt (31) is embedded in the base member (3).
4. The movable photovoltaic air film warehouse according to claim 1, characterized in that: The base member (3) is provided with a lifting ring (32).
5. The movable photovoltaic air film warehouse according to claim 1, characterized in that: The base member (3) is composed of a plurality of splicing members (33) spliced together, a docking member is arranged at one end of the splicing member (33), a docking groove is arranged at the other end of the splicing member (33), and the docking member in the splicing member (33) is embedded in the docking groove of the splicing member (33) at an adjacent position.
6. The movable photovoltaic air film warehouse according to claim 1, characterized in that: The power supply unit (23) is a generator.
7. The movable photovoltaic air film warehouse according to claim 1, characterized in that: A photovoltaic panel (24) is arranged on the top of the integrated installation box (21), an energy storage device is arranged on the inner side of the integrated installation box (21), and the photovoltaic panel (24) is electrically connected to the energy storage device.
8. The movable photovoltaic air film warehouse according to claim 1, characterized in that: The integrated installation box (21) is provided with a lifting ring (26).
9. The movable photovoltaic air film warehouse according to claim 5, characterized in that: The corresponding positions of the docking piece and the docking groove are respectively provided with pin holes, and the pin rod passes through the pin holes on the docking piece and the docking groove at adjacent positions.