Crawling ladder protection device for electric tower
By designing a tower ladder protection device composed of horizontal pipes and vertical pipes, the combination of turning joints and sliders is used to solve the problem that traditional protective devices cannot effectively block people's fall and assembly, and achieve all-round protection and simplified installation of personnel.
Patent Information
- Application Number
- CN202420927561.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-04-30
AI Technical Summary
The traditional electric tower climbing frame protection device cannot effectively prevent personnel from falling off during installation, and the assembly is complicated and it is difficult to achieve comprehensive protection of personnel's bodies.
A ladder protection device for electric towers is designed. The grid frame is composed of horizontal pipes and vertical pipes. The vertical pipes at both ends of the horizontal pipe are fixed by U-shaped pipe welding. The intermediate vertical pipe is equipped with a bent joint and connected to the slider. The slider slides in the slider to adjust the position of the grid frame, ensuring that the gap between the horizontal pipe and the vertical pipe is small, and providing all-round protection.
It effectively reduces the risk of personnel falling, ensures that the personnel's bodies are protected at any part outside the crawler, and simplifies the installation process of the protective device and reduces the assembly steps.
Smart Images

Figure CN222558091U_ABST
Abstract
Description
Technical Field
[0001] The utility model specifically relates to the technical field of ladder protection, in particular to a ladder protection device for an electric tower. Background Art
[0002] When assembling an electric tower, a climbing frame needs to be installed inside the tower for the convenience of later maintenance. However, when the climbing frame is installed, protective devices must be installed on the position groups on both sides. The traditional climbing frame protective devices are welded through steel structures, and the gap between two adjacent connecting beams is large. When performing protection, it cannot effectively block the human body, which may cause people to fall from the gap between the two connecting beams.
[0003] Chinese patent application number CN201721470767.6 is a climbing frame protective mesh; it includes a protective net and a mesh frame, the mesh frame constitutes a quadrilateral structure, the protective net is fixedly provided in the mesh frame, and a plurality of reinforced oblique square tubes are obliquely fixed in the mesh frame, a plurality of connecting sleeves are vertically provided on the outer surfaces at both ends of the mesh frame, the connecting sleeves and the fixed sleeves on the climbing frame uprights are matched, and a limiting axis is fixedly passed through the connecting sleeves and the fixed sleeves at the same time, and an anti-bending baffle is also provided on the outer side of the mesh frame, and the anti-bending baffle is movably clamped on the climbing frame uprights.
[0004] The protective net in the above patent is installed in the mesh frame, and multiple mesh frames are connected by anti-bending baffles and limiting ribs arranged on both sides and both ends of the mesh frame to realize the installation of multiple protective nets. A connecting sleeve is arranged on one side of the limiting rib, so that when connecting two adjacent mesh frames, the two mesh frames are in an active state. In this way, when the installation is completed, when the climbing frame is subjected to external force, the two adjacent mesh frames will deviate with the external force, so that the protective net loses its protective effect on the climbing frame. When installing the protective net in the above patent, it is necessary to first install it inside the mesh frame and flatten it through a reinforced oblique square tube. When installing the reinforced oblique square tube, it is necessary to fix it by welding. In this way, when assembling the protective device, multiple processes are required. After the assembly is completed, the two adjacent mesh frames are movably connected through a rotating shaft. In this way, when installing the protective device, multiple steps are required, and the assembly is cumbersome.
[0005] Therefore, we provide a ladder protection device for an electric tower. In this device, the grid is composed of horizontal tubes and vertical tubes, which effectively ensures that the gap in the grid is small, effectively ensures the protection of personnel, and effectively ensures that no part of the personnel's body is exposed outside the climbing frame. Turning joints are provided at both ends of the vertical beams in the grid, and the turning joints are fixedly connected to the slider to effectively realize the installation of the grid. The grid can be adjusted in position under the drive of the slider, which facilitates the replacement of the grid caused by damage. Utility Model Content
[0006] The purpose of the utility model is to provide a ladder protection device for an electric tower. In the device, turning joints are provided at both ends of the middle vertical pipe of the grid, and the turning joints are fixedly connected to the slider, so that the grid can be effectively fixed. In the device, the gap between the horizontal pipe and the vertical pipe is small, and the protection of personnel is effectively achieved, so as to solve the problems raised in the background technology.
[0007] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0008] A ladder protection device for an electric tower, comprising a grid frame, the grid frame comprising a horizontal tube and a vertical tube, a plurality of the horizontal tubes are provided, wherein the vertical tubes at both ends of the horizontal tube are fixed by welding through U-shaped tubes;
[0009] As a further technical solution of the utility model, the ends of the three vertical pipes arranged between the horizontal pipes are provided with turning joints.
[0010] As a further technical solution of the utility model, one end of the turning joint is fixedly connected to the slider; the slider is slidably installed in a slide groove opened on one side of the crossbeam in the frame.
[0011] As a further technical solution of the utility model, the frame body also includes a protrusion arranged on the surface adjacent to the slide groove, and there are multiple protrusions arranged in a rectangular array; a groove for engaging with the climbing frame is opened on the protrusion.
[0012] As a further technical solution of the utility model, two frames are provided and are symmetrically arranged; and the grid is arranged between the two frames.
[0013] As a further technical solution of the utility model, a connecting sleeve fixedly connected to the turning joint is provided on one side of the sliding block.
[0014] As a further technical solution of the present invention, the grid is entirely located on one side of the frame and a safety distance is provided between the grid and the frame.
[0015] As a further technical solution of the utility model, two U-shaped tubes are provided and are symmetrically arranged.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] 1. In the utility model, when in use, the two beams are connected to the climbing frame through the slots provided on the protruding blocks, so as to fix the frame body and the climbing frame. A slider is installed in the slide slot provided on one side of the beam, and a connecting sleeve is provided on one side of the slider. By sliding the slider in the slide slot, the slider can effectively drive the grid frame to adjust its position;
[0018] 2. The utility model provides a grid between two horizontal beams. The grid consists of horizontal tubes and vertical tubes. There are multiple horizontal tubes, and multiple vertical tubes run through the horizontal tubes, which effectively ensures that the gap between the horizontal tubes and the vertical tubes is small, preventing any part of the personnel from being located in an unexpected position on the climbing frame. During installation, a turning joint is provided on the vertical tube in the middle of the grid. The other end of the turning joint is fixedly connected to the connecting sleeve on the slider. By installing the turning joint and the connecting sleeve, the fixed installation of the grid is effectively achieved. The grid is connected to the slider as a whole. The position of the grid can be adjusted by sliding the slider in the slide groove. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.
[0020] Figure 2 This utility model Figure 1 Schematic diagram of the rear structure.
[0021] Figure 3 This utility model Figure 1 Side view of.
[0022] Figure 4 This utility model Figure 2 main view.
[0023] In the figure: 1-frame, 10-crossbeam, 11-cage, 12-slide, 2-grid, 20-cross pipe, 21-vertical pipe, 23-U-shaped pipe, 24-turn joint, 3-slider. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figure 1-4 In an embodiment of the utility model, a ladder protection device for an electric tower includes a grid 2, the grid 2 includes a horizontal tube 20 and a vertical tube 21, a plurality of the horizontal tubes 20 are provided, wherein the vertical tubes 21 at both ends of the horizontal tube 20 are fixed by welding through U-shaped tubes 23;
[0026] The ends of the three vertical pipes 21 arranged between the horizontal pipes 20 are provided with turning joints 24;
[0027] One end of the turning joint 24 is fixedly connected to the slider 3; the slider 3 is slidably installed in the slide groove 12 opened on one side of the cross beam 10 in the frame 1;
[0028] By adopting the above technical solution, when in use, the two beams 10 are connected to the climbing frame through the slots 11 provided on the provided protrusions, so as to fix the frame body 1 and the climbing frame. A slider 3 is installed in the slide groove 12 provided on one side of the beam 10, and a connecting sleeve is provided on one side of the slider 3. By sliding the slider 3 in the slide groove 12, the slider 3 can effectively drive the grid 2 to adjust its position.
[0029] The frame body 1 further comprises a convex block arranged on the surface adjacent to the slide groove 12, and a plurality of convex blocks are arranged in a rectangular array; a slot 11 for engaging with the climbing frame is provided on the convex block;
[0030] The frame 1 is provided with two and is symmetrically arranged; the grid 2 is arranged between the two frames 1;
[0031] A connecting sleeve fixedly connected to the turning joint 24 is provided on one side of the sliding block 3;
[0032] The grid frame 2 is entirely located on one side of the frame body 1 and a safety distance is provided between the grid frame 2 and the frame body 1 .
[0033] By adopting the above technical scheme, a grid 2 is arranged between the two cross beams 10. The grid 2 consists of a cross tube 20 and a vertical tube 21. There are multiple cross tubes 20, and multiple vertical tubes 21 run through the cross tube 20, which effectively ensures that the gap between the cross tube 20 and the vertical tube 21 is small, preventing any part of the personnel from being located in an unexpected position on the climbing frame. During installation, a turning joint 24 is arranged on the vertical tube 21 in the middle position of the grid 2, and the other end of the turning joint 24 is fixedly connected to the connecting sleeve on the slider 3. By installing the turning joint 24 and the connecting sleeve, the fixed installation of the grid 2 is effectively achieved. The grid 2 is connected to the slider 3 as a whole, and the position of the grid 2 can be adjusted by sliding the slider 3 in the slide groove 12.
[0034] In this embodiment, two U-shaped tubes 23 are provided and are symmetrically arranged.
[0035] By adopting the above technical solution, the gap between the grid 2 and the beam 10 is effectively filled by setting two U-shaped tubes to prevent the gap from being too large, causing people to be stuck between the grid 2 and the frame 1, thereby effectively protecting the personal safety of people.
[0036] The working principle of the utility model is: when in use, the frame body 1 is fixedly connected to the climbing frame through the slot 11 provided on the protrusion provided on the crossbeam 10;
[0037] The protrusion is provided with one side of the cross beam 10, and a slide groove 11 is opened on the adjacent surface of the protrusion. The slider 3 is movably installed in the slide groove 12. A connecting sleeve connected to the turning joint 24 is provided on one side of the slider 3 to achieve the connection with the grid 2. The turning joint 24 is welded and fixed to the vertical beam 21 in the middle position of the grid 2 to ensure the firmness of the connection;
[0038] Due to the sliding connection between the slider 3 and the frame 1, the grid 2 is connected to the connecting sleeve on the slider 3 through the turning joint 24, so that the grid 2 can be effectively driven by the slider 3 to adjust the position between the frames 1; the protection effect is effectively achieved through the installation of the grid 2.
[0039] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0040] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A ladder protection device for an electric tower, characterized in that: The grid frame (2) comprises a horizontal tube (20) and a vertical tube (21), wherein a plurality of the horizontal tubes (20) are provided, wherein the vertical tubes (21) at both ends of the horizontal tube (20) are fixed by welding through U-shaped tubes (23); The ends of the three vertical pipes (21) arranged between the horizontal pipes (20) are provided with turning joints (24).
2. A ladder protection device for an electric tower according to claim 1, characterized in that: One end of the turning joint (24) is fixedly connected to the slider (3); the slider (3) is slidably installed in a slide groove (12) opened on one side of the cross beam (10) in the frame body (1).
3. A ladder protection device for an electric tower according to claim 2, characterized in that: The frame body (1) further comprises a protrusion arranged on a surface adjacent to the slide groove (12), wherein a plurality of protrusions are arranged in a rectangular array; a slot (11) for engaging with the climbing frame is provided on the protrusion.
4. A ladder protection device for an electric tower according to claim 3, characterized in that: The frame bodies (1) are provided in two numbers and are symmetrically arranged; the grid frame (2) is arranged between the two frame bodies (1).
5. The ladder protection device for an electric tower according to claim 2, characterized in that: A connecting sleeve fixedly connected to the turning joint (24) is provided on one side of the sliding block (3).
6. The ladder protection device for an electric tower according to claim 1, characterized in that: The grid frame (2) is entirely located on one side of the frame body (1), and a safety distance is provided between the grid frame (2) and the frame body (1).
7. The ladder protection device for an electric tower according to claim 1, characterized in that: There are two U-shaped tubes (23) arranged symmetrically.
Citation Information
Patent Citations
Climb a protection otter board
CN207420001U