Green construction water recycling system
By designing a green construction water recycling system, the recycling and filtration of rainwater and wastewater, combined with tap water controlled by float valves, the problem of large-scale use of tap water in the existing technology is solved, and efficient utilization of water resources and stable water supply is achieved.
Patent Information
- Application Number
- CN202421238139.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing construction water recycling system requires the use of a large amount of tap water to replenish water, resulting in waste of water resources.
A green construction water recycling system is designed to realize the recycling and filtration of rainwater and wastewater through the combination of rainwater collection pool, sedimentation pool, filter pool and water tank, and control tap water replenishment with float valves to ensure sufficient water supply.
It effectively improves the recycling rate of rainwater and wastewater, reduces waste of water resources, ensures the adequacy of water supply, and saves the use of tap water.
Smart Images

Figure CN222575627U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a green construction water recycling system. Background Art
[0002] Green construction refers to construction activities that, under the premise of ensuring basic requirements such as quality and safety, maximize resource conservation and reduce negative impacts on the environment through scientific management and technological progress, thereby achieving energy conservation, land conservation, water conservation, material conservation and environmental protection.
[0003] The existing construction water recycling system usually transports rainwater and wastewater to the filter pool for filtration, and then directly transports it to various pipes for water replenishment through water pumps. Due to the limited purification capacity of rainwater and wastewater, it often needs to be mixed with tap water to ensure sufficient water supply. However, a large amount of mixed tap water does not save water resources. Therefore, we proposed a green construction water recycling system to solve the above problems. Utility Model Content
[0004] The utility model aims to provide a green construction water recycling system to solve the problem that the existing construction water recycling system needs to use a large amount of tap water to supplement water.
[0005] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a green construction water recycling system, including a rainwater and wastewater collection pool, which is connected to a fire water tank, a construction water tank and a booster pump room, a plurality of partitions are arranged in the rainwater and wastewater collection pool, and the rainwater and wastewater collection pool is divided into a sedimentation tank, a coarse filtration tank and a fine filtration tank in sequence, a water inlet and a water outlet are opened on the side wall of the rainwater and wastewater collection pool, a bifurcated pipe is connected between the fire water tank, the construction water tank and the water outlet, a water outlet is arranged on each partition, a water pipe is arranged between the fire water tank and the construction water tank, a first type of water source replenishment pipe and a second type of water source replenishment pipe are arranged on the upper end of the fire water tank and the construction water tank, each second type of water source replenishment pipe is provided with a first float valve, a cleaning pipe, a construction pipe, a spray pipe and a fire fighting pipe are arranged in the booster pump room, and the cleaning pipe, the construction pipe, the spray pipe and the fire fighting pipe are all connected with the water pipe.
[0006] The beneficial effects of this program are:
[0007] 1. Rainwater and wastewater generated during the construction process enter the rainwater and wastewater collection pool through the water inlet, and are filtered through the sedimentation tank, coarse filtration pool and fine filtration pool before being stored in the fire water tank and construction water tank, which effectively improves the recycling of rainwater and wastewater and reduces the waste of water resources.
[0008] 2. The first type of water source includes mountain river water and groundwater, and the second type of water source is tap water. By connecting the second type of water source supplementary pipe to the first float valve, when the first type of water source and recycled water in the fire water tank or construction water tank are insufficient, the water level drops and the first float valve is opened to release the second type of water source. When the water level rises to a suitable position, the first float valve automatically closes. In this process, the second type of water source only serves as a backup water source, which saves water while ensuring sufficient water supply.
[0009] Preferably, as an improvement, the cleaning pipes, construction pipes, spray pipes and fire-fighting pipes are all connected to water pumps, each water pump is electrically connected to a controller, the cleaning pipes, construction pipes and fire-fighting pipes are provided with remote control pressure gauges electrically connected to the corresponding controllers, the spray pipes are provided with dust monitoring devices electrically connected to the corresponding controllers, and the spray pipes are connected to the construction enclosure spray system.
[0010] The beneficial effects are: when each remote-controlled pressure gauge detects a decrease in water pressure in the corresponding pipeline, the corresponding water pump can be turned on through the controller to replenish water to each pipeline. When the dust monitoring device detects that the pollution in the environment is too high, the water pump can be turned on through the corresponding controller and water can be provided to the construction spray enclosure spray system through the spray pipeline, thereby reducing dust in the environment and reducing the pollution index in the air, thereby further realizing automatic control.
[0011] Preferably, as an improvement, the construction fence spray system includes a water supply pipeline and a booster main unit, the water supply pipeline is connected to the booster main unit, the spray pipeline between the booster pump room and the booster main unit is provided with a stop valve and a water filter, the booster main unit is provided with a second float valve, the second float valve is connected to the spray pipeline, and a plurality of nozzles are evenly connected to the outside of the water supply pipeline.
[0012] The beneficial effects are: by arranging a float valve in the booster main unit, the water level stored in the booster main unit can be controlled. At the same time, a water quality filter connected to the spray pipe is arranged in the booster pump room and the booster main unit, which can further filter the circulating water, improve the quality of the circulating water, prevent the nozzle from being blocked, and reduce dust in the air. The sprayed water falls to the ground and circulates again.
[0013] Preferably, as an improvement, a rectangular iron frame is provided inside the sedimentation tank, the coarse filtration tank and the fine filtration tank, each surface of the rectangular iron frame is provided with a stainless steel mesh, and hanging ears are symmetrically provided at the upper end of the rectangular iron frame.
[0014] The beneficial effect is: by placing corresponding filtering and adsorbing materials in the rectangular iron frame, the recovered rainwater and wastewater are filtered, thereby purifying the circulating water and improving the quality of the circulating water. Lifting ears are symmetrically arranged on the upper end of the rectangular iron frame to facilitate the staff to lift the rectangular iron frame from each pool and clean the filtering and adsorbing materials inside it.
[0015] Preferably, as an improvement, the fire water tank, the construction water tank and the outer wall of the booster pump room are all provided with lifting rings.
[0016] The beneficial effect is that by arranging lifting rings on the outer walls of the fire water tank, the construction water tank and the booster pump room, it is convenient to carry the fire water tank, the construction water tank and the booster pump room.
[0017] Preferably, as an improvement, the fire water tank and the construction water tank are provided with observation ports at their upper ends, and tank covers are hingedly connected to the observation ports.
[0018] The beneficial effects are: the box cover can prevent foreign matter from falling into the fire water tank and the construction water tank, the observation port is convenient for the staff to observe the float valve inside the fire water tank and the construction water tank, and it is also convenient for the staff to enter the fire water tank and the construction water tank to clean the inside.
[0019] Preferably, as an improvement, a connecting pipe is provided between the fire water tank and the construction water tank.
[0020] The beneficial effect is that when the water consumption of the fire water tank suddenly increases, causing the fire water tank to drop sharply, the water in the construction water tank can be transported to the fire water tank through a connecting pipe for replenishment.
[0021] Preferably, as an improvement, a plurality of maintenance valves are provided on the first type water source replenishment pipe, the second type water source replenishment pipe, the three-way pipe and the water pipe, and connecting valves are provided on the connecting pipe and the water pipe.
[0022] The beneficial effects are: the maintenance valve can block the water supply when the pipeline is repaired, reducing the waste of water resources, and at the same time it is more conducive to the staff to repair each pipeline. The connecting valve is usually in a closed state, allowing the fire-fighting pipeline to operate independently. When the fire water tank is insufficiently supplied with water and the water level drops, the construction water tank is connected to the fire water tank by opening each connecting valve, so that the water in the construction water tank is transported to the fire water tank or the inside of the fire pipeline for water replenishment. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present utility model;
[0024] Figure 2 This is a schematic diagram of the structure of the construction fence spray system according to Example 2 of the utility model. DETAILED DESCRIPTION
[0025] The following is further described in detail through specific implementation methods:
[0026] The figure marks in the drawings of the specification include: rainwater and wastewater collection pool 1, fire water tank 2, construction water tank 3, booster pump room 4, partition 5, sedimentation tank 6, coarse filtration tank 7, fine filtration tank 8, water inlet 9, water outlet 10, bifurcated pipe 11, water outlet 12, water pipe 13, first type water source replenishment pipe 14, second type water source replenishment pipe 15, first float valve 16, cleaning pipe 17, construction pipe 18, spray pipe 19, fire pipe 20, water pump 21, remote control pressure gauge 22, dust monitoring device 23, water pipe 24, booster main unit 25, stop valve 26, water quality filter 27, second float valve 28, sprinkler 29, rectangular iron frame 30, lifting ring 31, observation port 32, connecting pipe 33, maintenance valve 34, one-way valve 35.
[0027] Example 1
[0028] Embodiment 1 is basically as attached Figure 1 As shown, Figure 1 The green construction water recycling system shown in the figure includes a rainwater and wastewater collection pool 1, which is welded with 10mm thick steel plates, and its length, width and height are 6000*2000*2000mm respectively. The rainwater and wastewater collection pool 1 is connected with a fire water tank 2, a construction water tank 3 and a booster pump room 4. The outer walls of the fire water tank 2, the construction water tank 3 and the booster pump room 4 are all provided with a lifting ring 31. The fire water tank 2 and the construction water tank 3 are welded with 6 pieces of 10mm thick steel plates, and their length, width and height are The sizes of the rainwater and wastewater collection tank 1 are 3000*3000*2500mm respectively. Two 10mm thick partitions 5 are welded in the rainwater and wastewater collection tank 1, and the rainwater and wastewater collection tank 1 is divided into a sedimentation tank 6, a coarse filtration tank 7, and a fine filtration tank 8 from right to left. Each partition 5 is provided with a water inlet 12. The distance between the water inlet 12 on the right partition 5 and the upper end of the rainwater and wastewater collection tank 1 is set to 200mm, and the distance between the water inlet 12 on the left partition 5 and the upper end of the rainwater and wastewater collection tank 1 is set to 300mm.
[0029] A rectangular iron frame 30 is placed in the sedimentation tank 6, the coarse filtration tank 7 and the fine filtration tank 8. The length, width and height of the rectangular iron frame 30 are 1950*1950*1950mm respectively. A 5mm thick stainless steel mesh is welded on each surface of the rectangular iron frame 30. Four lifting ears are symmetrically welded on the frame of the upper end of the rectangular iron frame 30. Coarse stone, activated carbon and 8D filter mesh are placed inside the rectangular iron frame 30 located in the sedimentation tank 6, the coarse filtration tank 7 and the fine filtration tank 8 respectively. A water inlet 9 and a water outlet 10 are opened on the side wall of the rainwater and wastewater collection tank 1. The water inlet 9 is located at the right end of the rainwater and wastewater collection tank 1 and is connected to the sedimentation tank 6. The distance between the water inlet 9 and the bottom of the rainwater and wastewater collection tank 1 is 300mm. The water outlet 10 is located on the left side of the front end of the rainwater and wastewater collection tank 1 and is connected to the fine filtration tank 8. The distance between the water outlet 10 and the top of the rainwater and wastewater collection tank 1 is 300mm.
[0030] A bifurcated pipe 11 is connected between the fire water tank 2, the construction water tank 3 and the water outlet 10, and the connection points of the bifurcated pipe 11 are respectively located at the bottom of the fire water tank 2 and the construction water tank 3. A water delivery pipe 13 and a connecting pipe 33 are provided between the fire water tank 2 and the construction water tank 3. Both ends of the water delivery pipe 13 and the connecting pipe 33 are respectively connected to the bottom of the fire water tank 2 and the construction water tank 3. The upper ends of the fire water tank 2 and the construction water tank 3 are provided with a first type of water source replenishment pipe 14 and a second type of water source replenishment pipe 15. The first type of water source replenishment pipe 14 transports mountain river water or groundwater, and the second type of water source replenishment pipe 15 transports tap water. Each second type of water source replenishment pipe 15 is provided with a first float valve 16, and each first float valve 16 is respectively installed inside the fire water tank 2 and the construction water tank 3;
[0031] A connecting valve is installed in the connecting pipe 33, and a connecting valve is also installed in the water pipe 24 between the fire pipe 20 and the spray pipe 19. The first type of water source replenishment pipe 14, the second type of water source replenishment pipe 15, the water pipe 13 and the outer side of the bifurcated pipe 11 are all connected with a plurality of maintenance valves 34. The maintenance valves 34 are used to interrupt the water supply of each pipe to prevent the waste of water resources when the pipe is damaged, and at the same time facilitate workers to repair the pipe;
[0032] An observation port 32 is provided at the upper end of the fire water tank 2 and the construction water tank 3. The size of the observation port 32 is 500*500mm. Each observation port 32 is located at the upper end of the corresponding first float valve 16. A tank cover is hinged at the upper end of the observation port 32. A cleaning pipe 17, a construction pipe 18, a spray pipe 19 and a fire pipe 20 are fixedly installed side by side in the booster pump room 4. The cleaning pipe 17, the construction pipe 18, the spray pipe 19 and the fire pipe 20 are all connected to the water pipe 13. The cleaning pipe 17, the construction pipe 18, the spray pipe 19 and the fire pipe 20 are all connected to a water pump 21. The cleaning pipe 17, the construction pipe 18, the spray pipe 19 and the fire pipe 20 are all provided with a controller electrically connected to each water pump 21. The controllers on the cleaning pipe 17, the construction pipe 18 and the fire pipe 20 are all electrically connected to a remote control pressure gauge 22.
[0033] The remote-controlled pressure gauge 22 is used to monitor the water pressure in the cleaning pipe 17, the construction pipe 18, and the fire-fighting pipe 20. When the water pressure in each pipe decreases, the remote-controlled pressure gauge 22 opens the corresponding water pump 21 through the controller to replenish water. The spray pipe 19 is provided with a dust monitoring device 23 electrically connected to the controller. The dust monitoring device 23 is used to detect the degree of pollution in the air, so as to open the water pump 21 on the spray pipe 19 through the corresponding controller to work. The function of the cleaning pipe 17 is to transport recycled water to various cleaning points for washing roads, maintaining concrete and washing construction vehicles. The function of the construction pipe 18 is to transport recycled water to the construction water points on each floor of each building. The function of the fire-fighting pipe 20 is to transport recycled water to the fire hydrants on each floor of each building and the fire-fighting pipe 20. The spray pipe 19 is connected to the construction enclosure spray system.
[0034] The specific implementation process is as follows:
[0035] When rainwater and construction wastewater are recycled, the rainwater flows into the sedimentation tank 6 in the rainwater collection tank 1 through the water inlet 9. The solid particulate matter in the rainwater settles in the gaps formed by the coarse stones in the rectangular iron frame 30 due to its own gravity. The rainwater deposited in the sedimentation tank 6 enters the coarse filtration tank 7 through the water inlet 12 on the right partition 5, and then the pollutants are removed by the adsorption of the activated carbon placed inside the rectangular iron frame 30, thereby purifying the rainwater. The purified rainwater enters the fine filtration tank 8 through the water inlet 12 on the left partition 5, and is further filtered through the 8D filter screen in the rectangular iron frame 30 to form recycled water.
[0036] The recycled water enters the bifurcated pipe 11 through the outlet 10 on the outer wall of the rainwater and wastewater collection pool 1, and flows into the connected fire water tank 2 and construction water tank 3 through the bifurcated pipe 11 for storage. At this time, each connecting valve is in a closed state, and each maintenance valve 34 is in an open state. The first type of water source replenishment pipe 14 connected to the upper end of the fire water tank 2 and the construction water tank 3 can replenish mountain water and groundwater for them, and the second type of water source replenishment pipe 15 connected to the upper end of the fire water tank 2 and the construction water tank 3 can replenish tap water for them. When the recycled water and the first type of water source are insufficient, the first float valve 16 connected to the second type of water source replenishment pipe 15 is connected with the water level. The water level in the water tank 3 is lowered, thereby opening the first float valve 16, and delivering tap water through the second water source supplementary pipe 15, so as to keep the water level in each water tank sufficient at all times and avoid sudden interruption of the water source. The water delivery pipe 13 is connected with the cleaning pipe 17, the construction pipe 18, the spray pipe 19 and the fire fighting pipe 20 in the booster pump room 4. Since the connecting valves are in the closed state at this time, the cleaning pipe 17, the construction pipe 18 and the spray pipe 19 can only use the water source in the construction water tank 3, and the fire fighting pipe 20 can only use the water source in the fire fighting water tank 2, so that the fire fighting pipe 20 and other pipes can be operated independently;
[0037] When the water consumption in the fire water tank 2 increases and the water supply is insufficient, the construction water tank 3 can be connected to the fire water tank 2 by opening each connecting valve, so as to increase the water supply to the fire pipe 20 and ensure that the water supply to the fire pipe 20 is sufficient. When the remote control pressure gauge 22 connected to the cleaning pipe 17, the construction pipe 18 and the fire pipe 20 detects that the water pressure of each pipe decreases, the controller starts the corresponding water pump 21 of each pipe to work, and the water stored in the construction water tank 3 is transported to the corresponding pipe through the water pipe 13 for replenishment. When the dust monitoring device 23 detects that the air pollution level is high, the controller starts the water pump 21 connected to the spray pipe 19 to transport the water to the construction fence spray system for dust reduction treatment. The recycled water after use flows back into the rainwater and wastewater collection pool 1 through the ditch on the ground for filtration and circulation. In this process, the second type of water source is only used as a backup water source, which saves water while ensuring sufficient water supply.
[0038] Example 2
[0039] Example 2 is basically the same as Example 1, further: Figure 2 As shown, the construction fence spray system includes a water pipeline 24 and a booster main unit 25. The rated power of the booster main unit 25 at a rated voltage of 380V is 3kW, and a booster main unit 25 is added for every 200 meters of the water pipeline 24. The water pipeline 24 is arranged in a rectangular shape to surround the construction site. The spray pipeline 19 between the booster pump room 4 and the booster main unit 25 is connected to a stop valve 26 and a water filter 27. The water filter 27 further filters and recovers fine impurities in the water to prevent impurities from clogging the nozzle 29. The booster main unit 25 is provided with a second float valve 28, which is connected to the spray pipeline 19. The second float valve 28 is connected to the spray pipeline 19. The valve 28 automatically cuts off the water through the liquid level in the booster main unit 25, thereby protecting the booster main unit 25. A number of nozzles 29 are evenly connected to the outside of the water supply pipe 24. The nozzle 29 close to the front end of the booster main unit 25 adopts a stainless steel high-pressure direct spray type internal nozzle 29, and the rear end adopts a stainless steel low-pressure direct spray type internal nozzle 29. The spray distance is 1.5m and the installation spacing is 1m. The construction fence spray system can also be used on construction tower cranes. The principle is roughly the same. The difference is that the booster main unit 25 and the water filter 27 are installed at the rear end of the driver's cab, and the water supply pipe 24 is installed on the outside of the crane arm, so as to cool down or reduce dust on the tower crane boom.
[0040] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A green construction water recycling system, including a rainwater and wastewater collection pool, characterized in that: The rainwater and wastewater collection pool is connected to the fire water tank, the construction water tank and the booster pump room. A number of partitions are arranged in the rainwater and wastewater collection pool, and the rainwater and wastewater collection pool is divided into a sedimentation tank, a coarse filtration tank and a fine filtration tank in sequence. A water inlet and a water outlet are opened on the side wall of the rainwater and wastewater collection pool. A forked pipe is connected between the fire water tank, the construction water tank and the water outlet. A water outlet is arranged on each partition. A water pipe is arranged between the fire water tank and the construction water tank. A first type of water source replenishment pipe and a second type of water source replenishment pipe are arranged on the upper end of the fire water tank and the construction water tank. Each second type of water source replenishment pipe is provided with a first float valve. Cleaning pipes, construction pipes, spray pipes and fire fighting pipes are arranged in the booster pump room, and the cleaning pipes, construction pipes, spray pipes and fire fighting pipes are all connected with the water pipes.
2. A green construction water recycling system according to claim 1, characterized in that: The cleaning pipes, construction pipes, spray pipes and fire-fighting pipes are all connected to water pumps, each water pump is electrically connected to a controller, the cleaning pipes, construction pipes and fire-fighting pipes are provided with remote control pressure gauges electrically connected to the corresponding controllers, the spray pipes are provided with dust monitoring devices electrically connected to the corresponding controllers, and the spray pipes are connected to the construction enclosure spray system.
3. A green construction water recycling system according to claim 2, characterized in that: The construction fence spray system includes a water supply pipeline and a booster main unit. The water supply pipeline is connected to the booster main unit. The spray pipeline between the booster pump room and the booster main unit is provided with a stop valve and a water filter. The booster main unit is provided with a second float valve, which is connected to the spray pipeline. Several nozzles are evenly connected to the outside of the water supply pipeline.
4. The green construction water recycling system according to claim 1 is characterized in that: A rectangular iron frame is provided inside the sedimentation tank, the coarse filtration tank and the fine filtration tank. A stainless steel mesh is provided on each surface of the rectangular iron frame. Lifting ears are symmetrically provided on the upper end of the rectangular iron frame.
5. The green construction water recycling system according to claim 1 is characterized by: Fire water tanks, construction water tanks and the outer walls of booster pump rooms are all equipped with lifting rings.
6. A green construction water recycling system according to claim 5, characterized in that: There are observation ports on the top of the fire water tank and the construction water tank, and the tank covers are hinged at the observation ports.
7. A green construction water recycling system according to claim 6, characterized in that: A connecting pipe is provided between the fire water tank and the construction water tank.
8. The green construction water recycling system according to claim 7 is characterized by: Several maintenance valves are provided on the first-class water source supplementary pipe, the second-class water source supplementary pipe, the three-way pipe and the water supply pipe, and connecting valves are provided on the connecting pipe and the water supply pipe.