Rigid landfill construction formwork assembly and formwork system

By designing a formwork assembly adapted to a three-stage water stop screw, efficient lifting and assembly of rigid landfill construction is achieved, and the problems of low construction efficiency and safety hazards in the existing technology are solved.

CN222614309UActive Publication Date: 2025-03-14SHANDONG FANGZHENG CONSTR NEW MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420560774.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2025-03-14
Estimated Expiration
2034-03-21

AI Technical Summary

Technical Problem

The existing rigid landfill construction formwork assembly needs to be separately assembled at the construction site, which is cumbersome to operate, has low construction efficiency, and poses safety hazards.

Method used

A rigid landfill construction formwork assembly is designed, including multiple formwork and mold collection mechanisms. A first through-hole and a second through-hole are provided between adjacent forms. The diameter is matched with different parts of the three-stage water stop screw, allowing overall lifting and pre-assembly, and then tightening after installing the three-stage water stop screw.

Benefits of technology

Through overall lifting and pre-assembly, the construction process is simplified, construction efficiency is improved, and safety hazards of on-site assembly are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614309U_ABST
    Figure CN222614309U_ABST
Patent Text Reader

Abstract

The utility model relates to a rigid landfill construction template assembly and a template system, which comprise a plurality of templates and a template collecting mechanism arranged between adjacent templates, and are characterized in that in the two oppositely arranged templates, one template is provided with a first through hole, the other template is provided with a second through hole coaxial with the first through hole, and the first through hole is communicated with the second through hole; the diameter of the first through hole is matched with the diameter of the screw section of the three-section type water stop screw, the diameter of the second through hole is larger than the larger value between the maximum diameter value of the cone-shaped body in the three-section type water stop screw and the diameter value of the water stop piece, construction is convenient through the formwork assembly, and construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of rigid landfill construction, in particular to a rigid landfill construction template assembly and a template system. Background Art

[0002] The statements herein merely provide background art related to the present invention and do not necessarily constitute prior art.

[0003] Rigid landfill is a fully above-ground, fully reinforced concrete-blocked rigid safety landfill, mainly composed of landfill system, leachate collection system, rainwater and sewage drainage system, anti-seepage system, etc. Its advantage is that it can completely separate landfills according to different categories, avoiding mutual contamination and chemical reactions between different types of hazardous wastes, which is safe and reliable, and creates favorable conditions for the comprehensive utilization of resources in the future.

[0004] At present, during the construction of a rigid landfill, a template assembly is placed corresponding to each landfill grid, and a three-stage water-stop screw is arranged between adjacent template assemblies. Since the diameter of the through hole in the template for the three-stage water-stop screw to pass through only allows the rod of the three-stage water-stop screw to pass through, during construction, it is necessary to assemble one template assembly, install the three-stage water-stop screw, and then assemble the adjacent template assembly. Therefore, during the construction of the existing template assembly, it is necessary to separately set up a template assembly for each landfill grid at the construction site, which is cumbersome to operate, has low construction efficiency, and has safety hazards during installation and disassembly. Utility Model Content

[0005] The purpose of the utility model is to overcome the deficiencies of the above-mentioned prior art and to provide a rigid landfill construction template assembly and template system. During construction, all template assemblies can be hoisted as a whole to the landfill grid, and then a three-stage water-stop screw can be installed. The operation is simple and the construction efficiency is high.

[0006] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0007] In the first aspect, an embodiment of the utility model provides a rigid landfill construction template assembly, comprising a plurality of templates, a mold retracting mechanism being provided between adjacent templates, and two templates being arranged opposite to each other, one of which is provided with a first through hole, and the other template is provided with a second through hole coaxial with the first through hole, the diameter of the first through hole matches the screw segment diameter of the three-stage waterstop screw, and the diameter of the second through hole is larger than the larger value between the maximum diameter value of the cone body in the three-stage waterstop screw and the diameter value of the waterstop plate.

[0008] Optionally, the mold-closing mechanism includes a corner column, and a contraction mechanism is installed on the inner side of the corner column. The contraction mechanism is connected to two adjacent templates to drive the two templates to contract and expand.

[0009] Optionally, the cross-section of the corner column is an isosceles trapezoid, and a retracting mechanism is installed on the side corresponding to the long bottom side.

[0010] Optionally, the inner side surfaces of two adjacent templates are detachably connected with a diagonal brace.

[0011] In the second aspect, an embodiment of the utility model provides a rigid landfill construction template system, comprising a plurality of rigid landfill construction template assemblies, wherein a three-section water-stop screw is arranged between adjacent rigid landfill construction template assemblies, and in two mutually close templates of two adjacent rigid landfill construction template assemblies, a first screw portion at one end of the three-section water-stop screw passes through one of the templates through a first through hole, and a second screw portion at the other end passes through the other template through a second through hole, and a water-stop seal is arranged between the second screw portion and the hole surface of the second through hole.

[0012] Optionally, a back rib is provided on the outer side of the template, and the back rib is fitted with the outer side of the template. After the screw portion of the three-stage water-stop screw passes through the back rib, a fastener is threadedly connected, and the fastener presses the back rib against the outer side of the template.

[0013] Optionally, the water-stop seal includes a sleeve portion, which is sleeved on the outer periphery of the screw portion of the three-stage water-stop screw, and the two ends of the sleeve portion are respectively provided with a first fitting portion and a second fitting portion, wherein the first fitting portion is fitted with the outer side surface of the template and is provided with a sealing ring, the sealing ring extends between the screw portion of the three-stage water-stop screw and the hole surface of the second through hole, and its outer ring surface is sealingly fitted with the hole surface of the second through hole.

[0014] Optionally, the water-stop seal is made of plastic or steel.

[0015] Optionally, a plurality of lifting mechanisms are provided at the bottom of the rigid landfill construction template assembly, and the rigid landfill construction template assembly is supported by the lifting mechanisms.

[0016] Optionally, the lifting mechanism is arranged at the bottom of the corner column of the rigid landfill construction assembly and the middle of the bottom surface of each template.

[0017] The beneficial effects of the above utility model are as follows:

[0018] 1. In the rigid landfill construction template assembly of the utility model, among the two templates arranged relatively to each other, the first through hole of one template matches the screw diameter of the three-stage water-stop screw, and the second through hole diameter of the other template is larger than the larger value between the maximum diameter value of the cone body and the diameter value of the water-stop plate in the three-stage water-stop screw, so that during construction, a plurality of pre-assembled rigid landfill construction assemblies can be directly hoisted as a whole into the corresponding area of ​​the rigid landfill, and then the three-stage water-stop screw enters from the second through hole, and then passes through the templates close to each other between the two adjacent template assemblies, and then the three-stage water-stop screw is fastened between the two adjacent template assemblies. Therefore, during construction of the template assembly, there is no need to assemble it at the construction site, and it can be directly pre-assembled and hoisted into the corresponding position. The construction is convenient and quick, which improves the construction efficiency and avoids the safety hazards of on-site assembly.

[0019] 2. In the rigid landfill construction formwork system of the utility model, since the diameter of the second through hole is larger than the diameter of the screw portion of the three-stage water-stop screw, a water-stop seal is provided between the screw portion and the hole surface of the second through hole, which has a sealing and water-stopping effect and prevents external water from penetrating into the concrete wall cast between adjacent formwork assemblies. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings in the specification, which constitute a part of the present application, are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute a limitation on the present application.

[0021] Figure 1 This is a top view of the overall structure of Embodiment 1 of the utility model;

[0022] Figure 2 This utility model Figure 1 A partial enlarged view of point Ⅰ in FIG.

[0023] Figure 3 This is a schematic diagram of the overall structure of Embodiment 1 of the present utility model;

[0024] Figure 4 This is a front view of the overall structure of Embodiment 1 of the utility model;

[0025] Figure 5 This is a schematic diagram of the mold-collecting mechanism structure of Embodiment 1 of the present utility model;

[0026] Figure 6 It is a schematic diagram of a three-section water-stop screw rod provided between two adjacent templates in Embodiment 2 of the present invention;

[0027] Figure 7 This is a schematic diagram of the structure of a sealing water stop member according to Embodiment 2 of the present invention;

[0028] Figure 8This is a construction flow chart of a three-stage water-stop screw according to Embodiment 2 of the present invention;

[0029] Among them, 1. template, 1-1. first through hole, 1-2. second through hole, 2. mold retracting mechanism, 2-1. corner column, 2-2. rotating shaft, 2-3. first slider, 2-4. second slider, 2-5. first connecting rod, 2-6. second connecting rod, 2-7. first sliding member, 2-8. second sliding member, 2-9. third connecting rod, 2-10. fourth connecting rod, 3. diagonal brace, 4. three-section water-stop screw, 4-1. water-stop rod section, 4-2. water-stop plate, 4-3. first screw section, 4-4. first cone, 4-5. second screw section, 4-6. second cone, 5. water-stop seal, 5-1. sleeve part, 5-2. first fitting part, 5-3. second fitting part, 5-4. sealing ring, 6. back rib, 7. lifting mechanism, 8. concrete wall. DETAILED DESCRIPTION

[0030] Example 1

[0031] This embodiment provides a rigid landfill construction template assembly, such as Figure 1-Figure 4 As shown, it includes a plurality of templates 1, and a mold-collecting mechanism 2 is arranged between adjacent templates. In this embodiment, four templates 1 are arranged, and two adjacent templates 1 are arranged vertically. The four templates 1 enclose a rectangular space. The arrangement of the template 1 and the mold-collecting mechanism 2 can adopt the existing technology, such as the template and the mold-collecting mechanism disclosed in patent CN214575646U. Specifically, the mold-collecting mechanism includes a corner column 2-1. Compared with the technical solution disclosed in patent CN214575646U, the cross-section of the corner column 2-1 in this embodiment is an isosceles trapezoid, and a shrinking mechanism is installed on the side where the long bottom side is located. The shrinking mechanism is connected to two adjacent templates 1, and is used to realize the inward contraction or outward expansion movement of the two adjacent templates.

[0032] like Figure 5 As shown, the retraction mechanism includes a rotating shaft 2-2, both ends of which are rotatably connected to the bearing seat, the bearing seat is fixed on the corner column 2-1, and two or more bidirectional screw segments are arranged on the rotating shaft 2-2, the bidirectional screw segment has a first thread segment and a second thread segment with opposite rotation directions, the first thread segment is slidably connected to the first slider 2-3, the second thread segment is slidably connected to the second slider 2-4, the first slider 2-3 is slidably connected to the corner column 2-1, and the second slider 2-4 is slidably connected to the corner column 2-1.

[0033] By rotating the rotating shaft 2-2, the first slider 2-3 and the second slider 2-4 can move toward or away from each other synchronously.

[0034] Both sides of the first slider 2-3 are hinged to one end of the first connecting rod 2-5 and the second connecting rod 2-6 respectively, the other end of the first connecting rod 2-5 is hinged to the first sliding member 2-7, the other end of the second connecting rod 2-6 is hinged to the second sliding member 2-8, the first sliding member 2-7 and the second sliding member 2-8 are slidably connected to the side surfaces corresponding to the long bottom sides of the corner column 2-1, the first sliding member 2-7 is fixedly connected to one of the two adjacent templates 1, and the second sliding member 2-8 is fixedly connected to the other template 1.

[0035] Correspondingly, both sides of the second slider 2-4 are hinged to one end of the third connecting rod 2-9 and the fourth connecting rod 2-10 respectively, the other end of the third connecting rod 2-9 is hinged to the first sliding member 2-7, and the other end of the fourth connecting rod 2-10 is hinged to the second sliding member 2-8.

[0036] By rotating the rotating shaft, the first slider 2-3 and the second slider 2-4 can move toward or away from each other synchronously, thereby making the multiple templates 1 approach or move away from each other.

[0037] The above technology can adopt the technology disclosed in patent CN214575646U, and the only difference is the cross-sectional shape of the corner column. The specific technical details are not described in detail here.

[0038] An oblique brace 3 is provided between the inner side surfaces of two adjacent templates, and the oblique brace 3 is detachably connected to the template 1 by bolts. By providing the oblique brace, the structural strength of the entire construction template assembly is increased.

[0039] Specifically, the end of the diagonal brace 3 is rotatably connected to a connecting plate, and the connecting plate is detachably fixedly connected to the template 1 by bolts.

[0040] The construction template assembly of this embodiment is provided with four templates 1, two of which are arranged opposite to each other, and the other two are arranged opposite to each other. The two templates 1 arranged opposite to each other in this embodiment refer to two templates 1 parallel to each other in the construction template assembly.

[0041] Among the two relatively arranged templates 1, one of the templates is provided with a first through hole 1-1 for installing a three-stage water-stop screw, and the number of the first through holes 1-1 can be set according to actual needs. The other template 1 is provided with second through holes 1-2 corresponding to the first through holes 1-1, and the number of the second through holes 1-2 is the same as that of the first through holes 1-1, and the corresponding first through holes 1-1 and second through holes 1-2 are coaxially arranged.

[0042] The diameter of the first through hole 1-1 matches the diameter of the screw portion of the three-stage water-stop screw, allowing the screw portion to pass through but not allowing the cone and the water-stop plate to pass through. In this embodiment, the diameter of the first through hole 1-1 is 18mm-22mm, preferably 20mm.

[0043] The diameter of the second through hole 1-2 is larger than the larger value between the maximum diameter of the conical body of the three-stage water-stop screw and the diameter of the water-stop plate, so that the entire three-stage water-stop screw can pass through the second through hole. In this embodiment, the diameter of the second through hole is 33mm-37mm, preferably 35mm.

[0044] With this arrangement, since the three-section water-stop screw can pass through the second through hole 1-2 as a whole, during construction, multiple pre-assembled rigid landfill construction assemblies can be directly hoisted as a whole into the corresponding area of ​​the rigid landfill, and then the three-section water-stop screw enters from the second through hole 1-2, and then passes through the template 1 close to each other between two adjacent template assemblies, and then the three-section water-stop screw is fastened between the two adjacent template assemblies. Therefore, during construction of the template assembly, there is no need to assemble it at the construction site, and it can be directly pre-assembled and hoisted into the corresponding position. The construction is convenient and quick, which improves the construction efficiency and avoids the safety hazards of on-site assembly.

[0045] Example 2

[0046] This embodiment provides a rigid landfill construction template system, such as Figure 6 As shown, it includes multiple rigid landfill construction template assemblies described in Example 1, and each rigid landfill construction template assembly corresponds to a landfill grid of a rigid landfill.

[0047] In the adjacent rigid landfill construction template assembly, a three-section water-stop screw 4 is arranged between two templates close to each other.

[0048] The three-stage waterstop screw can adopt the existing technology, including a waterstop rod segment 4-1, a waterstop plate 4-2 is arranged on the waterstop rod segment 4-1, one end of the waterstop rod segment 4-1 is threadedly connected to the first screw segment 4-3, and a first cone 4-4 is arranged on the periphery of the connection position between the first screw segment 4-3 and the waterstop rod segment 4-1, and the end of the first cone 4-4 with a larger area is arranged toward the first screw segment 4-3, the other end of the waterstop rod segment 4-1 is threadedly connected to the second screw segment 4-5, and a second cone 4-6 is arranged on the periphery of the connection position between the second screw segment 4-5 and the waterstop rod segment 4-1, and the end of the second cone 4-6 with a larger area is arranged toward the second screw segment.

[0049] The water stop section and the two cones are used to be buried inside the poured concrete wall to play a water stop role.

[0050] The diameter of the first through hole 1-1 matches the diameter of the first screw segment 4-3, and the diameter of the second through hole 1-2 is greater than the larger value between the maximum diameter of the cone and the diameter of the water stop plate 4-2.

[0051] In the two templates 1 close to each other of two adjacent construction template assemblies, the first screw segment 4-3 passes through the first through hole 1-1 of one of the templates 1, the first cone 4-4 fits with the outer side surface of the template 1, and the second screw segment 4-5 passes through the second through hole 1-2 of the other template 1. Since the diameter of the second through hole 1-2 is larger than the diameter of the second screw segment 4-5, a water-stop seal 5 is arranged between the second screw segment 4-5 and the hole surface of the second through hole 1-2.

[0052] The water-stop seal 5 is made of plastic or steel. Figure 7 As shown, it includes a sleeve portion 5-1, which is sleeved on the outer periphery of the second screw segment, and the two ends of the sleeve portion 5-1 are provided with a first fitting portion 5-2 and a second fitting portion 5-3, and the first fitting portion 5-2 and the second fitting portion 5-3 both adopt a disc-shaped structure, and the first fitting portion 5-2 is fitted with the outer side surface of the template 1, and the first fitting portion 5-2 is provided with a sealing ring 5-4, which extends between the second screw segment 4-5 and the second through hole 1-2, and the outer side surface of the sealing ring 5-4 is sealed and fitted with the hole surface of the second through hole 1-2, thereby playing a role of water-stopping seal.

[0053] In this embodiment, a back rib 6 is provided on the outer side of the two templates, wherein the first screw segment 4-3 passes through the template 1 and the back rib 6 and is threadedly connected with a fastener. The fastener is a mountain-shaped clip and a nut located on the outer side of the mountain-shaped clip. By rotating the nut, the mountain-shaped clip presses the back rib, thereby pressing the back rib against the outer side of the template.

[0054] A back rib 6 is arranged on the outer side of the water-stop seal 5, and the back rib 6 is fitted with the second fitting portion 5-3. The second screw portion 4-5 passes through the template 1, the water-stop seal 5 and the back rib 6 and is threadedly connected with a fastener. The fastener adopts a mountain-shaped clip and a nut located on the outer side of the mountain-shaped clip. The nut is rotated to press the mountain-shaped clip against the back rib 6, thereby pressing the back rib 6 against the outer side of the second fitting portion 5-2.

[0055] Furthermore, since a reinforcing rib is provided on the inner side surface of the template 1, a notch is provided in the first fitting portion 5-2 to leave space for providing the reinforcing rib.

[0056] The template system further includes a plurality of lifting mechanisms 7 . A plurality of lifting mechanisms 7 are disposed below each template assembly, and the lifting mechanisms 7 support the template assembly.

[0057] In this embodiment, a lifting mechanism 7 is provided at the bottom surface of the corner column 2 - 1 of the template assembly and the middle position of the bottom surface of each template 1 , and the template assembly can be supported and leveled through the lifting mechanism 7 .

[0058] Preferably, the lifting mechanism 7 adopts an existing scissor-type lifting mechanism, and its specific structure is not described in detail here.

[0059] like Figure 8 As shown, the construction method of the formwork system of this embodiment includes the following steps:

[0060] Step 1: Before construction, divide the rigid landfill into several partitions according to actual needs to form multiple landfill grids to facilitate construction operations and save template consumables.

[0061] Step 2: Before the formwork is installed, a 0.4-meter-high concrete wall 8 is poured along the edge of the landfill grid to facilitate the installation and fixation of the formwork assembly.

[0062] Step 3: Install the lifting mechanism 7 at the four corners and the center of the four sides of the landfill grid.

[0063] Step 4: After cleaning the template 1 of the pre-assembled rigid landfill construction template assembly, evenly apply the release agent on the inner side with a roller to prevent the release agent from flowing. If there is strong wind, rain or fog, the release agent needs to be reapplied.

[0064] Step 5: Use a wrench to rotate the four shafts 2-2 of the rigid landfill construction template so that the four templates 1 move inward until they are contracted to the minimum, and then use a tower crane to lift the multiple template assemblies to the lifting mechanism 7 of the corresponding landfill grid, and then rotate the shaft 2-2 to move the template 1 outward until the outer side surface of the template is flush with the side surface where the waist of the corner column 2-1 is located.

[0065] Step 6: Use a steel ruler and plumb bob to check the verticality and diagonal dimensions of the template, adjust the lifting mechanism 7 so that the template assembly meets the horizontality requirements, and then install diagonal braces between adjacent templates.

[0066] Step 7: Install the three-section water-stop screw 4 between two adjacent template assemblies. Specifically, Figure 6 As shown, in two templates 1 close to each other of two adjacent template assemblies, the three-stage water-stop screw 4 is passed through the second through hole 1-2 of one template 1, so that the first screw segment 4-3 of the three-stage water-stop screw 4 passes through the first through hole 1-1 of another template 1 and then a back rib 6 is set on the outer side of the template 1 where the first through hole 1-1 is set, the first screw segment 4-4 passes through the back rib 6, and then a mountain-shaped clip and a nut are put on the first screw 4-3, the nut and the mountain-shaped clip are turned to press the back rib 6 against the outer side of the template 1, a sealing water-stop component 5 is inserted between the second through hole 1-2 and the second screw segment, and then the back rib 6 passed by the second screw segment 4-5 is placed, and then a mountain-shaped clip and a nut are put on the second screw segment 4-5, the nut is turned to press the back rib 6 against the second fitting portion 5-3 of the sealing water-stop component 5.

[0067] Using the same method, multiple back ribs 6 and three-stage water-stopping screws 4 are installed in sequence until all the back ribs 6 and three-stage water-stopping screws 4 are installed.

[0068] Step 8: pour concrete between two adjacent formwork assemblies to form a concrete wall, and the water-stop section 4 - 1 of the three-section water-stop screw 4 is buried inside the concrete wall.

[0069] When pouring concrete, the method of pouring in layers and intervals is adopted.

[0070] By using the formwork system and method of this embodiment, the pre-assembled formwork assembly is directly hoisted into the corresponding position, and then the back ribs and three-stage water-stop screws are installed. The construction is convenient and fast, the construction efficiency is improved, and the safety hazards of on-site assembly are avoided.

[0071] Although the above describes the specific implementation methods of the utility model in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A rigid landfill construction template assembly, comprising a plurality of templates, with a mold collection mechanism provided between adjacent templates, characterized in that: Among the two templates arranged opposite to each other, one of the templates is provided with a first through hole, and the other template is provided with a second through hole coaxial with the first through hole. The diameter of the first through hole matches the screw segment diameter of the three-stage water-stop screw, and the diameter of the second through hole is larger than the larger value between the maximum diameter value of the cone body in the three-stage water-stop screw and the diameter value of the water-stop plate.

2. A rigid landfill construction template assembly as claimed in claim 1, characterized in that: The mold closing mechanism comprises a corner column, and a contraction mechanism is installed on the inner side of the corner column. The contraction mechanism is connected to two adjacent templates to drive the two templates to contract and expand.

3. A rigid landfill construction template assembly as claimed in claim 2, characterized in that: The cross section of the corner column is an isosceles trapezoid, and a retracting mechanism is installed on the side corresponding to the long bottom side of the corner column.

4. A rigid landfill construction template assembly as claimed in claim 1, characterized in that: The inner side surfaces of two adjacent templates are detachably connected with diagonal braces.

5. A rigid landfill construction template system, characterized in that: The method comprises a rigid landfill construction formwork assembly as described in any one of claims 1 to 4, wherein a three-stage water-stop screw is arranged between adjacent rigid landfill construction formwork assemblies, and in two mutually adjacent formworks of two adjacent rigid landfill construction formwork assemblies, a first screw portion at one end of the three-stage water-stop screw passes through one of the formworks through a first through hole, and a second screw portion at the other end passes through the other formwork through a second through hole, and a water-stop seal is arranged between the second screw portion and the hole surface of the second through hole.

6. A rigid landfill construction template system as claimed in claim 5, characterized in that: The outer side of the template is provided with a back rib, which fits the outer side of the template. After the screw portion of the three-stage water-stop screw passes through the back rib, a fastener is threadedly connected, and the fastener presses the back rib against the outer side of the template.

7. A rigid landfill construction template system as claimed in claim 5, characterized in that: The water-stop seal includes a sleeve portion, which is sleeved on the outer periphery of the screw portion of the three-stage water-stop screw. The two ends of the sleeve portion are respectively provided with a first fitting portion and a second fitting portion, wherein the first fitting portion is fitted with the outer side surface of the template and is provided with a sealing ring, which extends between the screw portion of the three-stage water-stop screw and the hole surface of the second through hole, and its outer ring surface is sealingly fitted with the hole surface of the second through hole.

8. A rigid landfill construction template system as claimed in claim 5, characterized in that: The water-stop sealing component is made of plastic or steel.

9. A rigid landfill construction template system as claimed in claim 5, characterized in that: A plurality of lifting mechanisms are arranged at the bottom of the rigid landfill construction template assembly, and the rigid landfill construction template assembly is supported by the lifting mechanisms.

10. A rigid landfill construction template system as claimed in claim 9, characterized in that: The lifting mechanism is arranged at the bottom of the corner column of the rigid landfill construction assembly and the middle of the bottom surface of each template.