Building structure settlement monitoring device

By designing a building structure settlement monitoring device including a variety of fixed structures and adjustment devices, the problem of difficult adjustment of fixed column distances and insufficient stability in the prior art is solved, and diversity and stability are achieved when installing different settlement structures.

CN222616497UActive Publication Date: 2025-03-14THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421541794.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2025-03-14
Estimated Expiration
2034-07-02

AI Technical Summary

Technical Problem

The existing building structure settlement monitoring device is difficult to adjust the distance of fixed columns, resulting in a lack of diversity when installing different settlement structures and insufficient stability after installation.

Method used

A construction structure settlement monitoring device including a first fixed column, a first mounting base, a first fixing rod, a settlement rod, a second fixing rod, a camera, a damping spring and a second fixing rod are designed. The distance between the first fixed column and the second fixed column is adjusted by the first tightening thread, and the stability of the device is improved by the support rod, the support disc and the connecting rod.

Benefits of technology

The diversity and stability of the settlement structure is achieved when installing the settlement structure, the settlement of the building structure can be effectively monitored, and the needs of different settlement structures are adapted to the needs of different settlement structures by adjusting the distance of the fixed columns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222616497U_ABST
    Figure CN222616497U_ABST
Patent Text Reader

Abstract

The utility model discloses a building structure settlement monitoring device which comprises a first fixing column, one side of the first fixing column is fixedly connected with a first installation seat, the other side of the first fixing column is provided with a first fixing rod, the lower end of the first fixing rod is provided with a settlement pressing rod, and the inner side of a second fixing rod is provided with a damping spring. And the outer side of the second fixing rod is in threaded connection with a second fixing column. According to the structure, the second fixing column is arranged at the lower end of the second fixing rod, the first fixing column, the first fixing rod, the second fixing column and the second fixing rod are locked through the first tightening threads, so that the distance between the first fixing column and the second fixing column can be adjusted, and the outer wall of the second fixing column is fixedly connected with the mounting ring; a fixing ring is fixedly connected to the outer side of the mounting ring, four connecting rods are uniformly and fixedly connected to the outer wall of the fixing ring, supporting rods are fixedly connected to the lower ends of the connecting rods, supporting discs are fixedly connected to the lower ends of the supporting rods, and the stability is better after mounting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building structure settlement monitoring, in particular to a building structure settlement monitoring device. Background Art

[0002] At present, the housing stock is large, and a considerable number of houses built earlier have entered the aging period. Their structural health status needs to be closely monitored. Settlement is an important indicator to measure the health of the housing structure and an important item to assess the safety of the housing structure. It is necessary to monitor the settlement of the building structure, so it is necessary to set up a building structure settlement monitoring device.

[0003] When using a building structure settlement monitoring device, the settlement monitoring structure in the prior art is generally fixed by welding, which makes it difficult to adjust. When settlement structures of different sizes are needed, multiple devices are required, which makes it difficult to adjust. After installation, the settlement structure is a vertical structure, which makes its stability fail to meet expectations. Utility Model Content

[0004] The purpose of the utility model is to provide a building structure settlement monitoring device, which can adjust the distance between the first fixed column and the second fixed column, so that it has great diversity when installing the settlement structure, and has better stability after installation.

[0005] In order to achieve the above-mentioned purpose, a building structure settlement monitoring device is provided, including a first fixed column, a first mounting seat is fixedly connected to one side of the first fixed column, a first fixed rod is arranged on the other side of the first fixed column, a settlement pressure rod is arranged at the lower end of the first fixed rod, a second fixed rod is slidably connected to the outer side of the settlement pressure rod, a camera is arranged at the outer side of the second fixed rod, a damping spring is arranged on the inner side of the second fixed rod, a second fixed column is threadedly connected to the outer side of the second fixed rod, a plurality of connecting rods are evenly arranged on the outer side of the second fixed column, and a support plate is arranged at the lower end of the connecting rod.

[0006] According to the building structure settlement monitoring device, the upper end of the settlement pressure rod is fixedly connected to a fixing block, and the fixing block is fixedly connected to the lower end of the first fixing rod.

[0007] According to the building structure settlement monitoring device, a mounting block is fixedly connected to the upper end of the camera, and the mounting block is fixedly connected to the side wall of the second fixing rod.

[0008] According to the building structure settlement monitoring device, two scales are symmetrically arranged on both sides of the damping spring, and a transparent plate is arranged between the second fixing rod and the scales.

[0009] According to the building structure settlement monitoring device, a fixing ring is fixedly connected between the connecting rods, a mounting ring is fixedly connected between the fixing rings, and the mounting ring is fixedly connected to the outer wall of the second fixing column.

[0010] According to the building structure settlement monitoring device, the upper end of the support plate is fixedly connected to the support rod, and the upper end of the support rod is fixedly connected to the lower end of the connecting rod.

[0011] According to the building structure settlement monitoring device, the side walls of the first mounting seat and the second mounting seat are fixedly connected with supporting inclined plates, the first mounting seat is evenly threaded with a first locking bolt, and the second mounting seat is evenly threaded with a second locking bolt.

[0012] According to the building structure settlement monitoring device, the inner walls of the first fixing column and the second fixing column are both provided with a second tightening thread, the outer walls of the first fixing rod and the second fixing rod are both provided with a first tightening thread, and the first tightening thread and the second tightening thread are threadedly connected to each other.

[0013] Beneficial effects:

[0014] 1. A first mounting seat is provided on one side of the building structure, a first fixing column is provided on one side of the first mounting seat, a first fixing rod is provided on the inner side of the first fixing column, a second fixing rod is provided at the lower end of the first fixing rod, and a second fixing column is provided at the lower end of the second fixing rod. The first fixing column, the first fixing rod, the second fixing column, and the second fixing rod are all locked by a first tightening thread, so that the distance between the first fixing column and the second fixing column can be adjusted, so that there is great diversity when installing the settlement structure.

[0015] 2. One side of the first fixed column is installed through the first mounting seat, and four first locking bolts are evenly threaded on the first mounting seat. The lower end of the second fixed column is fixedly connected to the second mounting seat, and the second mounting seat is locked by the second locking bolt. The outer walls of the first mounting seat and the second mounting seat are both provided with supporting inclined plates, and the outer wall of the second fixed column is fixedly connected to the mounting ring, and the outer side of the mounting ring is fixedly connected to the fixing ring, and the outer wall of the fixing ring is evenly fixedly connected to four connecting rods, and the lower end of the connecting rod is fixedly connected to the supporting rod, and the lower end of the supporting rod is fixedly connected to the supporting plate, so that it has better stability after installation.

[0016] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments;

[0018] Figure 1A three-dimensional diagram of a building structure settlement monitoring device proposed by the utility model;

[0019] Figure 2 This is a schematic diagram of the internal structure of a second fixed column of a building structure settlement monitoring device proposed by the utility model;

[0020] Figure 3 The utility model proposed Figure 1 The structural diagram at A in the middle;

[0021] Figure 4 The utility model proposed Figure 1 Schematic diagram of the structure at B in the figure.

[0022] Legend:

[0023] 1. First fixing column; 2. First mounting seat; 3. First locking bolt; 4. Support inclined plate; 5. First fixing rod; 6. First tightening thread; 7. Fixing block; 8. Settling pressure rod; 9. Second fixing rod; 10. Mounting block; 11. Camera; 12. Transparent plate; 13. Damping spring; 14. Scale; 15. Second mounting seat; 16. Second fixing column; 17. Mounting ring; 18. Fixing ring; 19. Connecting rod; 20. Support plate; 21. Second tightening thread; 22. Support rod; 23. Second locking bolt. DETAILED DESCRIPTION

[0024] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0025] Reference Figure 1-4 The utility model embodiment is a building structure settlement monitoring device, which includes a first fixed column 1, one side of the first fixed column 1 is fixedly connected to a first mounting seat 2, the other side of the first fixed column 1 is provided with a first fixed rod 5, the lower end of the first fixed rod 5 is provided with a settlement pressure rod 8, the outer side of the settlement pressure rod 8 is slidably connected to a second fixed rod 9, the outer side of the second fixed rod 9 is provided with a camera 11, the camera 11 is a prior art structure, through power control, the inner side of the second fixed rod 9 is provided with a damping spring 13, the outer side of the second fixed rod 9 is threadedly connected to a second fixed column 16, the outer side of the second fixed column 16 is evenly provided with a plurality of connecting rods 19, and the lower end of the connecting rod 19 is provided with a support plate 20.

[0026] The upper end of the sedimentation pressure rod 8 is fixedly connected with a fixing block 7 , and the fixing block 7 is fixedly connected to the lower end of the first fixing rod 5 .

[0027] The upper end of the camera 11 is fixedly connected with a mounting block 10 , and the mounting block 10 is fixedly connected to the side wall of the second fixing rod 9 .

[0028] Two scales 14 are symmetrically arranged on both sides of the damping spring 13 . The scales 14 are used to see the distance of the settlement movement. A transparent plate 12 is arranged between the second fixing rod 9 and the scales 14 .

[0029] A fixing ring 18 is fixedly connected between the connecting rods 19 , a mounting ring 17 is fixedly connected between the fixing rings 18 , and the mounting ring 17 is fixedly connected to the outer wall of the second fixing column 16 .

[0030] The upper end of the support plate 20 is fixedly connected to the support rod 22 , and the upper end of the support rod 22 is fixedly connected to the lower end of the connecting rod 19 .

[0031] The side walls of the first mounting seat 2 and the second mounting seat 15 are fixedly connected with a supporting inclined plate 4, the first mounting seat 2 is evenly threaded with a first locking bolt 3, the first locking bolt 3 is used to fix the first mounting seat 2, and the second mounting seat 15 is evenly threaded with a second locking bolt 23, the second locking bolt 23 is used to fix the second mounting seat 15.

[0032] The inner walls of the first fixing column 1 and the second fixing column 16 are both provided with a second tightening thread 21, and the outer walls of the first fixing rod 5 and the second fixing rod 9 are both provided with a first tightening thread 6. The first tightening thread 6 can adjust the distance between the first fixing column 1 and the second fixing column 16, and the first tightening thread 6 and the second tightening thread 21 are threadedly connected to each other.

[0033] Working principle: After the device is installed, the inner sides of the settlement pressure rod 8 and the second fixing rod 9 are squeezed and moved against each other, so that when the building structure settles, the settlement pressure rod 8 can move. After the movement, it can be monitored by the camera 11 and the scale 14. The distance between the first fixing column 1, the first fixing rod 5, the second fixing column 16, and the second fixing rod 9 can be adjusted by the first tightening thread 6. The surrounding structure of the second fixing column 16 is supported and fixed by the support rod 22, the support plate 20, and the connecting rod 19.

[0034] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

Claims

1. A building structure settlement monitoring device, comprising a first fixed column (1), characterized in that: One side of the first fixing column (1) is fixedly connected to a first mounting seat (2); the other side of the first fixing column (1) is provided with a first fixing rod (5); a lower end of the first fixing rod (5) is provided with a sinking pressure rod (8); a second fixing rod (9) is slidably connected to the outer side of the sinking pressure rod (8); a camera (11) is provided on the outer side of the second fixing rod (9); a damping spring (13) is provided on the inner side of the second fixing rod (9); a second fixing column (16) is threadedly connected to the outer side of the second fixing rod (9); a plurality of connecting rods (19) are evenly provided on the outer side of the second fixing column (16); a supporting plate (20) is provided at the lower end of the connecting rod (19).

2. A building structure settlement monitoring device according to claim 1, characterized in that: The upper end of the settling pressure rod (8) is fixedly connected to a fixing block (7), and the fixing block (7) is fixedly connected to the lower end of the first fixing rod (5).

3. A building structure settlement monitoring device according to claim 1, characterized in that: The upper end of the camera (11) is fixedly connected to a mounting block (10), and the mounting block (10) is fixedly connected to the side wall of the second fixing rod (9).

4. A building structure settlement monitoring device according to claim 1, characterized in that: Two scales (14) are symmetrically arranged on both sides of the damping spring (13), and a transparent plate (12) is arranged between the second fixing rod (9) and the scale (14).

5. A building structure settlement monitoring device according to claim 1, characterized in that: A fixing ring (18) is fixedly connected between the connecting rods (19), a mounting ring (17) is fixedly connected between the fixing rings (18), and the mounting ring (17) is fixedly connected to the outer wall of the second fixing column (16).

6. A building structure settlement monitoring device according to claim 1, characterized in that: The upper end of the support plate (20) is fixedly connected to the support rod (22), and the upper end of the support rod (22) is fixedly connected to the lower end of the connecting rod (19).

7. A building structure settlement monitoring device according to claim 1, characterized in that: The side walls of the first mounting seat (2) and the second mounting seat (15) are both fixedly connected to a supporting inclined plate (4); the first mounting seat (2) is evenly threadedly connected to a first locking bolt (3); and the second mounting seat (15) is evenly threadedly connected to a second locking bolt (23).

8. A building structure settlement monitoring device according to claim 1, characterized in that: The inner walls of the first fixing column (1) and the second fixing column (16) are both provided with a second tightening thread (21), the outer walls of the first fixing rod (5) and the second fixing rod (9) are both provided with a first tightening thread (6), and the first tightening thread (6) and the second tightening thread (21) are threadedly connected to each other.