Monorail lifting appliance for lifting long steel rail and long steel rail lifting system

By connecting the tension sensor and the wireless signal transmitter in a single-rail lifting tool for long rail lifting, the self-test function of the spreader is realized, solving the problem of inadequate clamping of the spreader in the prior art, and improving the safety and efficiency of the lifting.

CN222647482UActive Publication Date: 2025-03-21BAODING XINTAI SLING MFG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202421473483.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2025-03-21
Estimated Expiration
2034-06-26

AI Technical Summary

Technical Problem

The existing monorail spreaders lack automatic detection function during the long rail lifting process, resulting in inadequate clamping of some spreaders, increasing the burden on adjacent vans, and even causing rail drop accidents, and manual inspections are inefficient.

Method used

A single-rail lifting tool for long rail lifting is designed. By connecting a series of tension sensors in the hoisting lug assembly, the tension load is accurately obtained, and the load data is wirelessly sent to the equipment control end through the signal transmitting box, and an alarm message is issued when a fault occurs.

Benefits of technology

The self-test function of the spreader is realized, which avoids the problem of inadequate clamping of some spreaders, improves the safety and efficiency of lifting, and reduces labor waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222647482U_ABST
    Figure CN222647482U_ABST
Patent Text Reader

Abstract

The utility model relates to a monorail lifting appliance for lifting a long steel rail and a long steel rail lifting system, which belong to the field of lifting equipment and comprise a lifting appliance main body, a tension sensor, a signal transmitting box, a lifting lug component, a pin shaft bolt and a lifting ring, the lifting lug assembly is arranged at the top of the lifting appliance main body, the top end of the lifting lug assembly is connected with the lifting ring through the pin shaft bolt, and the lifting ring is connected with a lifting hook of a crown block; the tension sensor is connected in series in the lifting lug assembly, the tension sensor is electrically connected to the signal transmitting box, and the signal transmitting box is arranged on the side wall of the lifting appliance main body; the signal transmitting box transmits load data to the equipment control end in a radio mode, and the equipment control end sends out alarm information. According to the utility model, the self-checking function of the lifting appliance is added, and the fault that a single-rail lifting appliance is not clamped in place is eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hoisting equipment, in particular to a monorail hoisting device for hoisting long steel rails and a long steel rail hoisting system. Background Art

[0002] The utility model patents with announcement numbers CN201198435Y and CN201520595U both disclose a monorail hoist for hoisting rails. The main structure of such hoists is consistent in that a hoist shaft drives a locker and then drives two relatively arranged hook heads at the bottom to clamp the rail head.

[0003] However, at the rail welding site, it is necessary to unload 100-meter-long rails from the train cargo box, weld 5 rails end to end to form a 500-meter-long rail, and then hoist them onto the shipping train carriage. A 100-meter-long rail requires 7 overhead cranes equipped with their own monorail hoists for group hoisting. And a 500-meter-long rail requires more than 30 overhead cranes equipped with their own monorail hoists for group hoisting. The overhead crane electric control cabinet can control the synchronous movement of all overhead cranes to ensure smooth hoisting operations. However, the existing monorail hoists do not have an automatic detection function. If individual monorail hoists are not clamped properly, it will increase the burden on adjacent overhead cranes, and in serious cases, it will cause rail drop hoisting accidents. If so many monorail hoists are manually checked one by one, it will cause a waste of manpower and reduce hoisting efficiency.

[0004] Therefore, it is necessary to develop a monorail hanger for long rail hoisting and a long rail hoisting system to overcome the above-mentioned defects. Utility Model Content

[0005] The utility model aims to provide a monorail hoisting device for hoisting long rails and a long rail hoisting system, which increases the self-checking function of the hoisting device and eliminates the failure of individual monorail hoists not being clamped in place.

[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0007] The utility model discloses a monorail hanger for hoisting long rails, comprising a hanger body, a tension sensor, a signal transmitting box, a lifting ear assembly, a pin bolt and a lifting ring, wherein the lifting ear assembly is arranged on the top of the hanger body and the top end is connected to the lifting ring through the pin bolt, and the lifting ring is connected to the hook of a crown block; the tension sensor is connected in series in the lifting ear assembly, and the tension sensor is electrically connected to the signal transmitting box, and the signal transmitting box is arranged on the side wall of the hanger body; the signal transmitting box sends load data to a device control end by radio, and the device control end sends an alarm message.

[0008] Furthermore, the lifting ear assembly includes a lower lifting ear and an upper lifting ear, the bottom leg plate of the lower lifting ear is connected to the rotating drum of the sling body locker, the top of the lower lifting ear is set as a threaded sleeve and is threadedly connected to the bottom screw segment of the tension sensor; the top screw segment of the tension sensor is threadedly connected to the threaded sleeve at the bottom of the upper lifting ear, and the top support ear plate of the upper lifting ear is connected to the pin bolt.

[0009] Furthermore, it also includes anti-loosening thin nuts, and the two anti-loosening thin nuts are respectively threadedly connected to the bottom screw segment and the top screw segment of the tension sensor, the bottom anti-loosening thin nut is locked on the threaded sleeve end face of the lower lifting ear, and the top anti-loosening thin nut is locked on the threaded sleeve end face of the upper lifting ear.

[0010] Furthermore, the signal transmitting box is provided with a buzzer and a warning light, and the buzzer and the warning light can send out an alarm signal according to the feedback signal.

[0011] Furthermore, the signal transmitting box is provided with countersunk bolt mounting holes at four corners and is mounted to the outer wall of the hanger body through hexagon socket bolts; the signal transmitting box is installed on one side of the bolt head of the hanger body mounting bolt, and the bolt head height of the mounting bolt is not less than the thickness of the signal transmitting box.

[0012] The utility model also discloses a long rail hoisting system, comprising:

[0013] A monorail hoist as described in any one of the above items, wherein a plurality of the monorail hoists are arranged at equal intervals along the rail to be hoisted;

[0014] The device control end specifically adopts an industrial computer, and the industrial computer establishes a wireless communication connection with all the signal transmission boxes;

[0015] The number of the overhead cranes is consistent with that of the monorail hoist and they are arranged in one-to-one correspondence. All the overhead cranes run synchronously and are electrically connected to the overhead crane control cabinet. The industrial computer is electrically connected to the overhead crane control cabinet.

[0016] Furthermore, a wireless communication connection is established between the industrial computer cabinet and the signal transmitting box via a radio transceiver module.

[0017] Compared with the prior art, the beneficial technical effects of the utility model are:

[0018] The utility model discloses a monorail hanger for hoisting long rails. A tension sensor is connected in series in the lifting ear component to ensure that the tension sensor accurately obtains the tension load. A signal transmitting box is provided to wirelessly send load data to the equipment control end. When an unexpected situation occurs, an alarm message can be issued, and the operator can eliminate the fault in time, thereby ensuring the safety of the operation.

[0019] In addition, the tension sensor is installed by threaded connection, and the lifting force of the overhead crane is completely transmitted through the tension sensor, ensuring the accuracy of the measurement. By using a thin anti-loosening nut to lock the end face of the threaded sleeve of the lower lifting ear and the upper lifting ear, a better anti-loosening effect can be achieved. By setting a buzzer and a warning light on the signal transmitting box, when a clamping failure occurs, sound and flash alarm information will be issued in time, which is convenient for operators to quickly find the monorail hanger with clamping failure among many monorail hangers and eliminate the jamming fault. By setting the signal transmitting box on the outer wall of the hanger body and on the same side as the bolt head of the mounting bolt, the bolt heads on all sides will form an outer protection for the signal transmitting box, reducing impact damage.

[0020] The utility model long rail hoisting system can monitor the working status of each hoisting device body in real time through wireless communication connection between an industrial computer and each signal transmitting box, and can perform emergency control on all overhead cranes through electrical connection to an overhead crane control cabinet via the industrial computer, thereby having good safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The utility model will be further described below in conjunction with the accompanying drawings.

[0022] Figure 1 This is a schematic diagram of the main structure of the monorail hoist for hoisting long rails of the utility model;

[0023] Figure 2 This is a right side structural schematic diagram of a monorail hoist for hoisting long rails of the utility model;

[0024] Figure 3 It is a schematic diagram of the composition of the long rail hoisting system of the utility model.

[0025] Explanation of the reference numerals: 1. Lifting device body; 101. Lower lifting eye; 2. Tension sensor; 3. Signal transmitting box; 301. Battery compartment; 302. Buzzer; 303. Warning light; 4. Upper lifting eye; 5. Pin bolt; 6. Lifting ring; 7. Anti-loosening thin nut; 8. Overhead crane; 801. Hook; 9. Industrial computer; 10. Overhead crane electric control cabinet; 11. Rail. DETAILED DESCRIPTION

[0026] The core of the utility model is to provide a monorail hanger for long rail hoisting and a long rail hoisting system, which increases the self-checking function of the hanger and eliminates the failure of individual monorail hangers not being clamped in place.

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0029] With reference to the accompanying drawings, Figure 1 This is a schematic diagram of the main structure of the monorail hoist for hoisting long rails of the utility model; Figure 2 This is a right side structural schematic diagram of a monorail hoist for hoisting long rails of the utility model; Figure 3 It is a schematic diagram of the composition of the long rail hoisting system of the utility model.

[0030] In a specific embodiment, Figure 1 and Figure 2 As shown, the utility model monorail sling for long rail hoisting includes a sling body 1, a tension sensor 2, a signal transmitting box 3, a lifting ear assembly, a pin bolt 5 and a lifting ring 6. The internal structure of the sling body 1 is consistent with the monorail sling in the prior art, and many comparative documents in the background technology have been described in detail, which will not be repeated here in the utility model. The lifting ear assembly is arranged at the top of the sling body 1 and the top is connected to the lifting ring 6 through the pin bolt 5, and the lifting ring 6 is connected to the hook of the overhead crane. The tension sensor 2 is connected in series in the vertically arranged lifting ear assembly to ensure that the tension load can be accurately obtained by the tension sensor 2. The tension sensor 2 is electrically connected to the signal transmitting box 3, and the signal transmitting box 3 is arranged on the side wall of the sling body 1. A radio transceiver module is arranged in the signal transmitting box 3 and the load data is sent to the device control end by radio. The device control end sends out an alarm message after comparison through the control program. For example, an alarm message is sent out when the load data is less than the set range during the lifting process of the overhead crane.

[0031] By connecting the tension sensor 2 in series in the lifting ear assembly, it is ensured that the tension sensor 2 accurately obtains the tension load; through the setting of the signal transmitting box 3, the load data can be wirelessly sent to the equipment control end, and then when an unexpected situation occurs, an alarm message can be issued, and the operator can eliminate the fault in time, ensuring the safety of the operation.

[0032] In a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, the lifting lug assembly includes a lower lifting lug 101 and an upper lifting lug 4, the bottom leg plate of the lower lifting lug 101 is connected to the locker drum of the sling body 1, and the top of the lower lifting lug 101 is set as a threaded sleeve and is threadedly connected to the bottom screw segment of the tension sensor 2. The top screw segment of the tension sensor 2 is threadedly connected to the threaded sleeve at the bottom of the upper lifting lug 4, and the top support lug plate of the upper lifting lug 4 is connected to the pin bolt 5. That is, both ends of the tension sensor 2 are set as external threaded rods, and are connected by threaded connection.

[0033] Specifically, if Figure 1 and Figure 2 As shown, the utility model monorail hanger for long rail hoisting also includes anti-loosening thin nuts 7, and two anti-loosening thin nuts 7 are respectively threadedly connected to the bottom screw section and the top screw section of the tension sensor 2, both of which adopt fine pitch threads. The bottom anti-loosening thin nut 7 is locked on the threaded sleeve end face of the lower lifting ear 101, and the top anti-loosening thin nut 7 is locked on the threaded sleeve end face of the upper lifting ear 4.

[0034] The tension sensor 2 is installed by threaded connection, and the lifting force of the overhead crane is completely transmitted through the tension sensor 2, ensuring the accuracy of the measurement. By using the anti-loosening thin nut 7 to lock the threaded sleeve end surface of the lower lifting ear 101 and the upper lifting ear 4, a better anti-loosening effect can be achieved.

[0035] In a specific embodiment of the present invention, Figure 1 and Figure 2 As shown, the signal transmitting box 3 is provided with a buzzer 302 and a warning light 303, which can send out an alarm signal according to the feedback signal. The warning light 303 is a red warning light, which flashes when it is lit.

[0036] Specifically, the signal transmitting box 3 is equipped with an independent battery compartment 301 and is equipped with dry batteries for power supply, and does not need to be connected with wires separately.

[0037] By arranging a buzzer 302 and a warning light 303 on the signal transmitting box 3, when a clamping failure occurs, sound and flashing alarm information are promptly issued, so that the operator can quickly find the monorail hanger with the clamping failure among many monorail hangers and eliminate the jamming fault.

[0038] In a specific embodiment of the present invention, Figure 1 and Figure 2As shown, the four corners of the signal transmitting box 3 are provided with countersunk bolt mounting holes and are mounted to the outer wall of the sling body 1 by hexagon socket bolts. The signal transmitting box 3 is made of a metal shell and has an IP65 protection level. The signal transmitting box 3 is mounted on one side of the bolt head of the mounting bolt of the sling body 1, and the bolt head height of the mounting bolt is not less than the thickness of the signal transmitting box 3.

[0039] By arranging the signal transmitting box 3 on the outer wall of the sling body 1 and on the same side as the bolt heads of the mounting bolts, the bolt heads around the signal transmitting box 3 form an outer protection, thereby reducing the possibility of impact damage.

[0040] In summary, the utility model of the monorail hoist for long rail hoisting ensures that the tension sensor 2 accurately obtains the tension load by connecting the tension sensor 2 in series in the lifting ear assembly; through the setting of the signal transmitting box 3, the load data can be wirelessly sent to the equipment control end, and then when an unexpected situation occurs, an alarm message can be issued, and the operator can eliminate the fault in time to ensure the safety of the operation. In addition, the tension sensor 2 is installed by threaded connection, and the lifting force of the overhead crane is completely transmitted through the tension sensor 2, which ensures the accuracy of the measurement. By using the anti-loosening thin nut 7 to lock it to the threaded sleeve end surface of the lower lifting ear 101 and the upper lifting ear 4, a better anti-loosening effect can be achieved. By setting the buzzer 302 and the warning light 303 on the signal transmitting box 3, when the clamping failure occurs, the sound and flashing alarm information are issued in time, which is convenient for the operator to quickly find the monorail hoist with clamping failure among many monorail hoists and eliminate the jamming fault. By arranging the signal transmitting box 3 on the outer wall of the sling body 1 and on the same side as the bolt heads of the mounting bolts, the bolt heads around the signal transmitting box 3 form an outer protection, thereby reducing the possibility of impact damage.

[0041] In one embodiment, the utility model also discloses a long rail hoisting system, such as Figure 3 As shown, including:

[0042] The monorail hoist in any of the above embodiments is used to hoist a 100-meter or 500-meter long rail, and a plurality of the monorail hoists are arranged at equal intervals along the rail 11 to be hoisted.

[0043] The equipment control end specifically adopts an industrial computer 9, which establishes a wireless communication connection with all signal transmission boxes 3. Specifically, the industrial computer 9 establishes a wireless communication connection with the signal transmission box 3 through a radio transceiver module in the cabinet, and a Bluetooth module with low energy consumption is used for wireless communication between the two.

[0044] The number of the overhead cranes 8 is consistent with that of the monorail hoist and they are arranged one by one. All the overhead cranes 8 run synchronously and are electrically connected to the overhead crane control cabinet 10 . The industrial computer 9 is electrically connected to the overhead crane control cabinet 10 .

[0045] The working process of the long rail hoisting system of the utility model is as follows: take the hoisting of the welded 500-meter rail 11 as an example for explanation. The operator operates the control panel of the overhead crane control cabinet 10, so that the 35 overhead cranes 8 required for the hoisting can run synchronously and run horizontally to the top of the 500-meter rail 11. The overhead crane 8 releases the wire rope, and the hook 801 descends with the hoisting device body 1 until the hook head of the hoisting device body 1 contacts the top of the rail 11, and then clamps the rail head. The overhead crane 8 reels in the wire rope, and the hook 801 clamps the rail 11, and slowly rises horizontally with the rail 11. At this time, the industrial computer 9 shows that the overhead cranes 8 have all entered the load state, and each hoisting device body 1 has its own ID number in the monitoring program of the industrial computer 9, displaying its own load weight data. When the value transmitted by the tension sensor 2 on some of the sling bodies 1 is significantly smaller than the value of the adjacent sling bodies 1 and exceeds the set range, an alarm message is displayed and a control command is sent to the overhead crane control cabinet 10. At this time, the overhead crane control cabinet 10 can only control the overhead crane 8 to descend synchronously, and cannot move or lift. At the same time, the industrial computer 9 sends a wireless signal to the corresponding signal transmission box 3, and the buzzer 302 and the warning light 303 on the signal transmission box 3 send out sound and flash alarm information. It is convenient for operators to quickly find the monorail sling with clamping failure among many monorail slings, and continue to work after eliminating the jamming fault.

[0046] The long rail hoisting system of the utility model can monitor the working status of each hoisting device body 1 in real time through the wireless communication connection between the industrial computer 9 and each signal transmitting box 3, and can perform emergency control on all the overhead cranes 8 through the electrical connection to the overhead crane control cabinet 10 through the industrial computer 9, thereby having good safety.

[0047] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0048] It should be noted that all components in the technical solution of this application require the necessary additional facilities of water supply, oil supply, electricity supply and gas supply to be driven and / or controlled. If there is no further explanation, it is assumed that the existing technology is used and equipped without special explanation.

[0049] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. A monorail hoist for hoisting long rails, characterized in that: The invention comprises a sling body (1), a tension sensor (2), a signal transmitting box (3), a lifting ear assembly, a pin bolt (5) and a lifting ring (6); the lifting ear assembly is arranged on the top of the sling body (1) and the top end is connected to the lifting ring (6) through the pin bolt (5); the lifting ring (6) is connected to the hook of the overhead travelling crane; the tension sensor (2) is connected in series in the lifting ear assembly, the tension sensor (2) is electrically connected to the signal transmitting box (3), and the signal transmitting box (3) is arranged on the side wall of the sling body (1); the signal transmitting box (3) transmits load data to the equipment control end by radio, and the equipment control end sends out an alarm message.

2. The monorail hanger for hoisting long rails according to claim 1, characterized in that: The lifting ear assembly comprises a lower lifting ear (101) and an upper lifting ear (4); the bottom leg plate of the lower lifting ear (101) is connected to the locking drum of the sling body (1); the top of the lower lifting ear (101) is arranged as a threaded sleeve and is threadedly connected to the bottom screw section of the tension sensor (2); the top screw section of the tension sensor (2) is threadedly connected to the threaded sleeve at the bottom of the upper lifting ear (4); the top support ear plate of the upper lifting ear (4) is connected to the pin bolt (5).

3. The monorail hanger for hoisting long rails according to claim 2, characterized in that: It also includes a thin anti-loosening nut (7), two of which are respectively threadedly connected to the bottom screw segment and the top screw segment of the tension sensor (2), the bottom anti-loosening nut (7) is locked on the threaded sleeve end face of the lower hanging ear (101), and the top anti-loosening nut (7) is locked on the threaded sleeve end face of the upper hanging ear (4).

4. The monorail hanger for hoisting long rails according to claim 1, characterized in that: The signal transmitting box (3) is provided with a buzzer (302) and a warning light (303), and the buzzer (302) and the warning light (303) can send out an alarm signal according to the feedback signal.

5. The monorail hanger for hoisting long rails according to claim 1, characterized in that: The signal transmitting box (3) is provided with countersunk bolt mounting holes at four corners and is mounted on the outer wall of the hanger body (1) via hexagon socket bolts; the signal transmitting box (3) is mounted on one side of the bolt head of the mounting bolt of the hanger body (1), and the height of the bolt head of the mounting bolt is not less than the thickness of the signal transmitting box (3).

6. A long rail hoisting system, characterized in that: include: The monorail hanger according to any one of claims 1 to 4, wherein a plurality of the monorail hangers are arranged at equal intervals along the rail (11) to be hoisted; The device control end specifically adopts an industrial computer (9), and the industrial computer (9) establishes a wireless communication connection with all the signal transmission boxes (3); An overhead crane (8), wherein the number of the overhead cranes (8) is consistent with that of the monorail hangers and they are arranged in a one-to-one correspondence, all the overhead cranes (8) operate synchronously and are electrically connected to an overhead crane control cabinet (10), and the industrial computer (9) is electrically connected to the overhead crane control cabinet (10).

7. The long rail hoisting system according to claim 6, characterized in that: The industrial computer (9) establishes a wireless communication connection with the signal transmission box (3) via a radio transceiver module in the cabinet.

Citation Information

Patent Citations

  • Mechanical box type single steel rail sling

    CN201198435Y

  • Single-rail mechanical automatic rail clamp

    CN201520595U