Hollow pier internal mold operation platform
By installing multiple cow legs on the hollow pier inner mold and connecting them with fine-rolled rebar, the problems of high installation cost of the hollow pier inner mold platform body and damage to concrete after removal are solved, and the effect of reducing construction costs and improving construction efficiency is achieved.
Patent Information
- Application Number
- CN202421408685.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-06-19
AI Technical Summary
In the prior art, the installation cost of hollow pier inner mold platform body is high, and after removal, it will cause damage to the concrete and affect the appearance quality.
A hollow pier inner mold operation platform is designed. By installing multiple beef legs on the inner mold, and connecting them with the beef legs with fine-rolled rebar, the movement and installation of the platform body is realized. The ox legs can be used multiple times, and are easy to install and disassemble, and will not cause damage to the concrete structure.
It reduces construction costs, simplifies the movement and installation process of the platform body, avoids concrete damage, and improves construction efficiency and concrete appearance quality.
Smart Images

Figure CN222648596U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to an inner formwork operating platform for a hollow pier. Background Art
[0002] As railway construction continues to strengthen, bridges, as one of its important components, have gradually become the focus of railway construction in various places. In the construction process of bridges, piers are a vital part, and their load-bearing capacity directly affects the stability and service life of the bridge. Hollow piers are one of the pier types widely used in recent years. They reduce the amount of concrete required for construction, improve construction efficiency, and also save costs.
[0003] Variable-section high bridge piers are one of the most common types of piers in mountain highways and railway bridges. For the inner formwork construction of variable-section hollow piers, the traditional practice is to pre-embed climbing cones when pouring concrete. After the concrete reaches a certain strength, the platform body is installed on the climbing cones. However, in the actual construction process, there are some problems in using climbing cones to install the platform body: multiple sets of climbing cones are required to meet the construction requirements, which is costly; disassembly and assembly are difficult; and the concrete needs to be repaired after the climbing cones are removed, which affects the appearance quality of the concrete. Utility Model Content
[0004] In view of the defects existing in the prior art, the present application provides a hollow pier inner mold operating platform, which can solve the technical problems in the prior art that the platform body has high installation cost and causes damage to the concrete after removal.
[0005] In a first aspect, an embodiment of the present application provides a hollow pier inner mold operation platform, comprising:
[0006] A plurality of corbels are installed on the straight line segment and the arc segment of the inner mold respectively. The corbels include a vertical plate and a horizontal plate. The vertical plate is installed on the inner mold. The horizontal plate extends from the vertical plate into the hollow pier and is provided with a threaded hole.
[0007] There are multiple fine-rolled threaded steel bars, the upper ends of which pass through the threaded holes and are threadedly connected to the cross plate, and the lower ends of which are equipped with hangers;
[0008] A plurality of first sleeves are respectively located at the top of each threaded hole and are threadedly connected to the precision-rolled threaded steel bar;
[0009] The platform body is connected to the bottom of each sling.
[0010] In the embodiment of the present application, when the platform body needs to be moved, it is only necessary to move the position of the corbel. The operation is simple and the installation and disassembly are convenient. The corbel can be used multiple times, which saves the investment of manpower and material resources and reduces the construction cost. Moreover, the corbel is installed on the inner mold, and the concrete structure will not be damaged when the corbel is disassembled and assembled.
[0011] In combination with the first aspect, in one embodiment, the cross plate includes two first channel steels arranged oppositely and in parallel, a top plate connecting the tops of the two first channel steels, and a bottom plate connecting the bottoms of the first channel steels, and the top plate and the bottom plate are both provided with corresponding threaded holes.
[0012] In the embodiment of the present application, through this setting, the strength of the horizontal plate can be enhanced to prevent the horizontal plate from falling off the inner mold during the construction process, thereby avoiding safety accidents during construction.
[0013] In combination with the first aspect, in one embodiment, the finish-rolled threaded steel includes a first finish-rolled threaded steel and a second finish-rolled threaded steel, the first finish-rolled threaded steel and the second finish-rolled threaded steel are connected via a second sleeve, and a hanger is installed at the lower end of the second finish-rolled threaded steel.
[0014] In the embodiment of the present application, by providing the first fine-rolled threaded steel and the second fine-rolled threaded steel, the installation and disassembly of the platform body are facilitated.
[0015] In combination with the first aspect, in one embodiment, the platform body includes a plurality of longitudinal beams and two transverse beams, the two transverse beams are arranged in parallel along a straight line segment of the inner mold, a plurality of the longitudinal beams are arranged in parallel and spaced apart between the two transverse beams, and the transverse beams are connected to the slings.
[0016] In the embodiment of the present application, by providing multiple longitudinal beams and two transverse beams, the stability of the platform body can be ensured, and it is convenient for construction workers to remove the inner molds of the straight segment and the arc segment.
[0017] In combination with the first aspect, in one embodiment, the length of the longitudinal beam located in the arc segment is shorter than the length of the longitudinal beam located in the straight segment.
[0018] In the embodiment of the present application, since the spacing between the two cross beams of the inner mold located in the arc segment is smaller than the spacing between the two cross beams of the inner mold located in the straight segment, it is necessary to reduce the length of the longitudinal beam of the arc segment to facilitate the removal of the inner mold of the arc segment.
[0019] In combination with the first aspect, in one embodiment, the crossbeam includes two second channel steels, the webs of the second channel steels are provided with a plurality of bolt holes, and the two second channel steels are fixed by bolts passing through the bolt holes.
[0020] In an embodiment of the present application, when the length of the hollow pier inner mold is large, the webs of the two second channel steels are staggered so that the length of the crossbeam becomes longer. The two staggered second channel steels are fixed by bolts passing through bolt holes, and can adapt to hollow pier inner molds of different lengths.
[0021] In combination with the first aspect, in one embodiment, the longitudinal beam includes two third channel steels, the webs of the third channel steels are provided with a plurality of bolt holes, and the two third channel steels are fixed by bolts passing through the bolt holes.
[0022] In an embodiment of the present application, when the radius of the hollow pier inner mold is large, the webs of the two third channel steels are staggered so that the length of the longitudinal beam becomes longer. The two staggered third channel steels are fixed by bolts passing through bolt holes, and can adapt to hollow pier inner molds of different radii.
[0023] In combination with the first aspect, in one embodiment, it further includes a hand chain hoist for moving the platform body, the number of the hand chain hoists is multiple, one end of the hand chain hoist is fixed to the platform body, and the other end extends out of the top of the inner mold.
[0024] In the embodiment of the present application, when the platform body needs to be moved, the mobile platform body can be moved to the desired position by providing power through a hand winch.
[0025] In combination with the first aspect, in one embodiment, the number of the hand hoists is four, and the hand hoists are respectively fixed to the four corners of the platform body.
[0026] In the embodiment of the present application, by arranging the hand winches at the four corners of the platform body, it can be ensured that when the platform body is moved, the force on the platform body is balanced and the platform body will not tip over.
[0027] In combination with the first aspect, in one implementation, the vertical plate and the inner mold are both correspondingly provided with bolt holes, and the vertical plate and the inner mold are fixed by bolts in the bolt holes.
[0028] In the embodiment of the present application, during the construction process, when the corbel needs to be removed, it is only necessary to remove the vertical plate, which is simple to operate and will not cause damage to the concrete structure.
[0029] The beneficial effects brought by the technical solution provided in the embodiments of the present application include:
[0030] The present application installs the corbels on the inner mold, and connects the platform body and the corbels through the precision-rolled threaded steel bars. When the platform body needs to be moved, it is only necessary to move the position of the corbels. The operation is simple, the installation and disassembly are convenient, the corbels can be used multiple times, and the investment of manpower and material resources is saved, and the construction cost is reduced. In addition, the corbels are installed on the inner mold, and the concrete structure will not be damaged when the corbels are disassembled and installed. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0032] Figure 1 This is a left schematic diagram of the inner mold operating platform of the hollow pier according to the embodiment of the present application;
[0033] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the middle;
[0034] Figure 3 for Figure 1 The enlarged schematic diagram of point B in the middle;
[0035] Figure 4 for Figure 1 A top view of the middle platform body;
[0036] Figure 5 for Figure 1 Schematic diagram of the top view of the middle corbel;
[0037] Figure 6 for Figure 2 Schematic diagram of the structure of the middle cross plate.
[0038] In the figure:
[0039] 1. Corbel; 11. Vertical plate; 12. Horizontal plate; 121. First channel steel; 122. Top plate; 123. Bottom plate; 2. Inner mold; 3. High-quality rolled rebar; 31. First high-quality rolled rebar; 32. Second high-quality rolled rebar; 4. First sleeve; 5. Second sleeve; 6. Lifting device; 7. Platform body; 71. Longitudinal beam; 72. Horizontal beam; 8. Hand chain hoist. DETAILED DESCRIPTION
[0040] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0041] The embodiment of the present application provides a hollow pier inner mold operating platform, which can solve the technical problems in the prior art that the operating platform has high installation costs and causes damage to concrete after removal.
[0042] like Figures 1 to 5As shown, the present application provides an embodiment of a hollow pier inner mold operating platform, the operating platform comprising: a bracket 1, a finely rolled threaded steel bar 3, a first sleeve 4 and a platform body 7, as shown in FIG. Figure 5 As shown, there are multiple brackets 1, and the multiple brackets 1 are respectively installed on the straight line segment and the arc segment of the inner mold 2. Figure 1 and Figure 2 As shown, the corbel 1 includes a vertical plate 11 and a horizontal plate 12. The vertical plate 11 is installed on the inner mold 2. The horizontal plate 12 extends from the vertical plate 11 into the hollow pier, and the horizontal plate 12 is provided with a threaded hole. There are multiple fine-rolled threaded steel bars 3. The upper end of the fine-rolled threaded steel bars 3 passes through the threaded hole and is threadedly connected to the horizontal plate 12. The lower end is installed with a hanger 6 (such as Figure 1 and Figure 3 As shown). There are multiple first sleeves 4, each of which is located at the top of each threaded hole and is threadedly connected to the finished rolled threaded steel bar 3. Figure 1 , Figure 3 and Figure 4 As shown, the platform body 7 is connected to the bottom of each sling 6 .
[0043] like Figure 5 As shown, in this embodiment, the number of the corbels 1 is 8, among which 4 corbels 1 are symmetrically located on the straight line segment of the inner mold 2, and 4 corbels 1 are symmetrically located on the arc segment of the inner mold 2, which is convenient for disassembly of the straight line segment and the arc segment of the inner mold 2.
[0044] When the platform body 7 needs to be moved, it is only necessary to move the position of the corbel 1. The operation is simple and the installation and disassembly are convenient. The corbel 1 can be used multiple times, which saves the investment of manpower and material resources and reduces the construction cost. In addition, the corbel 1 is installed on the inner mold 2, and the concrete structure will not be damaged when the corbel 1 is disassembled and assembled.
[0045] like Figure 1 and Figure 3 As shown, in some embodiments, the above-mentioned fine-rolled threaded steel 3 includes a first fine-rolled threaded steel 31 and a second fine-rolled threaded steel 32, the first fine-rolled threaded steel 31 and the second fine-rolled threaded steel 32 are connected through a second sleeve 5, the lower end of the first fine-rolled threaded steel 31 is located in the second sleeve 5, the upper end of the second fine-rolled threaded steel 32 is located in the second sleeve 5, the first fine-rolled threaded steel 31 and the second fine-rolled threaded steel 32 are both threadedly connected to the second sleeve 5, and the lower end of the second fine-rolled threaded steel 32 is installed with a hanger 6. When the platform body 7 needs to be installed, it is only necessary to install the first fine-rolled threaded steel 31 and the second fine-rolled threaded steel 32 in the second sleeve 5 respectively, and when the platform body 7 needs to be removed, it is only necessary to unscrew the second fine-rolled threaded steel 32 from the second sleeve 5. By providing the first fine-rolled threaded steel 31 and the second fine-rolled threaded steel 32, it is convenient to install and disassemble the platform body 7.
[0046] like Figure 4As shown, in some embodiments, the platform body 7 includes a plurality of longitudinal beams 71 and two transverse beams 72, the two transverse beams 72 are arranged in parallel along the straight section of the inner mold 2, and a plurality of longitudinal beams 71 are arranged between the two transverse beams 72 at intervals and in parallel, and the transverse beams 72 are connected to the hanger 6. By providing a plurality of longitudinal beams 71 and two transverse beams 72, the stability of the platform body 7 can be ensured, and it is convenient for construction personnel to remove the inner mold 2 of the straight section and the arc section. In this embodiment, the platform body 7 includes 11 longitudinal beams 71 and two transverse beams 72, the two transverse beams 72 are arranged in parallel along the straight section of the inner mold 2, the 11 longitudinal beams 71 are arranged between the two transverse beams 72 at intervals and in parallel, and the hanger 6 is installed on the transverse beams 72.
[0047] like Figure 4 As shown, further, the length of the longitudinal beam 71 located in the arc section is less than the length of the longitudinal beam 71 located in the straight section. Since the spacing between the two cross beams 72 of the inner mold 2 located in the arc section is less than the spacing between the two cross beams 72 of the inner mold 2 located in the straight section, it is necessary to reduce the length of the longitudinal beam 71 of the arc section to facilitate the removal of the inner mold 2 of the arc section.
[0048] In some embodiments, the cross beam 72 includes two second channel steels, the webs of the second channel steels are provided with a plurality of bolt holes, and the two second channel steels are fixed by bolts passing through the bolt holes. When the length of the hollow pier inner mold is large, the webs of the two second channel steels are staggered, so that the length of the cross beam 72 becomes longer, and the two staggered second channel steels are fixed by bolts passing through the bolt holes, which can adapt to hollow pier inner molds of different lengths.
[0049] In other embodiments, the wing plate of the second channel steel is further provided with a plurality of bolt holes to ensure that the two second channel steels are firmly connected.
[0050] In some embodiments, the longitudinal beam 71 includes two third channel steels, the webs of the third channel steels are provided with a plurality of bolt holes, and the two third channel steels are fixed by bolts passing through the bolt holes. When the radius of the hollow pier inner mold is large, the webs of the two third channel steels are staggered, so that the length of the longitudinal beam 71 becomes longer, and the two staggered third channel steels are fixed by bolts passing through the bolt holes, which can adapt to the hollow pier inner molds of different radii.
[0051] In other embodiments, the wing plate of the third channel steel is further provided with a plurality of bolt holes to ensure that the two third channel steels are firmly connected.
[0052] like Figure 4 As shown, in some embodiments, the operating platform further comprises: a hand chain hoist 8, the number of which is multiple, one end of the hand chain hoist 8 is fixed to the platform body 7, and the other end extends out of the top of the inner mold 2. When the platform body 7 needs to be moved, the hand chain hoist 8 provides power to move the mobile platform body 7 to the desired position.
[0053] like Figure 4 As shown, further, there are four hand chain hoists 8, which are respectively fixed at the four corners of the platform body 7. By arranging the hand chain hoists 8 at the four corners of the platform body 7, it can be ensured that when the platform body 7 is moved, the force of the platform body 7 is balanced and the platform body 7 will not tip over.
[0054] like Figure 6 As shown, in some embodiments, the horizontal plate 12 includes two first channel steels 121, a top plate 122 and a bottom plate 123. The two first channel steels 121 are arranged opposite to each other, with the notches facing outward, and the two first channel steels 121 are parallel to each other. The top plate 122 is located at the top of the two first channel steels 121, and the bottom plate 123 is located at the bottom of the two first channel steels 121. The top plate 122 and the bottom plate 123 are both provided with threaded holes correspondingly. The top of the threaded hole on the top plate 122 is provided with a first sleeve 4. The upper end of the finely rolled threaded steel 3 passes through the threaded hole, is threadedly connected with the first sleeve 4, and extends out of the top of the inner mold 2. Through this arrangement, the strength of the horizontal plate 12 can be enhanced, and the horizontal plate 12 can be prevented from falling off from the inner mold 2 during the construction process, thereby avoiding safety accidents during construction.
[0055] In some embodiments, the vertical plate 11 and the inner mold 2 are both provided with bolt holes, and the vertical plate 11 and the inner mold 2 are fixed by bolts in the bolt holes. During the construction process, when the corbel 1 needs to be removed, only the vertical plate 11 needs to be removed, which is simple to operate and will not damage the concrete structure.
[0056] In a second aspect, the present application provides a use embodiment of a hollow pier inner mold operation platform. When used,
[0057] First, multiple corbels 1 are fixed on the straight line segment and the arc segment at a certain height of the inner mold 2, and then the fine-rolled threaded steel 3 is installed on each corbel 1, and the hanger 6 is installed on each fine-rolled threaded steel 3, and the platform body 7 is fixed on the fine-rolled threaded steel 3 through each hanger 6. When the platform body 7 needs to be moved, the corbel 1 is removed, installed to the required position, and then the fine-rolled threaded steel 3 is fixed on the corbel 1 again.
[0058] To summarize, the present application installs the corbel 1 on the inner mold 2, and connects the platform body 7 and the corbel 1 through the fine-rolled threaded steel bar 3. When the platform body 7 needs to be moved, it is only necessary to move the position of the corbel 1. The operation is simple and the installation and disassembly are convenient. The corbel 1 can be used multiple times, which saves manpower and material resources and reduces construction costs. In addition, the corbel 1 is installed on the inner mold 2, and the concrete structure will not be damaged when the corbel 1 is disassembled and assembled.
[0059] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0060] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0061] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A hollow pier inner mold operating platform, characterized in that: include: A plurality of corbels (1) are respectively mounted on the straight line segment and the arc segment of the inner mold (2). The corbels (1) include a vertical plate (11) and a horizontal plate (12). The vertical plate (11) is mounted on the inner mold (2). The horizontal plate (12) extends from the vertical plate (11) into the hollow pier and is provided with a threaded hole. A plurality of finely rolled threaded steel bars (3), the upper ends of which pass through the threaded holes and are threadedly connected to the transverse plate (12), and the lower ends of which are equipped with a hanger (6); A plurality of first sleeves (4) are respectively located at the top of each threaded hole and are threadedly connected to the precision-rolled threaded steel bar (3); The platform body (7) is connected to the bottom of each sling (6).
2. The hollow pier inner mold operating platform according to claim 1, characterized in that: The transverse plate (12) comprises two first channel steels (121) arranged opposite to and in parallel, a top plate (122) connecting the tops of the two first channel steels (121), and a bottom plate (123) connecting the bottoms of the first channel steels (121), wherein the top plate (122) and the bottom plate (123) are both provided with threaded holes correspondingly.
3. The hollow pier inner mold operating platform according to claim 1, characterized in that: The finished rolled threaded steel (3) comprises a first finished rolled threaded steel (31) and a second finished rolled threaded steel (32); the first finished rolled threaded steel (31) and the second finished rolled threaded steel (32) are connected via a second sleeve (5); a hanger (6) is installed at the lower end of the second finished rolled threaded steel (32).
4. The hollow pier inner mold operating platform according to claim 1, characterized in that: The platform body (7) comprises a plurality of longitudinal beams (71) and two transverse beams (72), wherein the two transverse beams (72) are arranged in parallel along a straight line section of the inner mold (2), and the plurality of longitudinal beams (71) are arranged in parallel and at intervals between the two transverse beams (72), and the transverse beams (72) are connected to the sling (6).
5. The hollow pier inner mold operating platform as claimed in claim 4, characterized in that: The length of the longitudinal beam (71) located in the arc segment is shorter than the length of the longitudinal beam (71) located in the straight segment.
6. The hollow pier inner mold operating platform as claimed in claim 4, characterized in that: The crossbeam (72) comprises two second channel steels, the webs of the second channel steels are provided with a plurality of bolt holes, and the two second channel steels are fixed by bolts passing through the bolt holes.
7. The hollow pier inner mold operating platform as claimed in claim 4, characterized in that: The longitudinal beam (71) comprises two third channel steels, the webs of the third channel steels are provided with a plurality of bolt holes, and the two third channel steels are fixed by bolts passing through the bolt holes.
8. The hollow pier inner mold operating platform according to claim 1, characterized in that: It also includes a hand chain hoist (8) for moving the platform body (7), wherein the number of the hand chain hoists (8) is multiple, one end of the hand chain hoist (8) is fixed to the platform body (7), and the other end extends out of the top of the inner mold (2).
9. The hollow pier inner mold operating platform as claimed in claim 8, characterized in that: The number of the hand chain hoists (8) is four, and the hand chain hoists (8) are respectively fixed to the four corners of the platform body (7).
10. The hollow pier inner mold operating platform according to claim 1, characterized in that: The vertical plate (11) and the inner mold (2) are both provided with bolt holes correspondingly, and the vertical plate (11) and the inner mold (2) are fixed by bolts in the bolt holes.