Seam sealing structure for building seismic isolation seam
By adopting a sealing structure including folding plates and fill structures in the seismic isolation joints of the building, the problem of reinstalling the sealing structure in the prior art is solved, convenient inspection and maintenance are achieved, and the safety of the seismic isolation joints is improved.
Patent Information
- Application Number
- CN202421423646.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-03-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing building seismic isolation joint sealing structure needs to be reinstalled during manual and regular inspection, which leads to inconvenience in inspection and increases the difficulty of inspection.
A sealing structure including an upper layer, a limiting column, a lower layer, a folding plate and a filling structure is adopted. The folding plate is fixed to the isolation joint through a filling structure and is reset during vibration, reducing gaps and facilitating disassembly and replacement.
It realizes convenient installation and disassembly of the sealing seam structure, reduces the difficulty of manual inspection, and improves the detection efficiency and safety of the seismic isolation seam.
Smart Images

Figure CN222649114U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building seismic isolation joints, in particular to a sealing joint structure for building seismic isolation joints. Background Art
[0002] Seismic isolation joints are a special design in buildings, the main purpose of which is to reduce or avoid earthquake damage when an earthquake occurs. Seismic isolation joints are in the horizontal direction. When seismic waves are transmitted to the foundation of the building, the frequency and intensity of the seismic waves are changed at the seismic isolation joints due to the action of rubber bearings, dampers and other components at the seismic isolation joints. The energy during the earthquake is converted and released at the seismic isolation joints, thereby reducing damage to the building.
[0003] The sealing structure of the seismic isolation joint of the building is to ensure that the seismic isolation joint can work effectively during an earthquake, while preventing damage from external factors such as moisture penetration and mechanical damage. The design of the sealing structure should meet certain requirements for sealing performance, elasticity and durability. First of all, the selection of sealing materials is the key. Commonly used sealing materials include polyurethane, silicone, etc. These materials have good sealing performance, elasticity and anti-aging properties, which can ensure that the seismic isolation joint will not fail due to aging or deformation of the material during an earthquake. Secondly, the construction of the sealing material is also an important link. The construction should be carried out after the concrete base bed is fully hardened to ensure good bonding between the sealing material and the base bed. Clean the sealing gap to ensure that the gap is clean and free of debris, then fill the sealing material into the gap and fully compact it to ensure close contact and firm bonding between the sealing material and the concrete base bed.
[0004] When existing seismic isolation joints are installed, seismic isolation joints are left between the building and the foundation. The building is protected from shock by the seismic isolation joints, and the seismic isolation joints are protected by sealing structures, thereby reducing moisture penetration and damage to the seismic isolation joints. However, existing seismic isolation joint sealing structures usually adopt a fixed structure when protecting the seismic joints, so that when the seismic isolation joints are manually inspected regularly, the sealing joints need to be reinstalled, which makes manual inspection inconvenient and increases the difficulty of inspecting the seismic isolation joints. Utility Model Content
[0005] The purpose of the present application is to solve the problem that the existing sealing structure needs to be reinstalled when the isolation joints are manually inspected regularly, which makes manual inspection inconvenient. The present application provides a sealing structure for building isolation joints.
[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions:
[0007] A sealing structure for seismic isolation joints in buildings comprises an upper layer, a connector fixedly connected to the upper layer, a lower layer fixedly connected to the lower end of the connector, a limiting column fixedly connected to the upper layer, the limiting column fixedly connected to the lower layer, a folding plate arranged between the upper and lower layers, the two sides of the folding plate being matched with the limiting columns, and a filling structure arranged between the upper and lower layers.
[0008] By adopting the above technical scheme, when the sealing structure is used to protect the seismic isolation joint, the folding plate is first placed between the upper layer and the lower layer, and its two sides are fitted with the limit plates, and then the upper and lower ends of the folding plate are installed through the filling structure to fix it on the seismic isolation joint, and the seismic isolation joint is subjected to vibration through the folding plate. The folding plate shakes with the seismic isolation joint and cooperates with the filling structure to protect the seismic isolation joint, so that it always fills the space between the folding plate and the seismic isolation joint, and after the vibration ends, the folding plate is driven to reset, so that it is not easy to have a gap with the seismic isolation joint and protect it, and the folding plate is easier to disassemble through the filling structure, thereby facilitating personnel to detect the seismic isolation joint and facilitate personnel to check the status of the seismic isolation joint in time.
[0009] Furthermore, the filling structure includes mounting grooves provided on the upper layer and the lower layer, a mounting plate is slidably arranged in the mounting groove, the mounting plate is fixedly connected to the folding plate, and the folding plate is adapted to the limiting column.
[0010] By adopting the above technical solution, the disassembly of the folding plate is made more convenient by disassembling the mounting plate, thereby facilitating manual replacement of the folding plate and regular inspection of the interior of the seismic isolation joint, so that hidden dangers in the seismic isolation joint can be discovered in time during long-term use.
[0011] Furthermore, a fixing column is fixedly connected in the installation groove, a limiting groove is provided in the installation plate, the fixing column is slidably connected to the limiting groove, a limiting plate is rotatably connected to the fixing column, and the limiting plate is adapted to the limiting groove.
[0012] By adopting the above technical solution, the limiting groove on the mounting plate is sleeved on the fixing column, and the limiting plate is passed through the limiting groove, and then the limiting plate is rotated 90 degrees, so that the folding plate can be simply pre-fixed.
[0013] Furthermore, a spring is sleeved on the fixing column, an end of the spring is fixedly connected to the mounting slot, and an end of the spring away from the mounting slot contacts the mounting plate.
[0014] By adopting the above technical solution, when the folding plate is subjected to vibration, the spring can be used to push the mounting plate to move, thereby pulling up the two ends of the folding plate and driving it to reset.
[0015] Furthermore, a threaded rod is rotatably connected in the installation groove, an adjustment plate is threadedly connected to the threaded rod, and the adjustment plate is adapted to the installation plate.
[0016] By adopting the above technical solution, the adjustment plate is allowed to contact the mounting plate, thereby limiting the position of the mounting plate in the mounting groove, so that when the mounting plate is used in the seismic isolation joint, the pulling degree of the folding plate can be adjusted according to the different local earthquake ecology.
[0017] Furthermore, a rotating plate is rotatably connected to both the upper layer and the lower layer, a gear 2 is fixedly connected to the end of the rotating plate, the gear 2 is meshed with a gear 1, and the gear 1 is fixedly connected to the threaded rod.
[0018] By adopting the above technical solution, the rotating plate is rotated to rotate gear 2, and gear 2 then drives gear 1 to rotate, thereby driving the threaded rod to rotate, and driving the adjusting plate to move.
[0019] Furthermore, a telescopic plate is fixedly connected in the installation groove, and a telescopic end of the telescopic plate is fixedly connected to the adjustment plate.
[0020] By adopting the above technical solution, the adjusting plate is telescoped along the telescopic plate, making it more stable when moving.
[0021] Furthermore, both the upper layer and the lower layer are provided with placement grooves, and filling columns are placed in the placement grooves. The filling columns are rubber columns, and filling bars are fixedly connected to the filling columns, and the filling bars are adapted to the folding plates.
[0022] By adopting the above technical solution, when installing the folding plate, the filling column is first placed in the placement groove of the lower layer, and then the filling column is bent and its end is placed in the placement groove of the upper layer, so that the filling column supports the upper and lower layers, and the filling strip on it is placed between the folding plate and the limiting column, so that it fills the gap between the folding plate and the limiting column, reducing the entry of moisture and dust.
[0023] In summary, the present application includes at least one of the following beneficial effects:
[0024] 1. In the present application, when the folding plate needs to be installed, the limit groove on the mounting plate is firstly mounted on the fixed column, and the limit plate is passed through the limit groove, and then the limit plate is rotated ninety degrees. At the same time, the mounting plate contacts the end of the spring, and the mounting plate is pushed toward the limit plate by the reset of the spring. The mounting plates at both ends of the folding plate are limited by the cooperation of the limit plate and the spring, so that the folding plate can be pushed to move by the reset of the spring when it is subjected to vibration, thereby pulling up the two ends of the folding plate and driving it to reset, so that it can provide more comprehensive protection for the seismic isolation joint, and this installation method makes the disassembly of the folding plate more convenient, thereby facilitating the manual replacement of the folding plate and the regular inspection of the inside of the seismic isolation joint, so that the seismic isolation joint can timely discover the hidden dangers in the long-term use, thereby improving its safety.
[0025] 2. In the present application, when the folding plate is installed on the seismic isolation joint, the rotating plate is rotated to rotate gear 2, and gear 2 then drives gear 1 to rotate, thereby driving the threaded rod to rotate, so that it drives the adjustment plate to extend and retract along the telescopic plate, so that it contacts the mounting plate, thereby limiting the position of the mounting plate in the mounting groove, so that when the mounting plate is used in the seismic isolation joint, the degree of lifting of the folding plate can be adjusted according to the different local earthquake ecology, so that the folding plate can maintain an adaptive vibration amplitude when the seismic isolation joint is subjected to vibration, thereby reducing the damage to the folding plate and enabling it to better protect the seismic isolation joint when vibration occurs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a three-dimensional structural schematic diagram of a sealing structure for building seismic isolation joints in the present application;
[0027] Figure 2 It is a partial cross-sectional view of a sealing structure for building seismic isolation joints in the present application;
[0028] Figure 3 This application Figure 2 The enlarged schematic diagram at A in the middle;
[0029] Figure 4 This application Figure 2 Enlarged schematic diagram of point B in the middle.
[0030] Description of reference numerals:
[0031] 1. Upper layer; 2. Limiting column; 3. Lower layer; 4. Connector; 5. Folding plate; 6. Mounting groove; 7. Mounting plate; 8. Fixed column; 9. Spring; 10. Limiting plate; 11. Limiting groove; 12. Telescopic plate; 13. Adjusting plate; 14. Threaded rod; 15. Gear 1; 16. Gear 2; 17. Rotating plate; 18. Filling column; 19. Filling strip. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-4 This application is described in further detail.
[0033] The embodiment of the present application discloses a sealing structure for seismic isolation joints in buildings.
[0034] Reference Figure 1 A sealing structure for seismic isolation joints in buildings includes an upper layer 1, a connector 4 is fixedly connected to the upper layer 1, a lower layer 3 is fixedly connected to the lower end of the connector 4, a limiting column 2 is fixedly connected to the upper layer 1, the limiting column 2 is fixedly connected to the lower layer 3, a folding plate 5 is arranged between the upper layer 1 and the lower layer 3, both sides of the folding plate 5 are adapted to the limiting column 2, and a filling structure is arranged between the upper layer 1 and the lower layer 3.
[0035] When the sealing structure is used to protect the seismic isolation joint, the folding plate 5 is first placed between the upper layer 1 and the lower layer 3, and its two sides are fitted with the limit plates 10. Then, the upper and lower ends of the folding plate 5 are installed through the filling structure to fix it on the seismic isolation joint. The seismic isolation joint is subjected to vibration through the folding plate 5. The folding plate 5 shakes with the seismic isolation joint and cooperates with the filling structure to protect the seismic isolation joint, so that it always fills the space between the folding plate 5 and the seismic isolation joint, and drives the folding plate 5 to reset after the vibration ends, so that it is not easy to have a gap with the seismic isolation joint, and protects it. The folding plate 5 is also easier to disassemble through the filling structure, thereby facilitating personnel to detect the seismic isolation joint and facilitate personnel to check the status of the seismic isolation joint in time.
[0036] Reference Figure 1 and Figure 2 , Figure 3 The filling structure includes a mounting groove 6 provided on the upper layer 1 and the lower layer 3, a mounting plate 7 is slidably provided in the mounting groove 6, the mounting plate 7 is fixedly connected to the folding plate 5, and the folding plate 5 is adapted to the limiting column 2. A fixing column 8 is fixedly connected in the mounting groove 6, a limiting groove 11 is provided on the mounting plate 7, the fixing column 8 is slidably connected to the limiting groove 11, a limiting plate 10 is rotatably connected to the fixing column 8, and the limiting plate 10 is adapted to the limiting groove 11. A spring 9 is sleeved on the fixing column 8, the end of the spring 9 is fixedly connected to the mounting groove 6, and the end of the spring 9 away from the mounting groove 6 is in conflict with the mounting plate 7.
[0037] When the folding plate 5 needs to be installed, the limiting groove 11 on the mounting plate 7 is first sleeved on the fixing column 8, and the limiting plate 10 is passed through the limiting groove 11, and then the limiting plate 10 is rotated ninety degrees. At the same time, the mounting plate 7 is in conflict with the end of the spring 9, and the mounting plate 7 is pushed to move toward the limiting plate 10 by the reset of the spring 9. The mounting plates 7 at both ends of the folding plate 5 are limited by the cooperation of the limiting plate 10 and the spring 9, so that the folding plate 5 can be pushed to move by the reset of the spring 9 when it is subjected to vibration, thereby pulling up the two ends of the folding plate 5 and driving it to reset, so that it can protect the seismic isolation joint more comprehensively, and this installation method makes the disassembly of the folding plate 5 more convenient, thereby facilitating the manual replacement of the folding plate 5 and the regular inspection of the inside of the seismic isolation joint, so that the seismic isolation joint can timely discover the hidden dangers therein during long-term use, thereby improving its safety.
[0038] Reference Figure 2 and Figure 4 , a threaded rod 14 is rotatably connected in the mounting groove 6, an adjusting plate 13 is threadedly connected to the threaded rod 14, and the adjusting plate 13 is adapted to the mounting plate 7. A rotating plate 17 is rotatably connected to both the upper layer 1 and the lower layer 3, a gear 2 16 is fixedly connected to the end of the rotating plate 17, the gear 2 16 is meshed with a gear 15, and the gear 15 is fixedly connected to the threaded rod 14. A telescopic plate 12 is fixedly connected in the mounting groove 6, and the telescopic end of the telescopic plate 12 is fixedly connected to the adjusting plate 13.
[0039] When the folding plate 5 is installed on the seismic isolation joint, the rotating plate 17 is rotated to rotate the gear 2 16, and then the gear 2 16 drives the gear 1 15 to rotate, thereby driving the threaded rod 14 to rotate, so that it drives the adjustment plate 13 to extend and retract along the telescopic plate 12, so that it contacts the mounting plate 7, thereby limiting the position of the mounting plate 7 in the mounting groove 6, so that when the mounting plate 7 is used in the seismic isolation joint, the pulling degree of the folding plate 5 can be adjusted according to the different local earthquake ecology, so that the folding plate 5 can maintain an adaptive vibration amplitude when the seismic isolation joint is subjected to vibration, thereby reducing the damage of the folding plate 5 and enabling it to better protect the seismic isolation joint when vibration occurs.
[0040] Reference Figure 2 The upper layer 1 and the lower layer 3 are both provided with placement grooves, in which filling columns 18 are placed. The filling columns 18 are rubber columns, and filling strips 19 are fixedly connected to the filling columns 18 . The filling strips 19 are adapted to the folding plates 5 .
[0041] When installing the folding plate 5, first place the filling column 18 in the mounting groove of the lower layer 3, then bend the filling column 18 and place its end in the mounting groove of the upper layer 1, so that the filling column 18 supports the upper layer 1 and the lower layer 3, and place the filling strip 19 thereon between the folding plate 5 and the limiting column 2, so that it fills the gap between the folding plate 5 and the limiting column 2 to reduce the entry of moisture and dust.
[0042] Working principle: when the folding plate 5 needs to be installed, the limiting groove 11 on the mounting plate 7 is first sleeved on the fixing column 8, and the limiting plate 10 is passed through the limiting groove 11, and then the limiting plate 10 is rotated ninety degrees. At the same time, the mounting plate 7 is in conflict with the end of the spring 9, and the mounting plate 7 is pushed to move toward the limiting plate 10 by the reset of the spring 9. The mounting plates 7 at both ends of the folding plate 5 are limited by the cooperation of the limiting plate 10 and the spring 9, so that the folding plate 5 can be pushed to move by the reset of the spring 9 when it is subjected to vibration, thereby pulling up the two ends of the folding plate 5 and driving it to reset, so that it can provide more comprehensive protection for the seismic isolation joint, and this installation method makes the disassembly of the folding plate 5 more convenient, thereby facilitating the manual replacement of the folding plate 5 and the regular inspection of the inside of the seismic isolation joint, so that the seismic isolation joint can timely discover the hidden dangers in it during long-term use, thereby improving its safety;
[0043] When the folding plate 5 is installed on the seismic isolation joint, the rotating plate 17 is rotated to rotate the gear 2 16, and then the gear 2 16 drives the gear 1 15 to rotate, thereby driving the threaded rod 14 to rotate, so that it drives the adjustment plate 13 to extend and retract along the telescopic plate 12, so that it contacts the mounting plate 7, thereby limiting the position of the mounting plate 7 in the mounting groove 6, so that when the mounting plate 7 is used in the seismic isolation joint, the pulling degree of the folding plate 5 can be adjusted according to the different local earthquake ecology, so that the folding plate 5 can maintain an adaptive vibration amplitude when the seismic isolation joint is subjected to vibration, thereby reducing the damage of the folding plate 5 and enabling it to better protect the seismic isolation joint when vibration occurs.
Claims
1. A sealing structure for seismic isolation joints in buildings, comprising an upper layer (1), characterized in that: The upper layer (1) is fixedly connected to a connector (4), the lower end of the connector (4) is fixedly connected to the lower layer (3), the upper layer (1) is fixedly connected to a limiting column (2), the limiting column (2) is fixedly connected to the lower layer (3), a folding plate (5) is provided between the upper layer (1) and the lower layer (3), both sides of the folding plate (5) are adapted to the limiting column (2), and a filling structure is provided between the upper layer (1) and the lower layer (3).
2. A sealing structure for seismic isolation joints in buildings according to claim 1, characterized in that: The filling structure comprises a mounting groove (6) provided on the upper layer (1) and the lower layer (3), a mounting plate (7) being slidably arranged in the mounting groove (6), the mounting plate (7) being fixedly connected to the folding plate (5), and the folding plate (5) being adapted to the limiting column (2).
3. A sealing structure for building seismic isolation joints according to claim 2, characterized in that: A fixing column (8) is fixedly connected in the installation groove (6), a limiting groove (11) is provided on the installation plate (7), the fixing column (8) is slidably connected to the limiting groove (11), a limiting plate (10) is rotatably connected to the fixing column (8), and the limiting plate (10) is adapted to fit the limiting groove (11).
4. A sealing structure for building seismic isolation joints according to claim 3, characterized in that: A spring (9) is sleeved on the fixing column (8), an end of the spring (9) is fixedly connected to the mounting groove (6), and an end of the spring (9) away from the mounting groove (6) is in contact with the mounting plate (7).
5. A sealing structure for building seismic isolation joints according to claim 2, characterized in that: A threaded rod (14) is rotatably connected in the mounting groove (6), an adjustment plate (13) is threadedly connected to the threaded rod (14), and the adjustment plate (13) is adapted to fit the mounting plate (7).
6. A sealing structure for building seismic isolation joints according to claim 5, characterized in that: The upper layer (1) and the lower layer (3) are both rotatably connected with a rotating plate (17), the end of the rotating plate (17) is fixedly connected with a second gear (16), the second gear (16) is meshed with a first gear (15), and the first gear (15) is fixedly connected to the threaded rod (14).
7. A sealing structure for seismic isolation joints in buildings according to claim 5, characterized in that: A telescopic plate (12) is fixedly connected in the installation groove (6), and a telescopic end of the telescopic plate (12) is fixedly connected to the adjustment plate (13).
8. The sealing structure for building seismic isolation joints according to claim 1, characterized in that: The upper layer (1) and the lower layer (3) are both provided with a placement groove, in which a filling column (18) is placed. The filling column (18) is a rubber column. A filling strip (19) is fixedly connected to the filling column (18), and the filling strip (19) is compatible with the folding plate (5).