Fabricated stone connecting structure

By designing connection sleeves and components in the prefabricated stone connection structure, the fixing and installation of stone slabs is solved, and the problem of I-shaped clips running through the stone is improved, and the integrity of stone decoration is improved.

CN222649304UActive Publication Date: 2025-03-21JIN LIU GAO DESIGN (SHENZHEN) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420755757.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2025-03-21
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

In the existing prefabricated stone connection structure, I-shaped card parts need to penetrate into the stone, which cannot guarantee the integrity of the stone and affect the integrity of the stone decoration.

Method used

A prefabricated stone connecting structure is designed. By setting the first and second connecting sleeves in the wall and the stone slab, the connecting columns, wedge-shaped card blocks, elastic cards and sliders are used to fix and install the stone slab without destroying the integrity of the stone.

Benefits of technology

It realizes fixing and installing stone slabs without destroying the appearance of the stone, improving the integrity of stone decoration, and solving the problem of I-shaped clips running through the stone.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222649304U_ABST
    Figure CN222649304U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of stone connection, and discloses an assembly type stone connecting structure which comprises a wall body, a first connecting sleeve is arranged in the wall body, an elastic clamping piece is fixedly connected to the inner wall of the first connecting sleeve, a stone plate is arranged on one side of the wall body, a second connecting sleeve is arranged in the stone plate, and the elastic clamping piece is fixedly connected to the inner wall of the second connecting sleeve. A connecting column is arranged in the first connecting sleeve and the second connecting sleeve, a wedge-shaped clamping block is fixedly connected to one end of the outer wall of the connecting column, the outer wall of the wedge-shaped clamping block is embedded in an elastic clamping piece, a limiting groove is formed in the other end of the connecting column, and a limiting plate is slidably connected into the limiting groove. According to the stone plate mounting structure, the first connecting sleeve is fixed in the wall through the connecting layer, the wedge-shaped clamping block at one end of the connecting column is clamped into the first connecting sleeve, and the wedge-shaped clamping block is clamped through the elastic clamping piece, so that the effect of mounting the stone plate on the premise of not damaging the appearance of the stone plate is achieved, the problem of stone decoration integrity is solved, and the stone decoration integrity is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of stone connection, in particular to an assembled stone connection structure. Background Art

[0002] Prefabricated stone is a stone product that is prefabricated and processed in the factory before being installed on site. Compared with the traditional on-site stone installation method, it has higher efficiency and quality control, while reducing on-site construction time and labor costs. In order to facilitate the rapid installation of prefabricated stone and increase construction efficiency, it is necessary to use a prefabricated stone connection structure, which provides strong support and fixation while keeping the stone surface clean and continuous.

[0003] The announcement number is: CN217353350U, which discloses an assembled ground stone connection structure, including a base layer laid on a leveling layer, the upper surface of the base layer is provided with a prefabricated groove, the prefabricated groove is provided with an I-shaped clamp for clamping and fixing the ground stone, and the left and right sides of the I-shaped clamp are clamped with ground stones. The connection structure connects adjacent ground stones through the I-shaped clamp, which not only plays a role of limiting, but also has a good waterproof protection function. The ground stone connection structure is simple to assemble, and the I-shaped structure is easy to disassemble, which is convenient for later maintenance and care. However, this patent only solves the problem of connecting adjacent ground stones through I-shaped clamps, which not only plays a role of limiting, but also has a good waterproof protection function, and does not solve the problem that the I-shaped clamp needs to run through the stone, which cannot guarantee the integrity of the stone and affects the integrity of the stone decoration. Utility Model Content

[0004] In order to make up for the above deficiencies, the utility model provides an assembled stone connection structure, which aims to improve the problem that the I-shaped clips need to pass through the stone, which cannot ensure the integrity of the stone and affects the integrity of the stone decoration.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A prefabricated stone connection structure includes a wall, a first connecting sleeve is arranged inside the wall, an elastic card is fixedly connected to the inner wall of the first connecting sleeve, a stone slab is arranged on one side of the wall, a second connecting sleeve is arranged inside the stone slab, connecting columns are arranged inside the first connecting sleeve and the second connecting sleeve, one end of the outer wall of the connecting column is fixedly connected to a wedge-shaped block, the outer wall of the wedge-shaped block is embedded in the elastic card, a limiting groove is arranged inside the other end of the connecting column, a limiting plate is slidably connected inside the limiting groove, a slider is fixedly connected to the top of the limiting plate, a card groove is arranged inside the second connecting sleeve, the outer wall of the slider is embedded in the second connecting sleeve, and a supporting component is arranged in the limiting groove.

[0007] Through the above technical solution, the first connecting sleeve is fixed to the wall, and the connecting column is fixed in the first connecting sleeve by being clamped into the elastic card through the wedge-shaped clamping block. Then the second connecting sleeve is installed in the stone slab, and the stone slab is inserted into the connecting column through the second connecting sleeve. The connecting column is clamped into the second connecting sleeve through the slider, and the slider is limited in the limiting groove by the limiting plate.

[0008] Furthermore, the support assembly includes a telescopic rod and a spring, and the interior of the spring is sleeved on the outer wall of the telescopic rod.

[0009] Through the above technical solution, the telescopic rod is used for the limit spring.

[0010] Furthermore, one end of the telescopic rod is fixedly connected in the connecting column, and the other end of the telescopic rod is fixedly connected to the bottom of the limiting plate. One end of the spring is fixedly connected to the bottom of the limiting plate, and the other end of the spring is fixedly connected in the connecting column.

[0011] Through the above technical solution, the spring supports the slider through the limit plate, so that the slider clamps the second connecting sleeve.

[0012] Furthermore, a connecting layer is provided between the first connecting sleeve and the second connecting sleeve and the wall and the stone slab.

[0013] Through the above technical solution, the connecting layer is used to bond the first connecting sleeve in the wall and the second connecting sleeve in the stone slab.

[0014] Furthermore, a filling layer is provided between the wall and the stone slab.

[0015] Through the above technical solution, the filling layer is used to fill the gap between the stone slab and the wall.

[0016] Furthermore, the connecting layer is composed of epoxy resin and hardener.

[0017] Through the above technical solution, the epoxy resin and the hardener will undergo a chemical reaction after mixing to form a strong bonding layer.

[0018] Furthermore, the filling layer is a synthetic fiber support filling.

[0019] Through the above technical solution, the synthetic fiber filling material is polyester fiber, and the synthetic fiber filling material has the characteristics of lightness and good elasticity.

[0020] Furthermore, the elastic card is wide at the top and narrow at the bottom and extends into the first connecting sleeve.

[0021] Through the above technical solution, the wedge-shaped clamping block can be conveniently inserted.

[0022] The utility model has the following beneficial effects:

[0023] In the utility model, the first connecting sleeve is fixed in the wall through the connecting layer, the wedge-shaped block at one end of the connecting column is inserted into the first connecting sleeve, the wedge-shaped block is clamped by the elastic card, and the sliding block is inserted into the second connecting sleeve to fix the stone slab, thereby achieving the effect of installing the stone slab without damaging the appearance of the stone slab, solving the problem that the I-shaped clamp needs to pass through the stone, which cannot ensure the integrity of the stone and affects the integrity of the stone decoration, thereby improving the integrity of the stone decoration. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a three-dimensional schematic diagram of an assembled stone connection structure proposed by the utility model;

[0025] Figure 2 for Figure 1 A partial enlarged schematic diagram in the middle;

[0026] Figure 3 This is a schematic diagram of the internal structure of a connecting column of an assembled stone connecting structure proposed by the utility model;

[0027] Figure 4 The utility model provides a schematic diagram of an elastic card structure of an assembled stone connection structure.

[0028] Legend:

[0029] 1. Wall; 2. Stone slab; 3. Connecting column; 4. First connecting sleeve; 5. Elastic card; 6. Second connecting sleeve; 7. Filling layer; 8. Wedge-shaped block; 9. Limiting groove; 10. Sliding block; 11. Limiting plate; 12. Telescopic rod; 13. Spring; 14. Connecting layer. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0031] Reference Figure 1-4The utility model provides an embodiment: an assembled stone connection structure, including a wall 1, a stone slab 2 is arranged on one side of the wall 1, a second connecting sleeve 6 is arranged inside the stone slab 2, a connecting column 3 is arranged inside the first connecting sleeve 4 and the second connecting sleeve 6, a wedge-shaped card block 8 is fixedly connected to one end of the outer wall of the connecting column 3, the outer wall of the wedge-shaped card block 8 is embedded in the elastic card 5, a limiting groove 9 is provided inside the other end of the connecting column 3, a limiting plate 11 is slidably connected inside the limiting groove 9, a slider 10 is fixedly connected to the top of the limiting plate 11, a card groove is provided inside the second connecting sleeve 6, and the outer wall of the slider 10 is embedded in the second connecting sleeve 6.

[0032] Specifically, mounting holes are opened in the wall 1 and the stone slab 2, the first connecting sleeve 4 is installed in the mounting hole of the wall 1, and the second connecting sleeve 6 is installed in the mounting hole of the stone slab 2. First, one end of the reinforced connecting column 3 with the wedge-shaped block 8 is inserted into the first connecting sleeve 4, and the elastic card 5 inside the first connecting sleeve 4 will be embedded in the wedge-shaped block 8. Then, the stone slab 2 is inserted into the other end of the connecting column 3 through the second connecting sleeve 6, and the slider 10 will be squeezed into the limiting groove 9 through the inclined surface on one side.

[0033] A support assembly is arranged in the limiting groove 9, and the support assembly includes a telescopic rod 12 and a spring 13. The spring 13 is sleeved inside the outer wall of the telescopic rod 12, one end of the telescopic rod 12 is fixedly connected in the connecting column 3, and the other end of the telescopic rod 12 is fixedly connected to the bottom of the limiting plate 11, one end of the spring 13 is fixedly connected to the bottom of the limiting plate 11, and the other end of the spring 13 is fixedly connected in the connecting column 3.

[0034] Specifically, after the connecting column 3 is in place, the slider 10 is reset and popped out by the support of the spring 13 and fixed in the slot of the second connecting sleeve 6. The limiting plate 11 drives the slider 10 in the limiting slot 9 to prevent the slider 10 from detaching from the connecting column 3. The telescopic rod 12 is used to limit the spring 13.

[0035] A connecting layer 14 is arranged between the first connecting sleeve 4 and the second connecting sleeve 6 and the wall 1 and the stone slab 2. A filling layer 7 is arranged between the wall 1 and the stone slab 2. The connecting layer 14 is composed of epoxy resin and hardener. The filling layer 7 is supported and filled with synthetic fibers. The elastic card 5 is wide at the top and narrow at the bottom and extends into the first connecting sleeve 4.

[0036] Specifically, the first connecting sleeve 4 and the wall 1 are bonded to the second connecting sleeve 6 and the stone slab 2 through a connecting layer 14. In this embodiment, the connecting layer 14 is composed of epoxy resin and hardener in a 1:1 ratio. The filling layer 7 is used to fill the connection between the wall 1 and the stone slab 2 during installation. Gaps are set between the elastic cards 5 to provide space for movement during deformation.

[0037] Working principle: When using the assembled stone connection structure, first, a mounting hole is opened in the wall 1, and then a connecting layer 14 is applied in the mounting hole. The connecting layer 14 is a composite glue. Then, the first connecting sleeve 4 is installed in the wall 1, and the end of the connecting column 3 with the wedge-shaped block 8 is inserted into the first connecting sleeve 4, and is inserted into the elastic card 5 inside the first connecting sleeve 4. The elastic card 5 is engaged with the wedge-shaped block 8, and then a mounting hole is opened on the back of the stone slab 2, and the connecting layer 14 is applied in the hole. Then, the second connecting sleeve 6 is embedded in the stone slab 2. A groove is provided in the second connecting sleeve 6 for fixing the slider 10. The telescopic rod 12 is used to support the slider 10. The limit plate 11 drives the slider 10 to limit in the limit groove 9. The spring 13 supports the slider 10 to be ejected. The filling layer 7 between the wall 1 and the stone slab 2 is used to fill the gap after installation to prevent the stone slab 2 from loosening.

[0038] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An assembled stone connection structure, comprising a wall (1), characterized in that: A first connecting sleeve (4) is arranged inside the wall (1), and an elastic card (5) is fixedly connected to the inner wall of the first connecting sleeve (4). A stone slab (2) is arranged on one side of the wall (1), and a second connecting sleeve (6) is arranged inside the stone slab (2). A connecting column (3) is arranged inside the first connecting sleeve (4) and the second connecting sleeve (6), and one end of the outer wall of the connecting column (3) is fixedly connected to a wedge-shaped card block (8), and the outer wall of the wedge-shaped card block (8) is embedded in the elastic card (5). A limiting groove (9) is arranged inside the other end of the connecting column (3), and a limiting plate (11) is slidably connected inside the limiting groove (9). A sliding block (10) is fixedly connected to the top of the limiting plate (11). A card groove is arranged inside the second connecting sleeve (6), and the outer wall of the sliding block (10) is embedded in the second connecting sleeve (6). A supporting component is arranged inside the limiting groove (9).

2. The assembled stone connection structure according to claim 1, characterized in that: The support assembly comprises a telescopic rod (12) and a spring (13), wherein the spring (13) is sleeved inside the outer wall of the telescopic rod (12).

3. The assembled stone connection structure according to claim 2, characterized in that: One end of the telescopic rod (12) is fixedly connected in the connecting column (3), and the other end of the telescopic rod (12) is fixedly connected to the bottom of the limiting plate (11); one end of the spring (13) is fixedly connected to the bottom of the limiting plate (11), and the other end of the spring (13) is fixedly connected in the connecting column (3).

4. The assembled stone connection structure according to claim 1, characterized in that: A connecting layer (14) is provided between the first connecting sleeve (4) and the second connecting sleeve (6) and the wall (1) and the stone slab (2).

5. The assembled stone connection structure according to claim 1, characterized in that: A filling layer (7) is provided between the wall (1) and the stone slab (2).

6. The assembled stone connection structure according to claim 4, characterized in that: The connecting layer (14) is composed of epoxy resin and a hardener.

7. The assembled stone connection structure according to claim 5, characterized in that: The filling layer (7) is a synthetic fiber support filling.

8. The assembled stone connection structure according to claim 1, characterized in that: The elastic card (5) is wide at the top and narrow at the bottom and extends into the first connecting sleeve (4).

Citation Information

Patent Citations

  • Assembly type ground stone connecting structure

    CN217353350U