Construction positioning auxiliary device for stiff composite pile

By designing a construction positioning auxiliary device for stiff composite piles and adjusting the position of prefabricated pipe piles with guide components and draw ropes, the problems of high labor intensity and high risk in the existing construction methods are solved, and higher accuracy and safety are achieved.

CN222666800UActive Publication Date: 2025-03-25南京智慧岩土工程技术研究院有限公司 +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421421283.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2025-03-25
Estimated Expiration
2034-06-21

AI Technical Summary

Technical Problem

When the existing construction methods penetrate strong composite piles, the labor intensity is high and there is a great risk, especially during the lifting and positioning of prefabricated pipe piles.

Method used

A construction positioning auxiliary device is designed, including a positioning frame and a guide assembly, through a combination of multiple bearing seats, shafts and rope shafts, the position of the prefabricated pipe piles is adjusted using a draw rope to ensure that they are aligned with the center point of the cement pile.

Benefits of technology

It improves the accuracy and efficiency of construction, shortens the positioning time, reduces the risk of construction, and avoids the swing of prefabricated pipe piles in the hoisting state and injure people.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222666800U_ABST
    Figure CN222666800U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction positioning auxiliary device for a stiff composite pile, which comprises a positioning frame, and a guide component is arranged on the positioning frame; the guide assembly comprises a plurality of bearing seats fixedly connected with the positioning frame, the bearing seats are rotationally connected with first shaft rods, the bearing seats are rotationally connected with a plurality of second shaft rods, and the first shaft rods and the second shaft rods are fixedly sleeved with rope shafts. According to the auxiliary device, the guide assembly is arranged, when construction of the stiff composite pile is conducted, the auxiliary device is arranged at a pile point, then a cement pile is driven in, after the cement pile is driven in, a prefabricated pipe pile is hoisted to the auxiliary device to be added, then the prefabricated pipe pile is clamped through the clamping sleeve, then the first shaft rod is rotated, and the auxiliary device is driven into the cement pile. And the rope shafts are driven to rotate, so that the position of the prefabricated pipe pile is adjusted through the pull rope until the position of the prefabricated pipe pile is aligned to the center point of the cement pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction tooling, in particular to a construction positioning auxiliary device for rigid composite piles. Background Art

[0002] Reinforced composite piles are a type of composite foundation piles. The construction method is to first drive in a cement mixing pile, and before the cement solidifies, insert a prefabricated pipe pile at the center of the cement mixing pile. During the downward pressure of the prefabricated pipe pile, an extrusion force will be generated on the cement mixing pile, making the cement mixing pile and the soil more tightly combined. The friction between the pipe pile and the cement composite pile is greater, and ultimately the reinforced composite pile has a better supporting effect and is not easy to sink into the soil.

[0003] The construction of reinforced composite piles requires the cooperation of equipment for driving cement mixing piles and equipment for driving prefabricated pipe piles. Due to the large size of the equipment, construction needs to be carried out in turns. When the prefabricated pipe piles are driven in, the construction needs to be carried out before the cement is solidified. This not only places requirements on the construction speed, but also on the driving position of the prefabricated pipe piles. The existing construction method is for multiple workers to manually lift the prefabricated pipe piles in a lifting state and cooperate with the lifting equipment to position them. This is not only labor-intensive, but also involves great risks. To this end, we propose a construction positioning auxiliary device for reinforced composite piles to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to solve the problems existing in the prior art and to propose a construction positioning auxiliary device for rigid composite piles.

[0005] In order to achieve the above purpose, the present invention adopts the following technical solutions:

[0006] A construction positioning auxiliary device for a rigid composite pile comprises a positioning frame on which a guide assembly is provided;

[0007] The guide assembly includes a plurality of bearing seats fixedly connected to the positioning frame, the bearing seats are rotatably connected to a first shaft rod, and the bearing seats are rotatably connected to a plurality of second shaft rods, the first shaft rod and the second shaft rod are fixedly provided with a rope shaft, and a pull rope is wrapped around the rope shaft, and the end of the pull rope away from the rope shaft is fixedly connected to a jacket, one end of the first shaft rod is provided with a driving mechanism, and the end of the first shaft rod away from the driving mechanism is fixedly connected to a first bevel gear, both ends of the second shaft rod are fixedly connected to a second bevel gear, the first bevel gear and the second bevel gear are meshed with each other, and the two adjacent second bevel gears are meshed with each other.

[0008] Preferably, the positioning frame includes an annular base frame, a plurality of ground anchors are provided on the annular base frame, the upper end of the annular base frame is fixedly connected to a support leg, and the support leg is fixedly connected to a cross frame, the bearing seat is fixedly connected to the cross frame, and the cross frame is also fixedly connected to a guide rail, and the jacket is slidably connected to the guide rail.

[0009] Preferably, the jacket comprises a C-shaped shell, a slider is fixedly connected to the C-shaped shell, the slider is slidably connected to the guide rail, the pull rope is fixedly connected to the side wall of the C-shaped shell, and a pipe clamp is sleeved on the C-shaped shell.

[0010] Preferably, the driving mechanism includes a crank rotatably connected to the first shaft via a one-way bearing, a ratchet is fixedly connected to the first shaft, and ratchet teeth matching the ratchet are rotatably connected to the cross frame.

[0011] Preferably, an extension frame is fixedly connected to the upper end of the guide rail, and the extension frame is made of elastic material.

[0012] Preferably, the number of the second shafts is not less than three.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] 1. The utility model provides a guide assembly. When constructing a rigid composite pile, the auxiliary device is first arranged at the pile point, and then the cement pile is driven in. After the cement pile is driven in, the prefabricated pipe pile is hoisted to the auxiliary device. The prefabricated pipe pile is clamped by the jacket, and the first shaft is rotated to drive the multiple rope shafts to rotate, so that the position of the prefabricated pipe pile is adjusted by the pull rope until the position of the prefabricated pipe pile is aligned with the center point of the cement pile. The jacket is then removed to carry out the piling operation of the prefabricated pipe. This auxiliary device uses the pull rope to adjust the position of the prefabricated pipe pile, which not only has higher accuracy, but also improves construction efficiency and reduces positioning time. In addition, the prefabricated pipe pile in the hoisting state will not swing and injure people, thereby improving construction safety.

[0015] 2. The utility model provides a one-way bearing in combination with a crank handle, so that the user can drive the rope shaft to rotate by shaking the crank handle up and down, which makes it more labor-saving for the user to use. The ratchet is provided in combination with the ratchet teeth to prevent the swinging prefabricated pipe pile from driving the rope shaft to rotate, ensuring that multiple synchronously tightened rope shafts can effectively control the position of the prefabricated pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall structure of a construction positioning auxiliary device for rigid composite piles proposed in the present utility model;

[0017] Figure 2This is a schematic diagram of the structure of a guide assembly for a construction positioning auxiliary device for a rigid composite pile proposed in the present invention;

[0018] Figure 3 This is a schematic diagram of the jacket structure of a construction positioning auxiliary device for a rigid composite pile proposed in the present utility model;

[0019] Figure 4 for Figure 2 Schematic diagram of the enlarged structure at point A in the middle.

[0020] In the figure: 1. Positioning frame; 101. Annular base frame; 102. Ground anchor; 103. Support leg; 104. Cross frame; 105. Guide rail; 2. Bearing seat; 3. First shaft; 4. Second shaft; 5. Rope shaft; 6. Pull rope; 7. Jacket; 701. C-shaped shell; 702. Slider; 8. First bevel gear; 9. Second bevel gear; 10. Crank handle; 11. Ratchet; 12. Ratchet; 13. Extension frame. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0022] Reference Figure 1-3 , a construction positioning auxiliary device for a rigid composite pile, comprising a positioning frame, wherein the positioning frame is provided with a guide assembly;

[0023] The guide assembly includes a plurality of bearing seats fixedly connected to the positioning frame, the bearing seats are rotatably connected to a first shaft, and the bearing seats are rotatably connected to a plurality of second shafts, the first shaft and the second shaft are fixedly provided with a rope shaft, and a pull rope is wound around the rope shaft, and the end of the pull rope away from the rope shaft is fixedly connected to a jacket;

[0024] In this design, when in use, multiple rope shafts can be used to drive the pull ropes to pull the jacket synchronously in different directions, thereby moving the jacket to the center point of the positioning frame, ultimately achieving the purpose of rapid positioning;

[0025] A driving mechanism is provided at one end of the first shaft, and a first bevel gear is fixedly connected to an end of the first shaft away from the driving mechanism, and second bevel gears are fixedly connected to both ends of the second shaft, the first bevel gear and the second bevel gear are meshed with each other, and two adjacent second bevel gears are meshed with each other, and one of the second shafts is provided with a second bevel gear only at one end;

[0026] In this design, when carrying out the construction of the rigid composite pile, the user determines the piling point according to the design requirements, and then sets the construction positioning auxiliary device at the piling point. At the same time, the prefabricated pipe pile is first hoisted near the positioning auxiliary device, and the piling point is located at the center of the positioning frame. Then the user first carries out the cement pile driving operation. During the cement pile driving operation, the prefabricated pipe pile can be clamped and fixed by the jacket. After the cement pile driving operation is completed, the cement pile driving equipment moves away. At this time, the user hoists the prefabricated pipe pile and drives the prefabricated pipe pile driving equipment to the vicinity of the piling point.

[0027] When the lifting device is lifted, the lifting lever is tightened, and the lifting lever is tightened, so that the lifting lever is tightened, and the lifting lever is tightened, so that the lifting lever is tightened, and the lifting lever is tightened. When the lifting lever is lifted, the lifting lever is tightened, and the lifting lever is tightened, the lifting lever is tightened, and the lifting lever is tightened. When the lifting lever is lifted, the lifting lever is tightened, and the lifting lever is tightened, the lifting lever is tightened, and the lifting lever is tightened

[0028] Furthermore, the positioning frame includes an annular base frame, a plurality of ground anchors are provided on the annular base frame, the upper end of the annular base frame is fixedly connected to a support leg, and the support leg is fixedly connected to a cross frame, the cross frame can be annular or polygonal, and a large space is reserved in the middle of the cross frame so as not to hinder the construction of the piling equipment. The cross frame is also provided with a lifting lug for facilitating the user to move the entire auxiliary device, and the ground anchor is used to fix the annular base frame to ensure that the positioning frame will not be displaced as a whole under the drive of the prefabricated pipe pile when the prefabricated pipe pile is positioned. The bearing seat is fixedly connected to the cross frame, and a guide rail is also fixedly connected to the cross frame. The jacket is slidably connected to the guide rail, wherein the guide rail is used to further adjust the prefabricated pipe pile when the prefabricated pipe pile moves to a position close to the cross frame to ensure that the prefabricated pipe pile is in a vertical state at this time.

[0029] Furthermore, the jacket comprises a C-shaped shell, a slider is fixedly connected to the C-shaped shell, the slider is slidably connected to the guide rail, the pull rope is fixedly connected to the side wall of the C-shaped shell, and a pipe clamp is sleeved on the C-shaped shell;

[0030] The jacket is used to clamp the prefabricated pipe piles. The C-shaped shell and the pipe clamp structure are not only simple in structure and easy to use, but also the size of the prefabricated pipe piles is fixed, which does not increase the equipment cost of the C-shaped shell.

[0031] Furthermore, the driving mechanism includes a crank rotatably connected to a first shaft via a one-way bearing, a ratchet wheel is fixedly connected to the first shaft, and ratchet teeth matching the ratchet wheel are rotatably connected to the cross frame;

[0032] In this design, a one-way bearing is used in conjunction with a crank handle. The user can drive the first shaft rod to rotate by shaking the crank handle up and down. Not only will there be no interference with the cross frame when rotating the shaft rod, but it is also more labor-saving when used. A ratchet is provided in conjunction with the ratchet teeth. On the one hand, it is convenient to prevent the first shaft rod from rotating when the user lifts the crank handle. On the other hand, it is also used to prevent the rope shaft from rotating under the tension of the pull rope, thereby ensuring the stability of the positioning device when adjusting the position of the prefabricated pipe piles.

[0033] Furthermore, an extension frame is fixedly connected to the upper end of the guide rail, and the extension frame is made of elastic material. The guide jacket that can be replaced by the extension frame slides into the guide rail. At the same time, the extension frame made of elastic material allows a larger error and will not be damaged by the swing of the prefabricated pipe piles, so it is safer and more practical.

[0034] Furthermore, the number of the second shafts is not less than three. Under this design, the total number of rope shafts is not less than four, and the multiple rope shafts are arranged in a circular manner to ensure that the multiple jackets are evenly stressed in multiple directions, ensuring that the jackets can be pulled toward the center line of the horizontal frame.

[0035] The above is only a preferred specific implementation method of the present invention, but the protection scope of the present invention is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the present invention can make equivalent replacements or changes based on the technical solution and utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A construction positioning auxiliary device for a rigid composite pile, characterized in that: It comprises a positioning frame (1), on which a guide assembly is arranged; The guide assembly comprises a plurality of bearing seats (2) fixedly connected to the positioning frame (1); a first shaft (3) is rotatably connected to the bearing seat (2); and a plurality of second shafts (4) are rotatably connected to the bearing seat (2); a rope shaft (5) is fixedly sleeved on the first shaft (3) and the second shaft (4); a pull rope (6) is wound around the rope shaft (5); an end of the pull rope (6) away from the rope shaft (5) is fixedly connected to a jacket (7); a driving mechanism is provided at one end of the first shaft (3); and a first bevel gear (8) is fixedly connected to the end of the first shaft (3) away from the driving mechanism; both ends of the second shaft (4) are fixedly connected to second bevel gears (9); the first bevel gear (8) and the second bevel gear (9) are meshed with each other, and two adjacent second bevel gears (9) are meshed with each other.

2. A construction positioning auxiliary device for a rigid composite pile according to claim 1, characterized in that: The positioning frame (1) comprises an annular base frame (101), a plurality of ground anchors (102) are arranged on the annular base frame (101), a support leg (103) is fixedly connected to the upper end of the annular base frame (101), and a cross frame (104) is fixedly connected to the support leg (103), the bearing seat (2) is fixedly connected to the cross frame (104), a guide rail (105) is also fixedly connected to the cross frame (104), and the jacket (7) is slidably connected to the guide rail (105).

3. A construction positioning auxiliary device for a rigid composite pile according to claim 2, characterized in that: The jacket (7) comprises a C-shaped shell (701), a slider (702) is fixedly connected to the C-shaped shell (701), the slider (702) is slidably connected to the guide rail (105), the pull rope (6) is fixedly connected to the side wall of the C-shaped shell (701), and a pipe clamp is sleeved on the C-shaped shell (701).

4. A construction positioning auxiliary device for a rigid composite pile according to claim 2 or 3, characterized in that: The driving mechanism comprises a crank (10) rotatably connected to a first shaft (3) via a one-way bearing, a ratchet (11) being fixedly connected to the first shaft (3), and a ratchet (12) matching the ratchet (11) being rotatably connected to the cross frame (104).

5. The construction positioning auxiliary device for a rigid composite pile according to claim 2, characterized in that: The upper end of the guide rail (105) is fixedly connected to an extension frame (13), and the extension frame (13) is made of elastic material.

6. The construction positioning auxiliary device for a rigid composite pile according to claim 1, characterized in that: The number of the second shafts (4) is not less than three.

Citation Information

Cited By

  • An auxiliary construction equipment for composite pile

    CN224833717U