A device for finding the leakage position of boiler tube
By designing a detection device for ship boilers, using the method of detecting components and sealing components combined with pressure gauge detection, the problem of difficulty in accurately positioning the boiler pipe leakage is solved in traditional methods, which improves repair efficiency and shortens repair time.
Patent Information
- Application Number
- CN202420584123.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-03-25
AI Technical Summary
In marine boilers, traditional pressurized water detection methods are difficult to accurately locate the leaking boiler pipes, resulting in ineffective repair and misjudgment.
A device including a detection assembly and a sealing member is designed. By inserting the detection assembly and a sealing member into both ends of the boiler pipe, and using a pressure gauge to detect changes in air pressure or water pressure, the leakage pipe is quickly positioned.
The device can accurately determine the location of a single leaky boiler pipe, avoid misjudgment, improve the decision-making efficiency of boiler pipe repair or sealing, and shorten the repair time of the ship.
Smart Images

Figure CN222733783U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of ship boiler detection, and in particular relates to a device for finding the leakage position of a boiler tube. Background Art
[0002] Whether a ship is repaired and shipped out of the factory depends mainly on whether the boiler can provide energy for the ship. Therefore, every time a ship enters the factory for repair, in order to ensure the safety and stability of the boiler, the boiler body must be pressure tested to determine whether the boiler tube is intact and to check for leakage in the boiler tube.
[0003] Boiler tube leak detection is generally done by water pressure. There are many boiler tubes in a boiler, usually hundreds or thousands of boiler tubes. In the case of boiler tube leakage, it is difficult to locate the water pipe leak detection and it takes a long time. When there is a boiler tube that has burned through, the boiler tube will leak after water pressure detection. The water will spread to other boiler tubes near the boiler tube and soak the other boiler tubes. It is impossible to accurately identify the actual leaking boiler tube during leak detection. Due to the particularity and limitations of boiler tube pressure testing, it is impossible to inspect and troubleshoot the soaked boiler tubes one by one, so it is impossible to determine the exact location of a single leaking boiler tube. The traditional treatment method is to seal or replace all soaked boiler tubes, but this method is time-consuming and inefficient, and there may even be a phenomenon that the boiler tube is blocked incorrectly. Utility Model Content
[0004] In order to solve the above problems, the utility model adopts the following technical solutions:
[0005] A device for finding a boiler tube leakage position, comprising:
[0006] A detection component, the detection component is inserted into one end of the boiler tube, and comprises a detection piece, a first sealing ring, a first pressing piece and a first fastener; the detection piece is sequentially connected with a first cylindrical head, a first connecting part and a first threaded part, the diameters of the first cylindrical head, the first connecting part and the first threaded part decrease in sequence, and a through hole is provided in the axial center of the detection piece; the first sealing ring and the first pressing piece are sleeved on the first connecting part, the first sealing ring contacts the end of the first cylindrical head, the outer diameter of the first sealing ring contacts the inner wall of the boiler tube, and the first fastener is sleeved on the first threaded part and abuts against the first pressing piece;
[0007] A plugging component is inserted into the other end of the boiler tube, comprising a plugging component, a second sealing ring, a second pressing piece and a second fastener; the plugging component is sequentially connected with a second cylindrical head, a second connecting portion and a second threaded portion, and the diameters of the second cylindrical head, the second connecting portion and the second threaded portion decrease in sequence; the second sealing ring and the second pressing piece are sleeved on the second connecting portion, the second sealing ring contacts the end of the second cylindrical head, the outer diameter of the second sealing ring contacts the inner wall of the boiler tube, and the second fastener is sleeved on the second threaded portion and abuts against the second pressing piece.
[0008] As a further solution of the utility model, it also includes a first washer and a second washer; the first washer is provided between the first fastener and the first pressure piece; the second washer is provided between the second fastener and the second pressure piece.
[0009] As a further solution of the utility model, it also includes a pressure gauge, and the pressure gauge is connected to the detection component.
[0010] As a further solution of the utility model, the pressure gauge is an air pressure gauge or a water pressure gauge.
[0011] As a further solution of the utility model, the sizes of the first cylindrical head and the second cylindrical head, the first connecting part and the second connecting part, the first threaded part and the second connecting part, the first sealing ring and the second sealing ring, the first pressing piece and the second pressing piece, and the first fastener and the second pressing piece are consistent.
[0012] As a further solution of the present invention, the first sealing ring and the second sealing ring are made of silicone.
[0013] Beneficial effects of the utility model:
[0014] A device for finding the leakage position of a boiler tube, inserting the detection component and the plugging component into the two ends of the boiler tube respectively, inserting the water flow or air flow pipeline into the through hole of the detection component, and detecting by the pressure gauge, can quickly locate the leaking pipeline, accurately determine the position of a single leaking boiler tube, and avoid the occurrence of misjudgment. It effectively provides the shipowner with a basis for repairing the boiler, improves the decision-making efficiency of boiler tube repair, replacement or plugging, greatly shortens the repair time of the ship, and also creates space for the debugging of various related equipment, wins time for the main engine test and various equipment operation debugging, and creates higher benefits for the shipowner. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The invention is a schematic diagram of the assembly of the plugging components of a device for finding the leakage position of a boiler tube;
[0016] Figure 2 The present invention is a schematic diagram of the structure of a detection component of a device for finding the leakage position of a boiler tube;
[0017] Figure 3 The present invention is a schematic diagram of the structure of a plugging member of a device for finding the leakage position of a boiler tube;
[0018] Figure 4 The present invention is a schematic diagram of the structure of a first sealing ring / a second sealing ring of a device for finding the leakage position of a boiler tube;
[0019] Figure 5 The present invention is a schematic diagram of the structure of a first pressing member or a second pressing member of a device for finding a leakage position of a boiler tube;
[0020] Figure 6 The invention is a schematic diagram of the structure of a first fastener or a second fastener of a device for finding a leakage position of a boiler tube;
[0021] Figure 7 The present invention is a schematic diagram of the structure of a first gasket or a second gasket of a device for finding the leakage position of a boiler tube;
[0022] Figure 8 It is a schematic diagram of the structure of a boiler in a ship.
[0023] As shown in the figure, 11-detection member, 12-first sealing ring, 13-first pressing member, 14-first fastener, 15-first gasket, 111-first cylindrical head, 112-first connecting part, 113-first threaded part, 114-through hole;
[0024] 21-blocking member, 22-second sealing ring, 23-second pressing member, 24-second fastening member, 25-second gasket, 211-second cylindrical head, 212-second connecting portion, 213-second threaded portion;
[0025] 3- Boiler tubes. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. It should be understood that the present application is not limited to the example embodiments disclosed herein. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0027] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] In the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] like Figure 8 As shown, a schematic diagram of a boiler in a ship, wherein the boiler has a plurality of boiler tubes 3. A device for finding the position of boiler tube leakage is used to accurately detect which boiler tube 3 is leaking and repair it.
[0031] like Figure 1-7 As shown, a device for finding the leakage position of a boiler tube comprises:
[0032] The detection component is inserted into one end of the boiler tube 3, and includes a detection member 11, a first sealing ring 12, a first pressing member 13 and a first fastener 14; the detection member 11 is sequentially connected with a first cylindrical head 111, a first connecting portion 112 and a first threaded portion 113, the diameters of the first cylindrical head 111, the first connecting portion 112 and the first threaded portion 113 decrease in sequence, and a through hole 114 is provided in the axial center of the detection member 11; the first sealing ring 12 and the first pressing member 13 are sleeved on the first connecting portion 112, the first sealing ring 12 contacts with the end of the first cylindrical head 111, the outer diameter of the first sealing ring 12 contacts with the inner wall of the boiler tube 3, and the first fastener 14 is sleeved on the first threaded portion 113 and abuts against the first pressing member 13;
[0033] The plugging component is inserted into the other end of the boiler tube 3, and includes a plugging component 21, a second sealing ring 22, a second pressing piece 23 and a second fastener 24; the plugging component 21 is sequentially connected with a second cylindrical head 211, a second connecting portion 212 and a second threaded portion 213, and the diameters of the second cylindrical head 211, the second connecting portion 212 and the second threaded portion 213 decrease in sequence; the second sealing ring 22 and the second pressing piece 23 are sleeved on the second connecting portion 212, the second sealing ring 22 contacts the end of the second cylindrical head 211, the outer diameter of the second sealing ring 22 contacts the inner wall of the boiler tube 3, and the second fastener 24 is sleeved on the second threaded portion 213 and abuts against the second pressing piece 23.
[0034] In this embodiment, the sizes of the first cylindrical head 111 and the second cylindrical head 211, the first connecting portion 112 and the second connecting portion 212, the first threaded portion 113 and the second connecting portion 212, the first sealing ring 12 and the second sealing ring 22, the first pressing piece 13 and the second pressing piece 23, and the first fastener 14 and the second pressing piece 23 are consistent.
[0035] Among them, Figure 2 As shown, the manufacturing process of the detection member 11 is as follows: prepare a piece of iron rod, process a step position at one end of the iron rod as the first cylindrical head 111, a straight position as the first connecting part 112, and process the remaining iron rod into an M20 screw as the first threaded part 113, and process a through hole 114 in the center of the screw as a pressure test port for passing an air pipe or a liquid pipe to measure pressure changes. Figure 3 As shown, the processing of the blocking member 21 and the detection member 11 is similar, the difference being that the blocking member 21 does not have the through hole 114 .
[0036] like Figure 4 As shown, the first sealing ring 12 and the second sealing ring 22 are type sealing rings, which are sleeved on the first connecting portion 112 or the second connecting portion 212 and abut against the first cylindrical head 111 or the second cylindrical head 211. The first sealing ring 12 and the second sealing ring 22 are made of silicone.
[0037] like Figure 5 As shown, the processing and manufacturing process of the first pressing piece 13 or the second pressing piece 23 is as follows: prepare a section of iron rod, process a straight position for tightening the first sealing ring 12 or the second sealing ring 22, process a step position for tightening the first fastener 14 or the second fastener 24, and process a channel in the center for sleeved on the first connecting part 112 of the detection piece 11 or the second connecting part 212 of the blocking piece 21.
[0038] like Figure 6 As shown, the first fastener 14 or the second fastener 24 is a nut matched with the first threaded portion 113 or the second threaded portion 213 .
[0039] In other embodiments, Figure 7 As shown, the first washer 15 and the second washer 25 are also included; the first washer 15 is arranged between the first fastener 14 and the first pressing member 13, and the second washer 25 is arranged between the second fastener 24 and the second pressing member 23. The first washer 15 and the second washer 25 are flat washers, which are used to stably connect the first fastener 14 and the first threaded portion 113 or the second fastener 24 and the second threaded portion 213.
[0040] In this embodiment, a pressure gauge is also included, and the pressure gauge is connected to the detection component 11. The pressure gauge is an air pressure gauge or a water pressure gauge. Specifically, the detection component and the blocking component are used together and inserted into both ends of the boiler tube 3 respectively, and the air pressure or water pressure change of the boiler tube 3 is detected to determine whether there is a leak.
[0041] A device for finding the position of boiler tube leakage is used to accurately detect which boiler tube 3 is leaking. Figure 1 The connection method and detection method are as follows:
[0042] The detection member 11 is inserted into one end or the top end of the boiler tube 3, the through hole 114 is inserted into the hose of the inflator or the water press, the hose branch is connected to the air pressure gauge or the water pressure gauge, the first fastener 14 pushes the first gasket 15, and the first pressing member 13 squeezes the first sealing ring 12, so that the first sealing ring 12 is deformed and expanded to fit tightly against the inner wall of the boiler tube 3, so as to meet the detection tightness requirements.
[0043] The plugging piece 21 is inserted into the other end or the bottom end of the boiler tube 3, and the second fastener 24 pushes the second gasket 25, and the first second pressing piece squeezes the second sealing ring 22, so that the second sealing ring 22 is deformed and expanded to fit tightly against the inner wall of the boiler tube 3, thereby meeting the detection tightness requirement.
[0044] Start the inflator or water pressurizer, inject air or water through the pressure test port to increase pressure, and observe the pressure gauge. When the pressure reaches the specified value, if the boiler tube 3 is intact, the pointer of the pressure gauge will maintain the specified pressure value and will not drop the pressure, which means that the boiler tube 3 currently being tested is intact. If the specified pressure value cannot be reached during the pressure test, or the pressure cannot be maintained after reaching the specified pressure value, it means that the boiler tube 3 currently being tested is damaged.
[0045] In order to quickly perform inspection and quickly locate the leaking boiler tube 3, multiple sets of inspection tools can be manufactured and carried out alternately in the area to be inspected to shorten the waiting process and reduce the idle time of intermediate disassembly after the inspection is completed.
[0046] A device for finding the leakage position of a boiler tube, inserting the detection component and the plugging component into the two ends of the boiler tube respectively, inserting the water flow or air flow pipeline into the through hole of the detection component, and detecting by the pressure gauge, can quickly locate the leaking pipeline, accurately determine the position of a single leaking boiler tube, and avoid the occurrence of misjudgment. It effectively provides the shipowner with a basis for repairing the boiler, improves the decision-making efficiency of boiler tube repair, replacement or plugging, greatly shortens the repair time of the ship, and also creates space for the debugging of various related equipment, wins time for the main engine test and various equipment operation debugging, and creates higher benefits for the shipowner.
[0047] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "including a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0048] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A device for finding the leakage position of a boiler tube, characterized in that: include: A detection component, the detection component is inserted into one end of the boiler tube, and comprises a detection piece, a first sealing ring, a first pressing piece and a first fastener; the detection piece is sequentially connected with a first cylindrical head, a first connecting part and a first threaded part, the diameters of the first cylindrical head, the first connecting part and the first threaded part decrease in sequence, and a through hole is provided in the axial center of the detection piece; the first sealing ring and the first pressing piece are sleeved on the first connecting part, the first sealing ring contacts the end of the first cylindrical head, the outer diameter of the first sealing ring contacts the inner wall of the boiler tube, and the first fastener is sleeved on the first threaded part and abuts against the first pressing piece; A plugging component is inserted into the other end of the boiler tube, comprising a plugging component, a second sealing ring, a second pressing piece and a second fastener; the plugging component is sequentially connected with a second cylindrical head, a second connecting portion and a second threaded portion, and the diameters of the second cylindrical head, the second connecting portion and the second threaded portion decrease in sequence; the second sealing ring and the second pressing piece are sleeved on the second connecting portion, the second sealing ring contacts the end of the second cylindrical head, the outer diameter of the second sealing ring contacts the inner wall of the boiler tube, and the second fastener is sleeved on the second threaded portion and abuts against the second pressing piece.
2. The device for finding the leakage position of a boiler tube according to claim 1, characterized in that: It also includes a first washer and a second washer; the first washer is arranged between the first fastener and the first pressing member; the second washer is arranged between the second fastener and the second pressing member.
3. The device for finding the leakage position of a boiler tube according to claim 1 or 2, characterized in that: It also includes a pressure gauge, which is connected to the detection component.
4. The device for finding the leakage position of a boiler tube according to claim 3, characterized in that: The pressure gauge is a barometer or a water pressure gauge.
5. The device for finding the leakage position of a boiler tube according to claim 1, characterized in that: The sizes of the first cylindrical head and the second cylindrical head, the first connecting part and the second connecting part, the first threaded part and the second connecting part, the first sealing ring and the second sealing ring, the first pressing piece and the second pressing piece, and the first fastener and the second pressing piece are consistent.
6. The device for finding the leakage position of a boiler tube according to claim 1, characterized in that: The first sealing ring and the second sealing ring are made of silicone.
Citation Information
Cited By
A water-cooled wall tube leak detection device
CN224719598U