A prestressed concrete pipe pile anti-clogging device

By installing limit rings, guide rods, sliding plates and push components on concrete pipe piles, the problem of soil entering the pipe piles causing silt to form, achieving effective anti-silt effect and soil cleaning.

CN222745013UActive Publication Date: 2025-04-11JIANGXI GUJING COMPONENTS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421237640.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2025-04-11
Estimated Expiration
2034-06-03

AI Technical Summary

Technical Problem

When using concrete pipe piles, soil enters the inside of the pipe pile through the gap, resulting in silt formation and affecting later use.

Method used

A prestressed concrete pipe pile anti-silt device is designed, including concrete pipe piles, limit rings, guide rods, sliding plates and push-out components. The sliding plate slides through the guide rod, and the threaded rod penetrates through the sliding plate. The sponge pad absorbs water and soil, and the soil on the sponge pad is pushed out when the sliding plate moves.

Benefits of technology

Effectively prevent soil from entering the inside of the pipe pile, reduce silt formation, facilitate separation of soil and water, and improve the service life of the pipe pile.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222745013U_ABST
    Figure CN222745013U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of concrete pipe piles, and discloses a prestressed concrete pipe pile anti-clogging device, including a concrete pipe pile, a limit ring is fixedly installed on the surface of the concrete pipe pile, the surface of the limit ring is annularly and equidistantly provided with positioning grooves, the interior of the positioning groove is plugged with limit bolts, and guide rods are fixedly installed on both sides of the interior of the concrete pipe pile. During use, a person installs and slides the sliding plate through the guide rod, and then the threaded rod is threaded through the sliding plate. After penetrating the sliding plate, the bottom of the placement frame will contact the surface of the sliding plate. After contacting, the water and soil entering the interior of the concrete pipe pile will be adsorbed by the sponge pad inside the placement frame, and flow downward through the sliding plate. The soil will be blocked on it by the sponge pad. The person can rotate the threaded rod to move the sliding plate upward. When the sliding plate moves, the soil on the sponge pad inside the concrete pipe pile is pushed out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of concrete pipe piles, in particular to a prestressed concrete pipe pile anti-clogging device. Background Art

[0002] Concrete pipe piles, especially prestressed high-strength concrete pipe piles (PHC pipe piles), are hollow cylindrical concrete precast components made by prestressed centrifugal forming technology. The standard section length of this type of pipe pile is usually 10 meters, the diameter can range from 300 mm to 800 mm, and the concrete strength grade is not less than C80. Concrete pipe piles have many advantages, including high single pile bearing capacity, wide application range, reliable pile sinking quality and low engineering cost. They can adapt to different geological conditions, and have fast construction speed, high work efficiency and short construction period. Therefore, they are widely used in many engineering projects. When using concrete pipe piles, the soil falls into the pipe due to mechanical vibration, causing the pipe piles to need to be desilted later, so concrete pipe pile anti-clogging devices are needed.

[0003] For example, the utility model with publication number CN220686068U discloses a prestressed concrete pipe pile anti-clogging device, including two steel plates arranged opposite to each other, and the middle axes of the two steel plates are in line, and a number of steel holes are evenly arranged on the two steel plates around the middle axis, and a column is concentrically and coaxially arranged in the middle of the steel plate, and the two steel plates and the column cooperate to form an I-shaped structure, and the middle position of the I-shaped structure is filled with sponge around the column, one end of the column passes through the steel plate and protrudes outward, and a small pier is concentrically and coaxially provided on the end face of the protruding column, and a pull ring is provided on the small pier, and a number of cross brackets are evenly spaced around the middle axis on the side of the protruding column, which are all arranged radially along the column and clamped in the pipe mouth.

[0004] When blocking the soil, sometimes soil will enter the interior of the concrete pipe pile through the gap. The soil entering the concrete pipe pile cannot be pushed out, resulting in the formation of silt inside the concrete pipe pile, which affects the later use of the concrete pipe pile. Therefore, a prestressed concrete pipe pile anti-clogging device is proposed to address the above problem. Utility Model Content

[0005] In order to solve the problems raised in the above-mentioned background technology, the utility model provides a prestressed concrete pipe pile anti-clogging device, which can solve the problem that when blocking the soil, sometimes soil will enter the interior of the concrete pipe pile through the gap, and the soil entering the concrete pipe pile cannot be pushed out, resulting in the formation of silt inside the concrete pipe pile, which affects the subsequent use of the concrete pipe pile.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prestressed concrete pipe pile anti-clogging device, comprising a concrete pipe pile, a limit ring is fixedly installed on the surface of the concrete pipe pile, the surface of the limit ring is provided with annular positioning grooves equidistantly spaced, the interior of the positioning groove is plugged with limit bolts, guide rods are fixedly installed on both sides of the concrete pipe pile, the surface of the guide rod is slidably connected to a sliding plate, the surface of the sliding plate is provided with a threaded groove, and the internal thread of the threaded groove is penetrated by a push-out component.

[0007] Preferably, the ejection assembly includes a placement frame fixedly mounted on the surface of the sliding plate, a sponge pad is provided inside the placement frame, a through groove is opened on the surface of the placement frame, a threaded rod is penetrated through the internal thread of the through groove, and a limiting plate is fixedly mounted on one end of the threaded rod.

[0008] Preferably, a mounting groove is formed at one end of the concrete pipe pile, and a conical head is fixedly installed inside the mounting groove.

[0009] Preferably, a guide groove is provided on the surface of the sponge pad, and the size of the guide groove is matched with the size of the threaded rod.

[0010] Preferably, the surface of the sliding plate is provided with flow grooves in a circular array at equal intervals, and the surface of the placement frame is provided with grooves adapted to the flow grooves.

[0011] Preferably, sliding grooves are provided on both sides of the surface of the sliding plate, and the size of the sliding grooves is matched with the size of the guide rods.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0013] The utility model is provided with a guide rod, a sliding plate and a pushing-out component. During use, a person installs and slides the sliding plate through the guide rod, and then the threaded rod is threadedly penetrated through the sliding plate. After penetrating the sliding plate, the bottom of the placement frame will contact with the surface of the sliding plate. After the contact, the water and soil entering the interior of the concrete pipe pile will be adsorbed by the sponge pad inside the placement frame and flow downward through the sliding plate. The soil will be blocked on it by the sponge pad. The person can rotate the threaded rod and move the sliding plate upward. When the sliding plate moves, the soil on the sponge pad inside the concrete pipe pile is pushed out. After pushing out, the person cleans the soil on the sponge pad, which facilitates the person to separate the soil and water, reduces the formation of silt, and can push out the soil for cleaning. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2This is a schematic diagram of the split structure of the utility model;

[0016] Figure 3 A schematic diagram of the component structure is provided for the utility model;

[0017] Figure 4 This is a schematic diagram of the concrete pipe pile structure of the utility model.

[0018] In the figure: 1. concrete pipe pile; 2. limit ring; 3. limit bolt; 4. guide rod; 5. sliding plate; 6. ejection assembly; 61. placement frame; 62. sponge pad; 63. threaded rod; 64. limit plate; 7. conical head. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] like Figures 1 to 4 As shown, the utility model provides a prestressed concrete pipe pile anti-clogging device, including a concrete pipe pile 1, a limit ring 2 is fixedly installed on the surface of the concrete pipe pile 1, the surface of the limit ring 2 is annularly provided with positioning grooves at equal intervals, and a limit bolt 3 is inserted inside the positioning groove. When one end of the concrete pipe pile 1 contacts the ground, the limit bolt 3 on the limit ring 2 can be used to install and position the concrete pipe pile 1, guide rods 4 are fixedly installed on both sides of the concrete pipe pile 1, and a sliding plate 5 is slidably connected to the surface of the guide rod 4, and a threaded groove is opened on the surface of the sliding plate 5, and an ejection component 6 is penetrated by the internal thread of the threaded groove, and an installation groove is opened at one end of the concrete pipe pile 1, and a conical head 7 is fixedly installed inside the installation groove.

[0021] During use, personnel install and slide the sliding plate 5 through the guide rod 4, and then thread the threaded rod 63 through the sliding plate 5. After penetrating the sliding plate 5, the bottom of the placement frame 61 will contact the surface of the sliding plate 5. After contact, the water and soil entering the concrete pipe pile 1 will be adsorbed by the sponge pad 62 inside the placement frame 61 and flow downward through the sliding plate 5. The soil will be blocked on it by the sponge pad 62. Personnel can rotate the threaded rod 63 to move the sliding plate 5 upward. When the sliding plate 5 moves, the soil on the sponge pad 62 inside the concrete pipe pile 1 is pushed out. After pushing out, personnel clean the soil on the sponge pad 62.

[0022] like Figures 1 to 4As shown, the ejection assembly 6 includes a placement frame 61 fixedly mounted on the surface of the sliding plate 5, a sponge pad 62 is provided inside the placement frame 61, a through groove is provided on the surface of the placement frame 61, a threaded rod 63 is passed through the internal thread of the through groove, a limiting plate 64 is fixedly mounted on one end of the threaded rod 63, and a guide groove is provided on the surface of the sponge pad 62, and the size of the guide groove is adapted to the size of the threaded rod 63.

[0023] During use, personnel rotate the threaded rod 63, and the threaded rod 63 will drive the sliding plate 5 to move up and down through the threads on the surface. In the process of the sliding plate 5 moving up and down, it will drive the placement frame 61 to move, and the sponge pad 62 inside the placement frame 61 will absorb water, and flow downward through the grooves opened on the surfaces of the placement frame 61 and the sliding plate 5. The soil will be blocked by the sponge pad 62 on the surface of the sponge pad 62. When the placement frame 61 moves, it will drive the sponge pad 62 to move upward. When the sponge pad 62 moves to the surface of the concrete pipe pile 1, personnel can clean the soil on the surface of the sponge pad 62, reducing the occurrence of blockage of the sponge pad 62 by the soil, and can push out the soil inside the concrete pipe pile 1, avoiding the formation of silt inside the concrete pipe pile 1.

[0024] like Figures 1 to 4 As shown, the surface of the sliding plate 5 is provided with flow grooves equidistantly arranged in a circular array, the surface of the placement frame 61 is provided with grooves adapted to the flow grooves, and sliding grooves are provided on both sides of the surface of the sliding plate 5, and the size of the sliding grooves is adapted to the size of the guide rod 4.

[0025] Through the setting of the sliding plate 5 and the guide rod 4, the guide rod 4 and the sliding plate 5 are limited to prevent the sliding plate 5 from rotating with the rotation of the threaded rod 63. The sliding plate 5 supports the placement frame 61 and drives the placement frame 61 to move up and down, thereby reducing the occurrence of soil entering the concrete pipe pile 1.

[0026] The working principle and use process of the utility model are as follows: the sliding plate 5 is installed and slid through the guide rod 4, and then the threaded rod 63 is threaded through the sliding plate 5. After penetrating the sliding plate 5, the bottom of the placement frame 61 will contact the surface of the sliding plate 5. After the contact, the water and soil entering the concrete pipe pile 1 will be adsorbed by the sponge pad 62 inside the placement frame 61, and flow downward through the sliding plate 5. The soil will be blocked on it by the sponge pad 62. The staff can rotate the threaded rod 63 to move the sliding plate 5 upward. When the sliding plate 5 moves, the soil on the sponge pad 62 inside the concrete pipe pile 1 is pushed out. After pushing out, the staff cleans the soil on the sponge pad 62.

[0027] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prestressed concrete pipe pile anti-clogging device, comprising a concrete pipe pile (1), characterized in that: A limit ring (2) is fixedly installed on the surface of the concrete pipe pile (1), and the surface of the limit ring (2) is provided with positioning grooves at equal intervals in a ring shape, and a limit bolt (3) is inserted into the interior of the positioning groove. Guide rods (4) are fixedly installed on both sides of the interior of the concrete pipe pile (1), and a sliding plate (5) is slidably connected to the surface of the guide rod (4), and a thread groove is provided on the surface of the sliding plate (5), and a push-out component (6) is penetrated through the internal thread of the thread groove; The ejection assembly (6) comprises a placement frame (61) fixedly mounted on the surface of the sliding plate (5), a sponge pad (62) being provided inside the placement frame (61), a through groove being provided on the surface of the placement frame (61), a threaded rod (63) being passed through the internal thread of the through groove, and a limiting plate (64) being fixedly mounted on one end of the threaded rod (63).

2. The prestressed concrete pipe pile anti-clogging device according to claim 1 is characterized in that: One end of the concrete pipe pile (1) is provided with a mounting groove, and a conical head (7) is fixedly mounted inside the mounting groove.

3. The prestressed concrete pipe pile anti-clogging device according to claim 1 is characterized in that: A guide groove is provided on the surface of the sponge pad (62), and the size of the guide groove is adapted to the size of the threaded rod (63).

4. The prestressed concrete pipe pile anti-clogging device according to claim 1 is characterized in that: The surface of the sliding plate (5) is provided with flow grooves in an annular array at equal intervals, and the surface of the placement frame (61) is provided with grooves adapted to the flow grooves.

5. The prestressed concrete pipe pile anti-clogging device according to claim 4 is characterized in that: Sliding grooves are provided on both sides of the surface of the sliding plate (5), and the size of the sliding grooves is adapted to the size of the guide rod (4).

Citation Information

Patent Citations

  • Anti-clogging device for prestressed concrete pipe pile

    CN220686068U