Centralized photovoltaic module high-position installation operation platform

By using cantilever rods and platform beams connected to prefabricated pipe piles, the terrain limitations and stability problems of the existing photovoltaic module installation operation platform are solved, and the stability, safety and efficient installation efficiency of the platform are achieved.

CN222771839UActive Publication Date: 2025-04-18CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421139611.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2025-04-18
Estimated Expiration
2034-05-23

AI Technical Summary

Technical Problem

The existing photovoltaic module installation and operation platform has problems such as terrain limitations, high labor costs, unstable platform and poor safety.

Method used

The cantilever rods connected to prefabricated pipe piles are used to combine the platform beams and platform plates to achieve stable fixation of the platform through slots and bolt connections, avoid terrain restrictions, and meet different installation requirements by adjusting the height.

Benefits of technology

The stability and security of the platform are achieved, the terrain limitations are eliminated, the installation efficiency and security are improved, and the installation requirements of different heights are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222771839U_ABST
    Figure CN222771839U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of building construction, and particularly relates to a centralized photovoltaic module high-position installation operation platform which comprises a cantilever rod piece connected with a prefabricated pipe pile through a hoop, a platform cross beam connected with the cantilever rod piece and a platform plate arranged above the platform cross beam. According to the centralized high-position installation operation platform for the photovoltaic module, the operation platform is fixed to the proper position of the prefabricated pipe pile through the hoop and gets rid of terrain limitation, after installation is completed, the prefabricated pipe pile bears all loads of operators and the operation platform, and the operation platform is stable in overall structure, good in safety and free of any influence on photovoltaic support components; by adjusting the installation height, the vertical working face of the operator is enlarged, the installation efficiency of the operator is greatly improved, and the safety of the operator is guaranteed. Meanwhile, the height of the operation platform can be adjusted, and the installation requirements of different heights are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of building construction, and specifically relates to a centralized photovoltaic component high-position installation operation platform. Background Art

[0002] Centralized photovoltaic projects are widely used due to their large photovoltaic power generation and low operating costs. Among them, centralized photovoltaic projects such as "fishery-photovoltaic complementation" and "pastoral-photovoltaic complementation" modes are huge in size. Considering the normal operation of fisheries and animal husbandry during photovoltaic power generation, the installation height of photovoltaic modules is usually more than 3m from the ground. When installing photovoltaic modules, an installation operation platform is required, but the existing photovoltaic operation frame has the following shortcomings:

[0003] 1. Existing installation platforms mostly use scaffolding or stepladders. Scaffolding has strong limitations. It is necessary to ensure the flatness of the ground for erection. It is greatly affected by the terrain. There is a risk of platform overturning in mountain photovoltaics. Stepladder installation generally requires two people to form a group, which increases labor costs and reduces work efficiency.

[0004] 2. Although the existing installation and operation platforms have solved the problems of terrain restrictions and reduced work efficiency, most of the installation platforms are suspended, and their support points are mostly located on the crossbeams of the photovoltaic brackets, which cause many adverse quality problems such as node deformation and paint peeling on the photovoltaic brackets themselves. At the same time, due to the loose fixation, the operators shake significantly during the operation, which causes certain difficulties for the operators, and their own safety cannot be guaranteed. Utility Model Content

[0005] The purpose of the utility model is to overcome the defects in the prior art and provide a centralized photovoltaic assembly high-position installation operation platform.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

[0007] A centralized photovoltaic assembly high-position installation operation platform comprises a cantilever rod connected to a prefabricated pipe pile by using a clamp, a platform beam connected to the cantilever rod, and a platform plate arranged above the platform beam.

[0008] The clamp is connected to the cantilever rod through a connecting steel plate; a plurality of bolt holes connected to the clamp are arranged on the connecting steel plate; and the connecting steel plate is connected to the cantilever rod by welding.

[0009] The cantilever rod and the platform beam are connected by a slot; the slot is formed by two L-shaped angle steels arranged in reverse; one end of the L-shaped angle steel is welded to the cantilever rod, and the other end is provided with a first connecting hole; a second connecting hole matching the first connecting hole is provided on the platform beam; the first connecting hole and the second connecting hole are connected by bolts.

[0010] The clamps are two U-shaped clamps arranged up and down.

[0011] Platform claws are arranged on the left and right sides of the platform beam; the platform claws include a claw body connected to the platform and an L-shaped claw away from one end of the platform beam; the upper surface of the claw body is flush with the platform beam.

[0012] The platform clamping claws are multiple.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The present application provides a centralized photovoltaic module high-position installation operation platform, which is fixed to the appropriate position of the prefabricated pipe pile by a clamp, and is free from terrain restrictions. After installation, the prefabricated pipe pile bears all the loads of the operator and the operation platform. The overall structure of the operation platform is stable and safe, and has no effect on the photovoltaic support components. By adjusting the installation height, the vertical working surface of the operator is increased, which greatly improves the installation efficiency of the operator and ensures the safety of the operator. At the same time, the height of the operation platform can be adjusted to meet the installation requirements of different heights. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the overall structure of the utility model centralized photovoltaic module high-position installation operation platform; DETAILED DESCRIPTION

[0016] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and the best embodiment.

[0017] Figure 1 A centralized photovoltaic module high-position installation operation platform is shown, comprising a cantilever rod 3 connected to a prefabricated pipe pile using a clamp 1, a platform beam 4 connected to the cantilever rod 3, and a platform plate 7 arranged above the platform beam.

[0018] The clamp 1 is connected to the cantilever rod 3 via a connecting steel plate 2; the connecting steel plate 2 is provided with a plurality of bolt holes connected to the clamp 1; the connecting steel plate 1 is welded to the cantilever rod 3. The clamp 1 is two U-shaped clamps arranged up and down.

[0019] The cantilever rod 3 and the platform beam 4 are connected by a slot; the slot is formed by two L-shaped angle steels 6 arranged in opposite directions; one end of the L-shaped angle steel 6 is welded to the cantilever rod 3, and the other end is provided with a first connecting hole; a second connecting hole matching the first connecting hole is provided on the platform beam 4; the first connecting hole and the second connecting hole are connected by bolts.

[0020] The platform crossbeam 4 is provided with platform claws 5 on both sides; the platform claws include a claw body connected to the platform and an L-shaped claw away from one end of the platform crossbeam; the upper surface of the claw body is flush with the platform crossbeam. There are multiple platform claws.

[0021] The specific operation steps of the utility model are as follows:

[0022] First, select No. 10 channel steel as the cantilever rod 3, weld a 500mm wide * 300mm high and 8mm thick steel plate at one end of the cantilever rod 3 as the connecting steel plate 2, drill φ20mm holes symmetrically on the upper and lower sides of the connecting steel plate, and weld two L63*4mm angle steels (L-shaped angle steel 6) at appropriate positions on the other end, drill a φ10mm hole on the upper part, and the distance between the two angle steels is 80mm to serve as a slot.

[0023] Second, select 80mm*80mm*4mm square steel and drill a φ10mm hole (the second connecting hole) at the position corresponding to the hole position of the angle steel as the platform beam 4. The upper part of both sides of the platform beam 4 is symmetrically welded with 250mm long and 25mm high φ20 L-shaped claws (platform claws) to ensure that the upper part of the square steel (platform beam 4) and the upper end of the steel claw (claw body) are located in the same horizontal plane.

[0024] Third, the connecting steel plate 2 and the pile foundation bolts are connected and fastened through the clamp 1.

[0025] Fourth, after the cantilever rods 3 attached to the connecting steel plates 2 on both sides are fixed, the platform beam 4 is placed in the slots of the cantilever rods 3 at both ends and fixed with bolts.

[0026] Fifth, the platform board 7 is laid on the platform beam 4, and the photovoltaic bracket installation operation is carried out.

[0027] Sixth, adjust the fixed position of the operating platform according to different installation heights.

[0028] Sixth, after the operation is completed, move the installation operation platform to the next operation location.

[0029] In summary, the present application provides a centralized photovoltaic module high-position installation operation platform, which is fixed to the appropriate position of the prefabricated pipe pile by a clamp, and is free from terrain restrictions. After installation, the prefabricated pipe pile bears all the loads of the operator and the operation platform. The overall structure of the operation platform is stable and safe, and has no effect on the photovoltaic support components. By adjusting the installation height, the vertical working surface of the operator is increased, which greatly improves the installation efficiency of the operator and ensures the safety of the operator. At the same time, the height of the operation platform can be adjusted to meet the installation requirements of different heights.

[0030] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, according to the concept of the present invention, there will be changes in the specific implementation methods and application scopes. The contents of this specification should not be understood as limiting the present invention.

Claims

1. A centralized photovoltaic module high-position installation operation platform, characterized in that: It includes a cantilever rod connected to the prefabricated pipe pile using a hoop, a platform beam connected to the cantilever rod, and a platform plate arranged above the platform beam; The hoop is connected to the cantilever rod through a connecting steel plate; the connecting steel plate is provided with a plurality of bolt holes connected to the hoop; the connecting steel plate is connected to the cantilever rod by welding; The clamps are two U-shaped clamps arranged up and down; Platform claws are arranged on the left and right sides of the platform beam; the platform claws include a claw body connected to the platform and an L-shaped claw away from one end of the platform beam; the upper surface of the claw body is flush with the platform beam.

2. The centralized photovoltaic module high-position installation operation platform according to claim 1 is characterized in that: The cantilever rod and the platform beam are connected by a slot; the slot is formed by two L-shaped angle steels arranged in reverse; one end of the L-shaped angle steel is welded to the cantilever rod, and the other end is provided with a first connecting hole; a second connecting hole matching the first connecting hole is provided on the platform beam; the first connecting hole and the second connecting hole are connected by bolts.

3. The centralized photovoltaic module high-position installation operation platform according to claim 1 is characterized in that: The platform clamping claws are multiple.