Building engineering machinery lifting device
By designing a lifting device for construction engineering machinery, using multiple strands of wire ropes and connecting mechanisms to disperse the stress points, and evenly distribute the force through multiple cables, the problems of excessive pressure and unstable lifting of goods in the prior art are solved, and a smoother and safer lifting process is achieved.
Patent Information
- Application Number
- CN202421904013.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-08-07
AI Technical Summary
The existing construction machinery has simple structure, which causes the lifting ears and ropes to bear too much pressure when lifting heavy objects, which can easily cause local wear or damage, and it is difficult to stabilize the lifting of goods with irregular shapes or uneven center of gravity.
A construction machinery lifting device is designed, using multiple wire ropes to fix or support building materials through a connecting mechanism, disperse the stress points, and evenly distribute the force through multiple cables to reduce the risk of cargo shaking and inclination.
By dispersing the stress points and evenly distributing forces, the stability of the lifting process is improved, the risk of cargo shaking and tilting is reduced, and the balance and safe lifting of large irregular-shaped building materials are ensured.
Smart Images

Figure CN222821089U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering lifting devices, in particular to a construction engineering machinery lifting device. Background Art
[0002] During the construction process of a building project, building materials often need to be lifted to a high place. The lifting lug is a load-bearing component installed on the equipment for lifting. It is a device used to lift heavy objects. The lifting lug is hung on the crane hook and moved by the crane.
[0003] The lifting ear in the prior art has a simple structure. When lifting building materials, usually only two steel wire ropes are passed through the lifting ear to fix or tie to the building materials. Due to the lifting method of the two ropes, the force points are very concentrated, which may cause the lifting ear and the rope to be subjected to excessive pressure when lifting heavy objects, which may easily cause local wear and even damage. For example, when lifting heavy metal components, the concentrated force may cause cracks in the lifting ear. Secondly, since there are only two force points, for goods with irregular shapes or uneven center of gravity, the goods are prone to tilting and shaking. For example, when lifting asymmetric large equipment, the balance may be lost due to the shift of the center of gravity. Therefore, it is necessary to design a lifting device for construction machinery to solve the above problems. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and provides a lifting device for construction engineering machinery.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The lifting device of construction machinery includes a mounting plate and two fixing parts. The mounting plate is provided with a lifting ear. A plurality of connecting mechanisms for connecting binding ropes are provided under the mounting plate. The connecting mechanisms include a mounting rod arranged at the lower end of the mounting plate. A hanging ear is provided at the lower end of the mounting rod. The plurality of mounting rods are arranged at equal intervals. A plurality of fixing mechanisms for fixing the mounting rods are provided at the lower end of the mounting plate.
[0007] Preferably, the fixing mechanism comprises a mounting tube fixedly connected to the lower end of the mounting plate, and the side wall of the mounting tube is provided with two second bolts, and the second bolts are provided with second nuts.
[0008] Preferably, the side wall of the fixing member is provided with a plurality of first bolts, the first bolts are provided with two first nuts, the side wall of the fixing member is provided with a plurality of mounting ears, the upper end of the mounting plate is connected to a plurality of cables through a plurality of mounting blocks, the cables are provided with a limiting cylinder, and the limiting cylinder is provided with a third bolt.
[0009] Preferably, the cross section of the mounting rod is rectangular, and the cross section of the mounting tube is a mouth-shaped structure.
[0010] Preferably, the plurality of mounting blocks are arranged at equal intervals, and the cables are steel cables.
[0011] Preferably, a plurality of support rods are fixedly connected to the inner wall of the mounting plate, and a vertical rod is commonly provided on the plurality of support rods.
[0012] Preferably, the plurality of support rods are arranged at equal intervals, and the cross-section of the support rod is Y-shaped.
[0013] The utility model has the following beneficial effects:
[0014] 1. This device is equipped with a connection mechanism, and multiple steel wire ropes are used to fix or support building materials, which disperses the force points, making the lifting process more stable and reducing the risk of goods shaking and tilting. For example, when lifting large irregular-shaped building materials, it can better maintain balance and avoid accidents caused by the shift of the center of gravity;
[0015] 2. The device is equipped with an installation mechanism, so that the installation rod and the suspension ear can be replaced separately when they are damaged, without the need to replace the entire device, thus reducing the replacement cost;
[0016] 3. The device is provided with fixings, etc., which can help to more evenly distribute the force acting on the mounting plate through multiple cables, avoid the force being concentrated on one side or one point, so that the overall force of the mounting plate is more balanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of the lifting device for construction machinery proposed by the utility model;
[0018] Figure 2 A side view of the lifting device for construction machinery proposed by the utility model;
[0019] Figure 3 This is another side view of the lifting device for construction machinery proposed by the utility model.
[0020] In the figure: 1 mounting plate, 2 lifting ear, 3 fixing piece, 4 first bolt, 5 mounting ear, 6 mounting rod, 7 hanging ear, 8 vertical rod, 9 supporting rod, 10 mounting cylinder, 11 second bolt, 12 limiting cylinder, 13 mounting block, 14 third bolt, 15 cable. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0022] Reference Figure 1-3The lifting device of construction machinery includes a mounting plate 1 and two fixing parts 3. The mounting plate 1 is provided with a lifting ear 2. A plurality of connecting mechanisms for connecting binding ropes are provided under the mounting plate 1. The connecting mechanism includes a mounting rod 6 arranged at the lower end of the mounting plate 1. A hanging ear 7 is provided at the lower end of the mounting rod 6. A plurality of mounting rods 6 are arranged at equal intervals. The hanging ear 7 is rotatably connected to the mounting rod 6, and a fixed heavy object that can be replaced by a cable can be rotated.
[0023] The lower end of the mounting plate 1 is provided with a plurality of fixing mechanisms for fixing the mounting rod 6, the fixing mechanisms include a mounting tube 10 fixedly connected to the lower end of the mounting plate 1, the side wall of the mounting tube 10 is provided with two second bolts 11, and the second bolts 11 are provided with second nuts.
[0024] In the utility model, a plurality of first bolts 4 are provided on the side wall of the fixing member 3, two first nuts are provided on the first bolts 4, a plurality of mounting ears 5 are provided on the side wall of the fixing member 3, a plurality of cables 15 are connected to the upper end of the mounting plate 1 through a plurality of mounting blocks 13, a limiting cylinder 12 is provided on the cable 15, the limiting cylinder 12 and the cable 15 are actually steel wire rope cable clamps, the two strands of cables in the two limiting cylinders 12 are rubbed and fixed by the third bolt 14 so that the cable 15 will not loosen, the limiting cylinder 12 is provided with a third bolt 14, the two fixing members 3 can be fixed on the crane cable, and the cable 15 is fixed on the plurality of mounting ears 5, which help to distribute the force acting on the mounting plate 1 more evenly.
[0025] In the present invention, the cross section of the mounting rod 6 is rectangular, and the cross section of the mounting tube 10 is a mouth-shaped structure, so that the mounting rod 6 will not rotate in the mounting tube 10, making the installation of the mounting rod 6 easier.
[0026] In the present invention, a plurality of mounting blocks 13 are arranged at equal intervals, so that a plurality of cables 15 can distribute weight more evenly, and the cables 15 are steel wire ropes.
[0027] In the utility model, a plurality of support rods 9 are fixedly connected to the inner wall of the installation plate 1, and a vertical rod 8 is commonly arranged on the plurality of support rods 9, so that the overall structure of the installation plate 1 can be made more stable.
[0028] In the present invention, multiple support rods 9 are arranged at equal intervals, so that the force shared by the multiple support rods 9 is more uniform. The cross-section of the support rod 9 is Y-shaped, and the stability principle of the triangle is used to make the installation plate 1 structure more stable.
[0029] In the initial state, the limiting cylinder 12 on the cable 15 is removed.
[0030] When in use, the two fixing members 3 are disassembled, the lifting ears 2 on the limiting cylinder 12 are removed and hung on the hook of the crane, and the two fixing members 3 are fitted on both sides of the cable on the hook, and multiple first bolts 4 and first nuts are screwed in to fix the two fixing members 3 on the cable, and then the limiting cylinder 12 is put on, and the end of the cable 15 passes through the cable mounting ear 5, and the end of the cable 15 is reversely passed through the limiting cylinder 12 and screwed into the third bolt 14 for fixing. It is worth noting that the cable 15 is kept in a taut state, and multiple cables 15 can help to more evenly distribute the force acting on the mounting plate 1, avoid the force being concentrated on one side or one point, so that the overall force of the mounting plate 1 is more balanced;
[0031] Pass the external steel wire rope through the hanging ear 7, pass the steel wire rope through the bottom of the cargo and pass through another hanging ear 7 under the mounting plate 1, fix it with a cable clamp, repeat the above operation, and the double-disc cargo has at least two sets of cables to fix it, which greatly improves the stability of the cargo.
[0032] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and practical concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A lifting device for construction machinery, comprising a mounting plate (1) and two fixing members (3), characterized in that: The mounting plate (1) is provided with a hanging ear (2), and a plurality of connection mechanisms for connecting a binding rope are provided below the mounting plate (1), the connection mechanisms comprising a mounting rod (6) arranged at the lower end of the mounting plate (1), a hanging ear (7) being provided at the lower end of the mounting rod (6), a plurality of the mounting rods (6) being arranged at equal intervals, and a plurality of fixing mechanisms for fixing the mounting rods (6) are provided at the lower end of the mounting plate (1).
2. The construction machinery lifting device according to claim 1, characterized in that: The fixing mechanism comprises a mounting tube (10) fixedly connected to the lower end of the mounting plate (1), the side wall of the mounting tube (10) being provided with two second bolts (11), and the second bolts (11) being provided with second nuts.
3. The construction machinery lifting device according to claim 2, characterized in that: The side wall of the fixing member (3) is provided with a plurality of first bolts (4), the first bolts (4) are provided with two first nuts, the side wall of the fixing member (3) is provided with a plurality of mounting ears (5), the upper end of the mounting plate (1) is connected to a plurality of cables (15) through a plurality of mounting blocks (13), the cables (15) are provided with a limiting cylinder (12), and the limiting cylinder (12) is provided with a third bolt (14).
4. The construction machinery lifting device according to claim 3, characterized in that: The cross section of the installation rod (6) is rectangular, and the cross section of the installation tube (10) is a mouth-shaped structure.
5. The construction machinery lifting device according to claim 4, characterized in that: The plurality of mounting blocks (13) are arranged at equal intervals, and the cable (15) is a steel wire rope.
6. The construction machinery lifting device according to claim 5, characterized in that: A plurality of support rods (9) are fixedly connected to the inner wall of the installation plate (1), and a vertical rod (8) is commonly provided on the plurality of support rods (9).
7. The construction machinery lifting device according to claim 6, characterized in that: The plurality of support rods (9) are arranged at equal intervals, and the cross-section of the support rod (9) is Y-shaped.