Shaft coal uncovering drilling construction platform
By designing a wellbore coal-exposed drilling construction platform for multi-layer steel rim base and ground anchor assembly, the problems of difficulty in fixing and moving the drilling rig and the impact of extraction pipelines on construction are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202421976674.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2034-08-14
AI Technical Summary
In the wellbore coal drilling construction, the drilling rig is difficult to fix and move, and the extraction pipeline affects the drilling construction, resulting in low safety and efficiency.
A wellbore coal drilling construction platform is designed, including a steel ring base and a ground anchor assembly. The steel ring base is installed on the ground through short sleepers and long road wood. A gap is left between the multi-layer steel ring and the ground to lead the extraction pipeline. The drilling rig is fixed and moved on the steel ring.
The drilling rig is stable and conveniently moved, avoiding the impact of extraction pipelines on drilling construction, and improving construction efficiency and safety.
Smart Images

Figure CN222909944U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of shaft coal drilling construction, in particular to a shaft coal drilling construction platform. Background Art
[0002] The second auxiliary shaft and the second return air shaft of the second level of Dingji Mine uncovered 13-1 coal, 11-2 coal, 8 coal, 7-2 coal, 5 coal, 4 coal and other outburst coal seams, and it is necessary to drill holes to eliminate outbursts in the construction area. The drilling holes for coal uncovering in the shaft are all downward holes, and the drilling volume is large, and the construction period is tight. When constructing in the shaft, there is no fulcrum above the drilling rig, and the pressure column cannot be hit. In addition, after the drilling holes that have been constructed on the bottom plate are closed, the exposed sealing pipes and extraction pipes will affect the movement of the drilling rig and the drilling construction, seriously affecting the safety and efficiency of drilling.
[0003] At present, when drilling to eliminate outbursts in the construction area, there are the following deficiencies:
[0004] 1. How to fix the drilling rig during drilling construction.
[0005] 2. How to move the drilling rig safely and quickly to improve drilling construction efficiency.
[0006] 3. How to eliminate the impact of the extraction hose of the drill hole constructed in the bottom plate on the movement of the drilling rig and the drilling construction. Utility Model Content
[0007] The technical problem to be solved by the utility model is: how to provide a shaft coal drilling construction platform which can ensure that the movement of the drilling rig is not affected.
[0008] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0009] A shaft coal drilling construction platform comprises a steel ring base and a ground anchor assembly, wherein the bottom of the steel ring base is installed on the ground through short sleepers and long rails;
[0010] The steel ring base is provided with a fourth steel ring, a third steel ring, a second steel ring and a first steel ring from the inside to the outside, wherein the fourth steel ring, the third steel ring, the second steel ring and the first steel ring are equidistantly installed with ground anchor assemblies and are fixed to the ground by the ground anchor assemblies.
[0011] The present application sets up a steel ring base, on which the drilling rig is installed, and sets up several layers of steel rings in sequence from the inside to the outside, and sleepers and road logs are set between the several layers of steel rings and the ground for support, and the gap left between the steel rings and the ground is just enough to lead out the extraction pipeline, thereby avoiding the influence of the extraction pipeline on the drilling construction; and the drilling rig is installed on several layers of steel rings, and when moving, it only needs to be pulled on the steel rings. The friction on the steel rings is small, and pulling is more convenient, saving time and effort.
[0012] As a further solution of the utility model: the fourth layer of steel ring is evenly divided into two arc segments, and the gap between the two arc segments is 200 mm.
[0013] As a further solution of the utility model: the third layer of steel ring is evenly divided into three arc segments, and the gap between every two of the three arc segments is 200 mm.
[0014] As a further solution of the utility model: the second layer of steel ring is evenly divided into four arc segments, and the gap between every two of the four arc segments is 200 mm.
[0015] As a further solution of the utility model: the first layer of steel ring is evenly divided into six arc segments, and the gap between every two of the six arc segments is 200 mm.
[0016] As a further solution of the utility model: a plurality of anchor holes for connecting with the ground anchor assembly are equidistantly arranged on the fourth layer of steel ring, the third layer of steel ring, the second layer of steel ring and the first layer of steel ring.
[0017] As a further solution of the utility model: the ground anchor assembly includes an anchor chain and an anchor rod connected to the anchor chain. The anchor chain passes through the anchor hole and is fixed to the anchor rod, and the anchor rod is fixed on the ground.
[0018] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0019] Firstly, in this application, by setting a steel ring base, the drill is installed on the steel ring base, and several layers of steel rings are arranged in sequence from the inside to the outside. Sleepers and wooden beams are arranged between the several layers of steel rings and the ground. The gap left between the steel rings and the ground can just lead out the extraction pipeline, avoiding the influence of the extraction pipeline on the drilling construction. Moreover, the drill is installed on several layers of steel rings. When moving, it only needs to be pulled on the steel rings. The friction on the steel rings is small, and it is more convenient to pull, saving time and effort.
[0020] Secondly, in this application, a "sleeper + steel ring + ground anchor" combined device is installed on the shaft floor. This device forms an integral body between the steel ring and the floor through the ground anchor and the anchor chain, making the steel ring serve as a base for fixing the drill. The drill can be fixed and moved on the steel ring, solving the problem that the pressing columns cannot support during the shaft construction. And the steel ring is padded with sleepers to leave enough space between the steel ring and the floor. The extraction hoses of the drilled holes that have been constructed are arranged under the steel ring, avoiding the influence of the extraction pipeline on the drilling construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic structural diagram of the shaft coal uncovering drilling construction platform in the embodiment of the utility model;
[0022] Figure 2This is a schematic structural diagram of the shaft coal uncovering borehole construction platform after installing the large plate in the embodiment of the present utility model;
[0023] Figure 3 This is a layout schematic diagram of the steel ring base in the embodiment of the present utility model;
[0024] Explanation of reference numerals:
[0025] 1. Steel ring base; 101. First layer of steel ring; 102. Second layer of steel ring; 103. Third layer of steel ring; 104. Fourth layer of steel ring; 105. Anchor hole;
[0026] 2. Short sleeper;
[0027] 3. Long wooden beam;
[0028] 4. Ground anchor assembly; 401. Anchor chain; 402. Anchor rod;
[0029] 5. Large plate. Specific implementation mode
[0030] To make the objectives, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model. Obviously, the described embodiments are part of the embodiments of the present utility model, rather than all of the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without making creative efforts belong to the scope of protection of the present utility model.
[0031] Refer to Figure 1 、 Figure 2 and Figure 3 , a shaft coal uncovering borehole construction platform includes a steel ring base 1, a short sleeper 2, a long wooden beam 3 and a ground anchor assembly 4. The bottom of the steel ring base 1 is installed on the bottom of the shaft through the short sleeper 2 and the long wooden beam 3; since the short sleeper 2 and the long wooden beam 3 are provided to support the steel ring, there is a certain gap between the steel ring and the bottom of the shaft. Since the drilled hole connecting extraction hose that has been constructed is arranged below the steel ring, such a design can avoid the influence of the extraction pipeline on the borehole construction.
[0032] Refer to Figure 1 、 Figure 2 and Figure 3 , the steel ring base 1 is successively provided with a fourth layer of steel ring 104, a third layer of steel ring 103, a second layer of steel ring 102 and a first layer of steel ring 101 from the inside to the outside. The fourth layer of steel ring 104, the third layer of steel ring 103, the second layer of steel ring 102 and the first layer of steel ring 101 are all equally spaced with anchor holes 105. The ground anchor assembly 4 is installed on the anchor holes 105 and is fixed on the ground through the ground anchor assembly 4.
[0033] It should be noted that the specific number of steel rings can be appropriately increased or decreased according to the width of the shaft, and the number of anchor holes 105 on each steel ring can also be determined according to the actual size of the steel ring or the actual situation on site. This application does not make any limitations.
[0034] Referring to Figure 3 , the radius of the fourth-layer steel ring 104 is 0.8 m, and it is evenly divided into two arc segments, with a gap of 200 mm between the two arc segments.
[0035] Referring to Figure 3 , the radius of the third-layer steel ring 103 is 2.1 m, and it is evenly divided into three arc segments, with a gap of 200 mm between every two of the three arc segments.
[0036] Referring to Figure 3 , the radius of the second-layer steel ring 102 is 3.3 m, and it is evenly divided into four arc segments, with a gap of 200 mm between every two of the four arc segments.
[0037] Referring to Figure 3 , the radius of the first-layer steel ring 101 is 4.6 m, and it is evenly divided into six arc segments, with a gap of 200 mm between every two of the six arc segments.
[0038] Referring to Figure 1 and Figure 2 , a number of short sleepers 2 are provided, and the width × height × length are 20 mm × 20 mm × 0.3 m respectively. It should be noted that the dimensions here can be determined according to the actual situation. This application only provides a data reference and cannot play a restrictive role. The short sleepers 2 and the corresponding steel rings are fixed by spikes, and the number of sleepers and ties can be adjusted according to the actual situation.
[0039] Referring to Figure 1 and Figure 2 , a number of long sleepers 3 are provided to connect and fix all the steel rings, and the width × height × length are 200 mm × 200 mm × 3.4 m respectively. It should be noted that the dimensions here can be determined according to the actual situation. This application only provides a data reference and cannot play a restrictive role. The long sleepers 3 and the corresponding steel rings are fixed by spikes, and the number of sleepers and ties can be adjusted according to the actual situation.
[0040] Referring to Figure 3 , the ground anchor assembly 4 includes an anchor chain 401 and an anchor rod 402. The anchor chain 401 passes through the corresponding anchor holes 105 opened on the fourth-layer steel ring 104, the third-layer steel ring 103, the second-layer steel ring 102, and the first-layer steel ring 101, and then the anchor chain 401 passes through the anchor holes 105 and is fixed to the anchor rod 402, and the anchor rod 402 is fixed on the ground.
[0041] The specific operation principle of this application is as follows:
[0042] 1. Four steel rings are made of I-beams with a thickness of 90 mm, namely the fourth-layer steel ring 104, the third-layer steel ring 103, the second-layer steel ring 102, and the first-layer steel ring 101. Four long sleepers 3 and several short sleepers 2 are placed under the steel rings. The long sleepers 3 and short sleepers 2 are fixed to the corresponding steel rings with spikes. The number of sleepers and short sleepers can be adjusted according to the actual situation.
[0043] 2. A pair of anchor holes 105 are drilled at a certain distance on the side of the steel ring. An anchor assembly 4 is constructed below the anchor holes 105. An anchor chain 401 is used to pass through and link with an anchor rod 402 to fix the steel ring.
[0044] 3. During the drilling construction process, large plates 5 are laid above the steel rings. The drilling rig, operation platform, drill pipe rack, and materials are all placed on the large plates 5. Subsequently, the drilling rig and the large plates 5 can be pulled along the steel rings by an underground electric hoist; the friction on the steel rings is small, and it is relatively easy to pull.
[0045] This application improves the drilling construction efficiency and saves drilling time. During the drilling of the two shafts.
[0046] On the premise of ensuring the drilling quality, this application can complete the drilling construction task of shaft coal uncovering better and faster, and gain sufficient time for coal seam gas extraction.
[0047] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A coal mining drilling construction platform, characterized in that: It comprises a steel ring base (1) and a ground anchor assembly (4), wherein the bottom of the steel ring base (1) is installed on the ground via short sleepers (2) and long rails (3); The steel ring base (1) is provided with a fourth steel ring (104), a third steel ring (103), a second steel ring (102) and a first steel ring (101) in sequence from the inside to the outside, wherein the fourth steel ring (104), the third steel ring (103), the second steel ring (102) and the first steel ring (101) are equidistantly installed with ground anchor assemblies (4) and are fixed to the ground via the ground anchor assemblies (4).
2. A coal mining drilling construction platform according to claim 1, characterized in that: The fourth layer of steel ring (104) is evenly divided into two arc segments, wherein the gap between the two arc segments is 200 mm.
3. A coal mining drilling construction platform according to claim 1, characterized in that: The third layer of steel ring (103) is evenly divided into three arc segments, wherein the gap between any two of the three arc segments is 200 mm.
4. A coal mining drilling construction platform according to claim 1, characterized in that: The second layer of steel ring (102) is evenly divided into four arc segments, wherein the gap between any two of the four arc segments is 200 mm.
5. A shaft coal drilling construction platform according to claim 1, characterized in that: The first layer of steel ring (101) is evenly divided into six arc segments, wherein the gap between any two of the six arc segments is 200 mm.
6. A coal mining drilling construction platform according to claim 1, characterized in that: The fourth layer steel ring (104), the third layer steel ring (103), the second layer steel ring (102) and the first layer steel ring (101) are all provided with a plurality of anchor holes (105) at equal intervals for connection with the ground anchor assembly (4).
7. A shaft coal drilling construction platform according to claim 6, characterized in that: The ground anchor assembly (4) comprises an anchor chain (401) and an anchor rod (402) connected to the anchor chain (401); the anchor chain (401) passes through an anchor hole (105) and is fixed to the anchor rod (402); and the anchor rod (402) is fixed on the ground.