Industrial factory building external wall panel hoisting and mounting integrated operation frame

By designing an integrated operating frame for lifting and installing exterior wall panels in industrial plants, the problem of long plates being easily deformed or broken during the lifting process is solved, and the rapid lifting and installation of wall panels is realized, which improves construction efficiency and reduces costs.

CN222936366UActive Publication Date: 2025-06-03CHINA CONSTR XINJIANG CONSTR ENG GRP THIRD CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422007354.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2025-06-03
Estimated Expiration
2034-08-19

AI Technical Summary

Technical Problem

In the construction of industrial factory buildings, long-board exterior wall panels are prone to deform or break during lifting, and the construction efficiency is low, resulting in high machinery rental costs.

Method used

Design an integrated operating frame for lifting and installation of exterior wall panels in industrial factories, including frame components, lifting components, wall panel support components and wall panel fixing components. Through the synergy of these components, the rapid lifting and installation of wall panels can be achieved.

Benefits of technology

The operating frame can quickly lift wall panels, reduce breakage and deformation, improve construction efficiency, reduce machinery rental costs, and facilitate operators to quickly install wall panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222936366U_ABST
    Figure CN222936366U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building equipment, in particular to an industrial factory building external wall panel hoisting and mounting integrated operation frame which comprises a frame body assembly. The hoisting assembly is mounted at the upper end part of the frame body assembly; the wallboard supporting assembly is mounted at the end of the frame body assembly and is opposite to the hoisting assembly; and the wallboard fixing assembly is installed on the side wall of the frame body assembly, and the wallboard fixing assembly and the wallboard supporting assembly are located on the same side. According to the utility model, the wallboard can be rapidly hoisted, the fracture and deformation of the wallboard are reduced, and meanwhile, the rapid installation of operators is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to an integrated operating frame for hoisting and installing external wall panels of industrial factories. Background Art

[0002] The external wall panels of industrial factories are an important part of the peripheral structure of the factory buildings. They not only play the role of protecting the internal environment and resisting harsh external weather conditions, but also have an important impact on the aesthetics, energy conservation and durability of the factory buildings.

[0003] The construction of industrial factories is a complex engineering project, involving multiple stages such as planning, design, construction and maintenance. The maintenance structure of the factory building often uses color steel sandwich panels with thermal insulation. To meet the overall effect of the factory building facade required by the owner, the length of a single panel often reaches more than 10m. Conventionally, the installation of external wall panels is carried out by using truck-mounted cranes in cooperation with external scaffolds or aerial work platforms, which inevitably causes deformation or breakage of the long panels during the hoisting process, and a large amount of pipe rental and machinery rental costs are incurred, and the construction efficiency is relatively low.

[0004] Therefore, technicians in this field are committed to developing an integrated operating frame for hoisting and installing external wall panels of industrial factories, which can not only quickly hoist the wall panels, reduce the breakage and deformation of the wall panels, but also facilitate the rapid installation by the operators. Summary of the Utility Model

[0005] The technical problem to be solved by the utility model is to provide an integrated operating frame for hoisting and installing external wall panels of industrial factories, which can not only quickly hoist the wall panels, reduce the breakage and deformation of the wall panels, but also facilitate the rapid installation by the operators.

[0006] The technical solution of the utility model to solve the above technical problems is as follows:

[0007] An integrated operating frame for hoisting and installing external wall panels of industrial factories, characterized by comprising

[0008] a frame body assembly;

[0009] a hoisting assembly, the hoisting assembly is installed at the upper end of the frame body assembly;

[0010] a wall panel support assembly, the wall panel support assembly is installed at the end of the frame body assembly and is arranged opposite to the hoisting assembly;

[0011] a wall panel fixing assembly, the wall panel fixing assembly is installed on the side wall of the frame body assembly and is on the same side as the wall panel support assembly.

[0012] The beneficial effects of adopting the above solution are as follows: After the frame assembly is placed flat, the wall panel is placed on the side wall of the frame assembly, and after being fixed and limited by the wall panel fixing assembly, it is beneficial for the hoisting assembly to hoist the frame assembly and the wall panel. At the same time, the wall panel support assembly prevents the wall panel from sliding down and falling. After being hoisted to the appropriate position, the operator climbs onto the frame assembly to install the wall panel, reducing the breakage and deformation of the wall panel and facilitating the rapid installation by the operator.

[0013] On the basis of the above technical solution, the present utility model can also be improved as follows.

[0014] Further, the hoisting assembly includes a first hoisting frame and a second hoisting frame, and the first hoisting frame and the second hoisting frame are respectively on both sides of the upper end of the frame assembly.

[0015] The beneficial effects of adopting the above further solution are as follows: The first hoisting frame and the second hoisting frame are beneficial for connecting with a crane or a hoisting device, facilitating the overall hoisting of the frame assembly and the wall panel.

[0016] Further, the frame assembly includes a first support column, a second support column, a third support column and a fourth support column, and the first support column, the second support column, the third support column and the fourth support column are connected by a connecting frame.

[0017] The beneficial effects of adopting the above further solution are as follows: The connecting frame not only facilitates the connection of each support column, but also facilitates the operator to stand and install the wall panel.

[0018] Further, climbing frames are installed between the first support column and the second support column, and between the third support column and the fourth support column.

[0019] The beneficial effects of adopting the above further solution are as follows: The climbing frame is beneficial for the operator to move on the frame assembly to install the wall panel.

[0020] Further, a safety railing is also installed between the second support column and the third support column.

[0021] The beneficial effects of adopting the above further solution are as follows: The safety railing prevents the operator from falling to the ground when standing on the connecting frame to install, protecting the personal safety of the operator.

[0022] Further, the wall panel support assembly includes a support plate, and the support plate is installed at the ends of the first support column and the fourth support column.

[0023] The beneficial effects of adopting the above further solution are as follows: The support plate is used to support the wall panel to prevent the wall panel from falling during hoisting and installation.

[0024] Further, the wall panel fixing assembly includes a first fixing plate and a second fixing plate respectively installed on the first support column and the second support column. Fixing holes are provided at the relative positions of the first fixing plate and the second fixing plate. The fixing holes have internal threads, and a fixing rod is inserted through two oppositely arranged fixing holes. The fixing rod has an external thread that mates with the internal thread.

[0025] The beneficial effect of adopting the above further solution is that the frame assembly and the fixing rod limit and fix the wall panel, avoiding breakage or deformation during hoisting.

[0026] Further, safety catches are also installed on the second support column and the third support column.

[0027] The beneficial effect of adopting the above further solution is that the safety catches are used to fasten the safety rope when the operator climbs the frame assembly.

[0028] Further, connection catches for connecting with the wall are also installed on the first support column and the fourth support column.

[0029] The beneficial effect of adopting the above further solution is that the connection catches facilitate the connection of the frame assembly to the wall, reduce the sway of the frame assembly, and at the same time facilitate the rapid installation of the wall panel. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 is a schematic structural diagram of Embodiment 1 of the present utility model;

[0031] Figure 2 is a schematic structural diagram of the wall panel fixing assembly of Embodiment 1 of the present utility model;

[0032] Figure 3 is a schematic structural diagram of Embodiment 2 of the present utility model.

[0033] In the drawings, the list of components represented by each reference numeral is as follows:

[0034] 1. Frame assembly; 2. Hoisting assembly; 3. Wall panel support assembly; 4. Wall panel fixing assembly; 5. First hoisting frame; 6. Second hoisting frame; 7. First support column; 8. Second support column; 9. Third support column; 10. Fourth support column; 11. Connection frame; 12. Climbing frame; 13. Safety railing; 14. Support plate; 15. First fixing plate; 16. Second fixing plate; 17. Fixing hole; 18. Fixing rod; 19. Safety catch; 20. Connection catch. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0035] The principles and features of the present utility model are described below with reference to the accompanying drawings. The examples given are only for explaining the present utility model and are not intended to limit the scope of the present utility model.

[0036] In the description of the present utility model, it should be understood that the orientation or positional relationship indicated by the terms "center", "length", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "inner", "outer", "peripheral side", "circumferential direction", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the system or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation to the present utility model.

[0037] In the description of the present utility model, the meaning of "a plurality of" is at least two, such as two, three, etc., unless otherwise specifically defined.

[0038] In the present utility model, unless otherwise clearly specified and defined, the terms "installed", "connected", "connected", "fixed", etc. should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or integrated; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. It can be the communication inside two elements or the interaction relationship between two elements, unless otherwise clearly defined. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0039] Embodiment 1

[0040] As Figure 1 、 Figure 2 shown, an integrated operation frame for hoisting and installing the outer wall panels of an industrial building includes

[0041] a frame assembly 1;

[0042] a hoisting assembly 2, and the hoisting assembly 2 is installed at the upper end of the frame assembly 1;

[0043] a wall panel support assembly 3, and the wall panel support assembly 3 is installed at the end of the frame assembly 1 and is arranged opposite to the hoisting assembly 2;

[0044] a wall panel fixing assembly 4, and the wall panel fixing assembly 4 is installed on the side wall of the frame assembly 1 and is on the same side as the wall panel support assembly 3.

[0045] In the present utility model, after the frame assembly 1 is placed flat and the wall panel is placed on the side wall of the frame assembly 1 and fixed and limited by the wall panel fixing assembly 4, it is beneficial for the hoisting assembly 2 to hoist the frame assembly 1 and the wall panel. At the same time, the wall panel support assembly 3 prevents the wall panel from sliding down and falling. After hoisting to the appropriate position, the operator climbs onto the frame assembly 1 to install the wall panel, reducing the breakage and deformation of the wall panel and facilitating the rapid installation by the operator.

[0046] As Figure 1 、Figure 2 As shown, in some embodiments, the frame assembly 1 includes a first support column 7, a second support column 8, a third support column 9, and a fourth support column 10. The first support column 7, the second support column 8, the third support column 9, and the fourth support column 10 can all be made of rectangular hollow tubes. The first support column 7, the second support column 8, the third support column 9, and the fourth support column 10 are connected by a connecting frame 11. The connecting frame 11 can also be a frame supported by rectangular hollow tubes, and a reinforcing tube is also installed on the frame. The connecting frame 11 not only facilitates the connection of each support column, but also facilitates the operator to stand and install the wall panel. A safety railing 13 is also installed between the second support column 8 and the third support column 9. The safety railing 13 prevents the operator from falling to the ground when standing on the connecting frame 11 for installation.

[0047] In another embodiment, the hoisting assembly 2 includes a first hoisting frame 5 and a second hoisting frame 6. The first hoisting frame 5 and the second hoisting frame 6 are respectively on both sides of the upper end of the frame assembly 1. To facilitate the operator to get on and off the frame assembly 1, climbing frames 12 are installed between the first support column 7 and the second support column 8, and between the third support column 9 and the fourth support column 10. The wall panel support assembly 3 includes a support plate 14. The support plate 14 is installed at the ends of the first support column 7 and the fourth support column 10. The support plate 14 is used to support the wall panel to prevent the wall panel from falling during hoisting and installation.

[0048] In this embodiment, the wall panel fixing assembly 4 includes a first fixing plate 15 and a second fixing plate 16 respectively installed on the first support column 7 and the second support column 8. Fixing holes 17 are provided at the relative positions of the first fixing plate 15 and the second fixing plate 16. The fixing holes 17 have internal threads. A fixing rod 18 is inserted through the two oppositely arranged fixing holes 17. The fixing rod 18 has an external thread that mates with the internal thread.

[0049] In other embodiments, a plurality of fixing holes 17 are provided at the relative positions of the first fixing plate 15 and the second fixing plate 16. Connecting nuts are installed outside the fixing holes 17. The appropriate fixing holes 17 are selected according to the thickness of the wall panel. Both ends of the fixing rod 18 are inserted into the two connecting nuts, so that the fixing rod 18 and the frame assembly 1 cooperate to firmly clamp the wall. To facilitate the rotation of the fixing rod 18, a rotating handle is also installed at the end of the fixing rod 18.

[0050] Embodiment Two

[0051] As Figure 3As shown in the figure, the difference between this embodiment and the first embodiment lies only in that safety catches 19 are also installed on the second support column 8 and the third support column 9, and connection catches 20 for connecting to the wall are also installed on the first support column 7 and the fourth support column 10. The safety catches 19 are used for an operator to buckle a safety rope when climbing the frame assembly 1, and the connection catches 20 facilitate the connection between the frame assembly 1 and the wall, reduce the sway of the frame assembly 1, and at the same time facilitate the rapid installation of wall panels.

[0052] Embodiment III

[0053] The wall installation includes the following steps:

[0054] S100: Lay the frame assembly 1 flat on the ground, place the industrial factory building exterior wall panel on the frame, and the bottom of the exterior wall panel lands on the support plate 14;

[0055] S200: According to the thickness of the exterior wall panel, insert the fixing rod 18 into the corresponding fixing hole 17, thereby fixing the exterior wall panel to the frame assembly 1;

[0056] S300: Connect the sling to the first lifting frame 5 and the second lifting frame 6, lift the frame assembly 1 by using a truck crane or other lifting device, and hoist it to the exterior wall operation position;

[0057] S400: The operator enters the frame assembly 1 from the lower side of the frame assembly 1, climbs to the operation surface position of the connection frame 11 from the climbing frames 12 on both sides with the assistance of the safety catches 19, and after connecting to the wall through the connection catches 20, loosen the fixing rod 18 and install the exterior wall panel;

[0058] S500: After the exterior wall panel is installed, the personnel withdraw from the bottom of the frame assembly 1, and the truck crane or other lifting device lays the frame assembly 1 flat and places the next exterior wall panel on the frame assembly 1.

[0059] In the description of this specification, the description with reference to terms such as "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials, or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described can be combined in a suitable manner in any one or more embodiments or examples. In addition, without contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples.

[0060] The above are only the preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.

Claims

1. An integrated operation frame for lifting and installing exterior wall panels of industrial plants, characterized in that: include A frame assembly (1); A hanging assembly (2), wherein the hanging assembly (2) is installed on the upper end of the frame assembly (1); A wall panel support assembly (3), the wall panel support assembly (3) being mounted on the end of the frame assembly (1) and arranged opposite to the hoisting assembly (2); A wall panel fixing assembly (4), wherein the wall panel fixing assembly (4) is installed on a side wall of the frame assembly (1) and is located on the same side as the wall panel supporting assembly (3).

2. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 1 is characterized in that: The hanging assembly (2) comprises a first hanging frame (5) and a second hanging frame (6), wherein the first hanging frame (5) and the second hanging frame (6) are respectively located on both sides of the upper end of the frame assembly (1).

3. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 1 is characterized in that: The frame assembly (1) comprises a first support column (7), a second support column (8), a third support column (9) and a fourth support column (10); the first support column (7), the second support column (8), the third support column (9) and the fourth support column (10) are connected via a connecting frame (11).

4. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized by: A climbing frame (12) is installed between the first supporting column (7) and the second supporting column (8), and between the third supporting column (9) and the fourth supporting column (10).

5. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized in that: A guardrail (13) is also installed between the second support column (8) and the third support column (9).

6. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized by: The wall panel support assembly (3) comprises a support plate (14), and the support plate (14) is installed on the ends of the first support column (7) and the fourth support column (10).

7. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized by: The wall panel fixing assembly (4) comprises a first fixing plate (15) and a second fixing plate (16) respectively mounted on the first supporting column (7) and the second supporting column (8), wherein the first fixing plate (15) and the second fixing plate (16) are provided with fixing holes (17) at relative positions, wherein the fixing holes (17) have internal threads, and fixing rods (18) are inserted into the two oppositely arranged fixing holes (17), wherein the fixing rods (18) have external threads matching the internal threads.

8. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized in that: Safety buckles (19) are also installed on the second support column (8) and the third support column (9).

9. The integrated operation frame for lifting and installing exterior wall panels of industrial plants according to claim 3 is characterized by: The first support column (7) and the fourth support column (10) are also provided with connection buckles (20) for connecting to a wall.