Construction engineering hanging bracket

By designing a hanger that includes mounting plates, support plates, limiting components, adjustment plates and curved fixtures, rapid adjustment of the height of the pipe hanger is achieved, solving the problem that existing hangers are difficult to adapt to building changes, and improving the flexibility and accuracy of construction.

CN222950562UActive Publication Date: 2025-06-06FUJIAN ZHONGJIAN TIANYUAN CONSTR DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421975600.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2025-06-06
Estimated Expiration
2034-08-15

AI Technical Summary

Technical Problem

The height of existing pipe hangers is usually fixed, making it difficult to adapt to changes in building structure and layout, limiting the flexibility of pipeline adjustment and rearrangement, resulting in inconvenience in use.

Method used

A hanger including mounting plate, support plate, limit assembly, adjustment plate and arc-shaped fixture is designed. The hanger height is quickly adjusted through the combination of support plate, limit assembly, adjustment plate and groove.

Benefits of technology

Through the height adjustment function, the hanger is more flexible during the installation process. Construction personnel can adjust the height of the hanger according to actual conditions to ensure that the installation position of the pipe is accurate and avoid construction problems caused by height mismatch.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222950562U_ABST
    Figure CN222950562U_ABST
Patent Text Reader

Abstract

The utility model provides a construction engineering hanging bracket which comprises a mounting plate, supporting plates are fixedly mounted on the two sides of the bottom of the mounting plate, a limiting assembly is fixedly mounted at the bottom of one side of each supporting plate, an adjusting plate is movably mounted in an inner cavity of each supporting plate, a groove is formed in one side of each adjusting plate, and a connecting plate is fixedly mounted at the bottom of each adjusting plate. Side plates are fixedly installed on the opposite sides of the two connecting plates, fixing plates are fixedly installed on the tops and the bottoms of the opposite sides of the two side plates, and three first arc-shaped clamps are fixedly installed on the top of one fixing plate. Through cooperative use of a supporting plate, a limiting assembly, an adjusting plate and a groove, the height of the hanging bracket can be rapidly adjusted, the pipeline hanging bracket is more flexible in the installation process through the height adjusting function, a constructor can adjust the height of the hanging bracket according to the actual situation, it is ensured that the installation position of a pipeline is accurate, and the practicability is high. And the subsequent construction problem caused by height mismatching is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a construction engineering hanger. Background Art

[0002] Hangers are needed in construction projects. Hangers in construction projects are important engineering facilities used to support and suspend various equipment, pipes, cables and other components inside and outside the building. The design and installation of hangers are crucial to the safety and functionality of the entire building.

[0003] The height of existing pipe hangers is usually fixed. The structure and layout of the building may require adjustment of the position or height of the pipe. Hangers without height adjustment function are difficult to adapt to these changes. During the use of the building, the pipes may need to be adjusted or rearranged. Hangers without height adjustment function will limit the flexibility of these adjustments and are very inconvenient to use.

[0004] Therefore, we make improvements to this and propose a construction engineering hanger. Utility Model Content

[0005] The purpose of the utility model is to solve the problem that the height of existing pipe hangers is usually fixed, the structure and layout of the building may require adjustment of the position or height of the pipe, and a hanger without a height adjustment function is difficult to adapt to these changes. The pipes may need to be adjusted or rearranged during the use of the building, and a hanger without a height adjustment function will limit the flexibility of these adjustments, which is very inconvenient during use.

[0006] In order to achieve the above-mentioned invention object, the utility model provides the following technical solutions:

[0007] Construction engineering hangers are used to improve the above problems.

[0008] The specific application is as follows:

[0009] It includes a mounting plate, support plates are fixedly installed on both sides of the bottom of the mounting plate, a limiting component is fixedly installed on the bottom of one side of the support plate, an adjustment plate is movably installed in the inner cavity of the support plate, a groove is opened on one side of the adjustment plate, a connecting plate is fixedly installed on the bottom of the adjustment plate, side plates are fixedly installed on the opposite sides of the two connecting plates, and fixing plates are fixedly installed on the top and bottom of the opposite sides of the two side plates, three first arc clamps are fixedly installed on the top of one of the fixing plates, a fixing component is fixedly installed on the top of the other fixing plate, and three second arc clamps are fixedly installed on the bottom of the fixing component.

[0010] Through the coordinated use of support plates, limit assemblies, adjustment plates and grooves, the height of the hanger can be quickly adjusted. The height adjustment function makes the pipe hanger more flexible during installation. Construction personnel can adjust the height of the hanger according to actual conditions to ensure that the installation position of the pipe is accurate and avoid subsequent construction problems caused by height mismatch.

[0011] As a preferred embodiment of the construction project hanger provided by the utility model, the limiting assembly includes an outer shell, and the two outer shells are respectively fixedly installed on the bottom of the opposite sides of the two support plates, and springs are fixedly installed on the opposite sides of the inner cavities of the two outer shells, and baffles are fixedly installed on the opposite sides of the two springs, and two plug rods are fixedly installed on the opposite sides of the two baffles, and pull plates are fixedly installed on the opposite sides of the two baffles, and one side of the pull plate passes through the outside of the outer shell.

[0012] As a preferred embodiment of the construction engineering hanger provided by the utility model, sliding blocks are fixedly installed on the top and bottom of the baffle, a sliding rod is slidably installed in the inner cavity of the sliding block, and the sliding rod is fixedly connected to the outer shell on one side close to the outer shell.

[0013] As a preferred embodiment of the construction engineering hanger provided by the utility model, positioning plates are fixedly installed on the top and bottom of the shell, and the side of the positioning plate close to the support plate is fixedly connected to the support plate.

[0014] As a preferred embodiment of the construction project hanger provided by the utility model, the fixing assembly includes a threaded sleeve, which is fixedly installed on the top of another fixed plate, the inner cavity of the threaded sleeve is threadedly connected with a threaded rod, a rotating disk is fixedly installed on the top of the threaded rod, and a placement plate is movably installed on the bottom of the threaded rod, and the placement plate is fixedly connected to the second arc clamp on one side close to the second arc clamp.

[0015] As a preferred embodiment of the construction engineering hanger provided by the utility model, movable rods are fixedly installed on both sides of the top of the placement plate, and movable sleeves are movably installed on the surface of the movable rods. The movable sleeves are fixedly connected to the fixed plate on one side close to the fixed plate.

[0016] As a preferred embodiment of the construction engineering hanger provided by the utility model, a limiting ring is sleeved on the surface of the threaded sleeve, and the limiting ring is fixedly connected to the fixing plate on a side close to the fixing plate.

[0017] As a preferred embodiment of the construction engineering hanger provided by the utility model, two slots are provided on both sides of the top of the first arc-shaped clamp, and two plug-in blocks are fixedly installed on both sides of the bottom of the second arc-shaped clamp.

[0018] As a preferred embodiment of the construction engineering hanger provided by the utility model, two mounting blocks are fixedly mounted on the front and rear sides of the mounting plate, and mounting holes are opened on the tops of the mounting blocks.

[0019] Compared with the prior art, the utility model has the following beneficial effects: through the coordinated use of the support plate, the limit assembly, the adjustment plate and the groove, the height of the hanger can be quickly adjusted. The height adjustment function makes the pipe hanger more flexible during the installation process. The construction personnel can adjust the height of the hanger according to the actual situation to ensure that the installation position of the pipeline is accurate and avoid subsequent construction problems caused by height mismatch. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the structure of the construction project hanger provided for this application;

[0021] Figure 2 A schematic diagram of a front view of a first arc-shaped clamp of a construction engineering hanger provided in this application;

[0022] Figure 3 A schematic diagram of a front and cross-sectional view of a limit assembly of a construction engineering hanger provided in this application;

[0023] Figure 4 A schematic front view of the fixing components of the construction engineering hanger provided for this application.

[0024] Indicated in the figure:

[0025] 1. Mounting plate; 2. Support plate; 3. Limiting assembly; 301. Housing; 302. Spring; 303. Baffle; 304. Insert rod; 305. Pull plate; 306. Sliding block; 307. Sliding rod; 308. Positioning plate; 4. Adjusting plate; 5. Groove; 6. Connecting plate; 7. Side plate; 8. Fixed plate; 9. First arc-shaped fixture; 10. Fixed assembly; 1001. Threaded sleeve; 1002. Threaded rod; 1003. Rotating disk; 1004. Placement plate; 1005. Movable rod; 1006. Movable sleeve; 1007. Limiting ring; 11. Second arc-shaped fixture; 12. Slot; 13. Insert block; 14. Mounting block; 15. Mounting hole. DETAILED DESCRIPTION

[0026] To make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments.

[0027] Therefore, the following detailed description of the embodiments of the present invention is not intended to limit the scope of the present invention to be protected, but merely represents some embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.

[0029] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0030] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "upper", "lower", etc. is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invention product is usually placed when in use, or the orientation or position relationship commonly understood by those skilled in the art. Such terms are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0031] As described in the background technology, the height of existing pipe hangers is usually fixed. The structure and layout of the building may require adjustment of the position or height of the pipe. Hangers without height adjustment function are difficult to adapt to these changes. The pipes may need to be adjusted or rearranged during the use of the building. Hangers without height adjustment function will limit the flexibility of these adjustments, which is very inconvenient during use.

[0032] In order to solve this technical problem, the utility model provides a construction engineering hanger.

[0033] Specifically, please refer to Figure 1-4The construction engineering hanger specifically includes: a mounting plate 1, support plates 2 are fixedly installed on both sides of the bottom of the mounting plate 1, a limiting component 3 is fixedly installed on the bottom of one side of the support plate 2, an adjusting plate 4 is movably installed in the inner cavity of the support plate 2, a groove 5 is opened on one side of the adjusting plate 4, a connecting plate 6 is fixedly installed on the bottom of the adjusting plate 4, side plates 7 are fixedly installed on the opposite sides of the two connecting plates 6, and fixing plates 8 are fixedly installed on the top and bottom of the opposite sides of the two side plates 7, three first arc clamps 9 are fixedly installed on the top of one of the fixing plates 8, a fixing component 10 is fixedly installed on the top of the other fixing plate 8, and three second arc clamps 11 are fixedly installed on the bottom of the fixing component 10.

[0034] By using the support plate 2, the limit assembly 3, the adjustment plate 4 and the groove 5 in coordination, the height of the hanger can be quickly adjusted. The height adjustment function makes the pipe hanger more flexible during the installation process. The construction personnel can adjust the height of the hanger according to the actual situation to ensure that the installation position of the pipe is accurate and avoid subsequent construction problems caused by height mismatch.

[0035] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings.

[0036] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features and technical solutions in the embodiments may be combined with each other.

[0037] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0038] Example 1

[0039] Please refer to Figure 1-4A construction engineering hanger comprises a mounting plate 1, support plates 2 are fixedly mounted on both sides of the bottom of the mounting plate 1, a limiting assembly 3 is fixedly mounted on the bottom of one side of the support plate 2, an adjusting plate 4 is movably mounted in the inner cavity of the support plate 2, a groove 5 is provided on one side of the adjusting plate 4, a connecting plate 6 is fixedly mounted on the bottom of the adjusting plate 4, side plates 7 are fixedly mounted on the opposite sides of the two connecting plates 6, fixing plates 8 are fixedly mounted on the top and bottom of the opposite sides of the two side plates 7, three first arc-shaped clamps 9 are fixedly mounted on the top of one of the fixing plates 8, a fixing assembly 10 is fixedly mounted on the top of the other fixing plate 8, and three second arc-shaped clamps 11 are fixedly mounted on the bottom of the fixing assembly 10. The limiting assembly 3 includes a shell 301, and the two shells 301 are fixedly installed at the bottom of the opposite side of the two support plates 2, respectively. A spring 302 is fixedly installed on the opposite side of the inner cavity of the two shells 301, and a baffle 303 is fixedly installed on the opposite side of the two springs 302. Two plug rods 304 are fixedly installed on the opposite side of the two baffles 303, and a pull plate 305 is fixedly installed on the opposite side of the two baffles 303, and one side of the pull plate 305 penetrates to the outside of the shell 301. Sliding blocks 306 are fixedly installed on the top and bottom of the baffle 303, and a sliding rod 307 is slidably installed in the inner cavity of the sliding block 306. The side of the sliding rod 307 close to the shell 301 is fixedly connected to the shell 301. Positioning plates 308 are fixedly installed on the top and bottom of the shell 301, and the side of the positioning plate 308 close to the support plate 2 is fixedly connected to the support plate 2.

[0040] During the implementation process, by pulling the pull plate 305, the pull plate 305 drives the baffle plate 303 and the plug rod 304 to move when being pulled, and the spring 302 can also be compressed, so that the adjustment plate 4 can be moved and adjusted, and the pull plate 305 is released. When the pull plate 305 is released, the spring 302 is reset, and the reset of the spring 302 drives the baffle plate 303 and the plug rod 304 to reset, allowing the plug rod 304 to enter the interior of the groove 5, thereby fixing the adjustment plate 4. When the adjustment plate 4 needs to be moved again, the pull plate 305 is pulled to allow the plug rod 304 to be separated from the interior of the groove 5, and the adjustment plate 4 can be moved, so that the height of the hanger can be adjusted. The height adjustment function makes the pipe hanger more flexible during the installation process. The construction personnel can adjust the height of the hanger according to the actual situation to ensure that the installation position of the pipeline is accurate and avoid subsequent construction problems caused by height mismatch.

[0041] Example 2

[0042] The fixing assembly 10 includes a threaded sleeve 1001, which is fixedly mounted on the top of another fixing plate 8. The inner cavity of the threaded sleeve 1001 is threadedly connected with a threaded rod 1002, and a rotating disk 1003 is fixedly mounted on the top of the threaded rod 1002. A placement plate 1004 is movably mounted on the bottom of the threaded rod 1002, and the side of the placement plate 1004 close to the second arc-shaped clamp 11 is fixedly connected to the second arc-shaped clamp 11. Movable rods 1005 are fixedly mounted on both sides of the top of the placement plate 1004, and a movable sleeve 1006 is movably mounted on the surface of the movable rod 1005, and the side of the movable sleeve 1006 close to the fixing plate 8 is fixedly connected to the fixing plate 8. A limiting ring 1007 is sleeved on the surface of the threaded sleeve 1001, and the side of the limiting ring 1007 close to the fixing plate 8 is fixedly connected to the fixing plate 8.

[0043] During the implementation process, by rotating the rotating disk 1003, the rotating disk 1003 will drive the threaded rod 1002 to rotate when it rotates. The threaded rod 1002 is threadedly connected to the inside of the threaded sleeve 1001. The threaded rod 1002 will move toward the bottom when it rotates, and the placement plate 1004 will move along with the movement of the threaded rod 1002. The second arc clamp 11 will move along with the movement of the placement plate 1004. Through the coordinated use of the first arc clamp 9 and the second arc clamp 11, the pipeline can be fixed. By fixing the pipeline, it can be ensured that the pipeline maintains a stable position and layout during use.

[0044] When in use, by pulling the pull plate 305, the pull plate 305 drives the baffle plate 303 and the plug rod 304 to move when being pulled, and the spring 302 can also be compressed, so that the adjustment plate 4 can be moved and adjusted, and the pull plate 305 is released. When the pull plate 305 is released, the spring 302 resets, and the reset of the spring 302 drives the baffle plate 303 and the plug rod 304 to reset, allowing the plug rod 304 to enter the inside of the groove 5, thereby fixing the adjustment plate 4. When the adjustment plate 4 needs to be moved again, the pull plate 305 is pulled to allow the plug rod 304 to be separated from the inside of the groove 5, and the adjustment plate 4 can be moved, so that the height of the hanger can be adjusted. The height adjustment function makes the pipe hanger more flexible during the installation process, and the construction personnel can Adjust the height of the hanger according to actual conditions to ensure that the installation position of the pipeline is accurate and avoid subsequent construction problems caused by height mismatch. By rotating the rotating disk 1003, the rotating disk 1003 will drive the threaded rod 1002 to rotate when it rotates. The threaded rod 1002 is threadedly connected to the inside of the threaded sleeve 1001. The threaded rod 1002 will move toward the bottom when it rotates, and the placement plate 1004 will move with the movement of the threaded rod 1002. The second arc clamp 11 will move with the movement of the placement plate 1004. The first arc clamp 9 and the second arc clamp 11 can be used in conjunction to fix the pipeline. By fixing the pipeline, it can be ensured that the pipeline maintains a stable position and layout during use.

[0045] The above embodiments are only used to illustrate the present invention and are not intended to limit the technical solutions described in the present invention. Although the present invention has been described in detail with reference to the above embodiments, the present invention is not limited to the above specific implementation methods. Therefore, any modification or equivalent replacement of the present invention; and all technical solutions and improvements thereof that do not depart from the spirit and scope of the invention are included in the scope of the claims of the present invention.

Claims

1. A construction engineering hanger, comprising a mounting plate (1), characterized in that: Support plates (2) are fixedly mounted on both sides of the bottom of the mounting plate (1); a limit assembly (3) is fixedly mounted on the bottom of one side of the support plate (2); an adjustment plate (4) is movably mounted in the inner cavity of the support plate (2); a groove (5) is provided on one side of the adjustment plate (4); a connecting plate (6) is fixedly mounted on the bottom of the adjustment plate (4); side plates (7) are fixedly mounted on opposite sides of the two connecting plates (6); fixing plates (8) are fixedly mounted on the top and bottom of opposite sides of the two side plates (7); three first arc-shaped clamps (9) are fixedly mounted on the top of one of the fixing plates (8); a fixing assembly (10) is fixedly mounted on the top of the other fixing plate (8); and three second arc-shaped clamps (11) are fixedly mounted on the bottom of the fixing assembly (10).

2. A construction engineering hanger according to claim 1, characterized in that: The limit assembly (3) comprises a shell (301), wherein the two shells (301) are fixedly mounted on the bottom of opposite sides of the two support plates (2), respectively; springs (302) are fixedly mounted on opposite sides of the inner cavities of the two shells (301); baffles (303) are fixedly mounted on opposite sides of the two springs (302); two plug rods (304) are fixedly mounted on opposite sides of the two baffles (303); and pull plates (305) are fixedly mounted on opposite sides of the two baffles (303); one side of the pull plates (305) passes through the outer side of the shell (301).

3. A construction engineering hanger according to claim 2, characterized in that: A sliding block (306) is fixedly mounted on the top and bottom of the baffle (303), a sliding rod (307) is slidably mounted in the inner cavity of the sliding block (306), and the sliding rod (307) is fixedly connected to the outer shell (301) on a side close to the outer shell (301).

4. A construction engineering hanger according to claim 2, characterized in that: Positioning plates (308) are fixedly mounted on the top and bottom of the housing (301), and the side of the positioning plate (308) close to the support plate (2) is fixedly connected to the support plate (2).

5. A construction engineering hanger according to claim 1, characterized in that: The fixing assembly (10) comprises a threaded sleeve (1001), wherein the threaded sleeve (1001) is fixedly mounted on the top of another fixing plate (8), the inner cavity of the threaded sleeve (1001) is threadedly connected to a threaded rod (1002), a rotating disk (1003) is fixedly mounted on the top of the threaded rod (1002), and a placement plate (1004) is movably mounted on the bottom of the threaded rod (1002), and the placement plate (1004) is fixedly connected to the second arc-shaped clamp (11) on a side close to the second arc-shaped clamp (11).

6. A construction engineering hanger according to claim 5, characterized in that: Movable rods (1005) are fixedly mounted on both sides of the top of the placement plate (1004), and a movable sleeve (1006) is movably mounted on the surface of the movable rod (1005), and the movable sleeve (1006) is fixedly connected to the fixed plate (8) on a side close to the fixed plate (8).

7. A construction engineering hanger according to claim 5, characterized in that: A limiting ring (1007) is sleeved on the surface of the threaded sleeve (1001), and the limiting ring (1007) is fixedly connected to the fixing plate (8) on a side close to the fixing plate (8).

8. A construction engineering hanger according to claim 1, characterized in that: Two slots (12) are provided on both sides of the top of the first arc-shaped clamp (9), and two insert blocks (13) are fixedly installed on both sides of the bottom of the second arc-shaped clamp (11).

9. A construction engineering hanger according to claim 1, characterized in that: Two mounting blocks (14) are fixedly mounted on the front and rear sides of the mounting plate (1), and mounting holes (15) are formed on the tops of the mounting blocks (14).