Fabricated pile foundation construction platform

By designing a prefabricated pile foundation construction platform, combined with the innovative design of the cartridge, fixed panel and multi-layer guardrail, the traditional platform's shortcomings in construction efficiency, accuracy and versatility are solved, and efficient and convenient construction operations are achieved.

CN222962043UActive Publication Date: 2025-06-10ROAD & BRIDGE INT CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421739503.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2025-06-10
Estimated Expiration
2034-07-22

AI Technical Summary

Technical Problem

Traditional pile foundation construction platforms have shortcomings in construction efficiency, accuracy and versatility, which are difficult to adapt to a variety of construction conditions, and require a lot of manual and on-site material allocation, resulting in high costs and delays in construction periods.

Method used

A prefabricated pile foundation construction platform is designed, which can achieve convenient disassembly and multi-functional operation of the platform through the vertical fixed connection of the guardrail and the fixed panel, combined with hollow design and multi-layer guardrail.

Benefits of technology

It realizes the platform's easy assembly and efficient support for full-process operations, improves construction efficiency and accuracy, reduces costs and construction periods, and adapts to a variety of construction conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222962043U_ABST
    Figure CN222962043U_ABST
Patent Text Reader

Abstract

The utility model relates to an assembly type pile foundation construction platform which comprises a pile casing and a shaping panel which is arranged at the top of the pile casing and is vertically and fixedly connected with the pile casing, a hollow part corresponding to the pile casing is arranged in the middle of the shaping panel, and the shaping panel is a square panel. The outer shaping guard bar is arranged on the periphery of the shaping panel, the inner shaping guard bar is arranged on the periphery of the hollow part, the outer shaping guard bar comprises outer positioning vertical rods arranged at the corners of the shaping panel respectively, the assembly type design of the operation platform and the pile casing can be achieved, on-site disassembly and assembly are convenient and fast, transportation is also convenient, and the working efficiency is improved. And the outer positioning vertical rod can be used as a fixed point, and whether pile foundation construction deviates or not is determined in the retesting process through a four-point cross line method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction platforms, and specifically to the technical field of an assembled pile foundation construction platform. Background Art

[0002] In the construction of pile foundations, it is crucial to ensure construction efficiency and precision. Most traditional pile foundation operation platforms rely on on-site construction. This method not only takes a long time and requires a lot of effort, but also has weak functionality, affecting construction quality and safety. And usually, it needs to be customized and built according to the specific project requirements. This process involves a large amount of manual labor and on-site material allocation, which is not only costly, but also greatly restricted by weather conditions and prone to project delays.

[0003] In actual operation, a series of processes such as the positioning and lowering of the pile foundation casing, the protection during the punching (drilling) process, the remeasurement and positioning, the lowering of steel bars, the cleaning of the bottom of the hole, and the pouring of concrete all need to be completed on the platform, which poses extremely high requirements for the stability and versatility of the platform. Especially in the remeasurement and positioning link, ensuring accuracy is crucial for the safety and stability of the entire pile foundation structure, while traditional temporarily built platforms often have difficulty providing continuous and stable support and precise positioning auxiliary facilities.

[0004] Regarding this problem, for example, Chinese Patent CN202122895860.4 discloses a multi-functional operation platform for the construction of highway bridge pile foundations, which uses a scheme of building an operation platform through multiple symmetrically arranged vertical support steels and horizontal support steels, as well as longitudinal support steels between the horizontal support steels. However, the functional expansion of such a scheme is limited. It mainly solves the problem of the stability of concrete pouring, and only alleviates the quality hidden dangers brought by the terrain, and also needs to be built on-site.

[0005] In view of the above problems, there is an increasingly urgent need in the prior art for a pile foundation platform that can adapt to various construction conditions, is easy to assemble, and can efficiently support the full process of operation. Summary of the Utility Model

[0006] In summary, aiming at the deficiencies of the prior art, the utility model provides an assembled pile foundation construction platform, aiming to provide a pile foundation platform that is easy to assemble and can efficiently support the full process of operation.

[0007] To achieve the above object, the utility model adopts the following technical solutions:

[0008] An assembled pile foundation construction platform includes a casing, and a shaped panel vertically and fixedly connected to the top of the casing. A hollow part corresponding to the casing is provided in the middle of the shaped panel, and the shaped panel is a square panel;

[0009] It also includes an outer shaping guardrail arranged on the outer periphery of the shaping panel and an inner shaping guardrail arranged on the outer periphery of the hollow portion, wherein the outer shaping guardrail includes outer positioning uprights respectively arranged at the corners of the shaping panel.

[0010] Compared with the prior art, this case vertically fixes the casing and the shaping panel, and sets a hollow part corresponding to the casing in the middle of the shaping panel, so that the work platform and the casing can be assembled, which makes it convenient to disassemble and assemble on site and also convenient for transportation. At the same time, external positioning poles are set at the corners of the shaping panel, and the external positioning poles are used as fixed points. The four-point cross line method can be used to confirm whether the pile foundation construction is deviated during the re-measurement process.

[0011] In some embodiments, the hollow portion is a square hollow portion, and the inner shaped guardrail includes inner positioning poles respectively arranged at the inner corners of the hollow portion. The inner positioning poles can also be used as fixed points for re-measurement.

[0012] In some embodiments, an inclined support for supporting the shaping panel is provided between the outer periphery of the casing and the outer periphery of the bottom of the shaping panel.

[0013] In some embodiments, the casing is provided with a slide groove for installing the oblique support, so as to facilitate the disassembly and assembly of the oblique support.

[0014] In some embodiments, a top corbel is provided between the top of the casing and the bottom of the shaping panel to support the inner side of the shaping panel.

[0015] In some embodiments, a steel cage support for supporting the steel cage in the casing is also included.

[0016] In some preferred embodiments, the steel cage support is telescopic square steel.

[0017] In some embodiments, the protective tube is provided with an openable and closable cover.

[0018] In some preferred embodiments, the casing is provided with a lifting ring to facilitate disassembly and assembly.

[0019] In some embodiments, the side wall of the casing is provided with mud drainage holes, through which the mud can be discharged. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is the overall side view of a prefabricated pile foundation construction platform in this case;

[0021] Figure 2 This is a schematic diagram of an internally shaped guardrail of a prefabricated pile foundation construction platform in this case;

[0022] Figure 3 It is a schematic diagram of the casing;

[0023] Figure 4It is a top - view schematic diagram of the casing positioning panel of an assembled pile foundation construction platform in this case;

[0024] Figure 5 It is a schematic diagram of the steel cage support and cover plate;

[0025] Figure 6 It is a schematic diagram of the working condition of an assembled pile foundation construction platform in this case;

[0026] Figure 7 It is Figure 6 The partial enlarged view at position A in

[0027] Figure 8 It is Figure 6 The partial enlarged view at position B in

[0028] Figure 9 It is an installation schematic diagram of an assembled pile foundation construction platform in this case. Specific implementation mode

[0029] The features of the present utility model and other related features are further described in detail through the following embodiments for the understanding of those skilled in the same industry:

[0030] Please refer to Figure 1 , an assembled pile foundation construction platform in this case includes a casing 100 and a positioning panel 200 vertically and fixedly connected to the top of the casing 100. The casing 100 can be customized according to the size of the pile foundation, which is 10 - 15 cm larger than the diameter of the pile foundation. Please refer to Figure 4 for the preferred case. In order to facilitate hoisting, lifting rings 110 are arranged at the top opening position. Specifically, 4 lifting rings 110 are evenly arranged at its circular top opening, and U - shaped 16 - round steel can be welded to the top of the casing 100 for hoisting the platform.

[0031] Please refer to Figure 3 , the side wall of the casing 100 is provided with a mud drainage hole 120, and the mud can be drained out through the mud drainage hole 120. Specifically, referring to Figure 9 , a mud drainage port 120 with a diameter of 20 cm can be set at 30 cm below the lower edge of the top of the casing 100. The mud drainage port 120 can be welded with a funnel - shaped outlet to facilitate connecting the mud drainage pipe 121 and accessing the mud pit 122. This method can effectively solve the impact of mud on the surrounding environment during pile foundation construction, ensure that there is no silt around, and strengthen the on - site safety and civilized construction. The mud drainage port 120 can be customized according to the size of the pile foundation and the pouring rate. For the mud drainage pipe 121, it can be selected according to the terrain conditions and economic conditions, and plastic pipes or cloth - bag pipes can be used.

[0032] For the sizing panel 200, please refer to Figure 1 and Figure 4, the shaping panel 200 is a square panel, and a hollow portion 210 corresponding to the casing 100 is provided in the middle. During operation, the casing 100 is operated through the hollow portion 210. Therefore, the hollow portion 210 can at least cover the casing 100. In this way, the casing 100 and the shaping panel 200 are vertically fixedly connected, and the hollow portion 210 corresponding to the casing 100 is provided in the middle of the shaping panel 200, so that the working platform and the casing 100 can be assembled, which makes it convenient to disassemble and assemble on site and also convenient for transportation. Specifically, the shaping panel 200 can use 50 square steel as the main keel, 30 square steel as the secondary keel, and the top is fully covered with steel mesh.

[0033] At this time, the top of the shaped panel 200 is the work surface, so safety measures are needed. An outer shaped guardrail 220 is arranged on the periphery of the shaped panel 200, and the outer shaped guardrail 220 includes an outer positioning upright 221 respectively arranged at the corners of the shaped panel 200, that is, it is arranged at the four corners of the square panel. In addition, the outer shaped guardrail 220 also includes a protective railing 222 of not less than 1.5m on the outside, a pull plate of not less than 1.2m on the inside, and a skirting board 20cm below. The pull plate is a device widely used in industrial fields such as the construction industry and the manufacturing industry. In simple terms, the pull plate is a rectangular iron plate, which is usually used in the fields of renewable resource utilization, shipbuilding, railway and bridge construction, and construction. The surface of the guardrail should be painted with red and white interval warning paint. The guardrails are bolted together, and the inner and outer guardrails can be rotated and opened to facilitate workers to go up and down. The external positioning pole 221 plays the same role as the guardrail 222 in protection, and also belongs to the guardrail 222. In order to describe its role as a fixed point in the re-survey process, it is named differently. In this way, the external positioning pole 221 is used as a fixed point, and the four-point cross line method can be used to confirm whether the pile foundation construction is offset during the re-survey process.

[0034] Similarly, please combine Figure 2 , an inner shaped guardrail 230 is provided on the outer periphery of the hollow portion 210. In a preferred embodiment, the hollow portion 210 is also a square hollow, and the inner shaped guardrail 230 includes an inner positioning rod 231 provided at the inner corner of the hollow portion 210, and the inner positioning rod 231 can also be used as a fixed point for re-measurement. The design of other guardrail configurations is consistent with the outer shaped guardrail 220, and will not be repeated here.

[0035] The four-point crosshair method, also known as the four-point positioning method, is a technique for image correction or geometric rectification. This method is mainly used to determine the geometric deformation in an image. By precisely selecting four control points on the image and knowing their accurate positions in the actual space coordinate system, the geometric transformation parameters of the image are calculated, thereby achieving precise correction of the entire image. In this embodiment, the outer positioning vertical rod 221 and the inner positioning vertical rod 231 are fixed points and are used as the control points as described above.

[0036] The following details the vertical fixing method of the casing 100 and the shaping panel 200. Please refer to Figure 4 and Figures 6 to 8 , there is an inclined support 300 for supporting the shaping panel 200 between the outer periphery of the casing 100 and the outer periphery of the bottom of the shaping panel 200. Its arrangement direction can be set towards the four corners in view of the square characteristics of the shaping panel 200. At the same time, a chute 130 for installing the inclined support 300 is provided on the casing 100, which facilitates the disassembly and assembly of the inclined support.

[0037] The inclined support 300 is specifically made of channel steel and serves as the main load-bearing member of the platform. The lower end is obliquely cut and welded with steel plates that are slightly larger on each side, and the protruding part can be inserted into the chute 130 for matching use. The upper end is welded with a horizontal steel plate 310 and is bolted to the shaping panel 200, which is convenient for disassembly and installation.

[0038] The chute 130 is formed by welding an L30*30 angle steel on the side wall of the casing 100, and a section of steel bar is welded at the bottom of the angle steel for use as a limit. The main function of the chute 130 is to make the inclined support 300 convenient for disassembly and assembly, facilitate transportation, and be assembled on-site.

[0039] Please refer to Figure 2 and Figure 4 , in some embodiments, as a support for the inner side of the shaping panel 200, a top-opening bracket 400 is provided between the top of the casing 100 and the bottom of the shaping panel 200. Specifically, it can be evenly arranged corresponding to the four sides of the hollow part 210.

[0040] Please refer to Figure 6 , to ensure the quality of pile foundation steel bar processing, the steel reinforcement cage 1 is processed in sections, and each section is welded or mechanically connected. At this time, after lowering a section, support needs to be given to the steel reinforcement cage 1.

[0041] Please refer to Figure 5 , therefore, a steel reinforcement cage support 500 is also provided in this case. After lowering a section, the steel reinforcement cage support 500 is used at the position of the steel reinforcement cage's reinforcing stirrup, and another section is lifted and butt-connected, ensuring the quality and safety of the pile foundation steel reinforcement cage during lowering. Preferably, the steel reinforcement cage support 500 is a telescopic square steel.

[0042] Please refer to Figure 4 andFigure 5 , in some embodiments, the casing 100 is provided with an openable and closable cover plate 140. The inner fixing guardrail 230 is welded with hinges at one time, and the steel mesh is customized according to the pile foundation diameter and connected to the hinges. It can be opened and closed. When installing the steel reinforcement cage without performing punching operations, the protective net should be covered. During construction, the protective net can be opened and fixed to the inner guardrail. A conduit hole is reserved in the middle of the protective net, and the conduit can extend into it during the pile foundation pouring of hole cleaning without opening the protective net, which is safer.

[0043] As described above, the present case protects an assembled pile foundation construction platform, and all technical solutions identical or similar to the present case should be regarded as falling within the protection scope of the present case.

Claims

1. An assembled pile foundation construction platform, characterized in that: It comprises a protective tube (100), and a shaping panel (200) vertically fixedly connected to the protective tube (100) at the top of the protective tube (100), wherein a hollow portion (210) corresponding to the protective tube (100) is provided in the middle of the shaping panel (200), and the shaping panel (200) is a square panel; It also includes an external shaping guardrail (220) arranged on the outer periphery of the shaping panel (200) and an internal shaping guardrail (230) arranged on the outer periphery of the hollow portion (210), wherein the external shaping guardrail (220) includes external positioning uprights (221) respectively arranged at the corners of the shaping panel (200).

2. The assembled pile foundation construction platform according to claim 1, characterized in that: The hollow portion (210) is a square hollow portion, and the inner shaped guardrail (230) comprises inner positioning upright poles (231) respectively arranged at the inner corners of the hollow portion (210).

3. The assembled pile foundation construction platform according to claim 1, characterized in that: An oblique support (300) for supporting the shaping panel (200) is provided between the outer periphery of the casing (100) and the outer periphery of the bottom of the shaping panel (200).

4. The assembled pile foundation construction platform according to claim 3, characterized in that: The casing (100) is provided with a slide groove (130) for installing the oblique support (300).

5. The assembled pile foundation construction platform according to claim 1, characterized in that: A top bracket (400) for supporting the inner side of the shaping panel (200) is provided between the top of the casing (100) and the bottom of the shaping panel (200).

6. The assembled pile foundation construction platform according to claim 1, characterized in that: It also includes a steel cage support (500) for supporting the steel cage (1) in the casing (100).

7. The assembled pile foundation construction platform according to claim 6, characterized in that: The steel cage support (500) is a telescopic square steel.

8. The assembled pile foundation construction platform according to claim 1, characterized in that: The protective tube (100) is provided with an openable and closable cover plate (140).

9. The assembled pile foundation construction platform according to claim 1, characterized in that: The casing (100) is provided with a hanging ring (110).

10. The assembled pile foundation construction platform according to claim 1, characterized in that: The side wall of the casing (100) is provided with a mud drainage hole (120).