Fabricated flat-head tower crane
By adopting a prefabricated design in the installation of tower cranes and using the plug-in slot structure of the mobile foundation and the standard section of the tower crane, the problem of low installation efficiency of existing tower cranes is solved, and rapid assembly and efficient installation are achieved.
Patent Information
- Application Number
- CN202421795488.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2034-07-29
AI Technical Summary
The existing tower crane needs to be casted during installation, resulting in low installation efficiency.
The prefabricated flat-head tower crane design is adopted, including the moving foundation and the tower crane standard section. The moving foundation is quickly moved to the installation position, and the insertion rod slot structure connecting the base and the tower crane standard section is used to achieve rapid assembly, avoiding the step of pouring the foundation.
It greatly improves the installation efficiency of tower cranes, simplifies the installation process, and improves safety and efficiency when cross-operating multiple towers.
Smart Images

Figure CN222974769U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tower cranes, in particular to an assembled flat-top tower crane. Background Art
[0002] Tower crane, also known as tower crane, originated in Western Europe. It is a rotating crane with a boom mounted on the top of a tall tower. It has a large working space and is mainly used for vertical and horizontal transportation of materials and installation of building components in house construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower body, boom and base. The working mechanism has four parts: lifting, luffing, rotation and walking. The electrical system includes motors, controllers, distribution cabinets, connecting lines, signals and lighting devices, etc. Flat-top tower crane is a heavy lifting equipment widely used in the fields of construction and engineering. Its notable feature is that there is no traditional tower head structure or tie rod on the top of the tower. This design makes the overall outline of the tower crane simpler, and it is more convenient to install and disassemble. It also improves the safety and efficiency of multi-tower cross operations.
[0003] For example, a tower crane foundation with publication number CN214940351 U includes bored piles, reinforced concrete cushion layers arranged at the top of the bored piles, lattice columns connected to the bored piles, concrete caps arranged at the top of the lattice columns, and a cross beam foundation arranged on the surface of the concrete cap. This application has the advantage of being able to withstand a larger load;
[0004] When installing this tower crane, it is necessary to cast the foundation at the installation site. The installation efficiency of this tower crane structure is low. In order to solve the above problem, an assembled flat-top tower crane is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide an assembled flat-top tower crane to solve the above problems, comprising:
[0006] A mobile foundation, the upper surface of which is integrally cast with a mounting platform, a steel frame is fixedly installed inside the mounting platform, a plurality of connection holes are opened on the upper surface of the steel frame, and a connecting base is fixedly installed on the upper surface of the steel frame by bolts;
[0007] The tower crane standard section is fixedly installed on the top of the connecting base. The four corners of the bottom of the tower crane standard section are provided with plug rods, and the four corners of the top of the tower crane standard section are provided with slots.
[0008] Through the above technical solution, when the tower crane needs to be assembled, first move the mobile foundation to the position where the tower crane needs to be installed, then fix and install the connecting base on the corresponding position of the upper surface of the steel frame according to the size of the tower crane, and then insert the insertion rod at the bottom of the tower crane standard section into the inside of the connecting base and fix it with bolts. When stacking the tower crane standard sections, rapid assembly can be achieved by inserting the insertion rod of the upper standard section into the slot of the lower standard section. At the same time, with the structure of the mobile foundation, it is not necessary to pour before installing the tower crane, which greatly improves the installation efficiency of the tower crane.
[0009] In a preferred embodiment, pressing blocks are arranged on the four sides of the upper surface of the mobile foundation.
[0010] Through the above technical solution, the mobile foundation is pressed and fixed by placing a plurality of pressing blocks on the upper surface of the mobile foundation, improving the stability of the mobile foundation.
[0011] In a preferred embodiment, grooves adapted to the pressing blocks are formed on the upper surface of the mobile foundation.
[0012] Through the above technical solution, the pressing blocks can be quickly placed on the upper surface of the mobile foundation through the grooves.
[0013] In a preferred embodiment, reinforcing bars are fixedly installed on the inner walls of the four sides of the tower crane standard section.
[0014] Through the above technical solution, the strength of the tower crane standard section is improved by fixedly installing reinforcing bars on the inner wall of the tower crane standard section.
[0015] In a preferred embodiment, a plurality of locking convex blocks are fixedly installed on the outer walls of the front and rear sides of the tower crane standard section by bolts.
[0016] Through the above technical solution, the climbing mechanism of the tower crane performs a locking operation through the locking convex platform.
[0017] In a preferred embodiment, a plurality of through holes are formed on the outer walls of the insertion rod and the slot.
[0018] Through the above technical solution, after the insertion rod is inserted into the inside of the slot, bolts can be fixed in the through holes to achieve fixation.
[0019] In summary, due to the adoption of the above technical solution, the beneficial effect of the present utility model is: The present utility model provides an assembled flat-top tower crane.
[0020] When the tower crane needs to be assembled, first move the mobile foundation to the position where the tower crane needs to be installed, then fix and install the connecting base on the corresponding position of the upper surface of the steel frame according to the size of the tower crane, and then insert the insertion rod at the bottom of the tower crane standard section into the inside of the connecting base and fix it with bolts. When stacking the tower crane standard sections, quick assembly can be achieved by inserting the insertion rod of the upper standard section into the slot of the lower standard section. At the same time, with the structure of the mobile foundation, there is no need to pour before installing the tower crane, which greatly improves the installation efficiency of the tower crane. Brief Description of the Drawings
[0021] Figure 1 is a schematic structural view of the present utility model;
[0022] Figure 2 is a schematic structural view of the mobile foundation in the present utility model;
[0023] Figure 3 is a schematic structural view of the tower crane marking section in the present utility model.
[0024] Markings in the figure: 1 - mobile foundation; 11 - installation platform; 12 - steel frame; 13 - connection hole; 14 - connecting base; 15 - pressing block; 2 - tower crane standard section; 21 - insertion rod; 22 - slot; 23 - reinforcing rod; 24 - locking convex block. Detailed Description of the Embodiment
[0025] To make the objectives, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model. Obviously, the described embodiments are some, but not all, of the embodiments of the present utility model. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without creative efforts shall fall within the protection scope of the present utility model.
[0026] The following will be combined with Figures 1-3 to give a detailed description of an assembled flat-top tower crane according to an embodiment of the present utility model.
[0027] Embodiment:
[0028] An assembled flat-top tower crane includes:
[0029] The mobile foundation 1 has an installation platform 11 integrally cast on its upper surface. Inside the installation platform 11, a steel frame 12 is fixedly installed. On the upper surface of the steel frame 12, a plurality of connection holes 13 are provided. A connection base 14 is fixedly installed on the upper surface of the steel frame 12 by bolts. When assembling the tower crane, first move the mobile foundation 1 to the position where the tower crane needs to be installed, then fixedly install the connection base 14 at the corresponding position on the upper surface of the steel frame 12 according to the size of the tower crane, and then insert the insertion rod 21 at the bottom of the tower crane standard section 2 into the inside of the connection base 14 and fix it with bolts. With the structure of the mobile foundation 1, it is not necessary to perform casting before installing the tower crane, which greatly improves the installation efficiency of the tower crane;
[0030] On the four sides of the upper surface of the mobile foundation 1, pressure blocks 15 are provided. By placing a plurality of pressure blocks 15 on the upper surface of the mobile foundation 1, the mobile foundation 1 is pressed and fixed, improving the stability of the mobile foundation 1. On the upper surface of the mobile foundation 1, grooves adapted to the pressure blocks 15 are provided, and the pressure blocks 15 can be quickly placed on the upper surface of the mobile foundation 1 through these grooves;
[0031] The tower crane standard section 2 is fixedly installed on the top of the connection base 14. At the four corners of the bottom of the tower crane standard section 2, insertion rods 21 are provided. At the four corners of the top of the tower crane standard section 2, insertion slots 22 are provided. On the inner walls of the four sides of the tower crane standard section 2, strengthening rods 23 are fixedly installed. By fixedly installing the strengthening rods 23 on the inner walls of the tower crane standard section 2, the strength of the tower crane standard section is improved. On the outer walls of the front and rear sides of the tower crane standard section 2, a plurality of locking protrusions 24 are fixedly installed by bolts. The climbing mechanism of the tower crane performs locking operations through the locking protrusions 24. A plurality of through holes are provided on the outer walls of the insertion rods 21 and the insertion slots 22. When the insertion rod 21 is inserted into the inside of the insertion slot 22, bolts can be fixed in the through holes to achieve fixation. When stacking the tower crane standard sections, rapid assembly can be achieved by inserting the insertion rod 21 of the upper standard section into the insertion slot 22 of the lower standard section.
[0032] Working principle:
[0033] When assembling the tower crane, first move the mobile foundation 1 to the position where the tower crane needs to be installed, then fixedly install the connection base 14 at the corresponding position on the upper surface of the steel frame 12 according to the size of the tower crane, and then insert the insertion rod 21 at the bottom of the tower crane standard section 2 into the inside of the connection base 14 and fix it with bolts. When stacking the tower crane standard sections, rapid assembly can be achieved by inserting the insertion rod 21 of the upper standard section into the insertion slot 22 of the lower standard section. At the same time, with the structure of the mobile foundation 1, it is not necessary to perform casting before installing the tower crane, which greatly improves the installation efficiency of the tower crane.
[0034] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. An assembled flat-top tower crane, characterized in that: include: A mobile foundation (1) has an integrally cast mounting platform (11) on its upper surface, a steel frame (12) is fixedly mounted inside the mounting platform (11), a plurality of connection holes (13) are opened on the upper surface of the steel frame (12), and a connection base (14) is fixedly mounted on the upper surface of the steel frame (12) by bolts; A tower crane standard section (2) is fixedly installed on the top of a connecting base (14), wherein four corners of the bottom of the tower crane standard section (2) are provided with plug rods (21), and four corners of the top of the tower crane standard section (2) are provided with slots (22).
2. The assembled flat-top tower crane according to claim 1, characterized in that: Pressing blocks (15) are arranged on four sides of the upper surface of the mobile foundation (1).
3. The assembled flat-top tower crane according to claim 2, characterized in that: The upper surface of the movable base (1) is provided with a groove adapted to the pressing block (15).
4. The assembled flat-top tower crane according to claim 1, characterized in that: Reinforcement rods (23) are fixedly mounted on the four inner walls of the tower crane standard section (2).
5. The assembled flat-top tower crane according to claim 1, characterized in that: The outer walls on both the front and rear sides of the tower crane standard section (2) are fixed with a plurality of locking protrusions (24) by means of bolts.
6. The assembled flat-top tower crane according to claim 1, characterized in that: The outer walls of the insertion rod (21) and the slot (22) are both provided with a plurality of through holes.