Building engineering temporary construction land-saving profile steel construction platform

By designing a temporary land-saving steel construction platform for construction engineering including bottom plate, stable seat, support column and arc plate, the problems of insufficient site and safety hazards in the construction platform setting in urban dense areas are solved, and stable platform construction and rapid installation efficiency are achieved.

CN222976336UActive Publication Date: 2025-06-13QINHUANGDAO HONG KONG YUAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421966781.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2025-06-13
Estimated Expiration
2034-08-14

AI Technical Summary

Technical Problem

Existing construction platforms often face problems such as insufficient site, substandard standards, safety hazards and limited location in the erection of urban dense areas.

Method used

A temporary construction steel construction platform for construction projects was designed. The platform includes components such as base plate, stable seat, support column, arc plate, rotating bracket, floor nail, etc. The stable seat is poured by concrete, the support column and floor nail are installed, and the structure of arc plate and fixed plate is combined with the structure of arc plate and fixed plate, and the support beam plate and support column are connected by bolts to quickly and conveniently install or disassemble the steel plate.

Benefits of technology

Effectively using narrow sites to build a stable construction platform, avoid the risk of platform collapse, improve construction efficiency, and ensure the safety of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222976336U_ABST
    Figure CN222976336U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction steel platforms, and discloses a construction engineering temporary construction land-saving profile steel construction platform which comprises a bottom plate, stabilizing bases are fixedly connected to the four corners of the upper portion of the bottom plate, supporting columns are connected to the interiors of the stabilizing bases in an opening and closing mode, and the supporting columns penetrate through the stabilizing bases. An arc plate is connected to the outer portion of the upper side of the stabilizing seat in a left-right clamping mode, fixing plates are fixedly connected to the front side and the rear side of the arc plate, rotating supports are fixedly connected to the front side and the rear side of the outer portion of each fixing plate, a mounting seat is fixedly connected to the bottom of the other side of each rotating support, and two ground nails are slidably connected to the interior of each mounting seat. The front side and the rear side of the arc plate are fixedly connected with fixing plates, and the upper side of the fixing plate on the left side is fixedly connected with a fixing block. According to the utility model, the supporting columns are stably mounted, the construction platform is built by using the existing narrow field, the final stability of the construction platform is ensured, and casualties caused by collapse of the construction platform are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction steel platforms, in particular to a temporary land-saving steel construction platform for building projects. Background Technique

[0002] Temporary construction refers to temporary buildings, structures and other temporary facilities for living and production that construction units must set up for project construction. A construction platform is a device that provides a working platform for construction workers during the building construction process. The design and construction plan of the construction platform are crucial for project quality and work safety.

[0003] In existing urban intensive areas, the building land is usually relatively narrow. Temporary construction is an important temporary facility at the building construction site. When looking for a site on the spot to set up temporary construction, the site is often insufficient, which is likely to cause the non-compliance of temporary construction standards, pose safety hazards, and the location is restricted by the external environment. Therefore, a temporary land-saving steel construction platform for building projects is proposed to solve the above problems. Content of the Utility Model

[0004] In order to make up for the above deficiencies, the utility model provides a temporary land-saving steel construction platform for building projects, aiming to improve the problems of insufficient site, easy non-compliance of temporary construction standards, safety hazards, and location restricted by the external environment in the existing technology.

[0005] In order to achieve the above purpose, the utility model adopts the following technical scheme: a temporary land-saving steel construction platform for building projects, including a bottom plate. Four corners of the upper part of the bottom plate are fixedly connected with stabilizing seats. A support column is connected in the stabilizing seat in an opening and closing manner. The support column penetrates through the stabilizing seat. Arc plates are clamped and connected to the left and right of the outer side of the upper side of the stabilizing seat. Fixed plates are fixedly connected to the front and rear sides of the arc plates. Rotating brackets are fixedly connected to the front and rear sides of the outer part of the fixed plates. The other side bottom of the rotating bracket is fixedly connected with a mounting seat. Two ground nails are slidably connected in the mounting seat. Fixed plates are fixedly connected to the front and rear sides of the arc plates. A fixed block is fixedly connected to the upper side of the left fixed plate. A second spring is fixedly connected to the bottom of the fixed block. A connecting block is fixedly connected to the bottom of the second spring. An installation component is fixedly connected to the bottom of the connecting block. The installation component is used to fixedly connect the arc plate to the outside of the stabilizing seat.

[0006] As a further description of the above technical solution:

[0007] A column is fixedly connected to the upper part of the bottom plate. Support beam plates are installed on the tops of the column and the support column through bolts. A steel plate is installed and connected to the upper part of the support beam plate. Uniformly distributed through slots are formed inside the steel plate. An installation cap is rotatably connected to the upper right side inside the through slot. A screw rod is fixedly connected to the bottom right side of the installation cap. The screw rod is threadedly connected inside the steel plate and the support beam plate. An elastic clamping member is fixedly connected to the bottom left side of the installation cap.

[0008] As a further description of the above technical solution:

[0009] The installation component includes an insertion block. The insertion block is fixedly connected to the bottom of the connection block. An installation block is fixedly connected to the lower side of the left fixing plate. The insertion block is slidably connected inside the installation block. An insertion rod is slidably connected inside the insertion block.

[0010] As a further description of the above technical solution:

[0011] A sliding rod is fixedly connected to the left side inside the through slot. A moving block is slidably connected to the outside of the sliding rod. A pressing member is fixedly connected to the upper left side of the moving block. A first spring is sleeved on the outside of the right side of the sliding rod.

[0012] As a further description of the above technical solution:

[0013] One end of the first spring is fixedly connected to the right side wall of the through slot, and the other end of the first spring is fixedly connected to the right side of the moving block.

[0014] As a further description of the above technical solution:

[0015] The moving block is slidably connected inside the through slot, and the right side of the moving block is in close contact with the left side of the elastic clamping member.

[0016] As a further description of the above technical solution:

[0017] Chute grooves are formed inside the fixing plates, and the connection block is slidably connected inside the chute grooves.

[0018] As a further description of the above technical solution:

[0019] The mounting seat is in close contact with the upper part of the bottom plate, and the ground nail penetrates through the mounting seat and the bottom plate.

[0020] The utility model has the following beneficial effects:

[0021] 1. In the present utility model, four stabilizing seats are cast with concrete around the upper part of the bottom plate. After the stabilizing seats are dried, the support columns are installed inside the stabilizing seats and inserted into the ground, and the arc plates are installed outside the stabilizing seats. After the arc plates are fitted, the connecting block is pulled to insert the inserting block into the inside of the mounting block, and the inserting rod is inserted into the inserting block to fix its position. After pulling the mounting seat to adjust the angle of the rotating bracket, the ground nail is inserted and penetrates through the bottom plate into the ground, realizing the stable installation of the support columns, achieving the construction of a construction platform using the existing narrow site, and ensuring the final stability of the construction platform, avoiding casualties caused by the collapse of the construction platform.

[0022] 2. In the present utility model, the support beam plate is installed and connected with the support column through bolts, and the column is installed on the upper part of the bottom plate and installed with the support beam plate to provide further stable support. The steel plate is placed on the upper part of the support beam plate. By pushing the pressing member, the moving block slides outside the sliding rod to squeeze the protruding part of the elastic clamping member, and then the mounting cap can be rotated to make the screw rod rotate and screw into the inside of the support beam plate, realizing the quick and convenient installation or disassembly of the steel plate, and improving the overall construction efficiency of the platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 is a three-dimensional view of the temporary construction land-saving steel construction platform proposed by the present utility model;

[0024] Figure 2 is a top view of the temporary construction land-saving steel construction platform proposed by the present utility model;

[0025] Figure 3 is a schematic diagram of the steel plate installation structure of the temporary construction land-saving steel construction platform proposed by the present utility model;

[0026] Figure 4 is Figure 1 an enlarged view of part A.

[0027] LEGEND DESCRIPTION:

[0028] 1. Bottom plate; 2. Stabilizing seat; 3. Support column; 4. Arc plate; 5. Rotating bracket; 6. Mounting seat; 7. Ground nail; 8. Column; 9. Support beam plate; 10. Steel plate; 11. Through groove; 12. Moving block; 13. Pressing member; 14. Sliding rod; 15. First spring; 16. Mounting cap; 17. Elastic clamping member; 18. Screw rod; 19. Fixed block; 20. Second spring; 21. Connecting block; 22. Inserting block; 23. Mounting block; 24. Inserting rod; 25. Chute; 26. Fixed plate. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0029] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.

[0030] Referring to Figure 1 , Figure 2 , Figure 4 , an embodiment provided by the present invention: a temporary land-saving steel construction platform for construction projects, including a bottom plate 1. Four corners of the upper part of the bottom plate 1 are fixedly connected with stabilizing seats 2. A support column 3 is connected to the inside of the stabilizing seat 2 in an opening and closing manner. The support column 3 penetrates through the stabilizing seat 2. The left and right sides of the outside of the upper side of the stabilizing seat 2 are snap-connected with arc plates 4. Both the front and rear sides of the arc plate 4 are fixedly connected with fixing plates 26. Both the front and rear sides of the outside of the fixing plate 26 are fixedly connected with rotating brackets 5. The other side bottom of the rotating bracket 5 is fixedly connected with a mounting seat 6. Two ground nails 7 are slidably connected to the inside of the mounting seat 6. Both the front and rear sides of the arc plate 4 are fixedly connected with fixing plates 26. The upper side of the left fixing plate 26 is fixedly connected with a fixing block 19. The bottom of the fixing block 19 is fixedly connected with a second spring 20. The bottom of the second spring 20 is fixedly connected with a connecting block 21. The bottom of the connecting block 21 is fixedly connected with a mounting component, and the mounting component is used to fixedly connect the arc plate 4 to the outside of the stabilizing seat 2;

[0031] The mounting component includes an insertion block 22. The insertion block 22 is fixedly connected to the bottom of the connecting block 21. The lower side of the left fixing plate 26 is fixedly connected with a mounting block 23. The insertion block 22 is slidably connected to the inside of the mounting block 23. A plug rod 24 is slidably connected to the inside of the insertion block 22. Slide grooves 25 are respectively opened in the fixing plates 26. The connecting block 21 is slidably connected to the inside of the slide groove 25; the mounting seat 6 is attached to the upper part of the bottom plate 1, and the ground nail 7 penetrates through the mounting seat 6 and the bottom plate 1.

[0032] By pouring four stabilizing seats 2 with concrete around the upper part of the bottom plate 1, after the stabilizing seats 2 are dried, the support column 3 is installed into the inside of the stabilizing seats 2 and inserted into the ground for preliminary installation of the support column 3, and the arc plate 4 is installed outside the stabilizing seats 2. When the arc plates 4 are attached, the connecting block 21 is pulled to make the second spring 20 generate a tensile force, so that the insertion block 22 is inserted into the inside of the mounting block 23. At the same time, the connecting block 21 slides inside the slide groove 25, and the plug rod 24 is inserted into the insertion block 22 to fix its position. After pulling the mounting seat 6 to adjust the angle of the rotating bracket 5, the ground nail 7 is inserted and penetrates through the bottom plate 1 into the ground to stably install the support column 3, achieving the use of the existing narrow site to build a construction platform and ensuring the final stability of the construction platform, and avoiding casualties caused by the collapse of the construction platform.

[0033] Reference Figure 1 、 Figure 2 、 Figure 3 As shown in FIGS. 1, 2, and 3, a column 8 is fixedly connected to the upper part of the bottom plate 1. Support beam plates 9 are installed on the tops of the column 8 and the support column 3 by bolts. A steel plate 10 is installed and connected to the upper part of the support beam plate 9. Uniformly distributed through grooves 11 are formed inside the steel plate 10. An installation cap 16 is rotatably connected to the upper right part inside the through groove 11. A screw rod 18 is fixedly connected to the bottom right side of the installation cap 16. The screw rod 18 is threadedly connected inside the steel plate 10 and the support beam plate 9. An elastic clamping member 17 is fixedly connected to the bottom left side of the installation cap 16;

[0034] A slide bar 14 is fixedly connected to the left side inside the through groove 11. A moving block 12 is slidably connected to the outside of the slide bar 14. A pressing member 13 is fixedly connected to the upper left side of the moving block 12. A first spring 15 is sleeved on the outside of the right side of the slide bar 14. One end of the first spring 15 is fixedly connected to the right side wall of the through groove 11, and the other end of the first spring 15 is fixedly connected to the right side of the moving block 12. The moving block 12 is slidably connected inside the through groove 11, and the right side of the moving block 12 is in contact with and attached to the left side of the elastic clamping member 17.

[0035] The support beam plate 9 is installed and connected to the support column 3 by bolts, and the column 8 is installed on the upper part of the bottom plate 1 and installed with the support beam plate 9 to provide further stable support. The steel plate 10 is placed on the upper part of the support beam plate 9. The pressing member 13 is pushed to make the moving block 12 slide on the outside of the slide bar 14 to squeeze the protruding part of the elastic clamping member 17, and at the same time squeeze the first spring 15 to generate a resilience force. Then the installation cap 16 can be rotated to make the screw rod 18 and the elastic clamping member 17 rotate, so that the screw rod 18 can be smoothly screwed into the inside of the support beam plate 9. After the screw rod 18 is screwed into the inside of the support beam plate 9, the pressing member 13 is released, and the moving block 12 moves inside the slide bar 14 under the resilience force of the first spring 15, so that it no longer squeezes the elastic clamping member 17, and the elastic clamping member 17 fits inside the through groove 11, further improving the connection stability between the steel plate 10 and the support beam plate 9, enabling quick and convenient installation or disassembly of the steel plate 10, and improving the overall platform construction efficiency.

[0036] Working principle: When the platform needs to be used, four stabilizing seats 2 are cast with concrete around the upper part of the bottom plate 1. After the stabilizing seats 2 are dry, the support columns 3 are installed inside the stabilizing seats 2 and inserted into the ground, and the arc plates 4 are installed outside the stabilizing seats 2. After the arc plates 4 are fitted, the connecting block 21 is pulled to make the inserting block 22 insert into the inside of the mounting block 23, and the inserting rod 24 is inserted into the inserting block 22 to fix its position. After pulling the mounting seat 6 to adjust the angle of the rotating bracket 5, the ground nail 7 is inserted and penetrates through the bottom plate 1 into the ground, realizing the stable installation of the support column 3, achieving the construction of the construction platform using the existing narrow site, and ensuring the final stability of the construction platform, avoiding casualties caused by the collapse of the construction platform;

[0037] The support beam plate 9 is installed and connected to the support column 3 through bolts, and the upright column 8 is installed on the upper part of the bottom plate 1 and installed with the support beam plate 9 to further stably support it. The steel plate 10 is placed on the upper part of the support beam plate 9. By pushing the pressing member 13, the moving block 12 slides outside the sliding rod 14 to squeeze the protruding part of the elastic clamping member 17, and then the mounting cap 16 can be rotated to make the screw rod 18 rotate and screw into the inside of the support beam plate 9, realizing the rapid and convenient installation or disassembly of the steel plate 10 and improving the overall construction efficiency of the platform.

[0038] Finally, it should be noted that the above are only the preferred embodiments of the present invention and are not used to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A temporary land-saving steel construction platform for construction engineering, comprising a bottom plate (1), characterized in that: The four upper corners of the bottom plate (1) are fixedly connected to a stabilizing seat (2); the interior of the stabilizing seat (2) is openably connected to a support column (3); the support column (3) passes through the stabilizing seat (2); the upper exterior of the stabilizing seat (2) is snap-connected to an arc plate (4) on the left and right sides; the front and rear sides of the arc plate (4) are fixedly connected to a fixing plate (26); the front and rear sides of the fixing plate (26) are fixedly connected to a rotating bracket (5); the other side of the rotating bracket (5) is fixedly connected to a mounting seat (6); Two ground nails (7) are slidably connected inside the mounting seat (6); the front and rear sides of the arc plate (4) are fixedly connected to fixing plates (26); the upper side of the left fixing plate (26) is fixedly connected to a fixing block (19); the bottom of the fixing block (19) is fixedly connected to a second spring (20); the bottom of the second spring (20) is fixedly connected to a connecting block (21); the bottom of the connecting block (21) is fixedly connected to a mounting assembly, and the mounting assembly is used to fix the arc plate (4) to the outside of the stabilizing seat (2).

2. The temporary land-saving steel construction platform for construction engineering according to claim 1 is characterized by: The upper part of the bottom plate (1) is fixedly connected to a column (8), the tops of the columns (8) and the support columns (3) are both bolted with support beams (9), the upper part of the support beams (9) is connected to a steel plate (10), the interior of the steel plate (10) is provided with evenly distributed through grooves (11), the upper right part of the interior of the through grooves (11) is rotatably connected to a mounting cap (16), the bottom right side of the mounting cap (16) is fixedly connected to a screw rod (18), the screw rod (18) is threadedly connected to the interior of the steel plate (10) and the support beams (9), and the bottom left side of the mounting cap (16) is fixedly connected to an elastic clamp (17).

3. The temporary land-saving steel construction platform for construction engineering according to claim 1 is characterized by: The mounting assembly comprises an insert block (22), wherein the insert block (22) is fixedly connected to the bottom of the connecting block (21), a mounting block (23) is fixedly connected to the lower side of the left fixing plate (26), the insert block (22) is slidably connected to the inside of the mounting block (23), and an insert rod (24) is slidably connected to the inside of the insert block (22).

4. The temporary land-saving steel construction platform for construction engineering according to claim 2 is characterized by: A slide rod (14) is fixedly connected to the left side of the inner part of the through slot (11), a moving block (12) is slidably connected to the outer part of the slide rod (14), a pressing piece (13) is fixedly connected to the upper left part of the moving block (12), and a first spring (15) is sleeved on the right side of the outer part of the slide rod (14).

5. The temporary land-saving steel construction platform for construction engineering according to claim 4 is characterized by: One end of the first spring (15) is fixedly connected to the right side wall of the through slot (11), and the other end of the first spring (15) is fixedly connected to the right side of the moving block (12).

6. The temporary land-saving steel construction platform for construction engineering according to claim 4 is characterized by: The moving block (12) is slidably connected inside the through slot (11), and the right side of the moving block (12) is fittedly connected to the left side of the elastic clamp (17).

7. The temporary land-saving steel construction platform for construction engineering according to claim 1 is characterized by: The fixing plates (26) are each provided with a sliding groove (25) inside, and the connecting block (21) is slidably connected inside the sliding groove (25).

8. The temporary land-saving steel construction platform for construction engineering according to claim 1 is characterized by: The mounting seat (6) is fitted and connected to the upper part of the base plate (1), and the ground nail (7) passes through the mounting seat (6) and the base plate (1).