By setting specific notches and fixing grooves on the installation bracket and climbing frame network of the construction climbing frame, and using connecting components, sliding components and limiting components, the rapid connection and disassembly of the climbing frame network and the installation bracket is achieved, solving the problem of time-consuming, labor-intensive and safety hazards in the installation and disassembly in the prior art.
Patent Information
- Application Number
- CN202421864742.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2034-08-02
AI Technical Summary
The existing building climbing frames are time-consuming and labor-intensive when installing and dismantling, and pose safety risks.
A construction climbing frame is designed. By setting notches and fixing grooves at the four corners of the installation bracket and the climbing frame net, the connecting components, sliding components and limiting components are used to achieve quick connection and disassembly between the climbing frame net and the installation bracket.
This technical solution greatly simplifies the connection and disassembly process between the climbing frame net and the mounting bracket, reduces the operation of staff on the periphery of the mounting bracket, improves work safety, and reduces the time and labor intensity of installation and disassembly.
Smart Images

Figure CN222976355U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building climbing scaffolds, and more specifically to a building construction climbing scaffold. Background Art
[0002] The climbing scaffold, also known as the lifting scaffold, is a new type of scaffolding system developed in recent years, mainly applied to high-rise shear wall buildings. It can climb or descend along the building, without being restricted by the building height, greatly saving manpower and materials, and also having a significant improvement in terms of safety compared to traditional scaffolding, showing great development advantages in high-rise buildings.
[0003] Currently, most of the installation brackets and climbing scaffold nets of the climbing scaffold are tied with iron wires or welded with steel pipes by workers outside the installation frame. When connecting the building climbing scaffold and the installation bracket in these two ways, it is time-consuming and laborious, and it is also troublesome for later disassembly. In addition, it requires workers to carry out installation work outside the installation bracket for a long time, increasing the potential safety hazards of the work. Content of the Utility Model
[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a building construction climbing scaffold to solve the problems of troublesome installation and disassembly when connecting the installation bracket and the climbing scaffold net in the above-mentioned background art.
[0005] The utility model provides the following technical solution: a building construction climbing scaffold, including an installation bracket and a climbing scaffold net. One side near the four corners of the installation bracket is respectively provided with notch openings. In each of the four notch openings, a connection component, a sliding component, and a limiting component are arranged. Both the sliding component and the limiting component are arranged on the connection component. The sliding component can move along the connection component to drive the limiting component to move horizontally. One side near the four corners of the climbing scaffold net is respectively provided with fixing grooves, and the fixing grooves and the notch openings are on the same horizontal line.
[0006] Further, the connection component includes a fixing rod and a spring. One end of the fixing rod is fixedly connected to the inner wall of the notch opening, and the other end of the fixing rod extends outside the notch opening. The spring is sleeved on the fixing rod, and one end of the spring is fixedly connected to the inner wall of the notch opening.
[0007] Further, the sliding component includes a slider, a connecting rod, and two push rods. The slider is slidably sleeved on the fixing rod, and the other end of the spring is fixedly connected to the slider. The slider is slidably matched with the inner wall of the notch opening. One end of the connecting rod is fixedly connected to the slider, and the other end penetrates through the notch opening and extends outside the installation bracket. The connecting rod is slidably matched with the installation bracket. The two push rods are symmetrically arranged on the slider, and one end of each of the two push rods is rotatably connected to the slider.
[0008] Furthermore, the limiting assembly includes two fixed tubes and two connecting tubes, the two fixed tubes are respectively fixedly installed on the left and right sides of the fixed rod, one end of the two connecting tubes is sealed, the two connecting tubes are respectively sleeved on the corresponding fixed tubes, the outer wall of the fixed tube is slidably matched with the inner wall of the connecting tube, and the other ends of the two push rods are rotatably connected to the corresponding outer wall of the connecting tube.
[0009] Furthermore, a plurality of support columns are arranged on the mounting bracket.
[0010] Furthermore, a sliding groove is provided on the top of the mounting bracket.
[0011] Furthermore, a clamping block is fixedly mounted on the bottom of the mounting bracket.
[0012] Technical effects and advantages of the utility model:
[0013] The fixing rod is passed through the fixing groove and the connecting tube is located outside the fixing groove. The fixing rod is connected to the fixing groove by the fixing rod, and the connecting tube is connected to the fixing groove by the fixing rod. The fixing rod is connected to the fixing groove by the fixing rod, and the fixing rod is connected to the fixing groove by the fixing rod. The fixing rod is connected to the fixing groove by the fixing rod. The fixing rod is connected to the fixing groove by the fixing rod. The fixing rod is connected to the fixing groove by the fixing rod.
[0014] 2. According to the utility model, the staff no longer connects the connecting rod and the mounting bracket by bolts. The staff pulls the connecting rod, and the connecting rod drives the slider to move along the slot, so that the slider moves from the connection between the slot and the fixed slot into the slot. The two push rods will come together and pull the connecting pipe. The connecting pipe moves along the climbing frame net toward the fixed pipe and gradually wraps the fixed pipe. When the fixed pipe is wrapped, the slider and the two connecting pipes no longer connect the climbing frame net and the mounting bracket, so that the staff can more conveniently disassemble the climbing frame net and the mounting bracket and reduce work risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 The enlarged structural schematic diagram of part A in the present utility model Figure 1 ;
[0017] Figure 3 The sectional structural schematic diagram of the present utility model
[0018] Figure 4 The enlarged structural schematic diagram of part B in the present utility model Figure 3 ;
[0019] Figure 5 The enlarged structural schematic diagram of part C in the present utility model Figure 3 ;
[0020] The reference numerals are: 1, mounting bracket; 2, climbing frame net; 3, notch; 4, connecting component; 401, fixing rod; 402, spring; 5, sliding component; 501, slider; 502, connecting rod; 503, push rod; 6, limiting component; 601, fixing tube; 602, connecting tube; 7, fixing groove; 8, support column; 9, sliding groove; 10, clamping block. Specific embodiments
[0021] The following further describes the present utility model with reference to specific embodiments. However, those skilled in the art should understand that the detailed description given here with reference to the accompanying drawings is for better explanation. The structure of the present utility model necessarily extends beyond these limited embodiments, and for some equivalent replacement schemes or common means, no detailed description is given herein, but they still fall within the protection scope of the present application.
[0022] Figures 1 to 5 is the best embodiment of the present utility model. The following further describes the present utility model with reference to the accompanying Figures 1 to 5 drawings.
[0023] The utility model discloses a climbing frame for building construction, which comprises an installation bracket 1 and a climbing frame net 2. One sides near the four corners of the installation bracket 1 are respectively provided with notches 3. Connection components 4, sliding components 5 and limiting components 6 are arranged in the four notches 3. The sliding components 5 and the limiting components 6 are both arranged on the connection components 4. The sliding components 5 can move along the connection components 4 to drive the limiting components 6 to move horizontally. One sides near the four corners of the climbing frame net 2 are respectively provided with fixing grooves 7. The fixing grooves 7 and the notches 3 are on the same horizontal line. The connection components 4 comprise fixing rods 401 and springs 402. One ends of the fixing rods 401 are fixedly connected with the inner walls of the notches 3, and the other ends of the fixing rods 401 extend to the outside of the notches 3. The springs 402 are sleeved on the fixing rods 401. One ends of the springs 402 are fixedly connected with the inner walls of the notches 3. The sliding components 5 comprise sliders 501, connecting rods 502 and two push rods 503. The sliders 501 are slidably sleeved on the fixing rods 401. The other ends of the springs 402 are fixedly connected with the sliders 501. The sliders 501 are slidably matched with the inner walls of the notches 3. One ends of the connecting rods 502 are fixedly connected with the sliders 501, and the other ends penetrate through the notches 3 and extend to the outside of the installation bracket 1. The connecting rods 502 are slidably matched with the installation bracket 1. The two push rods 503 are symmetrically arranged on the sliders 501. One ends of the two push rods 503 are rotatably connected with the sliders 501. The limiting components 6 comprise two fixed tubes 601 and two connecting tubes 602. The two fixed tubes 601 are respectively fixedly installed on the left and right sides of the fixing rods 401. One ends of the two connecting tubes 602 are hermetically arranged. The two connecting tubes 602 are respectively sleeved on the corresponding fixed tubes 601. The outer walls of the fixed tubes 601 are slidably matched with the inner walls of the connecting tubes 602. The other ends of the two push rods 503 are rotatably connected with the outer walls of the corresponding connecting tubes 602. A plurality of support columns 8 are arranged on the installation bracket 1.
[0024] In this embodiment, during installation, the staff connects the support column 8 to the wall through bolts, so that the mounting bracket 1 is fixedly installed on the wall. In the initial state, the connecting rod 502 is connected to the mounting bracket 1 through bolts, and the spring 402 is squeezed by the slider 501, and the connecting pipe 602 will completely cover the fixing pipe 601. At this time, the staff places the climbing frame net 2 on the mounting bracket 1. At this time, the fixing groove 7 and the notch 3 are on the same horizontal line, and the fixing rod 401 passes through the fixing groove 7. At this time, the connecting pipe 602 is located outside the fixing groove 7. At this time, the staff no longer uses bolts to connect the connecting rod 502 The spring 402 rebounds and drives the slider 501 and the connecting rod 502 to move. The slider 501 drives the connecting rod 502 to move along the notch 3. At this time, the two push rods 503 gradually move away from each other. Because the fixed tube 601 limits the connecting tube 602, the connecting tube 602 gradually moves away from the fixed tube 601, so that the fixed tube 601 is gradually exposed. At this time, one side of the connecting tube 602 is in contact with the climbing frame net 2, and the connecting tube 602 slides along the climbing frame net 2. When the slider 501 moves to the area where the notch 3 contacts the fixed groove 7, The climbing frame net 2 is supported by the slider 501, and the climbing frame net 2 is blocked by the sides of the two connecting pipes 602 to prevent the climbing frame net 2 from detaching from the mounting bracket 1. The climbing frame net 2 is connected to the mounting bracket 1 by the slider 501 and the two connecting pipes 602. At this time, the staff connects the connecting rod 502 to the mounting bracket 1 by bolts. When disassembly is required, the staff no longer connects the connecting rod 502 to the mounting bracket 1 by bolts. At this time, the staff pulls the connecting rod 502, and the connecting rod 502 drives the slider 501 to move along the slot 3, so that the slider 501 moves from the connection between the slot 3 and the fixed slot 7 to the slot 3. At this time, the two push rods 503 will come together and pull the connecting pipe 602. At this time, the connecting pipe 602 moves along the climbing frame net 2 and toward the fixed pipe 601, and gradually wraps the fixed pipe 601. When the fixed pipe 601 is wrapped, the slider 501 and the two connecting pipes 602 no longer connect the climbing frame net 2 and the mounting bracket 1, making it more convenient for the staff to install and disassemble the climbing frame net 2 and the mounting bracket 1. The staff does not need to install the climbing frame net 2 on the periphery of the mounting bracket 1, thereby reducing work risks.
[0025] Specifically, a sliding groove 9 is provided on the top of the mounting bracket 1 .
[0026] In this embodiment, the sliding groove 9 is used to facilitate connection with the upper mounting bracket 1 .
[0027] Specifically, a clamping block 10 is fixedly mounted on the bottom of the mounting bracket 1 .
[0028] In this embodiment, the clamping block 10 at the bottom enters the sliding groove 9 of the lower mounting bracket 1, so that the staff can connect the upper and lower mounting brackets 1 conveniently.
[0029] The above are only the preferred embodiments of the present utility model, and are not intended to limit the present utility model in any other form. Any person skilled in the art may use the technical content disclosed above to make changes or modifications into equivalent embodiments with equivalent changes. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present utility model without departing from the content of the technical solution of the present utility model still fall within the protection scope of the technical solution of the present utility model.
Claims
1. A construction climbing frame, comprising a mounting bracket (1) and a climbing frame net (2), characterized in that: A slot (3) is provided on one side near the four corners of the mounting bracket (1), and a connecting component (4), a sliding component (5) and a limiting component (6) are provided in each of the four slots (3). The sliding component (5) and the limiting component (6) are both provided on the connecting component (4), and the sliding component (5) can move along the connecting component (4) to drive the limiting component (6) to move horizontally. A fixing slot (7) is provided on one side near the four corners of the climbing frame net (2), and the fixing slot (7) and the slot (3) are on the same horizontal line.
2. A construction climbing frame according to claim 1, characterized in that: The connecting assembly (4) comprises a fixing rod (401) and a spring (402); one end of the fixing rod (401) is fixedly connected to the inner wall of the slot (3); the other end of the fixing rod (401) extends to the outside of the slot (3); the spring (402) is sleeved on the fixing rod (401); one end of the spring (402) is fixedly connected to the inner wall of the slot (3).
3. A construction climbing frame according to claim 2, characterized in that: The sliding assembly (5) comprises a slider (501), a connecting rod (502) and two push rods (503); the slider (501) is slidably mounted on the fixed rod (401); the other end of the spring (402) is fixedly connected to the slider (501); the slider (501) is slidably engaged with the inner wall of the slot (3); one end of the connecting rod (502) is fixedly connected to the slider (501); the other end passes through the slot (3) and extends to the outside of the mounting bracket (1); the connecting rod (502) is slidably engaged with the mounting bracket (1); the two push rods (503) are symmetrically arranged on the slider (501); one end of each of the two push rods (503) is rotatably connected to the slider (501).
4. A construction climbing frame according to claim 3, characterized in that: The limiting assembly (6) comprises two fixed tubes (601) and two connecting tubes (602), the two fixed tubes (601) being fixedly mounted on the left and right sides of the fixed rod (401), respectively; one end of the two connecting tubes (602) is sealed, the two connecting tubes (602) are respectively sleeved on the corresponding fixed tubes (601), the outer wall of the fixed tube (601) is slidably matched with the inner wall of the connecting tube (602), and the other ends of the two push rods (503) are rotatably connected to the outer wall of the corresponding connecting tube (602).
5. A construction climbing frame according to claim 1, characterized in that: A plurality of support columns (8) are arranged on the mounting bracket (1).
6. A construction climbing frame according to claim 1, characterized in that: A sliding groove (9) is provided on the top of the mounting bracket (1).
7. A construction climbing frame according to claim 1, characterized in that: A clamping block (10) is fixedly mounted on the bottom of the mounting bracket (1).