Temporary construction supporting device for highway engineering

By designing a temporary construction support device for highway engineering using a combined structure of slide rail and bolts, the problem of fixed length of construction support devices in the prior art is solved, and the construction support device is difficult to adapt to the needs of longer road construction, achieving higher efficiency and longer service life.

CN222976554UActive Publication Date: 2025-06-13SICHUAN RUIHE TIANDING CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422192624.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2025-06-13
Estimated Expiration
2034-09-09

AI Technical Summary

Technical Problem

The existing construction support devices have fixed lengths, which are difficult to meet the needs of long road construction, resulting in the need of multiple devices being spliced ​​and used, increasing the labor of staff.

Method used

A temporary construction support device for highway engineering is designed, using a combined structure of slide rails and bolts, so that the secondary guardrail can slide and lock in the main guardrail, enlarge the protection range, and facilitate parts replacement through the setting of T-shaped grooves and circular grooves, improving the efficiency of use.

Benefits of technology

The device reduces the need for splicing and uses through the combined structure of slide rails and bolts, improves construction efficiency and utilization. At the same time, through the design of parts, the service life of the device is extended and rust problem is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222976554U_ABST
    Figure CN222976554U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary construction supporting device for highway engineering, and belongs to the technical field of construction supporting devices. The highway engineering temporary construction supporting device comprises a main protective fence, a sliding rail is arranged on the side face of the main protective fence, a secondary protective fence is slidably connected to the inner wall of the sliding rail, an inserting hole is formed in the top of the secondary protective fence, and a circular groove is formed in the top of the main protective fence; the auxiliary protective fence can slide in the main protective fence through the arrangement of the sliding rails, the position of the auxiliary protective fence can be locked through the arrangement of the bolts, the main protective fence and the sliding rails are unfolded according to the actual situation, and therefore the protective range of the main protective fence and the sliding rails is enlarged, and the safety of the protective fence is improved. The situation that a plurality of traditional fixed type construction supporting devices need to be spliced for use, and consequently the labor strength of workers is consumed is avoided, and through cooperation of the parts, the utilization rate of the construction supporting device can be effectively increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction support devices, in particular to a temporary construction support device for highway engineering. Background Art

[0002] Highway engineering refers to the work of surveying, measuring, designing, constructing, maintaining, managing, etc. of highway structures. During the use of some highway engineering projects, inevitable losses will occur over time. During the construction process of highway engineering, situations where support or reinforcement is required will arise, and this requires the use of temporary construction support devices. The construction support devices should be carefully inspected and accepted to ensure that the support structure is firm and reliable. During the construction site, the monitoring and inspection of the construction support devices should be strengthened, problems should be dealt with in a timely manner, and safety standards and specifications should be complied with to ensure the safety and smoothness of the construction process;

[0003] However, the above patent still has deficiencies. Most of the lengths of the existing construction support devices are fixedly set. When it is necessary to construct a relatively long section of highway, multiple construction support devices are spliced and used, which increases the workload of the staff, resulting in certain deficiencies in the use of the construction support devices.

[0004] Therefore, in view of this problem, the utility model provides a temporary construction support device for highway engineering. Summary of the Utility Model

[0005] The purpose of the utility model is to solve the problems in the prior art, and a temporary construction support device for highway engineering is proposed.

[0006] In order to achieve the above purpose, the utility model adopts the following technical scheme:

[0007] A temporary construction support device for highway engineering, including a main guardrail. A slide rail is provided on the side surface of the main guardrail. A secondary guardrail is slidably connected to the inner wall of the slide rail. A jack is provided on the top of the secondary guardrail. A circular groove is provided on the top of the main guardrail. The top of the jack corresponds to the circular groove. A bolt is provided on the inner wall of the circular groove.

[0008] Preferably, a T-shaped groove is provided on the top of the main guardrail. The surface of the T-shaped groove is communicated with the circular groove. A T-shaped block is clamped to the inner wall of the T-shaped groove. A threaded cylinder is movably connected to the inner wall of the circular groove. The surface of the threaded cylinder is fixedly connected to the T-shaped block. The inner wall of the threaded cylinder is movably connected to the bolt through a thread.

[0009] Preferably, a first cross slot and a second cross slot are respectively provided on the top of the bolt. The second cross slot is located inside the first cross slot.

[0010] Preferably, a threaded cover is fixedly connected to the top of the main guardrail, and a protective cover is threadedly connected to the surface of the threaded cover.

[0011] Preferably, a pull handle is rotatably connected to the surface of the protective cover, and the shape of the pull handle can be set as an arc or a rectangle.

[0012] Preferably, mounting blocks are fixedly connected to the bottoms of the main guardrail and the secondary guardrail, and mounting holes are provided at the tops of the mounting blocks.

[0013] Compared with the prior art, the present utility model provides a temporary construction support device for highway engineering, which has the following beneficial effects:

[0014] 1. For this temporary construction support device for highway engineering, through the setting of the sliding rail, the secondary guardrail can slide in the main guardrail, and through the setting of the bolts, the position of the secondary guardrail can be locked, so that the main guardrail and the sliding rail can be unfolded according to the actual situation, thereby increasing the protection range of the main guardrail and the sliding rail, avoiding the need to splice multiple traditional fixed construction support devices, which consumes the labor force of the staff. Through the cooperation of the above components, the utilization rate of the construction support device can be effectively improved.

[0015] 2. For this temporary construction support device for highway engineering, through the setting of the T-shaped groove and the circular groove, the T-shaped block and the threaded barrel can be replaced, avoiding the phenomenon of thread slipping in the circular groove after long-term use of the construction support device, which affects the normal use in the future. Through the cooperation of the above components, it is more convenient for the staff to use the construction support device.

[0016] 3. For this temporary construction support device for highway engineering, through the setting of the threaded cover and the protective cover, the bolts can be shielded, avoiding the rusting reaction between the water molecules in the air and the bolts and the threaded barrel after long-term use of the construction support device, resulting in locking, so that the length of the construction support device cannot be adjusted well in the future. Through the cooperation of the above components, the practicality of the temporary construction support device for highway engineering can be effectively increased. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 is a schematic cross-sectional structure view of a temporary construction support device for highway engineering proposed by the present utility model;

[0018] Figure 2 is a schematic diagram of a temporary construction support device for highway engineering proposed by the present utility model Figure 1 in which the enlarged structure view at A;

[0019] Figure 3Schematic side view structure diagram of a temporary construction support device for highway engineering proposed by the present utility model.

[0020] In the figure: 1, main protective fence; 2, slide rail; 3, secondary protective fence; 4, jack; 5, bolt; 6, T-shaped groove; 7, T-shaped block; 8, threaded cylinder; 9, first cross groove; 10, second cross groove; 11, threaded cover; 12, protective cover; 13, pull handle; 14, mounting block; 15, circular groove. Specific implementation manner

[0021] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments.

[0022] In the description of the present utility model, it should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation to the present utility model.

[0023] Refer to Figures 1 - 3 , a temporary construction support device for highway engineering, including a main protective fence 1. A slide rail 2 is provided on the side of the main protective fence 1. A secondary protective fence 3 is slidably connected to the inner wall of the slide rail 2. A jack 4 is provided at the top of the secondary protective fence 3. A circular groove 15 is provided at the top of the main protective fence 1. The top of the jack 4 corresponds to the circular groove 15. A bolt 5 is provided on the inner wall of the circular groove 15.

[0024] In the present utility model, when it is necessary to construct a large-area highway construction site, first, the staff needs to hold a tool and rotate the bolt 5 counterclockwise so that the bolt 5 is disengaged from the jack 4 in the secondary protective fence 3. Then, the staff can pull the secondary protective fence 3 to expand it to both sides. When the secondary protective fence 3 moves to the required position, the staff can again use the tool to rotate the bolt 5 clockwise so that the bolt 5 is inserted into the jack 4 in the secondary protective fence 3 to form positioning and locking, so as to support highway construction sites of different areas according to actual situations, thereby effectively improving the utilization rate of the construction support.

[0025] Refer to Figure 2, a T-shaped groove 6 is opened at the top of the main guardrail 1, the surface of the T-shaped groove 6 is communicated with the circular groove 15, a T-shaped block 7 is clamped on the inner wall of the T-shaped groove 6, and a threaded cylinder 8 is movably connected to the inner wall of the circular groove 15. The surface of the threaded cylinder 8 is fixedly connected to the T-shaped block 7, and a bolt 5 is movably connected to the inner wall of the threaded cylinder 8 through a thread.

[0026] In the present utility model, when the construction support device is used for a long time, the threaded cylinder 8 will be thread-slid. At this time, the staff can clamp the threaded cylinder 8 with a hand-held vise, and then pull the threaded cylinder 8 out of the circular groove 15 with an upward force. At the same time, the threaded cylinder 8 drives the T-shaped block 7 to be pulled out of the T-shaped groove 6, so as to facilitate the staff to replace the thread-slid threaded cylinder 8 and avoid increasing the economic cost due to overall replacement.

[0027] The vise in this solution is an existing technology, so it will not be introduced in detail here.

[0028] Refer to Figure 2 , first cross grooves 9 and second cross grooves 10 are respectively opened at the top of the bolt 5, and the second cross grooves 10 are located inside the first cross grooves 9.

[0029] In the present utility model, through the arrangement of the first cross grooves 9 and the second cross grooves 10, it is convenient for the staff to twist the bolt 5 with two different sizes of auxiliary tools, thereby effectively improving the practicability of the bolt 5.

[0030] Refer to Figure 2 , a threaded cover 11 is fixedly connected to the top of the main guardrail 1, and a protective cover 12 is threadedly connected to the surface of the threaded cover 11.

[0031] In the present utility model, when the bolt 5 is inserted into the jack 4 in the secondary guardrail 3, the staff can rotate the protective cover 12 to connect with the threaded cover 11, so as to protect the bolt 5 and the threaded cylinder 8 and prevent water molecules in the air from rusting and locking with the bolt 5 and the threaded cylinder 8, which is not conducive to subsequent adjustment of the lengths of the main guardrail 1 and the secondary guardrail 3.

[0032] Refer to Figure 2 , a pull handle 13 is rotatably connected to the surface of the protective cover 12, and the shape of the pull handle 13 can be set as an arc or a rectangle.

[0033] In the present utility model, through the arrangement of the pull handle 13, the contact area of the staff's hand can be increased, so as to facilitate the staff to better drive the protective cover 12 to rotate.

[0034] Refer to Figure 3 , mounting blocks 14 are fixedly connected to the bottoms of the main guardrail 1 and the secondary guardrail 3, and mounting holes are provided at the tops of the mounting blocks 14.

[0035] In the present utility model, through the provision of the mounting block 14, it is convenient for the staff to fix the main protective fence 1 and the secondary protective fence 3 by screws, thereby effectively increasing the stability of the main protective fence 1 and the secondary protective fence 3.

[0036] The above is only the preferred specific embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present utility model, according to the technical solution of the present utility model and its inventive concept, makes equivalent substitutions or changes, and should be covered within the protection scope of the present utility model.

Claims

1. A temporary construction support device for a highway project, comprising a main guardrail (1), characterized in that: A slide rail (2) is provided on the side of the main guardrail (1), a secondary guardrail (3) is slidably connected to the inner wall of the slide rail (2), a plug hole (4) is provided on the top of the secondary guardrail (3), a circular groove (15) is provided on the top of the main guardrail (1), the top of the plug hole (4) corresponds to the circular groove (15), and a bolt (5) is provided on the inner wall of the circular groove (15).

2. A temporary construction support device for highway engineering according to claim 1, characterized in that: A T-shaped groove (6) is provided on the top of the main guardrail (1), the surface of the T-shaped groove (6) is connected to the circular groove (15), the inner wall of the T-shaped groove (6) is clamped with a T-shaped block (7), the inner wall of the circular groove (15) is movably connected with a threaded barrel (8), the surface of the threaded barrel (8) is fixedly connected to the T-shaped block (7), and the inner wall of the threaded barrel (8) is movably connected to the bolt (5) through a thread.

3. A temporary construction support device for highway engineering according to claim 2, characterized in that: The top of the bolt (5) is respectively provided with a first cross groove (9) and a second cross groove (10), and the second cross groove (10) is located inside the first cross groove (9).

4. A temporary construction support device for highway engineering according to claim 1, characterized in that: A threaded cover (11) is fixedly connected to the top of the main guardrail (1), and a protective cover (12) is connected to the surface of the threaded cover (11) via threads.

5. A temporary construction support device for highway engineering according to claim 4, characterized in that: A handle (13) is rotatably connected to the surface of the protective cover (12), and the shape of the handle (13) can be set to be an arc or a rectangle.

6. A temporary construction support device for highway engineering according to claim 1, characterized in that: The bottoms of the primary guardrail (1) and the secondary guardrail (3) are fixedly connected with mounting blocks (14), and the tops of the mounting blocks (14) are provided with mounting holes.