Hose hanging point device
By designing a hose hanging device including a second hanging point component and a first hanging point component, the problem of insufficient support strength of hose hanging points on the offshore oil platform is solved, and higher hanging point reliability and extension of hose service life is achieved.
Patent Information
- Application Number
- CN202422326233.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2025-06-17
- Estimated Expiration
- 2034-09-23
AI Technical Summary
In the prior art, the supporting strength of the oil and water hose of the offshore oil platform is insufficient in the form of hanging points, and the hanging ears are easily tilted, resulting in insufficient fixation in the marine environment, and the hose is easily worn during long-term use and disassembly, shortening its service life.
A hose hanging point device is designed, including a second hanging point component and a first hanging point component arranged on the guardrail. Through the combination of the first pipe clamp component and the second pipe clamp component, the structure of supporting H-shaped steel and strengthening H-shaped steel is used to ensure the stability and strength of the hanging point, and leave a gap in the design to reduce hose wear.
Improves the reliability of the hanging point, reduces the wear of the hose during use and disassembly, extends the service life of the hose, and reduces labor costs.
Smart Images

Figure CN222992380U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of oil platforms, in particular to a hose hanging point device. Background Art
[0002] Offshore oil platforms use supply vessels to connect oil and water pumping hoses to transport water and oil to the platform, so the fixation of the hoses is particularly important.
[0003] The previous hanging point form has insufficient support strength and the lifting lug is easy to tilt, and the fixation is not firm enough in the marine environment. In addition, the hose will be accelerated to wear during the use and disassembly process when it is hung on it for a long time, resulting in a shortened service life of the hose. This patent is aimed at the outboard oil and water pumping hose of the offshore oil platform, and designs a hose hanging point solution to fix the oil and water pumping hose, improve the reliability of the hanging point, reduce the wear of the oil and water pumping hose during use and disassembly, and increase the service life of the hose. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a hose hanging point device, which improves the reliability of the hanging point, reduces the wear of the oil and water pumping hose during use and disassembly, and increases the service life of the hose.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a hose hanging point device, comprising a second hanging point component arranged on a guardrail, the second hanging point component being fixedly connected to a first hanging point component;
[0006] The second hanging point component is movably connected with a first pipe clamp component, and the first pipe clamp component is movably connected with a second pipe clamp component for supporting and limiting the position of the hose;
[0007] A supporting H-shaped steel is provided at the bottom of the second hanging point component, a reinforcing H-shaped steel is provided at the bottom of the supporting H-shaped steel, and both the supporting H-shaped steel and the reinforcing H-shaped steel are connected to the guardrail.
[0008] Preferably, the first hanging point component is made of a seamless steel pipe, and a plurality of groups of arc-shaped notches are provided on the first hanging point component.
[0009] Preferably, the second hanging point component is composed of H-shaped steel.
[0010] Preferably, the first pipe clamp component is movably clamped in the arc-shaped notch of the first hanging point component.
[0011] Preferably, a gap is left between the first pipe clamp component and the second pipe clamp component and the hose to reduce surface wear on the hose.
[0012] Preferably, the first hanging point component is provided with a plurality of vertical poles, the first pipe clamp component is provided with a lifting ear and the lifting ear is provided with a hanging hole, and the first pipe clamp component is movably clamped on the vertical pole.
[0013] Preferably, the first hanging point component and the second hanging point component are provided with channel steels, and the channel steels are connected to the guardrail.
[0014] The utility model discloses a hose hanging point device, which has the following beneficial effects:
[0015] The hose hanging point device has a reasonable structural scheme and improves the reliability of the hanging point. When used for hanging oil and water pumping hoses, it can reduce wear and tear, increase the service life of the hoses, make the operation more user-friendly, facilitate offshore operation and construction, and reduce labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a side view of the utility model;
[0019] Figure 3 It is a structural schematic diagram of the first pipe clamp component of the utility model.
[0020] In the figure: 1. first hanging point component; 2. second hanging point component; 3. supporting H-shaped steel; 4. reinforcing H-shaped steel; 5. channel steel; 6. first pipe clamp component; 7. second pipe clamp component. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] The embodiment of the present application provides a hose hanging point device to solve the problem that the previous hanging point form has insufficient support strength, the lifting lug is easy to tilt, and the fixation is not firm enough in the marine environment. In addition, the hose will be worn faster during the use and disassembly process when it is hung on it for a long time, resulting in a shortened service life of the hose.
[0023] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0024] The utility model embodiment discloses a hose hanging point device, according to the attached Figure 1-3 As shown, it includes a second hanging point component 2 arranged on the guardrail, and the first hanging point component 1 is fixedly connected to the second hanging point component 2; the first hanging point component 1 and the second hanging point component 2 are provided with a channel steel 5, and the channel steel 5 is connected to the guardrail.
[0025] The second hanging point component 2 is movably connected with a first pipe clamp component 6, and the first pipe clamp component 6 is movably connected with a second pipe clamp component 7 for supporting and limiting the hose. The first pipe clamp component 6 and the second pipe clamp component 7 are fixed by bolts, and the hose is clamped between the first pipe clamp component 6 and the second pipe clamp component 7;
[0026] A supporting H-shaped steel 3 is provided at the bottom of the second hanging point component 2, and a reinforcing H-shaped steel 4 is provided at the bottom of the supporting H-shaped steel 3. The supporting H-shaped steel 3 and the reinforcing H-shaped steel 4 are both connected to the guardrail. The supporting H-shaped steel 3 and the reinforcing H-shaped steel 4 provide reinforcement for the fixed position of the first hanging point component 1 and the second hanging point component 2 to ensure good stability of the hanging point.
[0027] The first hanging point component 1 is provided with multiple groups of vertical poles, the first pipe clamp component 6 is provided with lifting ears and the lifting ears are provided with hanging holes, the first pipe clamp component 6 is movably connected to the vertical poles, and through the design of the vertical poles and the lifting ears, the first pipe clamp component 6 and the second pipe clamp component 7 can be conveniently installed on the first hanging point component 1 as a whole, thereby facilitating the hose hanging process.
[0028] The steps for using the hose hanging point device are as follows:
[0029] S1. Connect the first hanging point component 1 to the second hanging point component 2;
[0030] S2. Figure 1 As shown, the strength of the hanging point is enhanced by connecting the supporting H-shaped steel 3 and the reinforcing H-shaped steel 4 to the second hanging point component 2 and the platform structure respectively;
[0031] S3. Connect the hose hanging point to the railing through the channel steel 5 to further improve the strength of the hanging point to meet the needs of fixing the oil and water hose on the offshore platform;
[0032] S4. Connect the first pipe clamp component 6 and the second pipe clamp component 7 by bolts, and leave a certain gap between the first pipe clamp component 6 and the second pipe clamp component 7 to clamp the hose tightly while reducing wear on the hose.
[0033] S5. When the hose needs to be fixed, place the hose and the pipe clamp in the arc-shaped notch in the first hanging point component 1, and hang the first pipe clamp component 6 on the vertical pole of the first hanging point component 1, so that the hose and the pipe clamp are fixed on the hanging point, improving the fixing reliability. At the same time, the pipe clamp and the hose are in a vertical state, which is not easy to wear during installation and removal, and the service life of the hose is increased.
[0034] The first hanging point component 1 is made of a seamless steel pipe, and a plurality of arc-shaped grooves are provided on the first hanging point component 1. The second hanging point component 2 is composed of H-shaped steels. The first hanging point component 1 and the second hanging point component 2 facilitate support and positioning of the hose, and the second hanging point component 2 supports the first hanging point component 1.
[0035] The first pipe clamp component 6 is movably clamped in the arc-shaped notch of the first hanging point component 1. Through the arc-shaped notch design, the first pipe clamp component 6 and the second pipe clamp component 7 are easily clamped in the arc-shaped notch position of the first hanging point component 1, ensuring convenient support of the hose.
[0036] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A hose hanging point device, comprising a second hanging point component (2) arranged on a guardrail, characterized in that: The second hanging point component (2) is fixedly connected to the first hanging point component (1); The second hanging point component (2) is movably connected to a first pipe clamp component (6), and the first pipe clamp component (6) is movably connected to a second pipe clamp component (7) for supporting and limiting the position of the hose; A supporting H-shaped steel (3) is provided at the bottom of the second hanging point component (2), a reinforcing H-shaped steel (4) is provided at the bottom of the supporting H-shaped steel (3), and both the supporting H-shaped steel (3) and the reinforcing H-shaped steel (4) are connected to the guardrail; A gap is left between the first pipe clamp component (6) and the second pipe clamp component (7) and the hose, thereby reducing wear on the surface of the hose.
2. A hose hanging point device according to claim 1, characterized in that: The first hanging point component (1) is made of a seamless steel pipe, and a plurality of groups of arc-shaped notches are provided on the first hanging point component (1).
3. A hose hanging point device according to claim 1, characterized in that: The second hanging point component (2) is made of H-shaped steel.
4. A hose hanging point device according to claim 2, characterized in that: The first pipe clamp component (6) is movably clamped in the arc-shaped notch of the first hanging point component (1).
5. A hose hanging point device according to claim 1, characterized in that: The first hanging point component (1) is provided with a plurality of vertical poles, the first pipe clamp component (6) is provided with a lifting ear and a hanging hole is provided on the lifting ear, and the first pipe clamp component (6) is movably clamped on the vertical pole.
6. A hose hanging point device according to claim 1, characterized in that: Channel steels (5) are provided on the first hanging point component (1) and the second hanging point component (2), and the channel steels (5) are connected to the guardrail.