Steel pipe pile construction tool section top operation platform

By designing a tool section top operating platform for steel pipe pile construction, the problems of inconvenience and high safety risks of construction workers are solved, and safer and more efficient steel pipe column construction is achieved.

CN223034004UActive Publication Date: 2025-06-27中国水利水电第七工程局有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421995705.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-17
Publication Date
2025-06-27
Estimated Expiration
2034-08-17

AI Technical Summary

Technical Problem

During the steel pipe column construction process, it is difficult for construction personnel to safely and conveniently up and down, resulting in high safety risks, high operation difficulty, and lack of an effective operating platform.

Method used

A top operating platform for steel pipe pile construction tool section is designed, and a circular plane platform is used to fix the top of the tool section. The steel truss frame and slot structure formed by welding is provided to provide a stable operating platform, and is equipped with ladders and railings to ensure the safety of people up and down.

Benefits of technology

It provides convenient up and down channels, reduces the safety risks of construction personnel, improves construction efficiency, and the operating platform can be reused, reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223034004U_ABST
    Figure CN223034004U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel pipe pile construction tool section top operation platform which comprises a tool section used for mechanical steel pipe pile construction, and the plane of the operation platform is a circular plane platform matched with the circle of the cross section of the tool section. The supporting platform is equally divided into four planes in the radial direction and is of a fan-shaped structure, and the supporting platforms are mutually connected and fixed to the top end of a tool section; each supporting platform of the fan-shaped structure is a steel truss girder framework formed by welding and comprises a platform plane structure, a platform bottom clamping groove structure and a platform handrail. According to the operation platform, the split type operation platform body and the ladder stand are machined by welding steel, the steel pipe column is hoisted to the top of the tool section after being hoisted, a personnel operation platform is provided for pouring of steel pipe column concrete and dismounting of the tool section, and an up-down channel and a small equipment stacking operation platform are provided for construction; the problems of up-and-down channels and operation platforms in the steel pipe column construction process are solved, the safety risks that in the construction process, personnel cannot go up and down conveniently and fall off easily are solved, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction equipment design, especially to the technical field of building concrete pouring construction equipment design, and relates to an operation platform at the top of a tool joint for steel pipe pile construction. Background Technique

[0002] In recent years, with the improvement of China's comprehensive national strength, the construction of urban infrastructure has entered a period of rapid development. The speed and intensity of urban construction across the country have gradually increased, the volume of buildings has become larger and larger, and the number of multi-story buildings has increased sharply. The construction of modern buildings with multiple layers, large spans, heavy loads, and high seismic requirements has provided good conditions for the use of concrete-filled steel tubular columns.

[0003] The existing construction technology of steel pipe columns has approached maturity, and many papers and patents have discussed, improved, and optimized the construction of steel pipe columns. For example, in the Chinese science and technology periodical "Analysis of the Construction Technology of Steel Pipe Columns in the Cover and Excavation Reverse Construction Method of Subway Stations", the construction methods, technological requirements, and measures for the hole formation positioning and pouring of steel pipe columns are introduced, and some patents have provided some new ideas for the hole formation and verticality lowering of steel pipe columns.

[0004] Generally, a steel pipe column is assisted in lowering through a tool joint made of steel pipes. After the lowering is completed, the top is often several meters above the ground. When pouring inside the steel pipe column and removing the tool joint, it is often necessary for personnel to descend to the connection between the tool joint and the steel pipe column for the construction of the steel pipe column. There is no working surface at the top of the tool joint. Construction personnel descend into the tool joint to the connection with the steel pipe column through methods such as aerial work platforms, hanging baskets, and scaffolding. Moreover, there is no up-and-down passage inside and outside the tool joint, making it extremely difficult for personnel to go up and down, with a high safety risk and large operation difficulty. Summary of the Invention

[0005] The utility model discloses an operation platform at the top of a tool joint for steel pipe pile construction according to the deficiencies of the existing technology. The purpose of the utility model is to provide an operation platform at the top of a tool joint for steel pipe columns that is convenient for construction personnel to go up and down, safer, and has higher construction efficiency.

[0006] The utility model is realized through the following technical solutions:

[0007] An operation platform at the top of a tool joint for steel pipe pile construction, including a tool joint for mechanical steel pipe pile construction, characterized in that: the plane of the operation platform is a circular flat platform matching the circular cross-section of the tool joint, and is composed of four support platforms with fan-shaped structures equally divided along the radial direction and interconnected and fixed at the top of the tool joint; each support platform with a fan-shaped structure is a steel truss frame formed by welding, including a platform plane structure, a platform bottom card slot structure, and a platform railing.

[0008] The platform's planar structure consists of five equally spaced connecting radial beams arranged radially, an outer connecting beam, a middle connecting beam, and an inner connecting beam arranged circumferentially, and a connecting hanging plate provided on the upper plane of the inner ends of the three middle connecting radial beams; a vertically arranged platform support beam is provided below the inner end of each connecting radial beam, and a diagonal brace is provided between the lower end of the platform support beam and the outer end of the platform support beam.

[0009] The platform bottom card slot structure is composed of a platform hanging beam and a platform support beam vertically welded and fixed below the connecting hanging plate.

[0010] Furthermore, a vertical railing post is provided above the outer end of the connecting radial beam of the operating platform, and two to three layers of railings are provided between the posts.

[0011] Furthermore, a climbing ladder is suspended and fixed at the top of the inner connecting beam or the tool section of the operating platform.

[0012] Furthermore, the platform bottom card slot structure is composed of a U-shaped structure formed by welding a platform lower support beam, a hanging beam, and a connecting hanging plate. When the outer edge of the platform is stressed, the force is transmitted to the side wall of the tool section through the diagonal brace, making the platform stable when stressed.

[0013] The four fan-shaped structures supporting the platform are connected by pins. There are 4 rows of pin holes on the outermost connecting radial beam of the supporting platform, and they are fixed by pins after installation.

[0014] The operating platform of the present utility model is a split-type operating platform and climbing ladder processed by welding steel. After the steel pipe column is hoisted, it is hoisted and placed on the top of the tool section of the steel pipe column, providing a personnel operating platform for the pouring of the concrete of the steel pipe column and the disassembly of the tool section, providing an up-and-down passage and a small equipment stacking and operating platform for construction, solving the problems of up-and-down passage and operating platform during the construction of the steel pipe column, solving the safety risks such as inconvenient up-and-down movement and easy falling of personnel during the construction process, and improving the construction efficiency.

[0015] Compared with the prior art, the present utility model has the following beneficial effects:

[0016] 1. The operating platform of the present utility model is formed by welding angle steel and is fixedly connected to the top of the tool section of the steel pipe column through the bottom card slot. It can be disassembled into four parts and stacked in the construction site material stacking area during normal storage, occupying a small area.

[0017] 2. After the operating platform of the present utility model is used, it can provide an effective operating platform and up-and-down passage for the construction personnel of the steel pipe column, effectively avoiding risks such as falling and mechanical injury caused by the lack of up-and-down passage and platform during the construction process.

[0018] 3. The present utility model can be reused. After the construction of the steel pipe column is completed, the working platform can be treated as waste steel.

[0019] Using the utility model for the construction of steel pipe columns can effectively reduce safety risks, with convenient construction, low construction costs, simple processes, and can improve the overall construction efficiency. Through the application of the utility model, the construction efficiency can be improved. Description of the Drawings

[0020] Figure 1 is a schematic plan view of the operation platform of the utility model;

[0021] Figure 2 is a schematic quarter - fan plan view of the operation platform of the utility model;

[0022] Figure 3 is a schematic upper view of the operation platform of the utility model, that is Figure 2 the schematic sectional view of section AA in

[0023] Figure 4 is a schematic view of the connection part between the operation platform and the tool section of the utility model;

[0024] Figure 5 is a schematic view of the installation state of the operation platform of the utility model.

[0025] In the figure, 1 is the platform, 11 is the connecting hanging plate, 12 is the outer connecting beam, 13 is the middle connecting beam, 14 is the inner connecting beam, 15 is the connecting radial beam, 16 is the diagonal brace, 17 is the platform support beam, 18 is the platform hanging beam, 19 is the railing, P is the operation platform, T is the ladder, G is the tool section, D is the ground, and Z is the steel pipe pile. Detailed Embodiment

[0026] The following further describes the utility model in combination with the detailed embodiment. The detailed embodiment is a further explanation of the principle of the utility model, and does not limit the utility model in any way. The technologies identical or similar to the utility model do not exceed the protection scope of the utility model.

[0027] Combined with the drawings.

[0028] As shown in the figure, an operation platform at the top of the tool section of a steel pipe column for an urban rail transit station of the utility model includes a top operation platform and upper and lower ladders. The operation platform and the upper and lower ladders are both fabricated by welding. During use, a crane is used to hoist the platform to the top of the steel pipe column tool section, and then the upper and lower ladders can be leaned against the top of the tool section by manpower or crane, enabling personnel to move up and down for operation.

[0029] The specific steps are as follows:

[0030] (1) Fabricate the operation platform at the top of the tool section with angle steel according to the size of the steel pipe column tool section. In this example, it is designed according to a tool section with a diameter of 1.8m. The overall operation platform is circular in structure and is equally divided into four fan - shaped structural parts in the plane.

[0031] (2) After the steel pipe column tool section is installed, use a crane to lift the four parts of the operating platform to the top of the tool section in turn, and check whether the slot at the bottom of the operating platform is firmly embedded in the wall of the tool section.

[0032] (3) By manually or using a crane, the hook part at the top of the up-and-down ladder is hooked onto the wall of the tool section pipe, so that people can go up and down. The ladder can be installed inside or outside the tool section according to the needs of people going up and down, so that people can work on the top or inside of the tool section.

[0033] (4) After the construction of a single steel pipe column is completed, a crane is used to dismantle the top operating platform. The operating platform consists of 4 parts and occupies a small area when stacked.

[0034] (5) When the next steel pipe column is constructed, steps (1) to (4) are repeated until the construction of all steel pipe columns is completed.

Claims

1. A top operating platform of a steel pipe pile construction tool section, comprising a tool section for mechanical steel pipe pile construction, characterized in that: The operating platform plane is a circular plane platform matching the circular cross section of the tool section, and is composed of four support platforms with fan-shaped structures equally divided along the radial direction, which are connected and fixed to the top of the tool section; each fan-shaped support platform is a welded steel truss frame, including a platform plane structure, a slot structure at the bottom of the platform, and a platform railing; The platform plane structure is composed of five equally spaced connecting radial beams arranged in the radial direction, an outer connecting beam, a middle connecting beam, an inner connecting beam arranged in the circumferential direction, and a connecting hanging plate arranged on the upper plane of the inner ends of the three connecting radial beams in the middle; a vertically arranged platform support beam is arranged below the inner end of each connecting radial beam, and a diagonal brace is arranged between the lower end of the platform support beam and the outer end of the platform support beam; The slot structure at the bottom of the platform is composed of a platform hanging beam and a platform supporting beam which are vertically welded and fixed below the connecting hanging plate.

2. The top operating platform of the steel pipe pile construction tool section according to claim 1 is characterized by: The operating platform is connected to a radial beam and is provided with vertical railing pillars above the outer ends thereof, and two to three layers of railings are provided between the pillars.

3. The top operating platform of the steel pipe pile construction tool section according to claim 1 is characterized by: A ladder is suspended and fixed on the top of the connecting beam or the tool section in the operating platform.

4. The top operating platform of the steel pipe pile construction tool section according to claim 1 is characterized by: The platform bottom slot structure is composed of a U-shaped structure formed by welding a support beam, a hanging beam and a connecting hanging plate below the platform.

5. The top operating platform of the steel pipe pile construction tool section according to claim 1 is characterized by: The support platforms are connected by bolts; four rows of bolt holes are arranged on the outermost connecting radial beams of the support platforms, and each bolt hole is connected and fixed by a bolt.